Round Rock Impact Fees by Project Type
Round Rock: Single-Family Impact Fees
A new single-family home in Round Rock pays at least $19,305.00 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Round Rock) — Service Area A, 3.18 veh-mi × $3,444/veh-mi ($10,952.00), Water Impact Fee (City of Round Rock) — 5/8" meter, 1 LUE × $4,912/LUE ($4,912.00) and Wastewater Impact Fee (City of Round Rock) — 5/8" meter, 1 LUE × $2,921/LUE ($2,921.00).
Parkland Fee in Lieu (City of Round Rock) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Round Rock Impact Fee Schedule
- Water Impact Fee (City of Round Rock) — 5/8" meter, 1 LUE × $4,912/LUE$4,912.00City of Round RockCity of Round Rock water impact fee of $4,912 per living unit equivalent for plats recorded after January 1, 2024, based on the water meter size (5/8 inch 1 LUE, 3/4 inch 1.5, 1 inch 2.5, 1-1/2 inch 5, 2 inch 8). Older plats pay the rate in effect when recorded, for example $4,234 per LUE for plats recorded after February 1, 2021.
- Water Meter Fee (City of Round Rock) — 5/8" meter$320.00City of Round RockCity of Round Rock water meter fee for a 5/8 inch meter, charged with the single-family building permit.
- Wastewater Impact Fee (City of Round Rock) — 5/8" meter, 1 LUE × $2,921/LUE$2,921.00City of Round RockCity of Round Rock wastewater impact fee of $2,921 per living unit equivalent for plats recorded after January 1, 2024, based on the water meter size (5/8 inch 1 LUE). Older plats pay the rate in effect when recorded, for example $1,799 per LUE for plats recorded after February 1, 2021.
- Water and Sewer Line Fee (City of Round Rock)$200.00City of Round RockCity of Round Rock water and sewer line fee charged with the single-family building permit.
- Roadway Impact Fee (City of Round Rock) — Service Area A, 3.18 veh-mi × $3,444/veh-mi$10,952.00City of Round RockCity of Round Rock roadway impact fee for plats recorded after January 1, 2025 (Ordinance O-2023-378): $3,444 per service unit in Service Area A, the highest of 4 rate service areas, and $2,291 in Service Areas B, C and D, times 3.18 vehicle-miles for a single-family detached home. Assessed at plat and due at building permit application; older plats pay lower phased rates.
- Parkland Fee in Lieu (City of Round Rock)Requires confirmationCity of Round RockResidential subdivisions in Round Rock convey parkland to the city or pay a fee in lieu of dedication under the city code.
- County Impact Fee (Williamson County)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Round Rock: Multifamily Impact Fees
A new multifamily unit in Round Rock pays at least $8,638.50 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Round Rock, MF) — Service Area A, 1.22 veh-mi × $3,444/veh-mi ($4,202.00), Water Impact Fee (City of Round Rock, MF) — 0.5 LUE × $4,912/LUE ($2,456.00) and Wastewater Impact Fee (City of Round Rock, MF) — 0.5 LUE × $2,921/LUE ($1,460.50).
Parkland Fee in Lieu (City of Round Rock, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Round Rock Impact Fee Schedule
- Water Impact Fee (City of Round Rock, MF) — 0.5 LUE × $4,912/LUE$2,456.00City of Round RockCity of Round Rock water impact fee of $4,912 per service unit (plats recorded after January 1, 2024); apartments count as 0.5 service unit per unit under the city's multifamily table.
- Water Meter Fee (City of Round Rock, MF) — 5/8" meter$320.00City of Round RockCity of Round Rock water meter fee for a 5/8 inch meter; a building on one meter pays once, and larger meters cost more.
- Wastewater Impact Fee (City of Round Rock, MF) — 0.5 LUE × $2,921/LUE$1,460.50City of Round RockCity of Round Rock wastewater impact fee of $2,921 per service unit (plats recorded after January 1, 2024); apartments count as 0.5 service unit per unit under the city's multifamily table.
