Leander applies its own fee schedule. Williamson County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $17,054.58 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Leander Impact Fees by Project Type

Leander: Single-Family Impact Fees

A new single-family home in Leander pays at least $17,054.58 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Leander) — 5/8" meter ($8,762.00), Roadway Impact Fee (City of Leander) — Service Area A, 4.04 veh-mi × $1,089.50/veh-mi ($4,401.58) and Wastewater Impact Fee (City of Leander) — 5/8" meter ($2,301.00).

Parkland Fee in Lieu (City of Leander) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Leander Impact Fee Schedule
Water$9,602.00
  • Water Impact Fee (City of Leander) — 5/8" meter
    City of Leander
    City of Leander water community impact fee of $8,762 per living unit equivalent under Ordinance 23-044-00 (adopted August 17, 2023), for lots platted after August 17, 2023, paid at building permit. A home on a 5/8 inch meter is one LUE; larger meters pay more. Lots platted from October 2, 2017 to August 17, 2023 pay the earlier rate of $4,309 at a 5/8 or 3/4 inch meter.
    $8,762.00
  • Water Tap Fee (City of Leander) — 5/8" meter
    City of Leander
    City of Leander water tap fee where the city installs the service line and sets the meter, charged in addition to the impact fee. Where the service line is already installed and the city only inspects and sets the meter, the fee is $340 (5/8 inch) or $415 (3/4 inch). Meters of 1 inch and larger pay a flat charge plus the cost of the meter; street cuts and boring are extra.
    $840.00
Sewer$3,051.00
  • Wastewater Impact Fee (City of Leander) — 5/8" meter
    City of Leander
    City of Leander wastewater community impact fee of $2,301 per living unit equivalent under Ordinance 23-044-00 (adopted August 17, 2023), for lots platted after August 17, 2023, paid at building permit. A home on a 5/8 inch meter is one LUE; larger meters pay more. Lots platted from October 2, 2017 to August 17, 2023 pay the earlier rate of $2,820. Lots in the Liberty Hill wholesale wastewater service area may receive a $350 system reservation fee credit.
    $2,301.00
  • Sewer Tap Fee (City of Leander) — City-installed line
    City of Leander
    City of Leander wastewater tap fee where the city installs the service line, charged in addition to the impact fee. Where the line is already installed and the city only inspects the connection, the fee is $100. Street cuts and boring are extra.
    $750.00
City$4,401.58
  • Roadway Impact Fee (City of Leander) — Service Area A, 4.04 veh-mi × $1,089.50/veh-mi
    City of Leander
    City of Leander roadway impact fee under Ordinance 22-059-00, collected on building permits from January 7, 2024: the residential collection rate per vehicle-mile for the lot's service area times 4.04 vehicle-miles for a single-family detached home. Service Area A is the highest of 5 rate service areas ($1,089.50 per vehicle-mile); the others are B $421, C $464.50, D $614.50 and E $143.50. The fee is assessed at final plat and offsets can apply.
    $4,401.58
  • Parkland Fee in Lieu (City of Leander)
    City of Leander
    Residential developers in Leander dedicate parkland under the city's park ordinance or pay a fee in lieu of dedication.
    Requires confirmation
County$0.00
  • County Impact Fee (Williamson County)
    Williamson County
    Texas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
    $0.00
Total (Leander): $17,054.58
Sources last checked Official fee schedules:City of Leander Williamson County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Leander: Multifamily Impact Fees

A new multifamily unit in Leander pays at least $8,951.86 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Leander, MF) ($4,381.00), Roadway Impact Fee (City of Leander, MF) — Service Area A, 1.68 veh-mi × $1,089.50/veh-mi ($1,830.36) and Wastewater Impact Fee (City of Leander, MF) ($1,150.50).

Parkland Fee in Lieu (City of Leander, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Leander Impact Fee Schedule
Water$5,221.00
  • Water Impact Fee (City of Leander, MF)
    City of Leander
    City of Leander water community impact fee for multifamily (four or more units) of $4,381 per dwelling unit regardless of meter size, half of the $8,762 per living unit equivalent rate under Ordinance 23-044-00 (adopted August 17, 2023), for lots platted after August 17, 2023, paid at building permit. Lots platted from October 2, 2017 to August 17, 2023 pay $2,154.50 per unit.
    $4,381.00
  • Water Tap Fee (City of Leander, MF) — 5/8" meter
    City of Leander
    City of Leander water tap fee per connection where the city installs the service line and sets the meter; a building on one connection pays once, and larger meters pay a flat charge plus the cost of the meter. Where the line is already installed the fee is $340.
    $840.00
Sewer$1,900.50
  • Wastewater Impact Fee (City of Leander, MF)
    City of Leander
    City of Leander wastewater community impact fee for multifamily (four or more units) of $1,150.50 per dwelling unit regardless of meter size, half of the $2,301 per living unit equivalent rate under Ordinance 23-044-00 (adopted August 17, 2023), for lots platted after August 17, 2023. Lots platted from October 2, 2017 to August 17, 2023 pay $1,410 per unit. Lots in the Liberty Hill wholesale wastewater service area may receive a $350 system reservation fee credit.
    $1,150.50
  • Sewer Tap Fee (City of Leander, MF) — City-installed line
    City of Leander
    City of Leander wastewater tap fee per connection where the city installs the service line; a building on one connection pays once. Where the line is already installed and the city only inspects, the fee is $100.
    $750.00
City$1,830.36
  • Roadway Impact Fee (City of Leander, MF) — Service Area A, 1.68 veh-mi × $1,089.50/veh-mi
    City of Leander
    City of Leander roadway impact fee under Ordinance 22-059-00, collected on building permits from January 7, 2024: the residential collection rate per vehicle-mile for the lot's service area times 1.68 vehicle-miles per mid-rise multifamily unit. Service Area A is the highest of 5 rate service areas ($1,089.50 per vehicle-mile); the others are B $421, C $464.50, D $614.50 and E $143.50. Low-rise multifamily is 2.19 vehicle-miles per unit.
    $1,830.36
  • Parkland Fee in Lieu (City of Leander, MF)
    City of Leander
    Residential developers in Leander dedicate parkland under the city's park ordinance or pay a fee in lieu of dedication.
    Requires confirmation
County$0.00
  • County Impact Fee (Williamson County, MF)
    Williamson County
    Texas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
    $0.00
Total (Leander): $8,951.86
Sources last checked Official fee schedules:City of Leander Williamson County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Leander: Commercial Impact Fees

