Coupland Impact Fees by Project Type
Coupland: Single-Family Impact Fees
A new single-family home in Coupland pays at least $14,121.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Manville WSC) — 5/8" meter ($13,871.00) and Parkland Fee in Lieu of Dedication (City of Coupland) ($250.00).
Sewer Connection Fee (Coupland Water Supply Corp) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Coupland Impact Fee Schedule
- Water Connection Fee (Manville WSC) — 5/8" meter$13,871.00Manville Water Supply CorporationManville Water Supply Corporation serves Coupland. The total for a new 5/8 inch meter is the $12,071 capital recovery fee plus $1,625 meter installation, $100 membership and $75 inspection. From January 1, 2027 the total becomes $14,591 ($2,120 meter and installation, $250 membership, $150 inspection; capital recovery unchanged). Line extensions, road crossings and feasibility studies cost extra.
- Sewer Connection Fee (Coupland Water Supply Corp)Requires confirmationCoupland Water Supply CorporationWastewater service in Coupland is provided by the nonprofit Coupland Water Supply Corporation; in 2026 the City began taking over the sewer system, a transfer expected to take about a year.
- Parkland Fee in Lieu of Dedication (City of Coupland)$250.00City of CouplandWhere the City Council requires a fee instead of parkland dedication (when less than five acres would be dedicated), the fee is $250 per new dwelling unit, paid before the final plat is recorded. Coupland has no other impact fees.
- County Impact Fee (Williamson County)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Coupland: Multifamily Impact Fees
A new multifamily unit in Coupland pays at least $8,699.70 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capital Recovery Fee (Manville WSC, MF) — 0.7 × $12,071 per 5/8" CRF ($8,449.70) and Parkland Fee in Lieu of Dedication (City of Coupland, MF) ($250.00).
Sewer Connection Fee (Coupland Water Supply Corp, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Coupland Impact Fee Schedule
- Water Capital Recovery Fee (Manville WSC, MF) — 0.7 × $12,071 per 5/8" CRF$8,449.70Manville Water Supply CorporationApartments larger than a fourplex on a master meter pay 70% of the 5/8 inch capital recovery fee for each dwelling unit, plus one meter setting fee for the master meter sized by Manville's engineer. Smaller multiunit buildings follow Manville's one dwelling per meter policy and pay the full single-meter charge per unit.
- Sewer Connection Fee (Coupland Water Supply Corp, MF)Requires confirmationCoupland Water Supply CorporationWastewater service in Coupland is provided by the nonprofit Coupland Water Supply Corporation; in 2026 the City began taking over the sewer system, a transfer expected to take about a year.
- Parkland Fee in Lieu of Dedication (City of Coupland, MF)$250.00City of CouplandWhere the City Council requires a fee instead of parkland dedication, the fee is $250 per new dwelling unit, paid before the final plat is recorded. Coupland has no other impact fees.
- County Impact Fee (Williamson County, MF)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Coupland: Commercial Impact Fees
Commercial development in Coupland pays no per-square-foot impact fees, but owes $26,272.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $26,272.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Manville WSC) — 1" meter ($26,272.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Coupland Water Supply Corp) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Coupland Impact Fee Schedule
- Water Connection Fee (Manville WSC) — 1" meter$26,272.00 one-timeManville Water Supply CorporationManville Water Supply Corporation serves Coupland. A nonresidential connection on a 1 inch meter pays the $24,142 capital recovery fee plus $1,955 meter installation, $100 membership and $75 inspection. Meters above 1 inch require an engineering feasibility study, and line extensions and road crossings cost extra.
- Sewer Connection Fee (Coupland Water Supply Corp)Requires confirmationCoupland Water Supply CorporationWastewater service in Coupland is provided by the nonprofit Coupland Water Supply Corporation; in 2026 the City began taking over the sewer system, a transfer expected to take about a year.
- City Impact Fee (City of Coupland, Commercial)$0.00City of CouplandThe City of Coupland has not adopted a development impact fee. Water comes from Manville Water Supply Corporation and sewer from the Coupland Water Supply Corporation, which charge their own connection fees.
- County Impact Fee (Williamson County, Commercial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Coupland.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Coupland: Industrial Impact Fees
Industrial development in Coupland pays no per-square-foot impact fees, but owes $26,272.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $26,272.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Manville WSC) — 1" meter ($26,272.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Coupland Water Supply Corp) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Coupland Impact Fee Schedule
- Water Connection Fee (Manville WSC) — 1" meter$26,272.00 one-timeManville Water Supply CorporationManville Water Supply Corporation serves Coupland. A nonresidential connection on a 1 inch meter pays the $24,142 capital recovery fee plus $1,955 meter installation, $100 membership and $75 inspection. Meters above 1 inch require an engineering feasibility study, and line extensions and road crossings cost extra.
- Sewer Connection Fee (Coupland Water Supply Corp)Requires confirmationCoupland Water Supply CorporationWastewater service in Coupland is provided by the nonprofit Coupland Water Supply Corporation; in 2026 the City began taking over the sewer system, a transfer expected to take about a year.
- City Impact Fee (City of Coupland, Industrial)$0.00City of CouplandThe City of Coupland has not adopted a development impact fee. Water comes from Manville Water Supply Corporation and sewer from the Coupland Water Supply Corporation, which charge their own connection fees.
- County Impact Fee (Williamson County, Industrial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Coupland.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Coupland: Office Impact Fees
Office development in Coupland pays no per-square-foot impact fees, but owes $26,272.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 25,000 sq ft building, that comes to at least $26,272.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (Manville WSC) — 1" meter ($26,272.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Coupland Water Supply Corp) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Coupland Impact Fee Schedule
- Water Connection Fee (Manville WSC) — 1" meter$26,272.00 one-timeManville Water Supply CorporationManville Water Supply Corporation serves Coupland. A nonresidential connection on a 1 inch meter pays the $24,142 capital recovery fee plus $1,955 meter installation, $100 membership and $75 inspection. Meters above 1 inch require an engineering feasibility study, and line extensions and road crossings cost extra.
- Sewer Connection Fee (Coupland Water Supply Corp)Requires confirmationCoupland Water Supply CorporationWastewater service in Coupland is provided by the nonprofit Coupland Water Supply Corporation; in 2026 the City began taking over the sewer system, a transfer expected to take about a year.
- City Impact Fee (City of Coupland, Office)$0.00City of CouplandThe City of Coupland has not adopted a development impact fee. Water comes from Manville Water Supply Corporation and sewer from the Coupland Water Supply Corporation, which charge their own connection fees.
- County Impact Fee (Williamson County, Office)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Coupland.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Coupland Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Coupland Impact Fee FAQs
What are the total impact fees for a single-family home in Coupland, Texas?
A new single-family home in Coupland pays at least $14,121.00 per unit in combined impact fees (rates sourced November 13, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Coupland?
Commercial development in Coupland pays no per-square-foot impact fees, but owes $26,272.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Coupland charge its own impact fees?
Yes. Coupland levies its own municipal impact or utility fees. Williamson County does not currently add county-level impact fees inside Coupland. The schedule on this page shows every fee that applies to development in Coupland.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Williamson County impact fees page.