Tomball, Texas Impact Fees

Tomball applies its own fee schedule. Harris County does not currently add county-level impact fees inside city limits. A new single-family home pays $20,310.43 per unit (rates sourced ). The full breakdown is below.

Tomball Impact Fees by Project Type

Tomball: Single-Family Impact Fees

A new single-family home in Tomball pays $20,310.43 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Tomball) — ¾" meter ($8,069.00), Water Impact Fee (City of Tomball) — ¾" meter ($6,618.00) and Water Tap Fee (City of Tomball) — 5/8" to 3/4" meter ($1,750.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Tomball Impact Fee Schedule
Water$9,118.00
  • Water Impact Fee (City of Tomball) — ¾" meter
    City of Tomball
    City of Tomball water impact fee, charged per living unit equivalent (LUE) by meter size; a 3/4" meter is 1.0 LUE. Rates from the Master Fee Schedule effective October 1, 2026. Paid in addition to the water tap and meter installation fees.
    $6,618.00
  • Water Tap Fee (City of Tomball) — 5/8" to 3/4" meter
    City of Tomball
    City of Tomball water tap fee by meter size, effective October 1, 2026. The city installs taps up to 2"; a connection in a State right-of-way adds $190. Paid with the meter installation fee and the water impact fee.
    $1,750.00
  • Water Meter Installation Fee (City of Tomball) — 5/8" to 3/4" meter
    City of Tomball
    City of Tomball water meter installation fee by meter size, effective October 1, 2026, paid with the water tap fee. Meters over 2" are installed by the developer's contractor.
    $750.00
Sewer$9,744.00
  • Wastewater Impact Fee (City of Tomball) — ¾" meter
    City of Tomball
    City of Tomball wastewater impact fee, charged per living unit equivalent (LUE) by water meter size; a 3/4" meter is 1.0 LUE. Rates from the Master Fee Schedule effective October 1, 2026. Paid in addition to the sewer tap fee.
    $8,069.00
  • Sewer Tap Fee (City of Tomball) — 4" connection
    City of Tomball
    City of Tomball sewer tap fee by connection size, effective October 1, 2026; a single-family home typically uses a 4" connection. A connection in a State right-of-way adds $250. Paid with the wastewater impact fee.
    $1,675.00
City$0.00
County$0.00
Other$1,448.43
  • Drainage Impact Fee (City of Tomball) — 0.1837 ac × $7,886.69/ac
    Basin M121E
    City of Tomball
    City of Tomball drainage impact fee, charged per developed acre by drainage basin. Shown for an 8,000 sq ft lot in basin M121E ($7,886.69 per acre), the highest of 4 basins; other basins: M121W $6,692.00, M118 $5,757.81, M125 $436.88 per acre. Rates effective October 1, 2026.
    $1,448.43
Total (Tomball): $20,310.43
Sources last checked Official fee schedules:City of Tomball Harris County

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tomball: Multifamily Impact Fees

A new multifamily unit in Tomball pays at least $18,862.00 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Tomball, MF) — ¾" meter ($8,069.00), Water Impact Fee (City of Tomball, MF) — ¾" meter ($6,618.00) and Water Tap Fee (City of Tomball, MF) — 5/8" to 3/4" meter ($1,750.00).

Drainage Impact Fee (City of Tomball, MF) — per developed acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Tomball Impact Fee Schedule
Water$9,118.00
Sewer$9,744.00
  • Wastewater Impact Fee (City of Tomball, MF) — ¾" meter
    City of Tomball
    City of Tomball wastewater impact fee, charged per living unit equivalent (LUE) by water meter size; a 3/4" meter is 1.0 LUE. A building on one master meter pays once at that meter's size (3" $107,317, 4" $214,635 and up). Rates effective October 1, 2026.
    $8,069.00
  • Sewer Tap Fee (City of Tomball, MF) — 4" connection
    City of Tomball
    City of Tomball sewer tap fee by connection size, effective October 1, 2026, charged per connection: a building on one connection pays it once. A connection in a State right-of-way adds $250.
    $1,675.00
City$0.00
County$0.00
Other$0.00
  • Drainage Impact Fee (City of Tomball, MF) — per developed acre
    Basin M121E
    City of Tomball
    City of Tomball drainage impact fee, charged per developed acre by drainage basin, effective October 1, 2026: M121E $7,886.69, M121W $6,692.00, M118 $5,757.81, M125 $436.88 per acre. The amount per apartment depends on the site's acreage, so none is shown.
    Requires confirmation
Total (Tomball): $18,862.00
Sources last checked Official fee schedules:City of Tomball Harris County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tomball: Commercial Impact Fees

