Cedar Park applies its own fee schedule. Williamson County does not currently add county-level impact fees inside city limits. A new single-family home pays $9,155.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Cedar Park Impact Fees by Project Type

Cedar Park: Single-Family Impact Fees

A new single-family home in Cedar Park pays $9,155.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Cedar Park) ($3,170.00), Water Impact Fee (City of Cedar Park) ($3,160.00) and Parkland Fee in Lieu of Dedication (City of Cedar Park) — Under 6 units per acre ($1,200.00).

Sewer Connection Fee (City of Cedar Park) — City-installed tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cedar Park Impact Fee Schedule
Water$3,585.00
  • Water Impact Fee (City of Cedar Park)
    City of Cedar Park
    Charged per living unit equivalent (LUE); a single-family detached home is 1.0 LUE. Paid when the building permit is issued. Rate in effect since January 2020.
    $3,160.00
  • Water Tap Fee (City of Cedar Park) — 3/4" meter
    City of Cedar Park
    Charged where the City installs the service line and sets the meter. Where the service line is already installed and the City only inspects and sets the meter, the lower inspection-only tap fee applies instead.
    $425.00
Sewer$3,920.00
City$1,650.00
  • Parkland Fee in Lieu of Dedication (City of Cedar Park) — Under 6 units per acre
    Under 6 units/acre
    City of Cedar Park
    Cash paid in lieu of parkland dedication, per dwelling unit, by gross density of the development: $1,200 under 6 units per acre, $1,000 from 6 to 20, $800 over 20. Single-family plats pay at or before final plat approval. Plats of three or fewer lots of at least one acre each are exempt; developments that dedicate parkland do not pay it.
    $1,200.00
  • Park Improvement Fee (City of Cedar Park) — Under 6 units per acre
    Under 6 units/acre
    City of Cedar Park
    Charged in addition to parkland dedication or the fee in lieu, per dwelling unit by gross density: $450 under 6 units per acre, $375 from 6 to 20, $300 over 20. Due before final plat approval (or site development permit approval). Private recreation facilities can earn a credit of up to half the fee.
    $450.00
County$0.00
  • County Impact Fee (Williamson County)
    Williamson County
    Texas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
    $0.00
Total (Cedar Park): $9,155.00
Sources last checked Official fee schedules:City of Cedar Park Williamson County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Cedar Park: Multifamily Impact Fees

A new multifamily unit in Cedar Park pays $5,440.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Cedar Park, MF) — 0.5 LUE × $3,170/LUE ($1,585.00), Water Impact Fee (City of Cedar Park, MF) — 0.5 LUE × $3,160/LUE ($1,580.00) and Parkland Fee in Lieu of Dedication (City of Cedar Park, MF) — Over 20 units per acre ($800.00).

Sewer Connection Fee (City of Cedar Park, MF) — City-installed tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cedar Park Impact Fee Schedule
Water$2,005.00
Sewer$2,335.00
City$1,100.00
  • Parkland Fee in Lieu of Dedication (City of Cedar Park, MF) — Over 20 units per acre
    Over 20 units/acre
    City of Cedar Park
    Cash paid in lieu of parkland dedication, per dwelling unit, by gross density of the development: $800 over 20 units per acre, $1,000 from 6 to 20, $1,200 under 6. Developments needing a site development permit pay before that permit is issued; developments that dedicate parkland do not pay it.
    $800.00
  • Park Improvement Fee (City of Cedar Park, MF) — Over 20 units per acre
    Over 20 units/acre
    City of Cedar Park
    Charged in addition to parkland dedication or the fee in lieu, per dwelling unit by gross density: $300 over 20 units per acre, $375 from 6 to 20, $450 under 6. Due before site development permit approval. Private recreation facilities can earn a credit of up to half the fee.
    $300.00
County$0.00
  • County Impact Fee (Williamson County, MF)
    Williamson County
    Texas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
    $0.00
Total (Cedar Park): $5,440.00
Sources last checked Official fee schedules:City of Cedar Park Williamson County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Cedar Park: Commercial Impact Fees

Commercial development in Cedar Park pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 50,000 sq ft building, that comes to at least $1,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Cedar Park) — 1" meter ($675.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Cedar Park) — City-installed tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Impact Fee (City of Cedar Park) — $3,160 per LUE of 450 gpd and Wastewater Impact Fee (City of Cedar Park) — $3,170 per LUE of 300 gpd are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Cedar Park Impact Fee Schedule
Water$675.00 one-time
  • Water Tap Fee (City of Cedar Park) — 1" meter
    City of Cedar Park
    Cedar Park's water tap fee for a 1 inch meter where the City installs the service line and sets the meter. Where the service line is already installed and the City only inspects and sets the meter, the lower inspection-only tap fee applies instead.
    $675.00 one-time
  • Water Impact Fee (City of Cedar Park) — $3,160 per LUE of 450 gpd
    City of Cedar Park
    Cedar Park charges $3,160 per living unit equivalent (450 gallons per day of water demand). For nonresidential uses the number of units is set by the Director of Public Works from the applicant's engineering data, to the nearest tenth. Paid when the building permit is issued. Rate in effect since January 2020; a five-year update has been under study since 2025.
    Contact jurisdiction/utility to verify
Sewer$750.00 one-time
  • Sewer Connection Fee (City of Cedar Park) — City-installed tap
    City of Cedar Park
    One-time sewer connection fee due on connection, in addition to the wastewater impact fee. Where the City does not install the sewer tap and lateral, a $50 tap inspection fee applies instead.
    $750.00 one-timeRequires confirmation
  • Wastewater Impact Fee (City of Cedar Park) — $3,170 per LUE of 300 gpd
    City of Cedar Park
    Cedar Park charges $3,170 per living unit equivalent (300 gallons per day of wastewater). For nonresidential uses the number of units is set by the Director of Public Works from the applicant's engineering data, to the nearest tenth. Paid when the building permit is issued. Rate in effect since January 2020; a five-year update has been under study since 2025.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Cedar Park): $1,425.00 one-time (≈ $1,425.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cedar Park Williamson County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Park: Industrial Impact Fees

