Cocoa Beach, Florida Impact Fees

Cocoa Beach applies its own fee schedule: municipal fees plus the Brevard County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $13,733.98 per unit (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Cocoa Beach impact fees by project type

Cocoa Beach: Single-Family Impact Fees

A new single-family home in Cocoa Beach pays at least $13,733.98 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $3,950.00.

The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Sewer New Installation Fee (City of Cocoa Beach, SFR) ($2,200.00).

City Impact Fees (Cocoa Beach) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,750.00
  • Water Impact Fee (Cocoa Utilities)
    City of Cocoa (Cocoa Utilities)
    CONFIRMED 2026-07-14 (Unconfirmed box cleared). Cocoa Beach is served by Cocoa Utilities water (sewer is the city's own Water Reclamation utility). Cocoa Schedule B — Utility Impact & Connection Fees, updated October 2025: Water Service Impact Fee, single family residence = 1.00 ERC = $1,750 (reclaimed not available); $1,300 where reclaimed is available.
    $1,750.00
Sewer$2,200.00
City$0.00
  • City Impact Fees (Cocoa Beach)
    City of Cocoa Beach
    ⚠️ VERIFY. Cocoa Beach may have city-level impact fees. Check cityofcocoabeach.com or call (321) 868-3200.
    Requires confirmation
County$9,783.98
Total (Cocoa Beach): $13,733.98
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cocoa Beach: Multifamily Impact Fees

A new multifamily unit in Cocoa Beach pays at least $8,492.81 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $3,950.00.

The largest line items are County Transportation Impact Fee (MF) ($2,381.00), Sewer New Installation Fee (Cocoa Beach, MF) ($2,200.00) and County Education Impact Fee (MF) ($1,940.50).

City Impact Fees is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,750.00
  • Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC
    City of Cocoa (Cocoa Utilities)
    CONFIRMED 2026-07-14. Cocoa Beach is served by Cocoa Utilities water. Cocoa Schedule B (updated October 2025): 'Apartment or Condo: 2 or more bath' = 1.00 ERC = $1,750. Canonical MF unit (2BR/2BA) is in this tier; MF = SFR by design (both 1.00 ERC), not a copy error.
    $1,750.00
Sewer$2,200.00
City$0.00
  • City Impact Fees
    City of Cocoa Beach
    ⚠️ VERIFY. Cocoa Beach may have city-level impact fees. Call (321) 868-3200.
    Requires confirmation
County$4,542.81
  • County Transportation Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B. Apartment 3+ stories. Fire/EMS/Correctional/Library/Solid Waste rates differ per interlocal — confirm full PDF or contact impact.fees@brevardfl.gov.
    $2,381.00
  • County Education Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County / Brevard Public Schools
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
    $1,940.50
  • County Solid Waste Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
    $120.00
  • County Correctional Facility Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
    $41.25
  • County Library Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
    $37.91
  • County EMS Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories. Fire/Rescue = Not Applicable.
    $22.15
  • County Fire/Rescue Impact Fee — N/A (Cocoa Beach own fire dept, MF)
    Confirmed $0. Brevard County Residential Impact Fee Schedule (eff. 1-2-2017), Table 2: Fire/Rescue = 'Not Applicable'. Added 2026-07-14 for SFR/MF parallelism.
    $0.00
Total (Cocoa Beach): $8,492.81
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cocoa Beach: Commercial Impact Fees

