Titusville impact fees by project type
Titusville: Single-Family Impact Fees
A new single-family home in Titusville pays $15,034.22 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $5,250.24.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Sewer Connection Fee (City of Titusville) ($2,320.00).
View the full fee schedule
- Water Connection Fee (City of Titusville)$2,035.00City of TitusvilleOrd. 18-2025 effective Oct 1, 2025. $2,035/ERC (5/8-3/4" meter). Steps to $2,100/ERC Oct 1, 2026. Titusville operates own distribution system (wholesale supply from Cocoa Utilities). Source: Sec. 34-442.
- Sewer Connection Fee (City of Titusville)$2,320.00City of TitusvilleOrd. 18-2025 effective Oct 1, 2025. $2,320/ERC (5/8-3/4" meter). Steps to $2,450/ERC Oct 1, 2026. Titusville operates own sewer system. Source: Sec. 34-441.
- City Impact Fees (Police, Fire, City Hall, Public Works)$895.24City of TitusvilleOrd. 19-2025 effective Oct 1, 2025. Police $407.00 + Fire $354.245 + City Hall $9.76 + Public Works $124.235 = $895.24/unit. Parks currently $0. Roads = Brevard County transportation fee. Fire phases annually: $375.83 (Oct 2026), $397.415 (Oct 2027), $419.00 (Oct 2028). Source: Sec. 34-424.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public Schools
- Transportation Impact Fee (SFR)$4,353.00Brevard County
- Solid Waste Impact Fee (SFR)$160.00Brevard County
- Correctional Facility Impact Fee (SFR)$71.99Brevard County
- Library Impact Fee (SFR)$63.84Brevard County
- EMS Impact Fee (SFR)$38.65Brevard County
- Fire/Rescue — N/A (Titusville own fire services)$0.00Brevard CountyCounty Fire/Rescue impact fee is Not Applicable in this city per the Brevard County Residential Impact Fee Schedule (eff. 1/2/2017, still adopted July 2026). $0 confirmed placeholder.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Multifamily Impact Fees
A new multifamily unit in Titusville pays $9,139.80 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $4,596.99.
The largest line items are County Transportation Impact Fee (MF) ($2,381.00), Sewer Connection Fee (City of Titusville, MF) ($1,972.00) and County Education Impact Fee (MF) ($1,940.50).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Fee (City of Titusville, MF)$1,729.75City of TitusvilleOrd. 18-2025 effective Oct 1, 2025. MF = 0.85 ERC × $2,035 = $1,729.75/unit. Steps to $1,785/unit Oct 1, 2026 (0.85 × $2,100). Source: Sec. 34-442.
- Sewer Connection Fee (City of Titusville, MF)$1,972.00City of TitusvilleOrd. 18-2025 effective Oct 1, 2025. MF = 0.85 ERC × $2,320 = $1,972/unit. Steps to $2,082.50/unit Oct 1, 2026 (0.85 × $2,450). Source: Sec. 34-441.
- City Impact Fees (Parks, Police, Fire, City Hall, Public Works)$895.24City of TitusvilleOrd. 19-2025 effective Oct 1, 2025. Police $407.00 + Fire $354.245 + City Hall $9.76 + Public Works $124.235 = $895.24/unit. Parks currently $0 in schedule. Fire phases annually: $375.83 (Oct 2026), $397.415 (Oct 2027), $419.00 (Oct 2028). Roads = Brevard County transportation fee.
- County Transportation Impact Fee (MF)$2,381.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B. Apartment 3+ stories. Other county fees differ per interlocal — confirm full PDF or impact.fees@brevardfl.gov. Brevard County collects Titusville's transportation impact fee per titusville.com/1025.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories. Fire/Rescue = Not Applicable.
