Nassau Bay Impact Fees by Project Type
Nassau Bay: Single-Family Impact Fees
A new single-family home in Nassau Bay pays at least $850.00 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Charge (City of Nassau Bay) ($850.00).
Sewer Connection Fee (City of Nassau Bay) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nassau Bay Impact Fee Schedule
- Water Meter Charge (City of Nassau Bay)$850.00City of Nassau BayCity of Nassau Bay charge for a city-installed standard residential water meter up to 1 inch, materials and labor included. A $400 boring charge applies only when the city finds boring necessary; residential meters over 1 inch are charged as commercial meters ($200 plus the meter's actual cost). No Chapter 395 water impact fee.
- Sewer Connection Fee (City of Nassau Bay)Requires confirmationCity of Nassau BaySewer in Nassau Bay is provided by the city. The city's current water and sewer rate ordinance (Ord. No. 2025-1020-1) sets monthly rates only; no one-time tap or connection charge is published.
- City Impact Fee (City of Nassau Bay)$0.00City of Nassau BayThe City of Nassau Bay levies no municipal impact or parkland dedication fee; only utility connection fees apply.
- County Impact Fee (Harris County)$0.00Harris CountyNo Harris County impact fee applies in Nassau Bay. Harris County levies no countywide impact fee; the Harris County Flood Control District's drainage impact fee applies only in two watershed service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nassau Bay: Multifamily Impact Fees
A new multifamily unit in Nassau Bay pays at least $850.00 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Charge (City of Nassau Bay, MF) ($850.00).
Sewer Connection Fee (City of Nassau Bay, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nassau Bay Impact Fee Schedule
- Water Meter Charge (City of Nassau Bay, MF)$850.00City of Nassau BayCity of Nassau Bay charge for a city-installed standard residential water meter up to 1 inch, charged per meter with no separate multifamily rate; a building on one meter pays once. Meters over 1 inch are charged as commercial meters ($200 plus the meter's actual cost), and a $400 boring charge applies only when needed. No Chapter 395 water impact fee.
- Sewer Connection Fee (City of Nassau Bay, MF)Requires confirmationCity of Nassau BaySewer in Nassau Bay is provided by the city. The city's current water and sewer rate ordinance (Ord. No. 2025-1020-1) sets monthly rates only; no one-time tap or connection charge is published.
- City Impact Fee (City of Nassau Bay, MF)$0.00City of Nassau BayThe City of Nassau Bay levies no municipal impact or parkland dedication fee.
- County Impact Fee (Harris County, MF)$0.00Harris CountyNo Harris County impact fee applies in Nassau Bay. Harris County levies no countywide impact fee; the Harris County Flood Control District's drainage impact fee applies only in two watershed service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nassau Bay: Commercial Impact Fees
Commercial development in Nassau Bay pays no per-square-foot impact fees, but owes $200.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).
For a 50,000 sq ft building, that comes to at least $200.00. The calculator below adjusts to your exact square footage.
The largest line items are Commercial Water Meter Charge (City of Nassau Bay) ($200.00 one-time).
Sewer Connection Fee (City of Nassau Bay) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nassau Bay Impact Fee Schedule
- Commercial Water Meter Charge (City of Nassau Bay)$200.00 one-timeCity of Nassau BayNassau Bay provides water service. A commercial meter (1 inch to 8 inch) is plumber-installed to city specifications; the city charges this fee plus the actual cost of the meter, with permit and inspections required. The city charges no water impact fee.
- Sewer Connection Fee (City of Nassau Bay)Requires confirmationCity of Nassau BayNassau Bay provides sewer service. Its code prints no sewer tap or connection amount; the commercial meter charge is listed with the water fees. The city charges no wastewater impact fee.
- City Impact Fee (City of Nassau Bay, Commercial)$0.00City of Nassau BayThe City of Nassau Bay charges no city impact fee on commercial, office or industrial development. Its water meter charge is listed with the water fees.
- County Impact Fee (Harris County, Nassau Bay, Commercial)$0.00Harris CountyHarris County charges no county impact fee on development in Nassau Bay; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nassau Bay: Industrial Impact Fees
Industrial development in Nassau Bay pays no per-square-foot impact fees, but owes $200.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).
For a 50,000 sq ft building, that comes to at least $200.00. The calculator below adjusts to your exact square footage.
The largest line items are Commercial Water Meter Charge (City of Nassau Bay) ($200.00 one-time).
Sewer Connection Fee (City of Nassau Bay) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nassau Bay Impact Fee Schedule
- Commercial Water Meter Charge (City of Nassau Bay)$200.00 one-timeCity of Nassau BayNassau Bay provides water service. A commercial meter (1 inch to 8 inch) is plumber-installed to city specifications; the city charges this fee plus the actual cost of the meter, with permit and inspections required. The city charges no water impact fee.
- Sewer Connection Fee (City of Nassau Bay)Requires confirmationCity of Nassau BayNassau Bay provides sewer service. Its code prints no sewer tap or connection amount; the commercial meter charge is listed with the water fees. The city charges no wastewater impact fee.
- City Impact Fee (City of Nassau Bay, Industrial)$0.00City of Nassau BayThe City of Nassau Bay charges no city impact fee on commercial, office or industrial development. Its water meter charge is listed with the water fees.
- County Impact Fee (Harris County, Nassau Bay, Industrial)$0.00Harris CountyHarris County charges no county impact fee on development in Nassau Bay; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nassau Bay: Office Impact Fees
Office development in Nassau Bay pays no per-square-foot impact fees, but owes $200.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).
For a 25,000 sq ft building, that comes to at least $200.00. The calculator below adjusts to your exact square footage.
The largest line items are Commercial Water Meter Charge (City of Nassau Bay) ($200.00 one-time).
Sewer Connection Fee (City of Nassau Bay) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Nassau Bay Impact Fee Schedule
- Commercial Water Meter Charge (City of Nassau Bay)$200.00 one-timeCity of Nassau BayNassau Bay provides water service. A commercial meter (1 inch to 8 inch) is plumber-installed to city specifications; the city charges this fee plus the actual cost of the meter, with permit and inspections required. The city charges no water impact fee.
- Sewer Connection Fee (City of Nassau Bay)Requires confirmationCity of Nassau BayNassau Bay provides sewer service. Its code prints no sewer tap or connection amount; the commercial meter charge is listed with the water fees. The city charges no wastewater impact fee.
- City Impact Fee (City of Nassau Bay, Office)$0.00City of Nassau BayThe City of Nassau Bay charges no city impact fee on commercial, office or industrial development. Its water meter charge is listed with the water fees.
- County Impact Fee (Harris County, Nassau Bay, Office)$0.00Harris CountyHarris County charges no county impact fee on development in Nassau Bay; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nassau Bay Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Nassau Bay Impact Fee FAQs
What are the total impact fees for a single-family home in Nassau Bay, Texas?
A new single-family home in Nassau Bay pays at least $850.00 per unit in combined impact fees (rates sourced November 22, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Nassau Bay?
Commercial development in Nassau Bay pays no per-square-foot impact fees, but owes $200.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Nassau Bay charge its own impact fees?
Yes. Nassau Bay levies its own municipal impact or utility fees. Harris County does not currently add county-level impact fees inside Nassau Bay. The schedule on this page shows every fee that applies to development in Nassau Bay.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Harris County impact fees page.