Commercial development in Tomball pays no per-square-foot impact fees, but owes $27,898.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 50,000 sq ft building, that comes to at least $27,898.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Tomball) — 1" meter ($12,910.00 one-time), Water Impact Fee (City of Tomball) — 1" meter ($10,588.00 one-time) and Water Tap Fee (City of Tomball) — 1" meter ($1,875.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Drainage Impact Fee (City of Tomball, Commercial) — per developed acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Tomball Impact Fee Schedule
Water$13,313.00 one-time
  • Water Impact Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water impact fee, charged per living unit equivalent (LUE) by meter size; a 1 inch meter is 1.6 LUE. Rates effective October 1, 2026. Paid in addition to the water tap and meter installation fees.
    $10,588.00 one-time
  • Water Tap Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water tap fee by meter size, effective October 1, 2026. The schedule says commercial taps are completed by the developer's contractor and inspected by the city; where the contractor makes the tap, choose the contractor-installed option. A connection in a State right-of-way adds $190.
    $1,875.00 one-time
  • Water Meter Installation Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water meter installation fee by meter size, effective October 1, 2026, paid with the water tap fee. Meters over 2 inches are ordered and installed in a vault by the developer's contractor.
    $850.00 one-time
Sewer$14,585.00 one-time
  • Wastewater Impact Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball wastewater impact fee, charged per living unit equivalent (LUE) by water meter size; a 1 inch meter is 1.6 LUE. Rates effective October 1, 2026. Paid in addition to the sewer tap fee.
    $12,910.00 one-time
  • Sewer Tap Fee (City of Tomball) — 4" connection
    City of Tomball
    City of Tomball sewer tap fee by connection size, effective October 1, 2026. The schedule says commercial taps are completed by the developer's contractor and inspected by the city; where the contractor makes the tap, choose the contractor-installed option. A connection in a State right-of-way adds $250.
    $1,675.00 one-time
City$0.00
  • Drainage Impact Fee (City of Tomball, Commercial) — per developed acre
    City of Tomball
    One-time drainage impact fee charged per developed acre by drainage basin, effective October 1, 2026: M121E $7,886.69, M121W $6,692.00, M118 $5,757.81, M125 $436.88 per acre. Not included in the total because it depends on the site's acreage. Tomball levies no roadway impact fee; its water and wastewater impact fees are listed separately.
    Requires confirmation
County$0.00
Total (Tomball): $27,898.00 one-time (≈ $27,898.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Tomball Harris County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tomball: Industrial Impact Fees

Industrial development in Tomball pays no per-square-foot impact fees, but owes $27,898.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 50,000 sq ft building, that comes to at least $27,898.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Tomball) — 1" meter ($12,910.00 one-time), Water Impact Fee (City of Tomball) — 1" meter ($10,588.00 one-time) and Water Tap Fee (City of Tomball) — 1" meter ($1,875.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Drainage Impact Fee (City of Tomball, Industrial) — per developed acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Tomball Impact Fee Schedule
Water$13,313.00 one-time
  • Water Impact Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water impact fee, charged per living unit equivalent (LUE) by meter size; a 1 inch meter is 1.6 LUE. Rates effective October 1, 2026. Paid in addition to the water tap and meter installation fees.
    $10,588.00 one-time
  • Water Tap Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water tap fee by meter size, effective October 1, 2026. The schedule says commercial taps are completed by the developer's contractor and inspected by the city; where the contractor makes the tap, choose the contractor-installed option. A connection in a State right-of-way adds $190.
    $1,875.00 one-time
  • Water Meter Installation Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water meter installation fee by meter size, effective October 1, 2026, paid with the water tap fee. Meters over 2 inches are ordered and installed in a vault by the developer's contractor.
    $850.00 one-time
Sewer$14,585.00 one-time
  • Wastewater Impact Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball wastewater impact fee, charged per living unit equivalent (LUE) by water meter size; a 1 inch meter is 1.6 LUE. Rates effective October 1, 2026. Paid in addition to the sewer tap fee.
    $12,910.00 one-time
  • Sewer Tap Fee (City of Tomball) — 4" connection
    City of Tomball
    City of Tomball sewer tap fee by connection size, effective October 1, 2026. The schedule says commercial taps are completed by the developer's contractor and inspected by the city; where the contractor makes the tap, choose the contractor-installed option. A connection in a State right-of-way adds $250.
    $1,675.00 one-time
City$0.00
  • Drainage Impact Fee (City of Tomball, Industrial) — per developed acre
    City of Tomball
    One-time drainage impact fee charged per developed acre by drainage basin, effective October 1, 2026: M121E $7,886.69, M121W $6,692.00, M118 $5,757.81, M125 $436.88 per acre. Not included in the total because it depends on the site's acreage. Tomball levies no roadway impact fee; its water and wastewater impact fees are listed separately.
    Requires confirmation
County$0.00
Total (Tomball): $27,898.00 one-time (≈ $27,898.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Tomball Harris County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tomball: Office Impact Fees