Commercial development in Cocoa Beach pays $6.64 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $336,503.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer New Installation Fee (City of Cocoa Beach) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
    $4,375.00 one-time
Sewer$0.00
  • Sewer New Installation Fee (City of Cocoa Beach)
    City of Cocoa Beach
    ⚠️ VERIFY. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Cocoa Beach operates its own water reclamation (sewer) system; connection charges are set by resolution per City Code Ch. 19. The PUBLISHED "New Installation Sewer Fees" schedule (FY 10-1-2024 to 9-30-2025) is USE-BASED, not meter-size based, and covers ONLY residential, lodging, laundromats and food service — there is NO published fee for general commercial, office, industrial, retail, medical or warehouse use. Published nonres rows (within city / outside city): motel or hotel WITH kitchen $1,500 / $2,250 per unit; motel or hotel WITHOUT kitchen $1,300 / $1,950 per unit; laundromat $2,200 / $3,300 per machine; restaurant, lounge or cafe with food service $150 / $225 per seat; cocktail lounge or bar without food service $100 / $150 per seat — seating computed as one seat per 15 square feet. Outside-city is a flat 50% premium. Reclaimed water connection fees: multi-unit or commercial $360 (1.5" line), $540 (2" line); >2" based on consumption and installation cost as determined by the Director of Utilities. CONFIRM the general-commercial / office / industrial sewer connection charge and any adopted resolution containing a meter-size schedule. Contact: Cocoa Beach Water Reclamation Department, 1600 Minutemen Causeway, Cocoa Beach FL 32931, (321) 868-3228.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Cocoa Beach, Commercial) — none
    City of Cocoa Beach
    Confirmed $0. The City of Cocoa Beach levies NO development impact fees. Checked: Municode full-code search for "impact fee" — 15 hits, ZERO of which relate to development impact fees (hits are photography permits, special events, franchise fee, definitions, home occupations, surface maintenance, certificate of occupancy, public camping, Ocean Beach Park licenses). No impact fee chapter exists. Brevard County overlay fees do apply in Cocoa Beach (Table B). The city's sewer (water reclamation) connection fee is tracked separately as Fee Type = Sewer and is not a City fee.
    $0.00
County$6.64/sq ft
  • Transportation Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
    $6.40/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
    $0.16/sq ft
  • EMS Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
    $0.09/sq ft
  • Solid Waste Impact Fee (Brevard County, Commercial)
    Brevard County
    ⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County's solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
    Requires confirmation
Total (Cocoa Beach): $6.64/sq ft + $4,375.00 one-time (≈ $336,503.50 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Cocoa (Cocoa Utilities) City of Cocoa Beach Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cocoa Beach: Industrial Impact Fees

Industrial development in Cocoa Beach pays no per-square-foot impact fees, but owes $4,375.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $4,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer New Installation Fee (City of Cocoa Beach) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
    $4,375.00 one-time
Sewer$0.00
  • Sewer New Installation Fee (City of Cocoa Beach)
    City of Cocoa Beach
    ⚠️ VERIFY. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Cocoa Beach operates its own water reclamation (sewer) system; connection charges are set by resolution per City Code Ch. 19. The PUBLISHED "New Installation Sewer Fees" schedule (FY 10-1-2024 to 9-30-2025) is USE-BASED, not meter-size based, and covers ONLY residential, lodging, laundromats and food service — there is NO published fee for general commercial, office, industrial, retail, medical or warehouse use. Published nonres rows (within city / outside city): motel or hotel WITH kitchen $1,500 / $2,250 per unit; motel or hotel WITHOUT kitchen $1,300 / $1,950 per unit; laundromat $2,200 / $3,300 per machine; restaurant, lounge or cafe with food service $150 / $225 per seat; cocktail lounge or bar without food service $100 / $150 per seat — seating computed as one seat per 15 square feet. Outside-city is a flat 50% premium. Reclaimed water connection fees: multi-unit or commercial $360 (1.5" line), $540 (2" line); >2" based on consumption and installation cost as determined by the Director of Utilities. CONFIRM the general-commercial / office / industrial sewer connection charge and any adopted resolution containing a meter-size schedule. Contact: Cocoa Beach Water Reclamation Department, 1600 Minutemen Causeway, Cocoa Beach FL 32931, (321) 868-3228.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Cocoa Beach, Industrial) — none
    City of Cocoa Beach
    Confirmed $0. The City of Cocoa Beach levies NO development impact fees. Checked: Municode full-code search for "impact fee" — 15 hits, ZERO of which relate to development impact fees (hits are photography permits, special events, franchise fee, definitions, home occupations, surface maintenance, certificate of occupancy, public camping, Ocean Beach Park licenses). No impact fee chapter exists. Brevard County overlay fees do apply in Cocoa Beach (Table B). The city's sewer (water reclamation) connection fee is tracked separately as Fee Type = Sewer and is not a City fee.
    $0.00
County$0.00
  • County Impact Fees (Brevard County, Industrial) — exempt
    Brevard County
    Confirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. Covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) code rates, reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential.
    $0.00
  • Solid Waste Impact Fee (Brevard County, Industrial)
    Brevard County
    ⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3. NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption covers Transportation, Fire Rescue, EMS and Correctional only. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
    Requires confirmation
Total (Cocoa Beach): $4,375.00 one-time (≈ $4,375.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Cocoa (Cocoa Utilities) City of Cocoa Beach Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cocoa Beach: Office Impact Fees

