Hutto Impact Fees by Project Type
Hutto: Single-Family Impact Fees
A new single-family home in Hutto pays $23,852.38 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Fee — City of Hutto, 1.0 SU × $7,600 + $850 connection ($8,450.00), Water Connection Fee — City of Hutto, 1.0 SU × $6,808 + $700 connection ($7,508.00) and Roadway Impact Fee (City of Hutto) — 4.31 veh-mi × $1,298/veh-mi ($5,594.38).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Hutto Impact Fee Schedule
- Water Connection Fee — City of Hutto, 1.0 SU × $6,808 + $700 connection$7,508.00City of HuttoCity of Hutto water service. Amount is the water impact fee of $6,808 per service unit for plats approved after February 3, 2025, plus the $700 connection fee for a 5/8 or 3/4 inch meter (FY 2027 fee schedule). Older plats pay the impact fee in force when they were approved. Larger meters count as more service units and pay higher connection fees ($900 for 1 inch, $1,400 for 1.5 inch, $1,600 for 2 inch).
- Sewer Connection Fee — City of Hutto, 1.0 SU × $7,600 + $850 connection$8,450.00City-installed connectionCity of HuttoCity of Hutto wastewater service. Amount is the residential wastewater impact fee of $7,600 per service unit for plats approved after February 3, 2025 plus the $850 connection fee (FY 2027 fee schedule). The connection fee is $300 where the developer installs the connection. Nonresidential development pays $12,670 per service unit.
- Roadway Impact Fee (City of Hutto) — 4.31 veh-mi × $1,298/veh-mi$5,594.38City of HuttoRoadway impact fee at $1,298 per vehicle-mile for plans approved after February 3, 2025 (FY 2027 fee schedule), with a single-family home generating 4.31 vehicle-miles. Plans approved earlier pay $784.31 per vehicle-mile. One rate applies citywide.
- Parkland Fee in Lieu (City of Hutto)$2,300.00City of HuttoParkland fee in lieu of dedication of $2,300 per dwelling unit (FY 2027 fee schedule).
- County Impact Fee (Williamson County)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hutto: Multifamily Impact Fees
A new multifamily unit in Hutto pays at least $4,623.42 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Hutto, MF) — 1.79 veh-mi × $1,298/veh-mi ($2,323.42) and Parkland Fee in Lieu (City of Hutto, MF) ($2,300.00).
Sewer Connection Fee (City of Hutto, MF) and Water Connection Fee (MF) — City of Hutto are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Hutto Impact Fee Schedule
- Water Connection Fee (MF) — City of HuttoRequires confirmationCity of HuttoCity of Hutto water service. The water impact fee is $6,808 per service unit for plats approved after February 3, 2025, plus a connection fee by meter size ($700 for a 5/8 or 3/4 inch meter); the number of service units for a multifamily building follows the city's land use equivalency table.
- Sewer Connection Fee (City of Hutto, MF)Requires confirmationCity of HuttoCity of Hutto wastewater service. The residential wastewater impact fee is $7,600 per service unit for plats approved after February 3, 2025 ($12,670 for nonresidential), plus an $850 connection fee ($300 if developer installed); a multifamily building's service units follow the city's land use equivalency table.
- Roadway Impact Fee (City of Hutto, MF) — 1.79 veh-mi × $1,298/veh-mi$2,323.42City of HuttoRoadway impact fee at $1,298 per vehicle-mile for plans approved after February 3, 2025, with a mid-rise apartment unit generating 1.79 vehicle-miles (low-rise units 2.34). One rate applies citywide.
- Parkland Fee in Lieu (City of Hutto, MF)$2,300.00City of HuttoParkland fee in lieu of dedication of $2,300 per dwelling unit (FY 2027 fee schedule).
