Cocoa impact fees by project type
Cocoa: Single-Family Impact Fees
A new single-family home in Cocoa pays at least $13,408.98 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $3,625.00.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Sewer Impact Fee (Cocoa Utilities, SFR) ($1,875.00).
City Impact Fees (Cocoa) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities, SFR)$1,750.00City of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B, eff. Oct 2025. SFR: $1,750/ERC (1.0 ERC).
- Sewer Impact Fee (Cocoa Utilities, SFR)$1,875.00City of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B, eff. Oct 2025. Sewer Impact Fee $1,875/ERC. Note: Sewer Force Main Fee $1,450/ERC if applicable.
- City Impact Fees (Cocoa)Requires confirmationCity of Cocoa⚠️ VERIFY. Cocoa may have city-level impact fees beyond water/sewer. Check cocoafl.gov or call (321) 433-8700.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public Schools
- Transportation Impact Fee (SFR)$4,353.00Brevard County⚠️ VERIFY. Eff. Jan 2, 2017. Table 2 (Cocoa + 8 cities).
- Solid Waste Impact Fee (SFR)$160.00Brevard County
- Correctional Facility Impact Fee (SFR)$71.99Brevard County
- Library Impact Fee (SFR)$63.84Brevard County
- EMS Impact Fee (SFR)$38.65Brevard County
- Fire/Rescue Impact Fee — N/A (Cocoa has own fire dept)$0.00Brevard CountyTable 2: Fire/Rescue = NOT APPLICABLE for all Table 2 cities (own municipal fire services).
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Multifamily Impact Fees
A new multifamily unit in Cocoa pays $8,167.81 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $3,625.00.
The largest line items are County Transportation Impact Fee (MF) ($2,381.00), County Education Impact Fee (MF) ($1,940.50) and Sewer Impact Fee (Cocoa Utilities, MF) — 1.00 ERC ($1,875.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC$1,750.00City of Cocoa (Cocoa Utilities)CONFIRMED 2026-07-14. Cocoa Schedule B — Utility Impact & Connection Fees (updated October 2025), unit-description table: 'Apartment or Condo: 2 or more bath' = 1.00 ERC = $1,750. The canonical MF unit (2BR/2BA) falls in this tier, so MF = SFR here BY DESIGN (both 1.00 ERC) — this is not a copied SFR figure. The 'Apartment or condo: 1 bath' tier is 0.80 ERC = $1,400 (separate non-default record).
- Sewer Impact Fee (Cocoa Utilities, MF) — 1.00 ERC$1,875.00City of Cocoa (Cocoa Utilities)CONFIRMED 2026-07-14. Cocoa Schedule B — Utility Impact & Connection Fees (updated October 2025): Sewer Service Impact Fee = $1,875 per ERC. A 2+ bath apartment/condo unit is 1.00 ERC under the same Schedule B unit-description table, so the MF per-unit sewer fee equals the SFR fee by design. A separate Sewer Force Main Fee of $1,450 per ERC applies where a force-main connection is required — not included here.
- City Impact Fees (Cocoa, MF)$0.00City of Cocoa$0 — the City of Cocoa levies no municipal (non-utility) development impact fees; residential development in Cocoa pays the Brevard County overlay schedule (Table 2) plus Cocoa Utilities water/sewer impact fees. URL cleared 2026-07-14: the record previously cited the bare cocoafl.gov homepage, which is not a fee citation (audit check H). Cocoa's utility impact fees are on Schedule B (Utilities Handbook, updated Oct 2025); no separate city impact-fee chapter exists.
- County Transportation Impact Fee (MF)$2,381.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Cocoa, Cocoa Beach, Indialantic, Indian Harbour Beach, Malabar, Melbourne Beach, Rockledge, Satellite Beach, Titusville) — Table 1. Apartment 3+ stories. Fire/EMS/Correctional/Library/Solid Waste apply at different Group B rates — confirm from full PDF or impact.fees@brevardfl.gov.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories. Fire/Rescue = Not Applicable for this group.
- County Fire/Rescue Impact Fee — N/A (Cocoa own fire dept, MF)$0.00Confirmed $0. Brevard County Residential Impact Fee Schedule (eff. 1-2-2017), Table 2: Fire/Rescue = 'Not Applicable' in Cocoa, Cocoa Beach, Indialantic, Indian Harbour Beach, Malabar, Melbourne Beach, Rockledge, Satellite Beach and Titusville. Added 2026-07-14 for SFR/MF parallelism.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Commercial Impact Fees
Commercial development in Cocoa pays $6.64 per square foot in impact fees, plus $9,062.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $341,191.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
- Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC$4,687.50 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)⚠️ VERIFY — DERIVED METER LADDER. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Cocoa Utilities Schedule B (updated October 2025) publishes the sewer impact fee as $1,875 PER ERC but publishes NO sewer meter-size table. The amounts here apply Cocoa's own published WATER ERC factors (2.50 ERC for this meter) to the $1,875/ERC sewer rate — this is our derivation, not a published Cocoa table. Per Schedule B, the actual fee is the HIGHER of the calculated ERCs per the Utilities Handbook or the base fee. Also applicable where required: Sewer Force Main Fee $1,450/ERC (additional). CONFIRM the ERC determination and whether a published commercial sewer meter table exists: Cocoa Utilities Engineering, (321) 433-8700.