- County Fire/Rescue Impact Fee — N/A (Titusville own fire services, MF)$0.00Confirmed $0. Brevard County Residential Impact Fee Schedule (eff. 1-2-2017), Table 2: Fire/Rescue = 'Not Applicable'. Added 2026-07-14 for SFR/MF parallelism.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Commercial Impact Fees
Commercial development in Titusville pays $7.09 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $365,266.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($5,800.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,087.50 one-time) and Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Fee (City of Titusville) — 1" meter$5,087.50 one-timeCity of TitusvilleTitusville LDR Ch. 34, Art. IX, Div. 3, § 34-442 (Ord. No. 18-2025, §§ 6-7, adopted 5-27-2025), effective October 1, 2025. Water connection fee = 2.5 ERC × $2,035/ERC. Applies to all nonresidential categories — entered once under Commercial as the carrier category. PHASE-IN: base rate steps to $2,100/ERC effective October 1, 2026 (this meter = 2.5 × $2,100). Underlying study: "City of Titusville Water and Wastewater (Sewer) Impact Fee Study," Raftelis, 2-25-2025, adopted by reference at § 34-421(c). Meter sizes not listed are determined by the Public Works Director as ERCs × the per-ERC rate. Minimum fee 1 ERC. A change of use triggering a higher ERC classification incurs an additional charge even if none was paid originally. Titusville operates its own distribution system (wholesale supply purchased from Cocoa Utilities). No inside/outside-city differential published.
- Sewer Connection Fee (City of Titusville) — 1" meter$5,800.00 one-timeCity of TitusvilleTitusville LDR Ch. 34, Art. IX, Div. 3, § 34-441 (Ord. No. 18-2025, §§ 6-7, adopted 5-27-2025), effective October 1, 2025. Sewer connection fee = 2.5 ERC × $2,320/ERC. Applies to all nonresidential categories — entered once under Commercial as the carrier category. PHASE-IN: base rate steps to $2,450/ERC effective October 1, 2026 (this meter = 2.5 × $2,450). Underlying study: "City of Titusville Water and Wastewater (Sewer) Impact Fee Study," Raftelis, 2-25-2025, adopted by reference at § 34-421(c). Meter sizes not listed are determined by the Public Works Director as ERCs × the per-ERC rate. Minimum fee 1 ERC. A change of use triggering a higher ERC classification incurs an additional charge even if none was paid originally. Titusville operates its own sewer system. No inside/outside-city differential published.
- City Impact Fees (City of Titusville, Commercial)$0.45/sq ftCity of TitusvilleSingle nonres rate — no category split in schedule. Titusville LDR Ch. 34, Art. IX, Div. 2, § 34-424 "Computation of impact fees" (Ord. No. 9-2019, § 2, 3-26-19; Ord. No. 19-2025, § 4, 5-27-25), first step effective October 1, 2025. Schedule row verbatim: "Nonresidential (Commercial and industrial uses) per square foot" — one row covering retail, office, industrial, restaurant, medical and warehouse alike. Components eff. 10-1-2025: Police $0.30 + Fire $0.10 + City Hall $0.01125 + Public Works $0.03375 = $0.44500/sq ft. AUDIT 2026-07-12: Fee Amount corrected from a rounded $0.45 to the as-published $0.445/sq ft (Process Guide: enter as published, never round). Parks impact fee is $0 for nonresidential. Roads = the Brevard County transportation impact fee (no city road fee) per the schedule's footnote: "* Brevard County Transportation Impact fee per Chapter 62, Article V, Division 6, Sections 62-801 through 62-819 of the Brevard County Code." PHASE-IN (next step-up 10-1-2026, not yet due): $0.46000/sq ft eff. 10-1-2026; $0.47500 eff. 10-1-2027; $0.49000 eff. 10-1-2028. GFA vs GLA basis not specified in the table — contact City of Titusville Planning & Growth Management / Building Dept., 555 S. Washington Ave., (321) 567-3760. No ITE codes published.
