Georgetown Impact Fees by Project Type
Georgetown: Single-Family Impact Fees
A new single-family home in Georgetown pays $38,389.80 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Georgetown) ($12,000.00), Transportation Impact Fee (City of Georgetown) — Area F ($11,916.30) and Wastewater Impact Fee (City of Georgetown) ($10,250.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Georgetown Impact Fee Schedule
- Water Impact Fee (City of Georgetown)$12,000.00City of GeorgetownWater impact fee of $12,000 per service unit for impact fees assessed August 31, 2026 through August 30, 2027 (Ord. 2025-40). It was $11,000 for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. A single-family home is one service unit (0.667 for a home of 1,200 sq ft or less with no automatic irrigation). The rate is set when the preliminary plat is deemed complete and cannot rise after that; it is collected with the building permit.
- Water Tap Fee (City of Georgetown) — 3/4" meter$698.50City of GeorgetownInside-city water meter connection charge, effective October 1, 2026 (Ord. 2026-34). Paid in addition to the water impact fee and the engineering and inspection fee. Meters of 4 inches and larger cost $726.95 plus the meter price.
- Water Engineering and Inspection Fee (City of Georgetown)$625.00City of GeorgetownWater engineering and inspection fee of $625 per single-family dwelling unit, charged with the water tap (effective October 1, 2026).
- Wastewater Impact Fee (City of Georgetown)$10,250.00City of GeorgetownWastewater impact fee of $10,250 per service unit for impact fees assessed August 31, 2026 through August 30, 2027 (Ord. 2025-40). It was $7,000 for assessments from August 31, 2025 and rises to $13,500 for assessments after August 31, 2027. A single-family home is one service unit. The rate is set when the preliminary plat is deemed complete and is collected with the building permit.
- Wastewater Engineering and Inspection Fee (City of Georgetown)$620.00City of GeorgetownWastewater engineering and inspection fee of $620 per single-family dwelling unit, charged with every sewer tap (effective October 1, 2025).
- Sewer Tap Fee (City of Georgetown) — 4" tap$300.00City of GeorgetownInside-city sewer tap charge for a 4 inch tap, effective October 1, 2025 (Ord. 2025-49). Paid in addition to the wastewater impact fee and the engineering and inspection fee.
- Transportation Impact Fee (City of Georgetown) — Area F$11,916.30City of GeorgetownRoadway impact fee for a single-family home in Service Area F, the highest of 10 service areas (other areas range from $0 in Lake Georgetown and Downtown to $10,692 in Area C). Phase 3 collection rate for developments whose preliminary plat application was deemed complete on or after September 1, 2026; earlier plats pay the Phase 2 rate ($8,936.40 in Area F). Applies only inside city limits, assessed at plat and collected with the building permit.
- Parkland Development Fee (City of Georgetown)$1,200.00City of GeorgetownParkland development fee of $1,200 per unit for one or two dwelling units on a lot, under the city fee schedule revised October 1, 2026.
- Parkland Dedication Fee (City of Georgetown)$780.00City of GeorgetownParkland dedication fee of $780 per unit for one or two dwelling units on a lot, under the city fee schedule revised October 1, 2026. Charged in addition to the parkland development fee.
- County Impact Fee (Williamson County)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Georgetown: Multifamily Impact Fees
A new multifamily unit in Georgetown pays $23,365.20 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Georgetown, MF) — 0.667 SUE × $12,000/SUE ($8,004.00), Wastewater Impact Fee (City of Georgetown, MF) — 0.667 SUE × $10,250/SUE ($6,836.75) and Transportation Impact Fee (City of Georgetown, MF) — Area F ($5,235.95).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Georgetown Impact Fee Schedule
- Water Impact Fee (City of Georgetown, MF) — 0.667 SUE × $12,000/SUE$8,004.00City of GeorgetownWater impact fee of 0.667 service unit per apartment or multifamily unit at $12,000 per service unit, for impact fees assessed August 31, 2026 through August 30, 2027 (Ord. 2025-40). Rises to $8,671 per unit for assessments after August 31, 2027. The rate is set at preliminary plat and collected with the building permit.
- Water Tap Fee (City of Georgetown, MF) — 3/4" meter$698.50City of GeorgetownInside-city water meter connection charge, effective October 1, 2026. A building on one connection pays it once, by meter size; a 3 inch meter is $2,976.85 and 4 inch and larger meters are $726.95 plus the meter price.