- County Impact Fee (Williamson County, MF)$0.00Williamson CountyTexas counties cannot charge impact fees except certain counties of 3.3 million or more (and their neighbors) for drainage under Local Government Code Sec. 395.079. Williamson County does not qualify.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hutto: Commercial Impact Fees
Commercial development in Hutto pays $6.16 per square foot in impact fees, plus $50,445.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $358,445.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee — City of Hutto, 1" meter, 2.5 SU × $12,670 + $850 connection ($32,525.00 one-time), Water Connection Fee — City of Hutto, 1" meter, 2.5 SU × $6,808 + $900 connection ($17,920.00 one-time) and Roadway Impact Fee (City of Hutto, Commercial) — 6.16 veh-mi × $1,000/veh-mi ($6.16/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Parkland Fee (City of Hutto, Commercial) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Hutto Impact Fee Schedule
- Water Connection Fee — City of Hutto, 1" meter, 2.5 SU × $6,808 + $900 connection$17,920.00 one-timeCity of HuttoCity of Hutto water service. Amount is the water impact fee of $6,808 per service unit for plats approved after September 30, 2024, times 2.5 service units for a 1 inch meter, plus the $900 connection fee for a 1 inch meter (FY 2027 fee schedule). Larger meters count as more service units (1.5 inch 5, 2 inch 8, 3 inch 17.5) and pay higher connection fees; meters over 2 inches also pay the actual meter cost plus $300. Assessed at plat and collected with the building permit.
- Sewer Connection Fee — City of Hutto, 1" meter, 2.5 SU × $12,670 + $850 connection$32,525.00 one-timeCity of HuttoCity of Hutto wastewater service. Amount is the non-residential wastewater impact fee of $12,670 per service unit for plats approved after September 30, 2024, times 2.5 service units for a 1 inch meter, plus the $850 city-installed connection fee (FY 2027 fee schedule). A developer-installed connection pays $300 instead of $850. Larger meters count as more service units (2 inch 8, 3 inch 17.5). Assessed at plat and collected with the building permit.
- Roadway Impact Fee (City of Hutto, Commercial) — 6.16 veh-mi × $1,000/veh-mi$6.16/sq ftCity of HuttoCity of Hutto roadway impact fee at $1,000 per vehicle-mile for plans approved after February 3, 2025, times 6.16 vehicle-miles per 1,000 sq ft for a general retail or shopping center use. One collection rate applies in all service areas (the maximum assessable rate ranges from $1,298 to $3,801 per service unit by area). Plans approved earlier pay $400 per vehicle-mile. Assessed at plat and collected with the building permit.
- Parkland Fee (City of Hutto, Commercial) — per acreContact jurisdiction/utility to verifyCity of HuttoHutto charges a nonresidential parkland fee in lieu of $975 for the first 3 acres plus $975 per additional acre, paid when the property is platted (FY 2027 fee schedule). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Williamson County, Commercial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Hutto.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hutto: Industrial Impact Fees
Industrial development in Hutto pays $3.66 per square foot in impact fees, plus $50,445.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $233,445.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee — City of Hutto, 1" meter, 2.5 SU × $12,670 + $850 connection ($32,525.00 one-time), Water Connection Fee — City of Hutto, 1" meter, 2.5 SU × $6,808 + $900 connection ($17,920.00 one-time) and Roadway Impact Fee (City of Hutto, Industrial) — 3.66 veh-mi × $1,000/veh-mi ($3.66/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Parkland Fee (City of Hutto, Industrial) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Hutto Impact Fee Schedule
- Water Connection Fee — City of Hutto, 1" meter, 2.5 SU × $6,808 + $900 connection$17,920.00 one-timeCity of HuttoCity of Hutto water service. Amount is the water impact fee of $6,808 per service unit for plats approved after September 30, 2024, times 2.5 service units for a 1 inch meter, plus the $900 connection fee for a 1 inch meter (FY 2027 fee schedule). Larger meters count as more service units (1.5 inch 5, 2 inch 8, 3 inch 17.5) and pay higher connection fees; meters over 2 inches also pay the actual meter cost plus $300. Assessed at plat and collected with the building permit.
- Sewer Connection Fee — City of Hutto, 1" meter, 2.5 SU × $12,670 + $850 connection$32,525.00 one-timeCity of HuttoCity of Hutto wastewater service. Amount is the non-residential wastewater impact fee of $12,670 per service unit for plats approved after September 30, 2024, times 2.5 service units for a 1 inch meter, plus the $850 city-installed connection fee (FY 2027 fee schedule). A developer-installed connection pays $300 instead of $850. Larger meters count as more service units (2 inch 8, 3 inch 17.5). Assessed at plat and collected with the building permit.
