Pasadena, Texas Impact Fees

Pasadena applies its own fee schedule. Harris County does not currently add county-level impact fees inside city limits. A new single-family home pays $1,720.00 per unit (rates sourced ). The full breakdown is below.

Pasadena Impact Fees by Project Type

Pasadena: Single-Family Impact Fees

A new single-family home in Pasadena pays $1,720.00 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Pasadena) ($1,000.00) and Water Meter and Tap Fee (City of Pasadena) — 5/8" or 3/4" ($720.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pasadena Impact Fee Schedule
Water$720.00
  • Water Meter and Tap Fee (City of Pasadena) — 5/8" or 3/4"
    City of Pasadena
    City of Pasadena water meter and tap installation, 5/8 or 3/4 inch meter: $220 meter plus $500 tap. Larger sizes: 1 inch $840, 1.5 inch $1,225, 2 inch $1,450; 3 to 10 inch compound meters are owner-supplied and the tap costs $1,900 to $3,500. A customer needing only a meter or only a tap pays that part. Pasadena levies no Chapter 395 water impact fee.
    $720.00
Sewer$1,000.00
  • Sewer Tap Fee (City of Pasadena)
    City of Pasadena
    City of Pasadena sewer tap, permit and inspection fee for a one-family dwelling: $1,000, plus $500 for each additional sewer tap. Taps are made by the city; a street bore, where needed, adds a minimum $1,600. No Chapter 395 wastewater impact fee.
    $1,000.00
City$0.00
  • City Impact Fee (City of Pasadena) — none
    City of Pasadena
    The City of Pasadena levies no Chapter 395 impact fee for roads or drainage and no parkland fee in lieu of dedication. Its subdivision ordinance reserves park sites only on plats of 40 acres or more, which the city purchases from the developer.
    $0.00
County$0.00
  • County Impact Fee (Harris County) — none levied
    Harris County
    No Harris County impact fee applies in Pasadena. Harris County levies no countywide impact fee; the Harris County Flood Control District's drainage impact fee applies only in two watershed service areas of unincorporated northwest Harris County.
    $0.00
Total (Pasadena): $1,720.00
Sources last checked Official fee schedules:City of Pasadena Harris County

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pasadena: Multifamily Impact Fees

A new multifamily unit in Pasadena pays $2,020.00 per unit in impact fees (rates sourced November 22, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Meter and Tap Fee (City of Pasadena, MF) — 5/8" or 3/4" ($720.00).

Sewer Tap Fee (City of Pasadena, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pasadena Impact Fee Schedule
Water$720.00
  • Water Meter and Tap Fee (City of Pasadena, MF) — 5/8" or 3/4"
    City of Pasadena
    City of Pasadena water meter and tap installation, charged per meter with no separate multifamily rate: 5/8 or 3/4 inch $720 ($220 meter plus $500 tap), up to $1,450 for a 2 inch meter. A building on one meter pays once; larger master meters are owner-supplied with taps of $1,900 to $3,500. No Chapter 395 water impact fee.
    $720.00
Sewer$1,300.00
  • Sewer Tap Fee (City of Pasadena, MF)
    City of Pasadena
    City of Pasadena sewer tap, permit and inspection fee: $1,300 per tap for buildings other than one-family dwellings, plus $550 for each additional tap (one-family dwellings pay $1,000). Charged per tap, so a building on one tap pays once. No Chapter 395 wastewater impact fee.
    $1,300.00Requires confirmation
City$0.00
  • City Impact Fee (City of Pasadena, MF) — none
    City of Pasadena
    The City of Pasadena levies no Chapter 395 impact fee for roads or drainage and no parkland fee in lieu of dedication. Its subdivision ordinance reserves park sites only on plats of 40 acres or more, which the city purchases from the developer.
    $0.00
County$0.00
  • County Impact Fee (Harris County, MF) — none levied
    Harris County
    No Harris County impact fee applies in Pasadena. Harris County levies no countywide impact fee; the Harris County Flood Control District's drainage impact fee applies only in two watershed service areas of unincorporated northwest Harris County.
    $0.00
Total (Pasadena): $2,020.00
Sources last checked Official fee schedules:City of Pasadena Harris County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pasadena: Commercial Impact Fees