- Water Engineering and Inspection Fee (City of Georgetown, MF)$400.00City of GeorgetownWater engineering and inspection fee of $400 per dwelling unit for multifamily buildings of 4 or more units inside the city (effective October 1, 2026).
- Wastewater Impact Fee (City of Georgetown, MF) — 0.667 SUE × $10,250/SUE$6,836.75City of GeorgetownWastewater impact fee of 0.667 service unit per multifamily unit at $10,250 per service unit, for impact fees assessed August 31, 2026 through August 30, 2027 (Ord. 2025-40). Rises to $9,004.50 per unit for assessments after August 31, 2027.
- Wastewater Engineering and Inspection Fee (City of Georgetown, MF)$420.00City of GeorgetownWastewater engineering and inspection fee of $420 per dwelling unit for multifamily buildings of more than 4 units (effective October 1, 2025).
- Sewer Tap Fee (City of Georgetown, MF)$300.00City of GeorgetownInside-city sewer tap charge, $300 for a 4 inch tap, which a building on one tap pays once; a 6 inch tap is $450 and an 8 inch tap $650.
- Transportation Impact Fee (City of Georgetown, MF) — Area F$5,235.95City of GeorgetownRoadway impact fee per mid-rise multifamily unit in Service Area F, the highest of 10 service areas (others range from $0 in Lake Georgetown and Downtown to $4,698 in Area C). Phase 3 collection rate for developments whose preliminary plat application was deemed complete on or after September 1, 2026; the Phase 2 rate for apartments was the same. Low-rise apartments pay more per unit ($6,860.90 in Area F). Applies only inside city limits.
- Parkland Development Fee (City of Georgetown, MF)$900.00City of GeorgetownParkland development fee of $900 per unit for three or more dwelling units on a lot, under the city fee schedule revised October 1, 2026.
- Parkland Dedication Fee (City of Georgetown, MF)$570.00City of GeorgetownParkland dedication fee of $570 per unit for three or more dwelling units on a lot, under the city fee schedule revised October 1, 2026. Charged in addition to the parkland development fee.
- County Impact Fee (Williamson County, MF)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Georgetown: Commercial Impact Fees
Commercial development in Georgetown pays $36.46 per square foot in impact fees, plus $38,161.70 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $1,861,211.70. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $12,000 + $770.95 tap ($20,774.95 one-time), Sewer Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $10,250 + $300 tap ($17,386.75 one-time) and Transportation Impact Fee (City of Georgetown, Commercial) — Area F ($36.46/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Georgetown Impact Fee Schedule
- Water Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $12,000 + $770.95 tap$20,774.95 one-timeCity of GeorgetownCity of Georgetown water impact fee of $12,000 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch meter, plus the inside-city 1 inch meter connection of $770.95. The impact fee was $11,000 per service unit for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. A nonresidential engineering and inspection fee of $0.25 per sq ft of building area also applies. The rate is set when the preliminary plat is deemed complete and collected with the building permit.
- Sewer Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $10,250 + $300 tap$17,386.75 one-timeCity of GeorgetownCity of Georgetown wastewater impact fee of $10,250 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch water meter, plus the inside-city 4 inch sewer tap of $300 (6 inch $450, 8 inch $650). The impact fee was $7,000 per service unit for assessments from August 31, 2025 and rises to $13,500 after August 31, 2027. A nonresidential engineering and inspection fee of $0.25 per sq ft of building area also applies.
- Transportation Impact Fee (City of Georgetown, Commercial) — Area F$36.46/sq ftCity of GeorgetownRoadway impact fee per 1,000 sq ft of gross leasable area for a shopping plaza of 40,000 to 150,000 sq ft in Service Area F, the highest of 10 service areas (others range from $0 in Lake Georgetown and Downtown to $32,724 in Area C). Applies only inside city limits, assessed at plat or site plan and collected with the building permit. Smaller strip retail and larger shopping centers have their own rates.