Commercial development in Leander pays $2.38 per square foot in impact fees, plus $29,207.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $148,072.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Leander) — 1" meter ($21,905.00 one-time), Wastewater Impact Fee (City of Leander) — 1" meter ($5,752.50 one-time) and Water Tap Fee (City of Leander) — 1" meter ($800.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Leander Impact Fee Schedule
Water$22,705.00 one-time
  • Water Impact Fee (City of Leander) — 1" meter
    City of Leander
    City of Leander water capital impact fee for a 1 inch meter: $21,905. Larger meters pay more (1.5 inch $43,810, 2 inch $70,096, up to 10 inch $1,007,630). A separate water tap fee applies. Paid at the building permit.
    $21,905.00 one-time
  • Water Tap Fee (City of Leander) — 1" meter
    City of Leander
    City of Leander water tap fee for a 1 inch meter where the city installs the line and meter: $800 plus the cost of the meter. Where the service line is already installed the fee is $225 plus the meter cost. A street cut adds $850 for a two-lane road plus $425 per extra lane. This is separate from the water capital impact fee.
    $800.00 one-time
Sewer$6,502.50 one-time
City$2.38/sq ft
County$0.00
Total (Leander): $2.38/sq ft + $29,207.50 one-time (≈ $148,072.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Leander Williamson County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Leander: Industrial Impact Fees

Industrial development in Leander pays $0.85 per square foot in impact fees, plus $29,207.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $71,698.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Leander) — 1" meter ($21,905.00 one-time), Wastewater Impact Fee (City of Leander) — 1" meter ($5,752.50 one-time) and Water Tap Fee (City of Leander) — 1" meter ($800.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Leander Impact Fee Schedule
Water$22,705.00 one-time
  • Water Impact Fee (City of Leander) — 1" meter
    City of Leander
    City of Leander water capital impact fee for a 1 inch meter: $21,905. Larger meters pay more (1.5 inch $43,810, 2 inch $70,096, up to 10 inch $1,007,630). A separate water tap fee applies. Paid at the building permit.
    $21,905.00 one-time
  • Water Tap Fee (City of Leander) — 1" meter
    City of Leander
    City of Leander water tap fee for a 1 inch meter where the city installs the line and meter: $800 plus the cost of the meter. Where the service line is already installed the fee is $225 plus the meter cost. A street cut adds $850 for a two-lane road plus $425 per extra lane. This is separate from the water capital impact fee.
    $800.00 one-time
Sewer$6,502.50 one-time
City$0.85/sq ft
County$0.00
Total (Leander): $0.85/sq ft + $29,207.50 one-time (≈ $71,698.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Leander Williamson County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Leander: Office Impact Fees

Office development in Leander pays $1.06 per square foot in impact fees, plus $29,207.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $55,736.75. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Leander) — 1" meter ($21,905.00 one-time), Wastewater Impact Fee (City of Leander) — 1" meter ($5,752.50 one-time) and Water Tap Fee (City of Leander) — 1" meter ($800.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Leander Impact Fee Schedule
Water$22,705.00 one-time
  • Water Impact Fee (City of Leander) — 1" meter
    City of Leander
    City of Leander water capital impact fee for a 1 inch meter: $21,905. Larger meters pay more (1.5 inch $43,810, 2 inch $70,096, up to 10 inch $1,007,630). A separate water tap fee applies. Paid at the building permit.
    $21,905.00 one-time
  • Water Tap Fee (City of Leander) — 1" meter
    City of Leander
    City of Leander water tap fee for a 1 inch meter where the city installs the line and meter: $800 plus the cost of the meter. Where the service line is already installed the fee is $225 plus the meter cost. A street cut adds $850 for a two-lane road plus $425 per extra lane. This is separate from the water capital impact fee.
    $800.00 one-time
Sewer$6,502.50 one-time
City$1.06/sq ft
County$0.00
Total (Leander): $1.06/sq ft + $29,207.50 one-time (≈ $55,736.75 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Leander Williamson County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Leander Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Leander Impact Fee FAQs

What are the total impact fees for a single-family home in Leander, Texas?

A new single-family home in Leander pays at least $17,054.58 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Leander?

Commercial development in Leander pays $2.38 per square foot in impact fees, plus $29,207.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $148,072.00 for a 50,000 sq ft building.

Does Leander charge its own impact fees?

Yes. Leander levies its own municipal impact or utility fees. Williamson County does not currently add county-level impact fees inside Leander. The schedule on this page shows every fee that applies to development in Leander.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Williamson County impact fees page.