Granger Impact Fees by Project Type
Granger: Single-Family Impact Fees
A new single-family home in Granger pays $5,050.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (City of Granger) — 5/8" or 3/4" meter ($2,500.00) and Sewer Tap Fee (City of Granger) ($2,500.00).
Parkland Fee (City of Granger) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Granger Impact Fee Schedule
- Water Tap Fee (City of Granger) — 5/8" or 3/4" meter$2,500.00City of GrangerCity of Granger water tap inside city limits. Taps outside city limits cost twice the inside rate plus any added expenses.
- $2,500.00
- Parkland Fee (City of Granger)$50.00Requires confirmationCity of GrangerParkland fee paid by the subdivider at final plat: $50 per residential lot or an amount equal to 8% of the appraised value of the land before subdivision. Minor plats are excluded.
- County Impact Fee (Williamson County)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Granger: Multifamily Impact Fees
A new multifamily unit in Granger pays $5,050.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of Granger, MF) ($2,500.00) and Water Tap Fee (City of Granger, MF) — 5/8" or 3/4" meter ($2,500.00).
Parkland Fee (City of Granger, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Granger Impact Fee Schedule
- Water Tap Fee (City of Granger, MF) — 5/8" or 3/4" meter$2,500.00City of GrangerCity of Granger water tap, charged per tap, so a building on one connection pays it once. Larger taps cost more; taps outside city limits cost twice the inside rate.
- Sewer Tap Fee (City of Granger, MF)$2,500.00City of GrangerCity of Granger sewer tap, charged per tap, so a building on one tap pays it once.
- Parkland Fee (City of Granger, MF)$50.00Requires confirmationCity of GrangerParkland fee paid by the subdivider at final plat: $50 per residential lot, so a multifamily building on one lot pays it once, or an amount equal to 8% of the appraised value of the land before subdivision.
- County Impact Fee (Williamson County, MF)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Granger: Commercial Impact Fees
Commercial development in Granger pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to about $5,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Granger) — 1" meter ($3,000.00 one-time) and Sewer Tap Fee (City of Granger) ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Granger Impact Fee Schedule
- Water Tap Fee (City of Granger) — 1" meter$3,000.00 one-timeCity of GrangerGranger's water tap charge for a 1 inch meter inside city limits, plus extra costs for pipe or copper tubing. Taps outside city limits cost twice the inside rate plus any added expenses.
- Sewer Tap Fee (City of Granger)$2,500.00 one-timeCity of GrangerGranger's sewer tap charge inside city limits. Taps outside city limits cost twice the inside rate plus any added expenses.
- City Impact Fee (City of Granger, Commercial)$0.00City of GrangerThe City of Granger has not adopted a development impact fee. Nonresidential development pays the city's water and sewer tap charges.
- County Impact Fee (Williamson County, Commercial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Granger.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Granger: Industrial Impact Fees
Industrial development in Granger pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to about $5,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Granger) — 1" meter ($3,000.00 one-time) and Sewer Tap Fee (City of Granger) ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Granger Impact Fee Schedule
- Water Tap Fee (City of Granger) — 1" meter$3,000.00 one-timeCity of GrangerGranger's water tap charge for a 1 inch meter inside city limits, plus extra costs for pipe or copper tubing. Taps outside city limits cost twice the inside rate plus any added expenses.
- Sewer Tap Fee (City of Granger)$2,500.00 one-timeCity of GrangerGranger's sewer tap charge inside city limits. Taps outside city limits cost twice the inside rate plus any added expenses.
- City Impact Fee (City of Granger, Industrial)$0.00City of GrangerThe City of Granger has not adopted a development impact fee. Nonresidential development pays the city's water and sewer tap charges.
- County Impact Fee (Williamson County, Industrial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Granger.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Granger: Office Impact Fees
Office development in Granger pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 25,000 sq ft building, that comes to about $5,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Granger) — 1" meter ($3,000.00 one-time) and Sewer Tap Fee (City of Granger) ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Granger Impact Fee Schedule
- Water Tap Fee (City of Granger) — 1" meter$3,000.00 one-timeCity of GrangerGranger's water tap charge for a 1 inch meter inside city limits, plus extra costs for pipe or copper tubing. Taps outside city limits cost twice the inside rate plus any added expenses.
- Sewer Tap Fee (City of Granger)$2,500.00 one-timeCity of GrangerGranger's sewer tap charge inside city limits. Taps outside city limits cost twice the inside rate plus any added expenses.
- City Impact Fee (City of Granger, Office)$0.00City of GrangerThe City of Granger has not adopted a development impact fee. Nonresidential development pays the city's water and sewer tap charges.
- County Impact Fee (Williamson County, Office)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Granger.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Granger Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Granger Impact Fee FAQs
What are the total impact fees for a single-family home in Granger, Texas?
A new single-family home in Granger pays $5,050.00 per unit in combined impact fees (rates sourced November 13, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Granger?
Commercial development in Granger pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Granger charge its own impact fees?
Yes. Granger levies its own municipal impact or utility fees. Williamson County does not currently add county-level impact fees inside Granger. The schedule on this page shows every fee that applies to development in Granger.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Williamson County impact fees page.