Office development in Tomball pays no per-square-foot impact fees, but owes $27,898.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 25,000 sq ft building, that comes to at least $27,898.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Tomball) — 1" meter ($12,910.00 one-time), Water Impact Fee (City of Tomball) — 1" meter ($10,588.00 one-time) and Water Tap Fee (City of Tomball) — 1" meter ($1,875.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Drainage Impact Fee (City of Tomball, Office) — per developed acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Tomball Impact Fee Schedule
Water$13,313.00 one-time
  • Water Impact Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water impact fee, charged per living unit equivalent (LUE) by meter size; a 1 inch meter is 1.6 LUE. Rates effective October 1, 2026. Paid in addition to the water tap and meter installation fees.
    $10,588.00 one-time
  • Water Tap Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water tap fee by meter size, effective October 1, 2026. The schedule says commercial taps are completed by the developer's contractor and inspected by the city; where the contractor makes the tap, choose the contractor-installed option. A connection in a State right-of-way adds $190.
    $1,875.00 one-time
  • Water Meter Installation Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball water meter installation fee by meter size, effective October 1, 2026, paid with the water tap fee. Meters over 2 inches are ordered and installed in a vault by the developer's contractor.
    $850.00 one-time
Sewer$14,585.00 one-time
  • Wastewater Impact Fee (City of Tomball) — 1" meter
    City of Tomball
    City of Tomball wastewater impact fee, charged per living unit equivalent (LUE) by water meter size; a 1 inch meter is 1.6 LUE. Rates effective October 1, 2026. Paid in addition to the sewer tap fee.
    $12,910.00 one-time
  • Sewer Tap Fee (City of Tomball) — 4" connection
    City of Tomball
    City of Tomball sewer tap fee by connection size, effective October 1, 2026. The schedule says commercial taps are completed by the developer's contractor and inspected by the city; where the contractor makes the tap, choose the contractor-installed option. A connection in a State right-of-way adds $250.
    $1,675.00 one-time
City$0.00
  • Drainage Impact Fee (City of Tomball, Office) — per developed acre
    City of Tomball
    One-time drainage impact fee charged per developed acre by drainage basin, effective October 1, 2026: M121E $7,886.69, M121W $6,692.00, M118 $5,757.81, M125 $436.88 per acre. Not included in the total because it depends on the site's acreage. Tomball levies no roadway impact fee; its water and wastewater impact fees are listed separately.
    Requires confirmation
County$0.00
  • County Impact Fee (Harris County, Tomball, Office)
    Harris County
    Harris County charges no county impact fee on development in Tomball; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
    $0.00
Total (Tomball): $27,898.00 one-time (≈ $27,898.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Tomball Harris County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Tomball Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Tomball Impact Fee FAQs

What are the total impact fees for a single-family home in Tomball, Texas?

A new single-family home in Tomball pays $20,310.43 per unit in combined impact fees (rates sourced November 22, 2026).

How much are commercial impact fees in Tomball?

Commercial development in Tomball pays no per-square-foot impact fees, but owes $27,898.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Tomball charge its own impact fees?

Yes. Tomball levies its own municipal impact or utility fees. Harris County does not currently add county-level impact fees inside Tomball. The schedule on this page shows every fee that applies to development in Tomball.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Harris County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.