Houston Impact Fees by Project Type
Houston: Single-Family Impact Fees
A new single-family home in Houston pays at least $5,083.35 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Houston) — 1.0 service unit ($2,553.11), Wastewater Impact Fee (City of Houston) — 1.0 service unit ($1,830.24) and Parkland Dedication Fee-in-Lieu (City of Houston) ($700.00).
Drainage Impact Fee (City of Houston) — per 1,000 sf impervious is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Houston Impact Fee Schedule
- Water Impact Fee (City of Houston) — 1.0 service unit$2,553.11City of Houston (Houston Public Works)City of Houston water impact (capital recovery) fee: $2,553.11 per service unit. A single-family residence up to 3,000 sq ft equals 1.0 service unit (250 gallons/day); larger homes add 0.0002 SU per sq ft. Rate is indexed to the Producer Price Index each July 1. Low- and moderate-cost single-family homes inside the city limits may qualify for full exemption. Paid at the wastewater capacity reservation / building-permit stage. Adopted under Texas LGC Ch. 395 (Code Ch. 47).
- Wastewater Impact Fee (City of Houston) — 1.0 service unit$1,830.24City of Houston (Houston Public Works)City of Houston wastewater impact (capital recovery) fee: $1,830.24 per service unit. A single-family residence up to 3,000 sq ft equals 1.0 service unit (250 gallons/day). Rate is indexed to the Producer Price Index each July 1. Low- and moderate-cost single-family homes inside the city limits may qualify for full exemption. Paid at the wastewater capacity reservation / building-permit stage. Adopted under Texas LGC Ch. 395 (Code Ch. 47).
- Parkland Dedication Fee-in-Lieu (City of Houston)$700.00City of Houston (Planning & Development Dept.)City of Houston parkland dedication fee-in-lieu: $700 per dwelling unit (Code Ch. 42, §42-253), applied to new single-family and multifamily residential and credited to the development's park sector fund. A developer may instead dedicate land ((10 acres × units × 1.8)/1,000). Aside from water, wastewater, and drainage impact fees, this is the only city development charge; Houston levies no roadway impact fee.
- County Impact Fee (Harris County) — none levied$0.00Harris CountyNo county impact fee. Harris County does not levy Texas LGC Ch. 395 impact fees. As a populous county it could adopt a Sec. 395.079 storm water and drainage impact fee but has not; county drainage is funded through the Harris County Flood Control District by property taxes, not a one-time development fee.
- Drainage Impact Fee (City of Houston) — per 1,000 sf imperviousRequires confirmationCity of Houston (Houston Public Works)City of Houston developer drainage impact fee: $25.56 per service unit (each 1,000 sq ft of added impervious surface) in each of its seven drainage service areas (Brays, Buffalo/White Oak, Clear Creek, Greens, Hunting, San Jacinto and Sims/Vince), effective July 1, 2026. The amount depends on the impervious area a project adds, so no per-home figure is shown. Due at building permit.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Houston: Multifamily Impact Fees
A new multifamily unit in Houston pays at least $2,787.35 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Houston, MF) — 0.4762 SU × $2,553.11/SU ($1,215.79), Wastewater Impact Fee (City of Houston, MF) — 0.4762 SU × $1,830.24/SU ($871.56) and Parkland Dedication Fee-in-Lieu (City of Houston, MF) ($700.00).
Drainage Impact Fee (City of Houston, MF) — per 1,000 sf impervious is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Houston Impact Fee Schedule
- Water Impact Fee (City of Houston, MF) — 0.4762 SU × $2,553.11/SU$1,215.79City of Houston (Houston Public Works)City of Houston water impact fee: $2,553.11 per service unit (250 gallons per day), effective July 1, 2026. An apartment unit with a washer and dryer counts as 0.4762 service unit (0.4046 without), per the city's service unit equivalency table. Indexed each July 1.
- Wastewater Impact Fee (City of Houston, MF) — 0.4762 SU × $1,830.24/SU$871.56City of Houston (Houston Public Works)City of Houston wastewater impact fee: $1,830.24 per service unit (250 gallons per day), effective July 1, 2026. An apartment unit with a washer and dryer counts as 0.4762 service unit (0.4046 without). Indexed each July 1.
