Brevard County impact fees by project type
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Brevard County: Single-Family Impact Fees
A new single-family home in unincorporated Brevard County pays at least $11,588.06 per unit in impact fees (rates sourced July 12, 2026). Of that, Brevard County-levied fees account for $9,838.06 and municipal or utility fees for $1,750.00.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Water Impact Fee (Cocoa Utilities, SFR) ($1,750.00).
Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities, SFR)$1,750.00City of Cocoa (Cocoa Utilities)Cocoa Utilities provides potable water to much of unincorporated central Brevard County. SFR rate: $1,750/ERC (1.0 ERC), effective Oct 2025, Schedule B. If reclaimed water available, rate drops to $1,300. Other areas of unincorp. Brevard may be served by different providers.
- Sewer Connection Fee (Brevard County Utilities)Requires confirmationBrevard County Utilities⚠️ VERIFY. Brevard County Utilities provides sewer service countywide (unincorporated). Connection fee set by rate resolution — amount not published online. Call (321) 633-2091 or email Utility.Development@BrevardFL.gov.
- City Impact Fees (Brevard County - Unincorporated)$0.00No municipal (city) impact fees apply in unincorporated Brevard County; only Brevard County overlay impact fees apply. $0 City placeholder documents this. Verified against Brevard County Residential Impact Fee Schedule (eff. 1/2/2017, still adopted as of July 2026).
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public Schools
- Transportation Impact Fee (SFR)$4,353.00Brevard CountyCodified §62-818 (Ord. 06-044), residential schedule eff. Jan 2, 2017; verified current on elaws + county Impact Fees page July 2026. SFD $4,353; MF 1-2 story $2,677 / 3+ story $2,381; mobile home $1,642 (not modeled).
- Solid Waste Impact Fee (SFR)$160.00Brevard County
- Correctional Facility Impact Fee (SFR)$71.99Brevard County
- Library Impact Fee (SFR)$63.84Brevard County
- Fire/Rescue Impact Fee (SFR)$54.08Brevard CountyBrevard County Residential Impact Fee Schedule, eff. Jan 2, 2017; verified current July 2026. Municipalities with their own fire departments do not pay the county fire fee (documented per-city).
- EMS Impact Fee (SFR)$38.65Brevard County
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Brevard County: Multifamily Impact Fees
A new multifamily unit in unincorporated Brevard County pays at least $6,323.80 per unit in impact fees (rates sourced July 12, 2026). Of that, Brevard County-levied fees account for $4,573.80 and municipal or utility fees for $1,750.00.
The largest line items are County Transportation Impact Fee (MF) ($2,381.00), County Education Impact Fee (MF) ($1,940.50) and Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC ($1,750.00).
Sewer Connection Fee (Brevard County Utilities, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC$1,750.00City of CocoaCONFIRMED 2026-07-14. Cocoa Utilities serves much of unincorporated Brevard (mainland/central). Cocoa Schedule B (updated October 2025): 'Apartment or Condo: 2 or more bath' = 1.00 ERC = $1,750. Canonical MF unit (2BR/2BA) is in this tier; MF = SFR by design (both 1.00 ERC). Fee Name normalized 2026-07-14 (was 'City Water Impact Fee (via Cocoa Utilities)').
- Sewer Connection Fee (Brevard County Utilities, MF)Requires confirmationBrevard County Utilities⚠️ VERIFY. Brevard County Utilities provides sewer service countywide. Connection fee set by rate resolution — amount not published online. Call (321) 633-2091 or email Utility.Development@BrevardFL.gov.
- City Impact Fees (Brevard County - Unincorporated, MF)$0.00No municipal (city) impact fees apply in unincorporated Brevard County; only Brevard County overlay impact fees apply. $0 City placeholder documents this. Verified against Brevard County Residential Impact Fee Schedule (eff. 1/2/2017, still adopted as of July 2026).
