Skip to content
IMPACTFEES.ORG

Morgan's Point, Texas Impact Fees

Morgan's Point applies its own fee schedule. Harris County does not currently add county-level impact fees inside city limits. A new single-family home pays $5,450.00 per unit (rates sourced ). The full breakdown is below.

Morgan's Point Impact Fees by Project Type

Morgan's Point: Single-Family Impact Fees

A new single-family home in Morgan's Point pays $5,450.00 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Connection Charge (City of Morgan's Point) ($1,750.00), Parkland Dedication Fee-in-Lieu (City of Morgan's Point) ($1,500.00) and Water Connection Charge (City of Morgan's Point) ($1,000.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Morgan's Point Impact Fee Schedule
Water$1,800.00
  • Water Connection Charge (City of Morgan's Point)
    City of Morgan's Point
    City of Morgan's Point water connection charge of $1,000 per lot connecting to a city water main, a share of the cost of the city's mains, paid in addition to the water tap and meter fees.
    $1,000.00
  • Water Tap Fee (City of Morgan's Point) — 5/8" x 3/4" meter, $400 connection + $400 meter size
    City of Morgan's Point
    City of Morgan's Point water tap for a 5/8 x 3/4 inch meter: $400 per connection plus $400 for the meter size. A 1 inch connection is $400 plus $500; larger connections are charged actual installation and meter cost, and actual costs apply where they exceed the listed amounts or the tap goes under paving. The separate per-lot water connection charge also applies.
    $800.00
Sewer$2,150.00
City$1,500.00
  • Parkland Dedication Fee-in-Lieu (City of Morgan's Point)
    City of Morgan's Point
    The City of Morgan's Point charges a parkland dedication fee-in-lieu of $1,500 per dwelling unit for residential subdivisions of 5-79 units (1-4 units exempt; 80+ units require land dedication).
    $1,500.00
County$0.00
  • County Impact Fee (Harris County)
    Harris County
    No Harris County impact fee applies in Morgan's Point. Harris County levies no countywide impact fee; the Harris County Flood Control District's drainage impact fee applies only in two watershed service areas of unincorporated northwest Harris County.
    $0.00
Total (Morgan's Point): $5,450.00
Sources last checked Official fee schedules:City of Morgan's Point Harris County

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Morgan's Point: Multifamily Impact Fees

A new multifamily unit in Morgan's Point pays $5,450.00 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Connection Charge (City of Morgan's Point, MF) ($1,750.00), Parkland Dedication Fee-in-Lieu (City of Morgan's Point, MF) ($1,500.00) and Water Connection Charge (City of Morgan's Point, MF) ($1,000.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Morgan's Point Impact Fee Schedule
Water$1,800.00
Sewer$2,150.00
City$1,500.00
County$0.00
  • County Impact Fee (Harris County, MF)
    Harris County
    No Harris County impact fee applies in Morgan's Point. Harris County levies no countywide impact fee; the Harris County Flood Control District's drainage impact fee applies only in two watershed service areas of unincorporated northwest Harris County.
    $0.00
Total (Morgan's Point): $5,450.00
Sources last checked Official fee schedules:City of Morgan's Point Harris County

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Morgan's Point: Commercial Impact Fees

Commercial development in Morgan's Point pays no per-square-foot impact fees, but owes $4,050.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 50,000 sq ft building, that comes to about $4,050.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Charge (City of Morgan's Point) ($1,750.00 one-time), Water Connection Charge (City of Morgan's Point) ($1,000.00 one-time) and Water Tap Fee (City of Morgan's Point) — 1" meter, $400 connection + $500 meter ($900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Morgan's Point Impact Fee Schedule
Water$1,900.00 one-time
  • Water Connection Charge (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point charges a water connection charge on each residential or commercial lot that connects to a city water main, as its share of the main's cost. It is paid in addition to the water tap fee.
    $1,000.00 one-time
  • Water Tap Fee (City of Morgan's Point) — 1" meter, $400 connection + $500 meter
    City of Morgan's Point
    Morgan's Point's code charges $400 per water connection plus a meter-size charge ($500 for a 1 inch meter). Meters larger than 1 inch, and any installation costing more than the listed amount, are billed at the city's actual cost plus the meter.
    $900.00 one-time
Sewer$2,150.00 one-time
  • Sewer Connection Charge (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point charges a wastewater connection charge on each residential or commercial lot that connects to a city sewer main, as its share of the main's cost. It is paid in addition to the sewer tap fee.
    $1,750.00 one-time
  • Sewer Tap Fee (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point provides sewer service. The sewer tap fee is charged per connection, plus the city's actual material, labor and equipment cost for the new service. The city charges no wastewater impact fee.
    $400.00 one-time
City$0.00
  • City Impact Fee (City of Morgan's Point, Commercial)
    City of Morgan's Point
    The City of Morgan's Point charges no city impact fee on commercial, office or industrial development; its parkland fee applies to residential subdivisions only. Its water and sewer charges are listed with the water and sewer fees.
    $0.00
County$0.00
Total (Morgan's Point): $4,050.00 one-time (≈ $4,050.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Morgan's Point Harris County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Morgan's Point: Industrial Impact Fees

