Cocoa Beach impact fees by project type
Cocoa Beach — single-family impact fees
A new single-family home in Cocoa Beach pays $13,733.98 per unit in impact fees (last verified June 5, 2026). Of that, Brevard County–levied fees account for $9,783.98 and municipal or utility fees for $3,950.00.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Sewer New Installation Fee (City of Cocoa Beach, SFR) ($2,200.00).
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) (⚠️ VERIFY)$1,750.00City of Cocoa (Cocoa Utilities)⚠️ VERIFY. Cocoa Beach receives water from Cocoa Utilities. Connection fee is likely Cocoa’s $1,750/ERC rate (Schedule B, Oct 2025), but confirm whether Cocoa Beach charges an additional or separate water connection fee.
- Sewer New Installation Fee (City of Cocoa Beach, SFR)$2,200.00City of Cocoa BeachCity of Cocoa Beach Water Reclamation Fees page (FY 2025). New Installation Sewer Fee: $2,200/unit for SFR within city limits. Outside city: $3,300/unit.
- City Impact Fees — ⚠️ VERIFY$0.00City of Cocoa Beach⚠️ VERIFY. Cocoa Beach may have city-level impact fees. Check cityofcocoabeach.com or call (321) 868-3200.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public Schools
- Transportation Impact Fee (SFR)$4,353.00Brevard County
- Solid Waste Impact Fee (SFR)$160.00Brevard County
- Correctional Facility Impact Fee (SFR)$71.99Brevard County
- Library Impact Fee (SFR)$63.84Brevard County
- EMS Impact Fee (SFR)$38.65Brevard County
- Fire/Rescue — N/A (Cocoa Beach own fire dept)$0.00Brevard County
Cocoa Beach — multifamily impact fees
A new multifamily unit in Cocoa Beach pays $8,492.81 per unit in impact fees (last verified June 5, 2026). Of that, Brevard County–levied fees account for $4,542.81 and municipal or utility fees for $3,950.00.
The largest line items are County Transportation Impact Fee ($2,381.00), Sewer New Installation Fee (Cocoa Beach, MF) — $2,200 ($2,200.00) and County Education Impact Fee ($1,940.50).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (Cocoa Utilities) — $1,750 (2+ bath, ⚠️ VERIFY)$1,750.00City of Cocoa (Cocoa Utilities)⚠️ VERIFY. Cocoa Beach receives Cocoa Utilities water. MF 2+ bath likely $1,750/unit. Confirm city doesn’t charge additional fee.
- Sewer New Installation Fee (Cocoa Beach, MF) — $2,200$2,200.00City of Cocoa BeachCocoa Beach Water Reclamation Fees (FY 2025). SFR/condo/multi-dwelling residential: $2,200/unit within city limits ($3,300 outside).
- City Impact Fees — ⚠️ VERIFY$0.00City of Cocoa Beach⚠️ VERIFY. Cocoa Beach may have city-level impact fees. Call (321) 868-3200.
- County Transportation Impact Fee$2,381.00Brevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B. Apartment 3+ stories. Fire/EMS/Correctional/Library/Solid Waste rates differ per interlocal — confirm full PDF or contact impact.fees@brevardfl.gov.
- County Education Impact Fee$1,940.50Brevard County / Brevard Public SchoolsBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
- County Solid Waste Impact Fee$120.00Brevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Correctional Facility Impact Fee$41.25Brevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Library Impact Fee$37.91Brevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County EMS Impact Fee$22.15Brevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories. Fire/Rescue = Not Applicable.
Cocoa Beach — commercial impact fees
Commercial impact fees in Cocoa Beach depend on the specific use, building size, and utility demand, and we don't yet have a sourced schedule for them. Rather than publish numbers we can't verify, we model an estimate from cited national fee surveys adjusted for Florida cost levels and local population.
The calculator below is set to commercial and produces a clearly labeled
Cocoa Beach — industrial impact fees
Industrial impact fees in Cocoa Beach depend on the specific use, building size, and utility demand, and we don't yet have a sourced schedule for them. Rather than publish numbers we can't verify, we model an estimate from cited national fee surveys adjusted for Florida cost levels and local population.
The calculator below is set to industrial and produces a clearly labeled
Cocoa Beach — office impact fees
Office impact fees in Cocoa Beach depend on the specific use, building size, and utility demand, and we don't yet have a sourced schedule for them. Rather than publish numbers we can't verify, we model an estimate from cited national fee surveys adjusted for Florida cost levels and local population.
The calculator below is set to office and produces a clearly labeled
Estimate your project in Cocoa Beach
Set to single-family — drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted — which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Cocoa Beach, Florida?
A new single-family home in Cocoa Beach pays $13,733.98 per unit in combined impact fees (last verified June 5, 2026).
Does Cocoa Beach charge its own impact fees?
Yes. Cocoa Beach levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cocoa Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.