- County Transportation Impact Fee (MF)$2,381.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A (Unincorporated, West Melbourne, Palm Shores, Grant-Valkaria). Apartment 3+ stories per unit.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential (multifamily) per unit. Applies countywide. Brevard County Code Sec. 62-927.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A (Unincorporated, West Melbourne, Palm Shores, Grant-Valkaria). Apartment 3+ stories per unit.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A (Unincorporated, West Melbourne, Palm Shores, Grant-Valkaria). Apartment 3+ stories per unit.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A (Unincorporated, West Melbourne, Palm Shores, Grant-Valkaria). Apartment 3+ stories per unit.
- County Fire/Rescue Impact Fee (MF)$30.99Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A (Unincorporated, West Melbourne, Palm Shores, Grant-Valkaria). Apartment 3+ stories per unit.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A (Unincorporated, West Melbourne, Palm Shores, Grant-Valkaria). Apartment 3+ stories per unit.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Brevard County: Commercial Impact Fees
Commercial development in unincorporated Brevard County pays $6.76 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to at least $342,530.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities serves much of central unincorporated Brevard (incl. Merritt Island); other parts of unincorporated Brevard may be served by different providers — verify the actual provider per parcel at https://gis.brevardfl.gov/utility_services/service_area/. Separate charges may apply: South Mainland Water Connection Fee (Zone 129A $887.98/ERC, Zone 129B $1,125/ERC); plan review & construction inspection $750.
- Sewer Connection Fee (Brevard County Utilities)Requires confirmationBrevard County Utility Services⚠️ VERIFY — NOT PUBLISHED. Brevard County Utility Services is the sanitary sewer provider for the unincorporated area. Code Ch. 110 Art. II sets rates 'by resolution' with no schedule in the code; the Utility Development Fees page publishes only plan-review / site-plan / inspection fees; the County Rates page publishes only MONTHLY sewer rates (commercial base $32.79 + $6.93/1,000 gal, no maximum); web search finds no adopted nonres capacity schedule. The one-time nonres sewer connection/capacity charge appears to be set administratively per project. AUDIT 2026-07-14: re-verified again — the Utility Development Fees page still shows ONLY Res. 2024-1158 (adopted 10-22-2024, eff. 1-1-2025) plan-review/inspection/site-plan fees, with no capacity or connection charge of any kind; no successor resolution has been posted. Flag stands; resolvable only by contacting the utility. CONFIRM: Brevard County Utility Services Development, Utility.Development@BrevardFL.gov, (321) 633-2091; Director Edward Fontanin.
- City Impact Fees (Brevard County - Unincorporated, Commercial) — none$0.00Brevard CountyConfirmed $0. No municipal (city) impact fees exist in unincorporated Brevard County — only the Brevard County overlay impact fees apply (entered separately as Fee Type = County). Water and sewer connection fees are tracked separately and are not City fees.
- Transportation Impact Fee (Brevard County, Commercial)$6.40/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- Fire Rescue Impact Fee (Brevard County, Commercial)$0.12/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Fire Rescue collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, Melbourne Village. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard County⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042. Impact Fees Office: Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Brevard County: Industrial Impact Fees
Industrial development in unincorporated Brevard County pays no per-square-foot impact fees, but owes $4,375.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to at least $4,375.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities serves much of central unincorporated Brevard (incl. Merritt Island); other parts of unincorporated Brevard may be served by different providers — verify the actual provider per parcel at https://gis.brevardfl.gov/utility_services/service_area/. Separate charges may apply: South Mainland Water Connection Fee (Zone 129A $887.98/ERC, Zone 129B $1,125/ERC); plan review & construction inspection $750.
- Sewer Connection Fee (Brevard County Utilities)Requires confirmationBrevard County Utility Services⚠️ VERIFY — NOT PUBLISHED. Brevard County Utility Services is the sanitary sewer provider for the unincorporated area. Code Ch. 110 Art. II sets rates 'by resolution' with no schedule in the code; the Utility Development Fees page publishes only plan-review / site-plan / inspection fees; the County Rates page publishes only MONTHLY sewer rates (commercial base $32.79 + $6.93/1,000 gal, no maximum); web search finds no adopted nonres capacity schedule. The one-time nonres sewer connection/capacity charge appears to be set administratively per project. AUDIT 2026-07-14: re-verified again — the Utility Development Fees page still shows ONLY Res. 2024-1158 (adopted 10-22-2024, eff. 1-1-2025) plan-review/inspection/site-plan fees, with no capacity or connection charge of any kind; no successor resolution has been posted. Flag stands; resolvable only by contacting the utility. CONFIRM: Brevard County Utility Services Development, Utility.Development@BrevardFL.gov, (321) 633-2091; Director Edward Fontanin.