- Parkland Dedication Fee-in-Lieu (City of Houston, MF)$700.00City of Houston (Planning & Development Dept.)City of Houston parkland dedication fee in lieu: $700 per dwelling unit (Code Ch. 42). Since July 2026, multifamily projects pay the fee rather than dedicating land, collected at certificate of occupancy. Houston levies no roadway impact fee.
- County Impact Fee (Harris County, MF) — none levied$0.00Harris CountyNo county impact fee. Harris County does not levy Texas LGC Ch. 395 impact fees. As a populous county it could adopt a Sec. 395.079 storm water and drainage impact fee but has not; county drainage is funded through the Harris County Flood Control District by property taxes.
- Drainage Impact Fee (City of Houston, MF) — per 1,000 sf imperviousRequires confirmationCity of Houston (Houston Public Works)City of Houston developer drainage impact fee: $25.56 per service unit (each 1,000 sq ft of added impervious surface) in each of its seven drainage service areas, effective July 1, 2026. The amount depends on the impervious area a project adds, so no per-unit figure is shown. Due at building permit.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Houston: Commercial Impact Fees
Commercial development in Houston pays $1.23 per square foot in impact fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $61,586.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Houston, Commercial) — 0.281 SU per 1,000 sf × $2,553.11/SU ($0.72/sq ft) and Wastewater Impact Fee (City of Houston, Commercial) — 0.281 SU per 1,000 sf × $1,830.24/SU ($0.51/sq ft).
Drainage Impact Fee (City of Houston, Commercial) — per 1,000 sf impervious is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Houston Impact Fee Schedule
- Water Impact Fee (City of Houston, Commercial) — 0.281 SU per 1,000 sf × $2,553.11/SU$0.72/sq ftCity of HoustonCity of Houston water impact fee of $2,553.11 per service unit (250 gallons per day), effective July 1, 2026. Houston sets nonresidential service units by floor area and use: retail is 0.000281 units per sq ft, so $717.42 per 1,000 sq ft. Restaurants, grocery stores and other listed uses have their own rates. The maximum assessable rate is $3,236.21 per unit. Credits apply for removed or converted development, and paid fees are not refundable. Parts of the city are served by utility districts with their own charges instead.
- Wastewater Impact Fee (City of Houston, Commercial) — 0.281 SU per 1,000 sf × $1,830.24/SU$0.51/sq ftCity of HoustonCity of Houston wastewater impact fee of $1,830.24 per service unit (250 gallons per day), effective July 1, 2026. Houston sets nonresidential service units by floor area and use: retail is 0.000281 units per sq ft, so $514.30 per 1,000 sq ft. Restaurants, grocery stores and other listed uses have their own rates. The maximum assessable rate is $2,316.62 per unit. Wastewater capacity is reserved through a Wastewater Capacity Reservation letter before permitting. Credits apply for removed or converted development, and paid fees are not refundable. Parts of the city are served by utility districts with their own charges instead.
- Drainage Impact Fee (City of Houston, Commercial) — per 1,000 sf imperviousRequires confirmationCity of HoustonOne-time drainage impact fee due at building permit on new development that adds impervious surface, charged per 1,000 sq ft of added impervious area. The city's fee schedule lists $25.56 per 1,000 sq ft in each of its seven drainage service areas, effective July 1, 2026. Not included in the total because it depends on the site's impervious area. Houston charges no roadway impact fee; its water and wastewater impact fees are listed separately.
- County Impact Fee (Harris County, Houston, Commercial)$0.00Harris CountyHarris County charges no county impact fee on development in the City of Houston; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Houston: Industrial Impact Fees
Industrial development in Houston pays $0.88 per square foot in impact fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $43,833.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Houston, Industrial) — 0.200 SU per 1,000 sf × $2,553.11/SU ($0.51/sq ft) and Wastewater Impact Fee (City of Houston, Industrial) — 0.200 SU per 1,000 sf × $1,830.24/SU ($0.37/sq ft).
Drainage Impact Fee (City of Houston, Industrial) — per 1,000 sf impervious is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Houston Impact Fee Schedule
- Water Impact Fee (City of Houston, Industrial) — 0.200 SU per 1,000 sf × $2,553.11/SU$0.51/sq ftCity of HoustonCity of Houston water impact fee of $2,553.11 per service unit (250 gallons per day), effective July 1, 2026. Houston sets nonresidential service units by floor area and use: manufacturing is 0.0002 units per sq ft, so $510.62 per 1,000 sq ft. Warehouse space is lower (0.000121 units per sq ft). The maximum assessable rate is $3,236.21 per unit. Credits apply for removed or converted development, and paid fees are not refundable. Parts of the city are served by utility districts with their own charges instead.