Office development in Cocoa Beach pays $5.11 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to at least $132,138.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer New Installation Fee (City of Cocoa Beach) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
    $4,375.00 one-time
Sewer$0.00
  • Sewer New Installation Fee (City of Cocoa Beach)
    City of Cocoa Beach
    ⚠️ VERIFY. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Cocoa Beach operates its own water reclamation (sewer) system; connection charges are set by resolution per City Code Ch. 19. The PUBLISHED "New Installation Sewer Fees" schedule (FY 10-1-2024 to 9-30-2025) is USE-BASED, not meter-size based, and covers ONLY residential, lodging, laundromats and food service — there is NO published fee for general commercial, office, industrial, retail, medical or warehouse use. Published nonres rows (within city / outside city): motel or hotel WITH kitchen $1,500 / $2,250 per unit; motel or hotel WITHOUT kitchen $1,300 / $1,950 per unit; laundromat $2,200 / $3,300 per machine; restaurant, lounge or cafe with food service $150 / $225 per seat; cocktail lounge or bar without food service $100 / $150 per seat — seating computed as one seat per 15 square feet. Outside-city is a flat 50% premium. Reclaimed water connection fees: multi-unit or commercial $360 (1.5" line), $540 (2" line); >2" based on consumption and installation cost as determined by the Director of Utilities. CONFIRM the general-commercial / office / industrial sewer connection charge and any adopted resolution containing a meter-size schedule. Contact: Cocoa Beach Water Reclamation Department, 1600 Minutemen Causeway, Cocoa Beach FL 32931, (321) 868-3228.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Cocoa Beach, Office) — none
    City of Cocoa Beach
    Confirmed $0. The City of Cocoa Beach levies NO development impact fees. Checked: Municode full-code search for "impact fee" — 15 hits, ZERO of which relate to development impact fees (hits are photography permits, special events, franchise fee, definitions, home occupations, surface maintenance, certificate of occupancy, public camping, Ocean Beach Park licenses). No impact fee chapter exists. Brevard County overlay fees do apply in Cocoa Beach (Table B). The city's sewer (water reclamation) connection fee is tracked separately as Fee Type = Sewer and is not a City fee.
    $0.00
County$5.11/sq ft
  • Transportation Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
    $5.06/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
    $0.03/sq ft
  • EMS Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
    $0.02/sq ft
  • Solid Waste Impact Fee (Brevard County, Office)
    Brevard County
    ⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution; applies in both incorporated and unincorporated areas. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068, impact.fees@brevardfl.gov. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
    Requires confirmation
Total (Cocoa Beach): $5.11/sq ft + $4,375.00 one-time (≈ $132,138.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Cocoa (Cocoa Utilities) City of Cocoa Beach Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Cocoa Beach

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Cocoa Beach, Florida?

A new single-family home in Cocoa Beach pays at least $13,733.98 per unit in combined impact fees (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Cocoa Beach?

Commercial development in Cocoa Beach pays $6.64 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $336,503.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Cocoa Beach charge its own impact fees?

Yes. Cocoa Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cocoa Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brevard County impact fees page.