- Transportation Impact Fee (Brevard County, Commercial)$6.40/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard County⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County's solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Industrial Impact Fees
Industrial development in Titusville pays $0.45 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $33,137.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($5,800.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,087.50 one-time) and City Impact Fees (City of Titusville, Industrial) ($0.45/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Fee (City of Titusville) — 1" meter$5,087.50 one-timeCity of TitusvilleTitusville LDR Ch. 34, Art. IX, Div. 3, § 34-442 (Ord. No. 18-2025, §§ 6-7, adopted 5-27-2025), effective October 1, 2025. Water connection fee = 2.5 ERC × $2,035/ERC. Applies to all nonresidential categories — entered once under Commercial as the carrier category. PHASE-IN: base rate steps to $2,100/ERC effective October 1, 2026 (this meter = 2.5 × $2,100). Underlying study: "City of Titusville Water and Wastewater (Sewer) Impact Fee Study," Raftelis, 2-25-2025, adopted by reference at § 34-421(c). Meter sizes not listed are determined by the Public Works Director as ERCs × the per-ERC rate. Minimum fee 1 ERC. A change of use triggering a higher ERC classification incurs an additional charge even if none was paid originally. Titusville operates its own distribution system (wholesale supply purchased from Cocoa Utilities). No inside/outside-city differential published.
- Sewer Connection Fee (City of Titusville) — 1" meter$5,800.00 one-timeCity of TitusvilleTitusville LDR Ch. 34, Art. IX, Div. 3, § 34-441 (Ord. No. 18-2025, §§ 6-7, adopted 5-27-2025), effective October 1, 2025. Sewer connection fee = 2.5 ERC × $2,320/ERC. Applies to all nonresidential categories — entered once under Commercial as the carrier category. PHASE-IN: base rate steps to $2,450/ERC effective October 1, 2026 (this meter = 2.5 × $2,450). Underlying study: "City of Titusville Water and Wastewater (Sewer) Impact Fee Study," Raftelis, 2-25-2025, adopted by reference at § 34-421(c). Meter sizes not listed are determined by the Public Works Director as ERCs × the per-ERC rate. Minimum fee 1 ERC. A change of use triggering a higher ERC classification incurs an additional charge even if none was paid originally. Titusville operates its own sewer system. No inside/outside-city differential published.
- City Impact Fees (City of Titusville, Industrial)$0.45/sq ftCity of TitusvilleSingle nonres rate — no category split in schedule. Titusville LDR Ch. 34, Art. IX, Div. 2, § 34-424 "Computation of impact fees" (Ord. No. 9-2019, § 2, 3-26-19; Ord. No. 19-2025, § 4, 5-27-25), first step effective October 1, 2025. Schedule row verbatim: "Nonresidential (Commercial and industrial uses) per square foot" — one row covering retail, office, industrial, restaurant, medical and warehouse alike; the city rate is NOT waived for industrial (unlike the county overlay fees, which exempt industrial NAICS sectors). Components eff. 10-1-2025: Police $0.30 + Fire $0.10 + City Hall $0.01125 + Public Works $0.03375 = $0.44500/sq ft. AUDIT 2026-07-12: Fee Amount corrected from a rounded $0.45 to the as-published $0.445/sq ft (Process Guide: enter as published, never round). Parks impact fee is $0 for nonresidential. Roads = the Brevard County transportation impact fee (no city road fee) per the schedule's footnote citing Brevard County Code Ch. 62, Art. V, Div. 6, §§ 62-801–62-819. PHASE-IN (next step-up 10-1-2026, not yet due): $0.46000/sq ft eff. 10-1-2026; $0.47500 eff. 10-1-2027; $0.49000 eff. 10-1-2028. GFA vs GLA basis not specified in the table — contact City of Titusville Planning & Growth Management / Building Dept., 555 S. Washington Ave., (321) 567-3760. No ITE codes published.
