Bunker Hill Village Impact Fees by Project Type
Bunker Hill Village: Single-Family Impact Fees
A new single-family home in Bunker Hill Village pays $2,130.00 per unit in impact fees (rates sourced November 21, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Fee (City of Bunker Hill Village) — 1" meter ($1,680.00) and Sewer Connection Fee (City of Bunker Hill Village) ($450.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bunker Hill Village Impact Fee Schedule
- Water Meter Fee (City of Bunker Hill Village) — 1" meter$1,680.00City of Bunker Hill VillageThe City of Bunker Hill Village provides water (purchased from the City of Houston). The one-time water meter fee is set by meter size; 1 inch is the smallest size on the city's fee schedule, and a registered plumber installs the meter at the builder's cost. Fee schedule effective January 21, 2026; the schedule effective January 1, 2027 keeps the same amounts. No Chapter 395 water impact fee.
- Sewer Connection Fee (City of Bunker Hill Village)$450.00City of Bunker Hill VillageThe City of Bunker Hill Village provides sewer service. The one-time sewer connection (service availability) fee is $450 under the fee schedule effective January 21, 2026; the schedule effective January 1, 2027 keeps the same amount. Public Works may add charges after reviewing the connection. No Chapter 395 wastewater impact fee.
- City Impact Fee (City of Bunker Hill Village)$0.00City of Bunker Hill VillageThe City of Bunker Hill Village levies no municipal impact or parkland dedication fee; only water and sewer connection fees apply.
- County Impact Fee (Harris County)$0.00Harris CountyHarris County levies no impact fee; under Texas Local Gov't Code §395.079 only a populous county's storm-water/drainage impact fee is possible, and Harris County has not adopted one.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bunker Hill Village: Multifamily Impact Fees
A new multifamily unit in Bunker Hill Village pays $2,130.00 per unit in impact fees (rates sourced November 21, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Fee (City of Bunker Hill Village, MF) — 1" meter ($1,680.00) and Sewer Connection Fee (City of Bunker Hill Village, MF) ($450.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bunker Hill Village Impact Fee Schedule
- Water Meter Fee (City of Bunker Hill Village, MF) — 1" meter$1,680.00City of Bunker Hill VillageThe City of Bunker Hill Village provides water (purchased from the City of Houston). The one-time water meter fee is charged per meter by size, so a building on one meter pays it once; 1 inch is the smallest size listed and 2 inches the largest. Fee schedule effective January 21, 2026; the schedule effective January 1, 2027 keeps the same amounts.
- Sewer Connection Fee (City of Bunker Hill Village, MF)$450.00City of Bunker Hill VillageThe City of Bunker Hill Village provides sewer service. The one-time sewer connection (service availability) fee of $450 is charged per connection, so a building on one connection pays it once. Fee schedule effective January 21, 2026; the schedule effective January 1, 2027 keeps the same amount. No Chapter 395 wastewater impact fee.
- City Impact Fee (City of Bunker Hill Village, MF)$0.00City of Bunker Hill VillageThe City of Bunker Hill Village levies no municipal impact or parkland dedication fee.
- County Impact Fee (Harris County, MF)$0.00Harris CountyHarris County levies no impact fee; under Texas Local Gov't Code §395.079 only a populous county's storm-water/drainage impact fee is possible, and Harris County has not adopted one.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bunker Hill Village: Commercial Impact Fees
Commercial development in Bunker Hill Village pays no per-square-foot impact fees, but owes $2,130.00 in one-time water and sewer connection fees (rates sourced November 21, 2026).
For a 50,000 sq ft building, that comes to about $2,130.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (City of Bunker Hill Village) — 1" meter ($1,680.00 one-time) and Sewer Connection Fee (City of Bunker Hill Village) ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bunker Hill Village Impact Fee Schedule
- Water Meter Fee (City of Bunker Hill Village) — 1" meter$1,680.00 one-timeCity of Bunker Hill VillageCity water meter charge by meter size, unchanged in the schedule effective January 1, 2027. The meter is installed by a registered plumber at the builder's cost, and a separate $100 meter inspection fee applies. The city charges no water impact fee.
- Sewer Connection Fee (City of Bunker Hill Village)$450.00 one-timeCity of Bunker Hill VillageCity sewer connection (service availability) fee, one price for every connection; the city may add charges after Public Works review. A separate $100 sewer tap inspection fee applies. The city charges no wastewater impact fee.