- County Impact Fee (Williamson County, Commercial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Georgetown.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Georgetown: Industrial Impact Fees
Industrial development in Georgetown pays $4.87 per square foot in impact fees, plus $38,161.70 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $281,836.70. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $12,000 + $770.95 tap ($20,774.95 one-time) and Sewer Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $10,250 + $300 tap ($17,386.75 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (City of Georgetown, Industrial) — Area F is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Georgetown Impact Fee Schedule
- Water Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $12,000 + $770.95 tap$20,774.95 one-timeCity of GeorgetownCity of Georgetown water impact fee of $12,000 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch meter, plus the inside-city 1 inch meter connection of $770.95. The impact fee was $11,000 per service unit for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. A nonresidential engineering and inspection fee of $0.25 per sq ft of building area also applies. The rate is set when the preliminary plat is deemed complete and collected with the building permit.
- Sewer Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $10,250 + $300 tap$17,386.75 one-timeCity of GeorgetownCity of Georgetown wastewater impact fee of $10,250 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch water meter, plus the inside-city 4 inch sewer tap of $300 (6 inch $450, 8 inch $650). The impact fee was $7,000 per service unit for assessments from August 31, 2025 and rises to $13,500 after August 31, 2027. A nonresidential engineering and inspection fee of $0.25 per sq ft of building area also applies.
- Transportation Impact Fee (City of Georgetown, Industrial) — Area F$4.87/sq ftRequires confirmationCity of GeorgetownRoadway impact fee per 1,000 sq ft for general light industrial space (ITE 110, 2.70 vehicle-miles) in Service Area F at the ordinance's Non-Residential rate, the highest of 10 service areas. The City's fee estimator prices this use at its higher Warehousing rate ($9,750 in Area F), so the amount charged may differ. Applies only inside city limits, assessed at plat or site plan and collected with the building permit.
- County Impact Fee (Williamson County, Industrial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Georgetown.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Georgetown: Office Impact Fees
Office development in Georgetown pays $8.79 per square foot in impact fees, plus $38,161.70 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $257,911.70. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $12,000 + $770.95 tap ($20,774.95 one-time), Sewer Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $10,250 + $300 tap ($17,386.75 one-time) and Transportation Impact Fee (City of Georgetown, Office) — Area F ($8.79/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Georgetown Impact Fee Schedule
- Water Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $12,000 + $770.95 tap$20,774.95 one-timeCity of GeorgetownCity of Georgetown water impact fee of $12,000 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch meter, plus the inside-city 1 inch meter connection of $770.95. The impact fee was $11,000 per service unit for assessments from August 31, 2025 and rises to $13,000 for assessments after August 31, 2027. A nonresidential engineering and inspection fee of $0.25 per sq ft of building area also applies. The rate is set when the preliminary plat is deemed complete and collected with the building permit.
- Sewer Connection Fee (City of Georgetown) — 1" meter, 1.667 SUE × $10,250 + $300 tap$17,386.75 one-timeCity of GeorgetownCity of Georgetown wastewater impact fee of $10,250 per service unit (Ord. 2025-40, Phase 2, for fees assessed August 31, 2026 through August 30, 2027) times 1.667 service units for a 1 inch water meter, plus the inside-city 4 inch sewer tap of $300 (6 inch $450, 8 inch $650). The impact fee was $7,000 per service unit for assessments from August 31, 2025 and rises to $13,500 after August 31, 2027. A nonresidential engineering and inspection fee of $0.25 per sq ft of building area also applies.
- Transportation Impact Fee (City of Georgetown, Office) — Area F$8.79/sq ftCity of GeorgetownRoadway impact fee per 1,000 sq ft for a general office building in Service Area F, the highest of 10 service areas (others range from $0 in Lake Georgetown and Downtown to $7,889 in Area C). Applies only inside city limits, assessed at plat or site plan and collected with the building permit.
- County Impact Fee (Williamson County, Office)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Georgetown.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Georgetown Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Georgetown Impact Fee FAQs
What are the total impact fees for a single-family home in Georgetown, Texas?
A new single-family home in Georgetown pays $38,389.80 per unit in combined impact fees (rates sourced November 25, 2026).
How much are commercial impact fees in Georgetown?
Commercial development in Georgetown pays $36.46 per square foot in impact fees, plus $38,161.70 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,861,211.70 for a 50,000 sq ft building.
Does Georgetown charge its own impact fees?
Yes. Georgetown levies its own municipal impact or utility fees. Williamson County does not currently add county-level impact fees inside Georgetown. The schedule on this page shows every fee that applies to development in Georgetown.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Williamson County impact fees page.