Impact fees in Williamson County depend on where you build. This page details the rates for unincorporated Williamson County: $13,393.40 per single-family unit as of . Brushy Creek is an unincorporated community. In Texas the city whose extraterritorial jurisdiction covers a site can charge water, wastewater and drainage impact fees there, and a utility district can charge its own fees, so new construction outside city limits may still owe them. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Williamson County Impact Fees by Project Type

Unincorporated Williamson County: Single-Family Impact Fees

A new single-family home in unincorporated Williamson County pays $13,393.40 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee — City of Georgetown, 1.0 SUE × $12,000 + $768.40 tap + $625 engineering ($13,393.40).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Williamson County Impact Fee Schedule
Water$13,393.40
  • Water Connection Fee — City of Georgetown, 1.0 SUE × $12,000 + $768.40 tap + $625 engineering
    City of Georgetown
    City of Georgetown water service, the largest water provider in unincorporated Williamson County. Amount is the water impact fee of $12,000 per service unit (Ord. 2025-40, Phase 2, for impact fees assessed August 31, 2026 through August 30, 2027) plus the outside-city 3/4 inch water tap of $768.40 and the $625 engineering and inspection fee. The impact fee was $11,000 for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. Georgetown assesses the fee when a preliminary plat is deemed complete (at final plat recording inside a MUD or PID), so the rate follows the plat date. A home of 1,200 sq ft or less with no automatic irrigation counts as 0.667 service unit.
    $13,393.40
Sewer$0.00
City$0.00
County$0.00
  • County Impact Fee (Williamson County)
    Williamson County
    Texas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
    $0.00
Total (unincorporated Williamson County): $13,393.40
Sources last checked Official fee schedules:City of Georgetown Williamson County

Unincorporated Williamson County: Multifamily Impact Fees

A new multifamily unit in unincorporated Williamson County pays $9,192.40 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (MF) — City of Georgetown, 0.667 SUE × $12,000 + $768.40 tap + $420 engineering ($9,192.40).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Williamson County Impact Fee Schedule
Water$9,192.40
  • Water Connection Fee (MF) — City of Georgetown, 0.667 SUE × $12,000 + $768.40 tap + $420 engineering
    City of Georgetown
    City of Georgetown water service. Water impact fee of 0.667 service unit per apartment or multifamily unit at $12,000 per service unit (Ord. 2025-40, Phase 2, for impact fees assessed August 31, 2026 through August 30, 2027), plus the $420 per unit engineering and inspection fee and the outside-city 3/4 inch tap of $768.40, which a building on one connection pays once; larger meters carry higher tap charges. The impact fee rate was $11,000 from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027.
    $9,192.40
City$0.00
County$0.00
  • County Impact Fee (Williamson County, MF)
    Williamson County
    Texas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
    $0.00
Total (unincorporated Williamson County): $9,192.40
Sources last checked Official fee schedules:City of Georgetown Williamson County

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Williamson County: Commercial Impact Fees

Commercial development in unincorporated Williamson County pays no per-square-foot impact fees, but owes $20,852.05 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 50,000 sq ft building, that comes to about $20,852.05. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — City of Georgetown, 1" meter, 1.667 SUE × $12,000 + $848.05 tap ($20,852.05 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Williamson County Impact Fee Schedule
Water$20,852.05 one-time
  • Water Connection Fee — City of Georgetown, 1" meter, 1.667 SUE × $12,000 + $848.05 tap
    City of Georgetown
    City of Georgetown water service, the largest water provider in unincorporated Williamson County. Amount is the water impact fee of $12,000 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch meter, plus the outside-city 1 inch water meter connection of $848.05. The impact fee was $11,000 per service unit for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. Georgetown also charges a nonresidential engineering and inspection fee of $0.25 per sq ft of building area on water and on sewer connections. The rate follows the plat assessment date.
    $20,852.05 one-time
Sewer$0.00
  • Sewer Connection Fee — Septic (no utility)
    None (on-site septic)
    Much of unincorporated Williamson County has no public sewer, and buildings use on-site septic systems permitted by the county. Where City of Georgetown or Jonah Water SUD sewer is available, their connection charges apply instead.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Williamson County, Commercial)
    Williamson County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Williamson County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (unincorporated Williamson County): $20,852.05 one-time (≈ $20,852.05 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Georgetown None (on-site septic) None (unincorporated area) Williamson County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Williamson County: Industrial Impact Fees