Industrial development in Cedar Park pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 50,000 sq ft building, that comes to at least $1,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Cedar Park) — 1" meter ($675.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Cedar Park) — City-installed tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Impact Fee (City of Cedar Park) — $3,160 per LUE of 450 gpd and Wastewater Impact Fee (City of Cedar Park) — $3,170 per LUE of 300 gpd are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Cedar Park Impact Fee Schedule
Water$675.00 one-time
  • Water Tap Fee (City of Cedar Park) — 1" meter
    City of Cedar Park
    Cedar Park's water tap fee for a 1 inch meter where the City installs the service line and sets the meter. Where the service line is already installed and the City only inspects and sets the meter, the lower inspection-only tap fee applies instead.
    $675.00 one-time
  • Water Impact Fee (City of Cedar Park) — $3,160 per LUE of 450 gpd
    City of Cedar Park
    Cedar Park charges $3,160 per living unit equivalent (450 gallons per day of water demand). For nonresidential uses the number of units is set by the Director of Public Works from the applicant's engineering data, to the nearest tenth. Paid when the building permit is issued. Rate in effect since January 2020; a five-year update has been under study since 2025.
    Contact jurisdiction/utility to verify
Sewer$750.00 one-time
  • Sewer Connection Fee (City of Cedar Park) — City-installed tap
    City of Cedar Park
    One-time sewer connection fee due on connection, in addition to the wastewater impact fee. Where the City does not install the sewer tap and lateral, a $50 tap inspection fee applies instead.
    $750.00 one-timeRequires confirmation
  • Wastewater Impact Fee (City of Cedar Park) — $3,170 per LUE of 300 gpd
    City of Cedar Park
    Cedar Park charges $3,170 per living unit equivalent (300 gallons per day of wastewater). For nonresidential uses the number of units is set by the Director of Public Works from the applicant's engineering data, to the nearest tenth. Paid when the building permit is issued. Rate in effect since January 2020; a five-year update has been under study since 2025.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Cedar Park): $1,425.00 one-time (≈ $1,425.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cedar Park Williamson County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Park: Office Impact Fees

Office development in Cedar Park pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 25,000 sq ft building, that comes to at least $1,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Cedar Park) — 1" meter ($675.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Cedar Park) — City-installed tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Impact Fee (City of Cedar Park) — $3,160 per LUE of 450 gpd and Wastewater Impact Fee (City of Cedar Park) — $3,170 per LUE of 300 gpd are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Cedar Park Impact Fee Schedule
Water$675.00 one-time
  • Water Tap Fee (City of Cedar Park) — 1" meter
    City of Cedar Park
    Cedar Park's water tap fee for a 1 inch meter where the City installs the service line and sets the meter. Where the service line is already installed and the City only inspects and sets the meter, the lower inspection-only tap fee applies instead.
    $675.00 one-time
  • Water Impact Fee (City of Cedar Park) — $3,160 per LUE of 450 gpd
    City of Cedar Park
    Cedar Park charges $3,160 per living unit equivalent (450 gallons per day of water demand). For nonresidential uses the number of units is set by the Director of Public Works from the applicant's engineering data, to the nearest tenth. Paid when the building permit is issued. Rate in effect since January 2020; a five-year update has been under study since 2025.
    Contact jurisdiction/utility to verify
Sewer$750.00 one-time
  • Sewer Connection Fee (City of Cedar Park) — City-installed tap
    City of Cedar Park
    One-time sewer connection fee due on connection, in addition to the wastewater impact fee. Where the City does not install the sewer tap and lateral, a $50 tap inspection fee applies instead.
    $750.00 one-timeRequires confirmation
  • Wastewater Impact Fee (City of Cedar Park) — $3,170 per LUE of 300 gpd
    City of Cedar Park
    Cedar Park charges $3,170 per living unit equivalent (300 gallons per day of wastewater). For nonresidential uses the number of units is set by the Director of Public Works from the applicant's engineering data, to the nearest tenth. Paid when the building permit is issued. Rate in effect since January 2020; a five-year update has been under study since 2025.
    Contact jurisdiction/utility to verify
City$0.00
County$0.00
Total (Cedar Park): $1,425.00 one-time (≈ $1,425.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Cedar Park Williamson County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Williamson County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Park Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Cedar Park Impact Fee FAQs

What are the total impact fees for a single-family home in Cedar Park, Texas?

A new single-family home in Cedar Park pays $9,155.00 per unit in combined impact fees (rates sourced November 13, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Cedar Park?

Commercial development in Cedar Park pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Cedar Park charge its own impact fees?

Yes. Cedar Park levies its own municipal impact or utility fees. Williamson County does not currently add county-level impact fees inside Cedar Park. The schedule on this page shows every fee that applies to development in Cedar Park.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Williamson County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.