Cocoa Impact Fees by Project Type
Cocoa: Single-Family Impact Fees
A new single-family home in Cocoa pays $14,858.98 per unit in impact fees (rates sourced October 9, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $5,075.00.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Sewer Impact Fee (Cocoa Utilities, SFR) ($1,875.00).
View the Full Cocoa Impact Fee Schedule
- Water Impact Fee (Cocoa Utilities, SFR)$1,750.00City of Cocoa (Cocoa Utilities)Water service is supplied by the City of Cocoa (Cocoa Utilities) system: one-time water impact fee $1,750 per ERC (1.0 ERC for a single-family home), per Cocoa's Schedule B as updated October 2026. Where reclaimed water is available the potable rate is $1,300.
- Sewer Impact Fee (Cocoa Utilities, SFR)$1,875.00City of Cocoa (Cocoa Utilities)Sewer service is provided by the City of Cocoa (Cocoa Utilities): one-time sewer impact fee $1,875 per ERC (Cocoa Schedule B, updated October 2026). A separate force main infrastructure charge of $1,450 per ERC is paid by every new wastewater user under Code Section 22-18(g), in addition to this fee.
- Sewer Force Main Fee (Cocoa Utilities)$1,450.00City of Cocoa (Cocoa Utilities)Sewer service is provided by the City of Cocoa (Cocoa Utilities): every new wastewater user pays a one-time force main infrastructure charge of $1,450 per ERC (1.0 ERC for a single-family home) in addition to the sewer impact fee, under City Code Section 22-18(g) and Cocoa's Schedule B as updated October 2026. Due at or before the application for water service.
- City Impact Fees (Cocoa)$0.00City of CocoaThe City of Cocoa does not charge its own general city impact fees (such as police, fire, or parks fees). County impact fees and water/sewer capacity charges are separate items.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public SchoolsBrevard County educational facilities (school) impact fee, single-family detached: $5,096.50/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Transportation Impact Fee (SFR)$4,353.00Brevard CountyBrevard County transportation impact fee, single-family detached: $4,353.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Solid Waste Impact Fee (SFR)$160.00Brevard CountyBrevard County solid waste impact fee, single-family detached: $160.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Correctional Facility Impact Fee (SFR)$71.99Brevard CountyBrevard County correctional facilities impact fee, single-family detached: $71.99/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Library Impact Fee (SFR)$63.84Brevard CountyBrevard County library facilities impact fee, single-family detached: $63.84/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- EMS Impact Fee (SFR)$38.65Brevard CountyBrevard County EMS (emergency medical services) impact fee, single-family detached: $38.65/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Fire/Rescue Impact Fee (Brevard County, within Cocoa)$0.00Brevard CountyThe Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Multifamily Impact Fees
A new multifamily unit in Cocoa pays $9,617.81 per unit in impact fees (rates sourced October 9, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $5,075.00.
The largest line items are County Transportation Impact Fee (MF) ($2,381.00), County Education Impact Fee (MF) ($1,940.50) and Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC ($1,750.00).
Sewer Force Main Fee (Cocoa Utilities, MF) and Sewer Impact Fee (Cocoa Utilities, MF) — 1.00 ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Cocoa Impact Fee Schedule
- Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC$1,750.00City of Cocoa (Cocoa Utilities)Water service is supplied by the City of Cocoa (Cocoa Utilities). An apartment/condo unit with two or more bathrooms is 1.00 ERC = $1,750 per unit (Cocoa Schedule B, updated October 2026); a one-bathroom unit is 0.80 ERC = $1,400.
- Sewer Impact Fee (Cocoa Utilities, MF) — 1.00 ERC$1,875.00Requires confirmationCity of Cocoa (Cocoa Utilities)Sewer service is provided by the City of Cocoa (Cocoa Utilities): one-time sewer impact fee $1,875 per ERC (Cocoa Schedule B, updated October 2026). A separate force main infrastructure charge of $1,450 per ERC is paid by every new wastewater user under Code Section 22-18(g), in addition to this fee.
- Sewer Force Main Fee (Cocoa Utilities, MF)$1,450.00Requires confirmationCity of Cocoa (Cocoa Utilities)Sewer service is provided by the City of Cocoa (Cocoa Utilities): every new wastewater user pays a one-time force main infrastructure charge of $1,450 per ERC in addition to the sewer impact fee, under City Code Section 22-18(g) and Cocoa's Schedule B as updated October 2026. The per-unit basis for an apartment follows the same ERC count as the sewer impact fee. Due at or before the application for water service.
- City Impact Fees (Cocoa, MF)$0.00City of CocoaThe City of Cocoa does not levy its own general municipal impact fees (police, fire, parks, etc.). County impact fees and Cocoa Utilities water/sewer charges are separate.