Commercial development in Pasadena pays no per-square-foot impact fees, but owes $2,140.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 50,000 sq ft building, that comes to about $2,140.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Pasadena) ($1,300.00 one-time) and Water Meter and Tap Fee (City of Pasadena) — 1" meter, $340 meter + $500 tap ($840.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pasadena Impact Fee Schedule
Water$840.00 one-time
  • Water Meter and Tap Fee (City of Pasadena) — 1" meter, $340 meter + $500 tap
    City of Pasadena
    Pasadena provides water service. The charge combines the meter price and the city's tap price for the meter size; a customer needing only a meter or only a tap pays that part alone. Meters 3 inch and larger are compound meters the owner supplies with the vault, and the city charges the tap only. The city charges no water impact fee.
    $840.00 one-time
Sewer$1,300.00 one-time
  • Sewer Tap Fee (City of Pasadena)
    City of Pasadena
    Pasadena provides sewer service. The commercial sewer tap fee covers the tap, permit and inspection; each additional tap costs less. Where the tap requires boring under a street, a separate boring charge applies, and taps not made by city crews pay double. The city charges no wastewater impact fee.
    $1,300.00 one-time
City$0.00
  • City Impact Fee (City of Pasadena, Commercial)
    City of Pasadena
    The City of Pasadena charges no city impact fee on commercial, office or industrial development. Its water meter, tap and sewer tap fees are listed with the water and sewer fees.
    $0.00
County$0.00
Total (Pasadena): $2,140.00 one-time (≈ $2,140.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Pasadena Harris County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pasadena: Industrial Impact Fees

Industrial development in Pasadena pays no per-square-foot impact fees, but owes $2,140.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 50,000 sq ft building, that comes to about $2,140.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Pasadena) ($1,300.00 one-time) and Water Meter and Tap Fee (City of Pasadena) — 1" meter, $340 meter + $500 tap ($840.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pasadena Impact Fee Schedule
Water$840.00 one-time
  • Water Meter and Tap Fee (City of Pasadena) — 1" meter, $340 meter + $500 tap
    City of Pasadena
    Pasadena provides water service. The charge combines the meter price and the city's tap price for the meter size; a customer needing only a meter or only a tap pays that part alone. Meters 3 inch and larger are compound meters the owner supplies with the vault, and the city charges the tap only. The city charges no water impact fee.
    $840.00 one-time
Sewer$1,300.00 one-time
  • Sewer Tap Fee (City of Pasadena)
    City of Pasadena
    Pasadena provides sewer service. The commercial sewer tap fee covers the tap, permit and inspection; each additional tap costs less. Where the tap requires boring under a street, a separate boring charge applies, and taps not made by city crews pay double. The city charges no wastewater impact fee.
    $1,300.00 one-time
City$0.00
  • City Impact Fee (City of Pasadena, Industrial)
    City of Pasadena
    The City of Pasadena charges no city impact fee on commercial, office or industrial development. Its water meter, tap and sewer tap fees are listed with the water and sewer fees.
    $0.00
County$0.00
Total (Pasadena): $2,140.00 one-time (≈ $2,140.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Pasadena Harris County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pasadena: Office Impact Fees

Office development in Pasadena pays no per-square-foot impact fees, but owes $2,140.00 in one-time water and sewer connection fees (rates sourced November 22, 2026).

For a 25,000 sq ft building, that comes to about $2,140.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Pasadena) ($1,300.00 one-time) and Water Meter and Tap Fee (City of Pasadena) — 1" meter, $340 meter + $500 tap ($840.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pasadena Impact Fee Schedule
Water$840.00 one-time
  • Water Meter and Tap Fee (City of Pasadena) — 1" meter, $340 meter + $500 tap
    City of Pasadena
    Pasadena provides water service. The charge combines the meter price and the city's tap price for the meter size; a customer needing only a meter or only a tap pays that part alone. Meters 3 inch and larger are compound meters the owner supplies with the vault, and the city charges the tap only. The city charges no water impact fee.
    $840.00 one-time
Sewer$1,300.00 one-time
  • Sewer Tap Fee (City of Pasadena)
    City of Pasadena
    Pasadena provides sewer service. The commercial sewer tap fee covers the tap, permit and inspection; each additional tap costs less. Where the tap requires boring under a street, a separate boring charge applies, and taps not made by city crews pay double. The city charges no wastewater impact fee.
    $1,300.00 one-time
City$0.00
  • City Impact Fee (City of Pasadena, Office)
    City of Pasadena
    The City of Pasadena charges no city impact fee on commercial, office or industrial development. Its water meter, tap and sewer tap fees are listed with the water and sewer fees.
    $0.00
County$0.00
  • County Impact Fee (Harris County, Pasadena, Office)
    Harris County
    Harris County charges no county impact fee on development in Pasadena; the Flood Control District's watershed fees apply only in two service areas of unincorporated northwest Harris County.
    $0.00
Total (Pasadena): $2,140.00 one-time (≈ $2,140.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Pasadena Harris County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Harris County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pasadena Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Pasadena Impact Fee FAQs

What are the total impact fees for a single-family home in Pasadena, Texas?

A new single-family home in Pasadena pays $1,720.00 per unit in combined impact fees (rates sourced November 22, 2026).

How much are commercial impact fees in Pasadena?

Commercial development in Pasadena pays no per-square-foot impact fees, but owes $2,140.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Pasadena charge its own impact fees?

Yes. Pasadena levies its own municipal impact or utility fees. Harris County does not currently add county-level impact fees inside Pasadena. The schedule on this page shows every fee that applies to development in Pasadena.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Harris County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.