- Water and Sewer Line Fee (City of Round Rock, MF)$200.00City of Round RockCity of Round Rock water and sewer line fee per connection; a building on one connection pays once.
- Roadway Impact Fee (City of Round Rock, MF) — Service Area A, 1.22 veh-mi × $3,444/veh-mi$4,202.00City of Round RockCity of Round Rock roadway impact fee for plats recorded after January 1, 2025 (Ordinance O-2023-378): $3,444 per service unit in Service Area A, the highest of 4 rate service areas, and $2,291 in Service Areas B, C and D, times 1.22 vehicle-miles per mid-rise multifamily unit. Low-rise multifamily is 1.59 vehicle-miles per unit.
- Parkland Fee in Lieu (City of Round Rock, MF)Requires confirmationCity of Round RockResidential subdivisions in Round Rock convey parkland to the city or pay a fee in lieu of dedication under the city code.
- County Impact Fee (Williamson County, MF)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Round Rock: Commercial Impact Fees
Commercial development in Round Rock pays $19.91 per square foot in impact fees, plus $19,582.50 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 50,000 sq ft building, that comes to at least $1,014,898.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $4,912/LUE ($12,280.00 one-time), Wastewater Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $2,921/LUE ($7,302.50 one-time) and Roadway Impact Fee (City of Round Rock, Commercial) — Service Area A, 11.56 veh-mi × $1,722/veh-mi ($19.91/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Round Rock) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Round Rock Impact Fee Schedule
- Water Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $4,912/LUE$12,280.00 one-timeCity of Round RockCity of Round Rock water impact fee of $4,912 per living unit equivalent for property platted on or after January 1, 2024, counted by meter size: a 1 inch meter is 2.5 units. Meters range from 5/8 inch (1 unit) to 10 inch (115 units). Property platted earlier pays the lower rate in effect at its plat date.
- Water Meter Fee (City of Round Rock)Requires confirmationCity of Round RockRound Rock charges a water meter fee by meter size at the building permit ($320 for a 5/8 inch residential meter). The commercial amount for larger meters is not published on the city's permit pages.
- Wastewater Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $2,921/LUE$7,302.50 one-timeCity of Round RockCity of Round Rock wastewater impact fee of $2,921 per living unit equivalent for property platted on or after January 1, 2024, counted by meter size: a 1 inch meter is 2.5 units. Meters range from 5/8 inch (1 unit) to 10 inch (115 units). Property platted earlier pays the lower rate in effect at its plat date.
- Roadway Impact Fee (City of Round Rock, Commercial) — Service Area A, 11.56 veh-mi × $1,722/veh-mi$19.91/sq ftCity of Round RockCity of Round Rock roadway impact fee for a shopping plaza of 40,000 to 150,000 sq ft, $1,722 per vehicle-mile in Service Area A (the higher of two rates; Areas B, C and D charge $1,145.40) times 11.56 vehicle-miles per 1,000 sq ft of leasable area. Applies to property platted on or after January 1, 2025, and is due at the building permit. A 2026 roadway impact fee study update is under review.
- County Impact Fee (Williamson County, Commercial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Round Rock.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Round Rock: Industrial Impact Fees
Industrial development in Round Rock pays $5.58 per square foot in impact fees, plus $19,582.50 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 50,000 sq ft building, that comes to at least $298,546.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $4,912/LUE ($12,280.00 one-time), Wastewater Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $2,921/LUE ($7,302.50 one-time) and Roadway Impact Fee (City of Round Rock, Industrial) — Service Area A, 3.24 veh-mi × $1,722/veh-mi ($5.58/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Round Rock) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Round Rock Impact Fee Schedule
- Water Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $4,912/LUE$12,280.00 one-timeCity of Round RockCity of Round Rock water impact fee of $4,912 per living unit equivalent for property platted on or after January 1, 2024, counted by meter size: a 1 inch meter is 2.5 units. Meters range from 5/8 inch (1 unit) to 10 inch (115 units). Property platted earlier pays the lower rate in effect at its plat date.