- County Transportation Impact Fee (MF)$2,381.00Apartment, 3+ storiesBrevard CountyBrevard County transportation impact fee, per apartment/multifamily unit: $2,381.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County educational facilities (school) impact fee, per apartment/multifamily unit: $1,940.50/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County solid waste impact fee, per apartment/multifamily unit: $120.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County correctional facilities impact fee, per apartment/multifamily unit: $41.25/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County library facilities impact fee, per apartment/multifamily unit: $37.91/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County EMS (emergency medical services) impact fee, per apartment/multifamily unit: $22.15/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Fire/Rescue Impact Fee (Brevard County, within Cocoa, MF)$0.00Brevard CountyThe Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Commercial Impact Fees
Commercial development in Cocoa pays $6.64 per square foot in impact fees, plus $10,512.50 in one-time water and sewer connection fees (rates sourced October 9, 2026).
For a 50,000 sq ft building, that comes to at least $342,641.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC and Sewer Force Main Fee (Cocoa Utilities) — 1 ERC × $1,450/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Cocoa Impact Fee Schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Effective per Cocoa Utilities Schedule B (updated October 2026): the commercial water impact fee is 2.50 ERC × $1,750/ERC = $4,375 for a 1" meter. The meter-size amount is a floor; the fee is the greater of this or the ERCs calculated under the Utilities Handbook. The reclaimed-water discount applies to single-family only; nonresidential receives no discount, and there is no inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, and much of unincorporated central Brevard.
- Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC$4,687.50 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)Per Cocoa Utilities Schedule B (updated October 2026), the sanitary sewer impact fee is $1,875 per ERC (2.50 ERC for a 1" meter = $4,687.50). Cocoa publishes no sewer meter-size table, so this amount applies Cocoa's water ERC factors; the fee charged is the greater of that or the ERCs calculated under the Utilities Handbook. Every new wastewater user also pays a separate Sewer Force Main Fee of $1,450 per ERC (City Code Section 22-18(g)).
- Sewer Force Main Fee (Cocoa Utilities) — 1 ERC × $1,450/ERC$1,450.00 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)Every new user of Cocoa Utilities wastewater service pays a sewer force main infrastructure charge of $1,450 per ERC under City Code Section 22-18(g) and Schedule B (updated October 2026), in addition to the sewer impact fee, payable at or before the application for water service. The $1,450 shown is one ERC; Cocoa determines a nonresidential project's ERCs from its estimated flow or meter size under the Utilities Handbook.
- City Impact Fees (City of Cocoa, Commercial)$0.00City of CocoaThe City of Cocoa levies no municipal development impact fees; Brevard County overlay impact fees still apply. Cocoa Utilities water and sewer fees are separate utility charges.
- Transportation Impact Fee (Brevard County, Commercial)$6.40/sq ftRetail 50,000 to 99,999 sq ftBrevard CountyBrevard County transportation impact fee: $6,396 per 1,000 sq ft of gross floor area for retail of 50,000 to 99,999 sq ft (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead, and Melbourne Village, where the county schedule does not collect it. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftRetail 10,001 to 100,000 sq ftBrevard CountyBrevard County correctional facilities impact fee: $160.44 per 1,000 sq ft of gross floor area for retail of 10,001 to 100,000 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftRetail 10,001 to 100,000 sq ftBrevard CountyBrevard County EMS impact fee: $86.13 per 1,000 sq ft of gross floor area for retail of 10,001 to 100,000 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Industrial Impact Fees
Industrial development in Cocoa pays no per-square-foot impact fees, but owes $10,512.50 in one-time water and sewer connection fees (rates sourced October 9, 2026).
For a 50,000 sq ft building, that comes to at least $10,512.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC and Sewer Force Main Fee (Cocoa Utilities) — 1 ERC × $1,450/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Cocoa Impact Fee Schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Effective per Cocoa Utilities Schedule B (updated October 2026): the commercial water impact fee is 2.50 ERC × $1,750/ERC = $4,375 for a 1" meter. The meter-size amount is a floor; the fee is the greater of this or the ERCs calculated under the Utilities Handbook. The reclaimed-water discount applies to single-family only; nonresidential receives no discount, and there is no inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, and much of unincorporated central Brevard.
- Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC$4,687.50 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)Per Cocoa Utilities Schedule B (updated October 2026), the sanitary sewer impact fee is $1,875 per ERC (2.50 ERC for a 1" meter = $4,687.50). Cocoa publishes no sewer meter-size table, so this amount applies Cocoa's water ERC factors; the fee charged is the greater of that or the ERCs calculated under the Utilities Handbook. Every new wastewater user also pays a separate Sewer Force Main Fee of $1,450 per ERC (City Code Section 22-18(g)).