- County Impact Fees (Brevard County, Industrial) — exempt$0.00Brevard CountyConfirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. Covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) code rates, reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3. NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption covers Transportation, Fire Rescue, EMS and Correctional only. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Office Impact Fees
Office development in Titusville pays $5.56 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $149,775.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($5,800.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,087.50 one-time) and Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Fee (City of Titusville) — 1" meter$5,087.50 one-timeCity of TitusvilleTitusville LDR Ch. 34, Art. IX, Div. 3, § 34-442 (Ord. No. 18-2025, §§ 6-7, adopted 5-27-2025), effective October 1, 2025. Water connection fee = 2.5 ERC × $2,035/ERC. Applies to all nonresidential categories — entered once under Commercial as the carrier category. PHASE-IN: base rate steps to $2,100/ERC effective October 1, 2026 (this meter = 2.5 × $2,100). Underlying study: "City of Titusville Water and Wastewater (Sewer) Impact Fee Study," Raftelis, 2-25-2025, adopted by reference at § 34-421(c). Meter sizes not listed are determined by the Public Works Director as ERCs × the per-ERC rate. Minimum fee 1 ERC. A change of use triggering a higher ERC classification incurs an additional charge even if none was paid originally. Titusville operates its own distribution system (wholesale supply purchased from Cocoa Utilities). No inside/outside-city differential published.
- Sewer Connection Fee (City of Titusville) — 1" meter$5,800.00 one-timeCity of TitusvilleTitusville LDR Ch. 34, Art. IX, Div. 3, § 34-441 (Ord. No. 18-2025, §§ 6-7, adopted 5-27-2025), effective October 1, 2025. Sewer connection fee = 2.5 ERC × $2,320/ERC. Applies to all nonresidential categories — entered once under Commercial as the carrier category. PHASE-IN: base rate steps to $2,450/ERC effective October 1, 2026 (this meter = 2.5 × $2,450). Underlying study: "City of Titusville Water and Wastewater (Sewer) Impact Fee Study," Raftelis, 2-25-2025, adopted by reference at § 34-421(c). Meter sizes not listed are determined by the Public Works Director as ERCs × the per-ERC rate. Minimum fee 1 ERC. A change of use triggering a higher ERC classification incurs an additional charge even if none was paid originally. Titusville operates its own sewer system. No inside/outside-city differential published.
- City Impact Fees (City of Titusville, Office)$0.45/sq ftCity of TitusvilleSingle nonres rate — no category split in schedule. Titusville LDR Ch. 34, Art. IX, Div. 2, § 34-424 "Computation of impact fees" (Ord. No. 9-2019, § 2, 3-26-19; Ord. No. 19-2025, § 4, 5-27-25), first step effective October 1, 2025. Schedule row verbatim: "Nonresidential (Commercial and industrial uses) per square foot" — one row covering retail, office, industrial, restaurant, medical and warehouse alike. Components eff. 10-1-2025: Police $0.30 + Fire $0.10 + City Hall $0.01125 + Public Works $0.03375 = $0.44500/sq ft. AUDIT 2026-07-12: Fee Amount corrected from a rounded $0.45 to the as-published $0.445/sq ft (Process Guide: enter as published, never round). Parks impact fee is $0 for nonresidential. Roads = the Brevard County transportation impact fee (no city road fee) per the schedule's footnote citing Brevard County Code Ch. 62, Art. V, Div. 6, §§ 62-801–62-819. PHASE-IN (next step-up 10-1-2026, not yet due): $0.46000/sq ft eff. 10-1-2026; $0.47500 eff. 10-1-2027; $0.49000 eff. 10-1-2028. GFA vs GLA basis not specified in the table — contact City of Titusville Planning & Growth Management / Building Dept., 555 S. Washington Ave., (321) 567-3760. No ITE codes published.
- Transportation Impact Fee (Brevard County, Office)$5.06/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Titusville
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Titusville, Florida?
A new single-family home in Titusville pays $15,034.22 per unit in combined impact fees (rates sourced July 14, 2026).
How much are commercial impact fees in Titusville?
Commercial development in Titusville pays $7.09 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $365,266.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Titusville charge its own impact fees?
Yes. Titusville levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Titusville, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.