- City Impact Fees (Brevard County - Unincorporated, Industrial) — none$0.00Brevard CountyConfirmed $0. No municipal (city) impact fees exist in unincorporated Brevard County — only the Brevard County overlay impact fees apply (entered separately as Fee Type = County). Water and sewer connection fees are tracked separately and are not City fees.
- County Impact Fees (Brevard County, Industrial) — exempt$0.00Brevard CountyConfirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. This covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) rates in the code, for reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution; applies in both incorporated and unincorporated areas. NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption in §§ 62-815(a)(6) / 62-735(a)(6) / 62-855(a)(6) covers Transportation, Fire Rescue, EMS and Correctional only. All three 2007 Brevard County Commercial Impact Fee Schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder, not a confirmed rate. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row (Process Guide Bldg Type rule: one row per category per fee).
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Brevard County: Office Impact Fees
Office development in unincorporated Brevard County pays $5.14 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to at least $132,779.75. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities serves much of central unincorporated Brevard (incl. Merritt Island); other parts of unincorporated Brevard may be served by different providers — verify the actual provider per parcel at https://gis.brevardfl.gov/utility_services/service_area/. Separate charges may apply: South Mainland Water Connection Fee (Zone 129A $887.98/ERC, Zone 129B $1,125/ERC); plan review & construction inspection $750.
- Sewer Connection Fee (Brevard County Utilities)Requires confirmationBrevard County Utility Services⚠️ VERIFY — NOT PUBLISHED. Brevard County Utility Services is the sanitary sewer provider for the unincorporated area. Code Ch. 110 Art. II sets rates 'by resolution' with no schedule in the code; the Utility Development Fees page publishes only plan-review / site-plan / inspection fees; the County Rates page publishes only MONTHLY sewer rates (commercial base $32.79 + $6.93/1,000 gal, no maximum); web search finds no adopted nonres capacity schedule. The one-time nonres sewer connection/capacity charge appears to be set administratively per project. AUDIT 2026-07-14: re-verified again — the Utility Development Fees page still shows ONLY Res. 2024-1158 (adopted 10-22-2024, eff. 1-1-2025) plan-review/inspection/site-plan fees, with no capacity or connection charge of any kind; no successor resolution has been posted. Flag stands; resolvable only by contacting the utility. CONFIRM: Brevard County Utility Services Development, Utility.Development@BrevardFL.gov, (321) 633-2091; Director Edward Fontanin.
- City Impact Fees (Brevard County - Unincorporated, Office) — none$0.00Brevard CountyConfirmed $0. No municipal (city) impact fees exist in unincorporated Brevard County — only the Brevard County overlay impact fees apply (entered separately as Fee Type = County). Water and sewer connection fees are tracked separately and are not City fees.
- Transportation Impact Fee (Brevard County, Office)$5.06/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- Fire Rescue Impact Fee (Brevard County, Office)$0.03/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Fire Rescue collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, Melbourne Village. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution; applies in both incorporated and unincorporated areas. All three 2007 Brevard County Commercial Impact Fee Schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder, not a confirmed rate. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row (Process Guide Bldg Type rule: one row per category per fee).
Estimate your project in Brevard County
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are single-family impact fees in Brevard County, Florida?
A new single-family home in unincorporated Brevard County pays at least $11,588.06 per unit in impact fees (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Brevard County?
Multifamily development in unincorporated Brevard County pays at least $6,323.80 per unit in impact fees (rates sourced July 12, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Brevard County?
Commercial development in unincorporated Brevard County pays $6.76 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $342,530.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Do cities in Brevard County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 15 of 16 cities in Brevard County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.