- Water Meter Fee (City of Round Rock)Requires confirmationCity of Round RockRound Rock charges a water meter fee by meter size at the building permit ($320 for a 5/8 inch residential meter). The commercial amount for larger meters is not published on the city's permit pages.
- Wastewater Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $2,921/LUE$7,302.50 one-timeCity of Round RockCity of Round Rock wastewater impact fee of $2,921 per living unit equivalent for property platted on or after January 1, 2024, counted by meter size: a 1 inch meter is 2.5 units. Meters range from 5/8 inch (1 unit) to 10 inch (115 units). Property platted earlier pays the lower rate in effect at its plat date.
- Roadway Impact Fee (City of Round Rock, Industrial) — Service Area A, 3.24 veh-mi × $1,722/veh-mi$5.58/sq ftCity of Round RockCity of Round Rock roadway impact fee for general light industrial space, $1,722 per vehicle-mile in Service Area A (the higher of two rates; Areas B, C and D charge $1,145.40) times 3.24 vehicle-miles per 1,000 sq ft. Applies to property platted on or after January 1, 2025, and is due at the building permit. A 2026 roadway impact fee study update is under review.
- County Impact Fee (Williamson County, Industrial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Round Rock.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Round Rock: Office Impact Fees
Office development in Round Rock pays $8.44 per square foot in impact fees, plus $19,582.50 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 25,000 sq ft building, that comes to at least $230,527.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $4,912/LUE ($12,280.00 one-time), Wastewater Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $2,921/LUE ($7,302.50 one-time) and Roadway Impact Fee (City of Round Rock, Office) — Service Area A, 4.90 veh-mi × $1,722/veh-mi ($8.44/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Round Rock) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Round Rock Impact Fee Schedule
- Water Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $4,912/LUE$12,280.00 one-timeCity of Round RockCity of Round Rock water impact fee of $4,912 per living unit equivalent for property platted on or after January 1, 2024, counted by meter size: a 1 inch meter is 2.5 units. Meters range from 5/8 inch (1 unit) to 10 inch (115 units). Property platted earlier pays the lower rate in effect at its plat date.
- Water Meter Fee (City of Round Rock)Requires confirmationCity of Round RockRound Rock charges a water meter fee by meter size at the building permit ($320 for a 5/8 inch residential meter). The commercial amount for larger meters is not published on the city's permit pages.
- Wastewater Impact Fee (City of Round Rock) — 1" meter, 2.5 LUE × $2,921/LUE$7,302.50 one-timeCity of Round RockCity of Round Rock wastewater impact fee of $2,921 per living unit equivalent for property platted on or after January 1, 2024, counted by meter size: a 1 inch meter is 2.5 units. Meters range from 5/8 inch (1 unit) to 10 inch (115 units). Property platted earlier pays the lower rate in effect at its plat date.
- Roadway Impact Fee (City of Round Rock, Office) — Service Area A, 4.90 veh-mi × $1,722/veh-mi$8.44/sq ftCity of Round RockCity of Round Rock roadway impact fee for a general office building, $1,722 per vehicle-mile in Service Area A (the higher of two rates; Areas B, C and D charge $1,145.40) times 4.90 vehicle-miles per 1,000 sq ft. Applies to property platted on or after January 1, 2025, and is due at the building permit. A 2026 roadway impact fee study update is under review.
- County Impact Fee (Williamson County, Office)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Round Rock.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Round Rock Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Round Rock Impact Fee FAQs
What are the total impact fees for a single-family home in Round Rock, Texas?
A new single-family home in Round Rock pays at least $19,305.00 per unit in combined impact fees (rates sourced November 24, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Round Rock?
Commercial development in Round Rock pays $19.91 per square foot in impact fees, plus $19,582.50 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $1,014,898.50 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Round Rock charge its own impact fees?
Yes. Round Rock levies its own municipal impact or utility fees. Williamson County does not currently add county-level impact fees inside Round Rock. The schedule on this page shows every fee that applies to development in Round Rock.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Williamson County impact fees page.