- Wastewater Impact Fee (City of Houston, Industrial) — 0.200 SU per 1,000 sf × $1,830.24/SU$0.37/sq ftCity of HoustonCity of Houston wastewater impact fee of $1,830.24 per service unit (250 gallons per day), effective July 1, 2026. Houston sets nonresidential service units by floor area and use: manufacturing is 0.0002 units per sq ft, so $366.05 per 1,000 sq ft. Warehouse space is lower (0.000121 units per sq ft). The maximum assessable rate is $2,316.62 per unit. Wastewater capacity is reserved through a Wastewater Capacity Reservation letter before permitting. Credits apply for removed or converted development, and paid fees are not refundable. Parts of the city are served by utility districts with their own charges instead.
- Drainage Impact Fee (City of Houston, Industrial) — per 1,000 sf imperviousRequires confirmationCity of HoustonOne-time drainage impact fee due at building permit on new development that adds impervious surface, charged per 1,000 sq ft of added impervious area. The city's fee schedule lists $25.56 per 1,000 sq ft in each of its seven drainage service areas, effective July 1, 2026. Not included in the total because it depends on the site's impervious area. Houston charges no roadway impact fee; its water and wastewater impact fees are listed separately.
- County Impact Fee (Harris County, Houston, Industrial)$0.00Harris CountyHarris County charges no county impact fee on development in the City of Houston; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Houston: Office Impact Fees
Office development in Houston pays $1.04 per square foot in impact fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $25,971.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Houston, Office) — 0.237 SU per 1,000 sf × $2,553.11/SU ($0.61/sq ft) and Wastewater Impact Fee (City of Houston, Office) — 0.237 SU per 1,000 sf × $1,830.24/SU ($0.43/sq ft).
Drainage Impact Fee (City of Houston, Office) — per 1,000 sf impervious is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Houston Impact Fee Schedule
- Water Impact Fee (City of Houston, Office) — 0.237 SU per 1,000 sf × $2,553.11/SU$0.61/sq ftCity of HoustonCity of Houston water impact fee of $2,553.11 per service unit (250 gallons per day), effective July 1, 2026. Houston sets nonresidential service units by floor area and use: office is 0.000237 units per sq ft, so $605.09 per 1,000 sq ft. The maximum assessable rate is $3,236.21 per unit. Credits apply for removed or converted development, and paid fees are not refundable. Parts of the city are served by utility districts with their own charges instead.
- Wastewater Impact Fee (City of Houston, Office) — 0.237 SU per 1,000 sf × $1,830.24/SU$0.43/sq ftCity of HoustonCity of Houston wastewater impact fee of $1,830.24 per service unit (250 gallons per day), effective July 1, 2026. Houston sets nonresidential service units by floor area and use: office is 0.000237 units per sq ft, so $433.77 per 1,000 sq ft. The maximum assessable rate is $2,316.62 per unit. Wastewater capacity is reserved through a Wastewater Capacity Reservation letter before permitting. Credits apply for removed or converted development, and paid fees are not refundable. Parts of the city are served by utility districts with their own charges instead.
- Drainage Impact Fee (City of Houston, Office) — per 1,000 sf imperviousRequires confirmationCity of HoustonOne-time drainage impact fee due at building permit on new development that adds impervious surface, charged per 1,000 sq ft of added impervious area. The city's fee schedule lists $25.56 per 1,000 sq ft in each of its seven drainage service areas, effective July 1, 2026. Not included in the total because it depends on the site's impervious area. Houston charges no roadway impact fee; its water and wastewater impact fees are listed separately.
- County Impact Fee (Harris County, Houston, Office)$0.00Harris CountyHarris County charges no county impact fee on development in the City of Houston; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
Where in Harris County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Houston Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Houston Impact Fee FAQs
What are the total impact fees for a single-family home in Houston, Texas?
A new single-family home in Houston pays at least $5,083.35 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Houston?
Commercial development in Houston pays $1.23 per square foot in impact fees, at least $61,586.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Houston charge its own impact fees?
Yes. Houston levies its own municipal impact or utility fees. Harris County does not currently add county-level impact fees inside Houston. The schedule on this page shows every fee that applies to development in Houston.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Harris County impact fees page.