Industrial development in Morgan's Point pays no per-square-foot impact fees, but owes $4,050.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 50,000 sq ft building, that comes to about $4,050.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Charge (City of Morgan's Point) ($1,750.00 one-time), Water Connection Charge (City of Morgan's Point) ($1,000.00 one-time) and Water Tap Fee (City of Morgan's Point) — 1" meter, $400 connection + $500 meter ($900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Morgan's Point Impact Fee Schedule
Water$1,900.00 one-time
  • Water Connection Charge (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point charges a water connection charge on each residential or commercial lot that connects to a city water main, as its share of the main's cost. It is paid in addition to the water tap fee.
    $1,000.00 one-time
  • Water Tap Fee (City of Morgan's Point) — 1" meter, $400 connection + $500 meter
    City of Morgan's Point
    Morgan's Point's code charges $400 per water connection plus a meter-size charge ($500 for a 1 inch meter). Meters larger than 1 inch, and any installation costing more than the listed amount, are billed at the city's actual cost plus the meter.
    $900.00 one-time
Sewer$2,150.00 one-time
  • Sewer Connection Charge (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point charges a wastewater connection charge on each residential or commercial lot that connects to a city sewer main, as its share of the main's cost. It is paid in addition to the sewer tap fee.
    $1,750.00 one-time
  • Sewer Tap Fee (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point provides sewer service. The sewer tap fee is charged per connection, plus the city's actual material, labor and equipment cost for the new service. The city charges no wastewater impact fee.
    $400.00 one-time
City$0.00
  • City Impact Fee (City of Morgan's Point, Industrial)
    City of Morgan's Point
    The City of Morgan's Point charges no city impact fee on commercial, office or industrial development; its parkland fee applies to residential subdivisions only. Its water and sewer charges are listed with the water and sewer fees.
    $0.00
County$0.00
Total (Morgan's Point): $4,050.00 one-time (≈ $4,050.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Morgan's Point Harris County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Morgan's Point: Office Impact Fees

Office development in Morgan's Point pays no per-square-foot impact fees, but owes $4,050.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 25,000 sq ft building, that comes to about $4,050.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Charge (City of Morgan's Point) ($1,750.00 one-time), Water Connection Charge (City of Morgan's Point) ($1,000.00 one-time) and Water Tap Fee (City of Morgan's Point) — 1" meter, $400 connection + $500 meter ($900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Morgan's Point Impact Fee Schedule
Water$1,900.00 one-time
  • Water Connection Charge (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point charges a water connection charge on each residential or commercial lot that connects to a city water main, as its share of the main's cost. It is paid in addition to the water tap fee.
    $1,000.00 one-time
  • Water Tap Fee (City of Morgan's Point) — 1" meter, $400 connection + $500 meter
    City of Morgan's Point
    Morgan's Point's code charges $400 per water connection plus a meter-size charge ($500 for a 1 inch meter). Meters larger than 1 inch, and any installation costing more than the listed amount, are billed at the city's actual cost plus the meter.
    $900.00 one-time
Sewer$2,150.00 one-time
  • Sewer Connection Charge (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point charges a wastewater connection charge on each residential or commercial lot that connects to a city sewer main, as its share of the main's cost. It is paid in addition to the sewer tap fee.
    $1,750.00 one-time
  • Sewer Tap Fee (City of Morgan's Point)
    City of Morgan's Point
    Morgan's Point provides sewer service. The sewer tap fee is charged per connection, plus the city's actual material, labor and equipment cost for the new service. The city charges no wastewater impact fee.
    $400.00 one-time
City$0.00
  • City Impact Fee (City of Morgan's Point, Office)
    City of Morgan's Point
    The City of Morgan's Point charges no city impact fee on commercial, office or industrial development; its parkland fee applies to residential subdivisions only. Its water and sewer charges are listed with the water and sewer fees.
    $0.00
County$0.00
Total (Morgan's Point): $4,050.00 one-time (≈ $4,050.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Morgan's Point Harris County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Morgan's Point Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Morgan's Point Impact Fee FAQs

What are the total impact fees for a single-family home in Morgan's Point, Texas?

A new single-family home in Morgan's Point pays $5,450.00 per unit in combined impact fees (rates sourced November 22, 2026).

How much are commercial impact fees in Morgan's Point?

Commercial development in Morgan's Point pays no per-square-foot impact fees, but owes $4,050.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Morgan's Point charge its own impact fees?

Yes. Morgan's Point levies its own municipal impact or utility fees. Harris County does not currently add county-level impact fees inside Morgan's Point. The schedule on this page shows every fee that applies to development in Morgan's Point.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Harris County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.