Industrial development in unincorporated Williamson County pays no per-square-foot impact fees, but owes $20,852.05 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 50,000 sq ft building, that comes to about $20,852.05. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — City of Georgetown, 1" meter, 1.667 SUE × $12,000 + $848.05 tap ($20,852.05 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Williamson County Impact Fee Schedule
Water$20,852.05 one-time
  • Water Connection Fee — City of Georgetown, 1" meter, 1.667 SUE × $12,000 + $848.05 tap
    City of Georgetown
    City of Georgetown water service, the largest water provider in unincorporated Williamson County. Amount is the water impact fee of $12,000 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch meter, plus the outside-city 1 inch water meter connection of $848.05. The impact fee was $11,000 per service unit for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. Georgetown also charges a nonresidential engineering and inspection fee of $0.25 per sq ft of building area on water and on sewer connections. The rate follows the plat assessment date.
    $20,852.05 one-time
Sewer$0.00
  • Sewer Connection Fee — Septic (no utility)
    None (on-site septic)
    Much of unincorporated Williamson County has no public sewer, and buildings use on-site septic systems permitted by the county. Where City of Georgetown or Jonah Water SUD sewer is available, their connection charges apply instead.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Williamson County, Industrial)
    Williamson County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Williamson County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (unincorporated Williamson County): $20,852.05 one-time (≈ $20,852.05 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Georgetown None (on-site septic) None (unincorporated area) Williamson County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Williamson County: Office Impact Fees

Office development in unincorporated Williamson County pays no per-square-foot impact fees, but owes $20,852.05 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 25,000 sq ft building, that comes to about $20,852.05. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee — City of Georgetown, 1" meter, 1.667 SUE × $12,000 + $848.05 tap ($20,852.05 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Williamson County Impact Fee Schedule
Water$20,852.05 one-time
  • Water Connection Fee — City of Georgetown, 1" meter, 1.667 SUE × $12,000 + $848.05 tap
    City of Georgetown
    City of Georgetown water service, the largest water provider in unincorporated Williamson County. Amount is the water impact fee of $12,000 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch meter, plus the outside-city 1 inch water meter connection of $848.05. The impact fee was $11,000 per service unit for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. Georgetown also charges a nonresidential engineering and inspection fee of $0.25 per sq ft of building area on water and on sewer connections. The rate follows the plat assessment date.
    $20,852.05 one-time
Sewer$0.00
  • Sewer Connection Fee — Septic (no utility)
    None (on-site septic)
    Much of unincorporated Williamson County has no public sewer, and buildings use on-site septic systems permitted by the county. Where City of Georgetown or Jonah Water SUD sewer is available, their connection charges apply instead.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Williamson County, Office)
    Williamson County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Williamson County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (unincorporated Williamson County): $20,852.05 one-time (≈ $20,852.05 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Georgetown None (on-site septic) None (unincorporated area) Williamson County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Williamson County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Williamson County Impact Fee FAQs

What are single-family impact fees in Williamson County, Texas?

A new single-family home in unincorporated Williamson County pays $13,393.40 per unit in impact fees (rates sourced November 13, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Williamson County?

Multifamily development in unincorporated Williamson County pays $9,192.40 per unit in impact fees (rates sourced November 13, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Williamson County?

Commercial development in unincorporated Williamson County pays no per-square-foot impact fees, but owes $20,852.05 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Brushy Creek pay Williamson County impact fees?

Brushy Creek is unincorporated, so the Williamson County charges on this page apply there. In Texas the city whose extraterritorial jurisdiction covers a site can charge water, wastewater and drainage impact fees there, and a utility district can charge its own fees, so new construction outside city limits may still owe them. Search a specific address in the calculator below to confirm it sits outside every city limit.

Do cities in Williamson County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 14 of 14 cities in Williamson County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction, or want to sponsor one?