- City Impact Fees (City of Cocoa, Commercial) — none$0.00City of CocoaConfirmed $0. The City of Cocoa levies NO development impact fees. Checked: Municode full-code search for "impact fee" (Code of Ordinances Supp. 16, codified through Ord. 13-2024, adopted 1-14-2025) — 18 hits, no impact fee chapter and no fee schedule anywhere in the TOC. The only substantive hits are Secs. 15-61 to 15-66 (proportionate fair-share mitigation, incl. Sec. 15-66 "Impact fee credit for proportionate fair-share mitigation" — a credit mechanism against the COUNTY transportation impact fee, not a city fee) plus Sec. 22-18 (wastewater rates), Sec. 22-26 (water rates) and Sec. 22-2 (sewer capital improvement account), all utility/out-of-scope. Brevard County overlay fees do apply in Cocoa (Table B). Cocoa Utilities water and sewer impact fees are tracked separately and are not City fees.
- Transportation Impact Fee (Brevard County, Commercial)$6.40/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard County⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County's solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Industrial Impact Fees
Industrial development in Cocoa pays no per-square-foot impact fees, but owes $9,062.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $9,062.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
- Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC$4,687.50 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)⚠️ VERIFY — DERIVED METER LADDER. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Cocoa Utilities Schedule B (updated October 2025) publishes the sewer impact fee as $1,875 PER ERC but publishes NO sewer meter-size table. The amounts here apply Cocoa's own published WATER ERC factors (2.50 ERC for this meter) to the $1,875/ERC sewer rate — this is our derivation, not a published Cocoa table. Per Schedule B, the actual fee is the HIGHER of the calculated ERCs per the Utilities Handbook or the base fee. Also applicable where required: Sewer Force Main Fee $1,450/ERC (additional). CONFIRM the ERC determination and whether a published commercial sewer meter table exists: Cocoa Utilities Engineering, (321) 433-8700.
- City Impact Fees (City of Cocoa, Industrial) — none$0.00City of CocoaConfirmed $0. The City of Cocoa levies NO development impact fees. Checked: Municode full-code search for "impact fee" (Code of Ordinances Supp. 16, codified through Ord. 13-2024, adopted 1-14-2025) — 18 hits, no impact fee chapter and no fee schedule anywhere in the TOC. The only substantive hits are Secs. 15-61 to 15-66 (proportionate fair-share mitigation, incl. Sec. 15-66 "Impact fee credit for proportionate fair-share mitigation" — a credit mechanism against the COUNTY transportation impact fee, not a city fee) plus Sec. 22-18 (wastewater rates), Sec. 22-26 (water rates) and Sec. 22-2 (sewer capital improvement account), all utility/out-of-scope. Brevard County overlay fees do apply in Cocoa (Table B). Cocoa Utilities water and sewer impact fees are tracked separately and are not City fees.
- County Impact Fees (Brevard County, Industrial) — exempt$0.00Brevard CountyConfirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. Covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) code rates, reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution. NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption covers Transportation, Fire Rescue, EMS and Correctional only. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068, impact.fees@brevardfl.gov. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Office Impact Fees
Office development in Cocoa pays $5.11 per square foot in impact fees, plus $9,062.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $136,825.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
- Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC$4,687.50 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)⚠️ VERIFY — DERIVED METER LADDER. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Cocoa Utilities Schedule B (updated October 2025) publishes the sewer impact fee as $1,875 PER ERC but publishes NO sewer meter-size table. The amounts here apply Cocoa's own published WATER ERC factors (2.50 ERC for this meter) to the $1,875/ERC sewer rate — this is our derivation, not a published Cocoa table. Per Schedule B, the actual fee is the HIGHER of the calculated ERCs per the Utilities Handbook or the base fee. Also applicable where required: Sewer Force Main Fee $1,450/ERC (additional). CONFIRM the ERC determination and whether a published commercial sewer meter table exists: Cocoa Utilities Engineering, (321) 433-8700.
- City Impact Fees (City of Cocoa, Office) — none$0.00City of CocoaConfirmed $0. The City of Cocoa levies NO development impact fees. Checked: Municode full-code search for "impact fee" (Code of Ordinances Supp. 16, codified through Ord. 13-2024, adopted 1-14-2025) — 18 hits, no impact fee chapter and no fee schedule anywhere in the TOC. The only substantive hits are Secs. 15-61 to 15-66 (proportionate fair-share mitigation, incl. Sec. 15-66 "Impact fee credit for proportionate fair-share mitigation" — a credit mechanism against the COUNTY transportation impact fee, not a city fee) plus Sec. 22-18 (wastewater rates), Sec. 22-26 (water rates) and Sec. 22-2 (sewer capital improvement account), all utility/out-of-scope. Brevard County overlay fees do apply in Cocoa (Table B). Cocoa Utilities water and sewer impact fees are tracked separately and are not City fees.
- Transportation Impact Fee (Brevard County, Office)$5.06/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution; applies in both incorporated and unincorporated areas. All three 2007 Brevard County Commercial Impact Fee Schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder, not a confirmed rate. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Brevard County Solid Waste Management, (321) 633-2042; Impact Fees Office, (321) 633-2068, impact.fees@brevardfl.gov. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Cocoa
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Cocoa, Florida?
A new single-family home in Cocoa pays at least $13,408.98 per unit in combined impact fees (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Cocoa?
Commercial development in Cocoa pays $6.64 per square foot in impact fees, plus $9,062.50 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $341,191.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Cocoa charge its own impact fees?
Yes. Cocoa levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cocoa, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.