- Roadway Impact Fee (City of Hutto, Industrial) — 3.66 veh-mi × $1,000/veh-mi$3.66/sq ftCity of HuttoCity of Hutto roadway impact fee at $1,000 per vehicle-mile for plans approved after February 3, 2025, times 3.66 vehicle-miles per 1,000 sq ft for a general light industrial use. One collection rate applies in all service areas. Plans approved earlier pay $400 per vehicle-mile. Assessed at plat and collected with the building permit.
- Parkland Fee (City of Hutto, Industrial) — per acreContact jurisdiction/utility to verifyCity of HuttoHutto charges a nonresidential parkland fee in lieu of $975 for the first 3 acres plus $975 per additional acre, paid when the property is platted (FY 2027 fee schedule). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Williamson County, Industrial)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Hutto.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hutto: Office Impact Fees
Office development in Hutto pays $8.64 per square foot in impact fees, plus $50,445.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $266,445.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee — City of Hutto, 1" meter, 2.5 SU × $12,670 + $850 connection ($32,525.00 one-time), Water Connection Fee — City of Hutto, 1" meter, 2.5 SU × $6,808 + $900 connection ($17,920.00 one-time) and Roadway Impact Fee (City of Hutto, Office) — 8.64 veh-mi × $1,000/veh-mi ($8.64/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Parkland Fee (City of Hutto, Office) — per acre is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Hutto Impact Fee Schedule
- Water Connection Fee — City of Hutto, 1" meter, 2.5 SU × $6,808 + $900 connection$17,920.00 one-timeCity of HuttoCity of Hutto water service. Amount is the water impact fee of $6,808 per service unit for plats approved after September 30, 2024, times 2.5 service units for a 1 inch meter, plus the $900 connection fee for a 1 inch meter (FY 2027 fee schedule). Larger meters count as more service units (1.5 inch 5, 2 inch 8, 3 inch 17.5) and pay higher connection fees; meters over 2 inches also pay the actual meter cost plus $300. Assessed at plat and collected with the building permit.
- Sewer Connection Fee — City of Hutto, 1" meter, 2.5 SU × $12,670 + $850 connection$32,525.00 one-timeCity of HuttoCity of Hutto wastewater service. Amount is the non-residential wastewater impact fee of $12,670 per service unit for plats approved after September 30, 2024, times 2.5 service units for a 1 inch meter, plus the $850 city-installed connection fee (FY 2027 fee schedule). A developer-installed connection pays $300 instead of $850. Larger meters count as more service units (2 inch 8, 3 inch 17.5). Assessed at plat and collected with the building permit.
- Roadway Impact Fee (City of Hutto, Office) — 8.64 veh-mi × $1,000/veh-mi$8.64/sq ftCity of HuttoCity of Hutto roadway impact fee at $1,000 per vehicle-mile for plans approved after February 3, 2025, times 8.64 vehicle-miles per 1,000 sq ft for a general office use. One collection rate applies in all service areas. Plans approved earlier pay $400 per vehicle-mile. Assessed at plat and collected with the building permit.
- Parkland Fee (City of Hutto, Office) — per acreContact jurisdiction/utility to verifyCity of HuttoHutto charges a nonresidential parkland fee in lieu of $975 for the first 3 acres plus $975 per additional acre, paid when the property is platted (FY 2027 fee schedule). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Williamson County, Office)$0.00Williamson CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so no county impact fee applies to development in the City of Hutto.
Where in Williamson County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hutto Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Hutto Impact Fee FAQs
What are the total impact fees for a single-family home in Hutto, Texas?
A new single-family home in Hutto pays $23,852.38 per unit in combined impact fees (rates sourced November 25, 2026).
How much are commercial impact fees in Hutto?
Commercial development in Hutto pays $6.16 per square foot in impact fees, plus $50,445.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $358,445.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Hutto charge its own impact fees?
Yes. Hutto levies its own municipal impact or utility fees. Williamson County does not currently add county-level impact fees inside Hutto. The schedule on this page shows every fee that applies to development in Hutto.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Williamson County impact fees page.