- Sewer Force Main Fee (Cocoa Utilities) — 1 ERC × $1,450/ERC$1,450.00 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)Every new user of Cocoa Utilities wastewater service pays a sewer force main infrastructure charge of $1,450 per ERC under City Code Section 22-18(g) and Schedule B (updated October 2026), in addition to the sewer impact fee, payable at or before the application for water service. The $1,450 shown is one ERC; Cocoa determines a nonresidential project's ERCs from its estimated flow or meter size under the Utilities Handbook.
- City Impact Fees (City of Cocoa, Industrial)$0.00City of CocoaThe City of Cocoa levies no municipal development impact fees; Brevard County overlay impact fees still apply. Cocoa Utilities water and sewer fees are separate utility charges.
- County Impact Fees (Brevard County, Industrial)$0.00Brevard CountyBrevard County exempts industrial land uses (general industrial, manufacturing, warehousing and similar uses) from its Transportation, Fire Rescue, EMS, and Correctional impact fees, so those county impact fees are $0 for industrial development. The county solid waste impact fee is not exempt and is listed separately. Any applicable city impact fees still apply.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa: Office Impact Fees
Office development in Cocoa pays $5.11 per square foot in impact fees, plus $10,512.50 in one-time water and sewer connection fees (rates sourced October 9, 2026).
For a 25,000 sq ft building, that comes to at least $138,275.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC and Sewer Force Main Fee (Cocoa Utilities) — 1 ERC × $1,450/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Cocoa Impact Fee Schedule
- Water Impact Fee (Cocoa Utilities) — 1" meter$4,375.00 one-timeCity of Cocoa (Cocoa Utilities)Effective per Cocoa Utilities Schedule B (updated October 2026): the commercial water impact fee is 2.50 ERC × $1,750/ERC = $4,375 for a 1" meter. The meter-size amount is a floor; the fee is the greater of this or the ERCs calculated under the Utilities Handbook. The reclaimed-water discount applies to single-family only; nonresidential receives no discount, and there is no inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, and much of unincorporated central Brevard.
- Sewer Impact Fee (Cocoa Utilities) — 1" meter = 2.50 ERC × $1,875/ERC$4,687.50 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)Per Cocoa Utilities Schedule B (updated October 2026), the sanitary sewer impact fee is $1,875 per ERC (2.50 ERC for a 1" meter = $4,687.50). Cocoa publishes no sewer meter-size table, so this amount applies Cocoa's water ERC factors; the fee charged is the greater of that or the ERCs calculated under the Utilities Handbook. Every new wastewater user also pays a separate Sewer Force Main Fee of $1,450 per ERC (City Code Section 22-18(g)).
- Sewer Force Main Fee (Cocoa Utilities) — 1 ERC × $1,450/ERC$1,450.00 one-timeRequires confirmationCity of Cocoa (Cocoa Utilities)Every new user of Cocoa Utilities wastewater service pays a sewer force main infrastructure charge of $1,450 per ERC under City Code Section 22-18(g) and Schedule B (updated October 2026), in addition to the sewer impact fee, payable at or before the application for water service. The $1,450 shown is one ERC; Cocoa determines a nonresidential project's ERCs from its estimated flow or meter size under the Utilities Handbook.
- City Impact Fees (City of Cocoa, Office)$0.00City of CocoaThe City of Cocoa levies no municipal development impact fees; Brevard County overlay impact fees still apply. Cocoa Utilities water and sewer fees are separate utility charges.
- Transportation Impact Fee (Brevard County, Office)$5.06/sq ftOffice 10,000 sq ft and overBrevard CountyBrevard County transportation impact fee: $5,058 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead, and Melbourne Village, where the county schedule does not collect it. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftOffice 10,000 sq ft and overBrevard CountyBrevard County correctional facilities impact fee: $34.17 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftOffice 10,000 sq ft and overBrevard CountyBrevard County EMS impact fee: $18.35 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cocoa Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
Pending and Recent Changes
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Cocoa Impact Fee FAQs
What are the total impact fees for a single-family home in Cocoa, Florida?
A new single-family home in Cocoa pays $14,858.98 per unit in combined impact fees (rates sourced October 9, 2026).
How much are commercial impact fees in Cocoa?
Commercial development in Cocoa pays $6.64 per square foot in impact fees, plus $10,512.50 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $342,641.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Cocoa charge its own impact fees?
Yes. Cocoa levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cocoa, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.