- City Impact Fee (City of Bunker Hill Village, Commercial)$0.00City of Bunker Hill VillageThe City of Bunker Hill Village charges no city impact fee on commercial, office or industrial development. New construction must detain its own stormwater on site, and the city charges a drainage plan review fee.
- County Impact Fee (Harris County, Bunker Hill Village, Commercial)$0.00Harris CountyHarris County charges no county impact fee on development in Bunker Hill Village; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bunker Hill Village: Industrial Impact Fees
Industrial development in Bunker Hill Village pays no per-square-foot impact fees, but owes $2,130.00 in one-time water and sewer connection fees (rates sourced November 21, 2026).
For a 50,000 sq ft building, that comes to about $2,130.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (City of Bunker Hill Village) — 1" meter ($1,680.00 one-time) and Sewer Connection Fee (City of Bunker Hill Village) ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bunker Hill Village Impact Fee Schedule
- Water Meter Fee (City of Bunker Hill Village) — 1" meter$1,680.00 one-timeCity of Bunker Hill VillageCity water meter charge by meter size, unchanged in the schedule effective January 1, 2027. The meter is installed by a registered plumber at the builder's cost, and a separate $100 meter inspection fee applies. The city charges no water impact fee.
- Sewer Connection Fee (City of Bunker Hill Village)$450.00 one-timeCity of Bunker Hill VillageCity sewer connection (service availability) fee, one price for every connection; the city may add charges after Public Works review. A separate $100 sewer tap inspection fee applies. The city charges no wastewater impact fee.
- City Impact Fee (City of Bunker Hill Village, Industrial)$0.00City of Bunker Hill VillageThe City of Bunker Hill Village charges no city impact fee on commercial, office or industrial development. New construction must detain its own stormwater on site, and the city charges a drainage plan review fee.
- County Impact Fee (Harris County, Bunker Hill Village, Industrial)$0.00Harris CountyHarris County charges no county impact fee on development in Bunker Hill Village; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bunker Hill Village: Office Impact Fees
Office development in Bunker Hill Village pays no per-square-foot impact fees, but owes $2,130.00 in one-time water and sewer connection fees (rates sourced November 21, 2026).
For a 25,000 sq ft building, that comes to about $2,130.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (City of Bunker Hill Village) — 1" meter ($1,680.00 one-time) and Sewer Connection Fee (City of Bunker Hill Village) ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bunker Hill Village Impact Fee Schedule
- Water Meter Fee (City of Bunker Hill Village) — 1" meter$1,680.00 one-timeCity of Bunker Hill VillageCity water meter charge by meter size, unchanged in the schedule effective January 1, 2027. The meter is installed by a registered plumber at the builder's cost, and a separate $100 meter inspection fee applies. The city charges no water impact fee.
- Sewer Connection Fee (City of Bunker Hill Village)$450.00 one-timeCity of Bunker Hill VillageCity sewer connection (service availability) fee, one price for every connection; the city may add charges after Public Works review. A separate $100 sewer tap inspection fee applies. The city charges no wastewater impact fee.
- City Impact Fee (City of Bunker Hill Village, Office)$0.00City of Bunker Hill VillageThe City of Bunker Hill Village charges no city impact fee on commercial, office or industrial development. New construction must detain its own stormwater on site, and the city charges a drainage plan review fee.
- County Impact Fee (Harris County, Bunker Hill Village, Office)$0.00Harris CountyHarris County charges no county impact fee on development in Bunker Hill Village; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bunker Hill Village Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Bunker Hill Village Impact Fee FAQs
What are the total impact fees for a single-family home in Bunker Hill Village, Texas?
A new single-family home in Bunker Hill Village pays $2,130.00 per unit in combined impact fees (rates sourced November 21, 2026).
How much are commercial impact fees in Bunker Hill Village?
Commercial development in Bunker Hill Village pays no per-square-foot impact fees, but owes $2,130.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Bunker Hill Village charge its own impact fees?
Yes. Bunker Hill Village levies its own municipal impact or utility fees. Harris County does not currently add county-level impact fees inside Bunker Hill Village. The schedule on this page shows every fee that applies to development in Bunker Hill Village.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Harris County impact fees page.