Titusville Impact Fees by Project Type
Titusville: Single-Family Impact Fees
A new single-family home in Titusville pays $15,034.22 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $5,250.24.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Sewer Connection Fee (City of Titusville) ($2,320.00).
View the Full Titusville Impact Fee Schedule
- Water Connection Fee (City of Titusville)$2,035.00City of TitusvilleWater is provided by the City of Titusville (wholesale supply from Cocoa): one-time water connection fee $2,035 per ERC for a standard 5/8–3/4" meter, effective October 1, 2025, increasing to $2,100 per ERC on October 1, 2026 (Ord. 18-2025).
- Sewer Connection Fee (City of Titusville)$2,320.00City of TitusvilleSewer is provided by the City of Titusville: one-time sewer connection fee $2,320 per ERC for a standard 5/8–3/4" meter, effective October 1, 2025, increasing to $2,450 per ERC on October 1, 2026 (Ord. 18-2025).
- City Impact Fees (Police, Fire, City Hall, Public Works)$895.24City of TitusvilleCity of Titusville municipal impact fees total $895.24 per dwelling unit — police $407.00, fire $354.25, city hall $9.76, and public works $124.24 (Ord. 19-2025, effective October 1, 2025; parks currently $0). Roads are covered by the Brevard County transportation fee. The fire component steps up each October to $419.00 by October 2028.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public SchoolsBrevard County educational facilities (school) impact fee, single-family detached: $5,096.50/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Transportation Impact Fee (SFR)$4,353.00Brevard CountyBrevard County transportation impact fee, single-family detached: $4,353.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Solid Waste Impact Fee (SFR)$160.00Brevard CountyBrevard County solid waste impact fee, single-family detached: $160.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Correctional Facility Impact Fee (SFR)$71.99Brevard CountyBrevard County correctional facilities impact fee, single-family detached: $71.99/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Library Impact Fee (SFR)$63.84Brevard CountyBrevard County library facilities impact fee, single-family detached: $63.84/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- EMS Impact Fee (SFR)$38.65Brevard CountyBrevard County EMS (emergency medical services) impact fee, single-family detached: $38.65/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Fire/Rescue — N/A (Titusville own fire services)$0.00Brevard CountyThe Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Multifamily Impact Fees
A new multifamily unit in Titusville pays $9,139.80 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $4,596.99.
The largest line items are County Transportation Impact Fee (MF) ($2,381.00), Sewer Connection Fee (City of Titusville, MF) ($1,972.00) and County Education Impact Fee (MF) ($1,940.50).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Titusville Impact Fee Schedule
- Water Connection Fee (City of Titusville, MF)$1,729.75City of TitusvilleWater is provided by the City of Titusville: multifamily water connection fee $1,729.75 per unit (0.85 ERC × $2,035), effective October 1, 2025, increasing to $1,785 per unit on October 1, 2026 (Ord. 18-2025).
- Sewer Connection Fee (City of Titusville, MF)$1,972.00City of TitusvilleSewer is provided by the City of Titusville: multifamily sewer connection fee $1,972 per unit (0.85 ERC × $2,320), effective October 1, 2025, increasing to $2,082.50 per unit on October 1, 2026 (Ord. 18-2025).
- City Impact Fees (Parks, Police, Fire, City Hall, Public Works)$895.24City of TitusvilleCity of Titusville municipal impact fees total $895.24 per dwelling unit — police $407.00, fire $354.25, city hall $9.76, and public works $124.24 (Ord. 19-2025, effective October 1, 2025; parks currently $0). Roads are covered by the Brevard County transportation fee. The fire component steps up each October to $419.00 by October 2028.
- County Transportation Impact Fee (MF)$2,381.00Apartment, 3+ storiesBrevard CountyBrevard County transportation impact fee, per apartment/multifamily unit: $2,381.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County educational facilities (school) impact fee, per apartment/multifamily unit: $1,940.50/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County solid waste impact fee, per apartment/multifamily unit: $120.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County correctional facilities impact fee, per apartment/multifamily unit: $41.25/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County library facilities impact fee, per apartment/multifamily unit: $37.91/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County EMS (emergency medical services) impact fee, per apartment/multifamily unit: $22.15/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Fire/Rescue Impact Fee — N/A (Titusville own fire services, MF)$0.00The Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Commercial Impact Fees
Commercial development in Titusville pays $7.09 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $365,266.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($5,800.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,087.50 one-time) and Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Titusville Impact Fee Schedule
- Water Connection Fee (City of Titusville) — 1" meter$5,087.50 one-timeCity of TitusvilleEffective October 1, 2025 per City of Titusville Ord. No. 18-2025: the water connection fee is 2.5 ERC × $2,035/ERC = $5,087.50 for a 1" meter. Phase-in: the per-ERC rate rises to $2,100 effective October 1, 2026 (making this meter $5,250). Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. Titusville operates its own water distribution system (supplied wholesale by Cocoa Utilities), with no inside/outside-city differential.
- Sewer Connection Fee (City of Titusville) — 1" meter$5,800.00 one-timeCity of TitusvilleEffective October 1, 2025 per City of Titusville Ord. No. 18-2025: the sewer connection fee is 2.5 ERC × $2,320/ERC = $5,800 for a 1" meter. Phase-in: the per-ERC rate rises to $2,450 effective October 1, 2026 (making this meter $6,125). Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. Titusville operates its own sewer system, with no inside/outside-city differential.
- City Impact Fees (City of Titusville, Commercial)$0.45/sq ftCity of TitusvilleCurrent rate $0.445/sq ft effective October 1, 2025. Scheduled annual step-ups: $0.460/sq ft on October 1, 2026; $0.475/sq ft on October 1, 2027; $0.490/sq ft on October 1, 2028. A single nonresidential rate applies to commercial, office, and industrial uses alike. Roads are covered by the separate Brevard County transportation impact fee; the city levies no separate road fee. Nonresidential parks impact fee is $0.
- Transportation Impact Fee (Brevard County, Commercial)$6.40/sq ftBrevard CountyBrevard County transportation impact fee — $6,396 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead.
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftBrevard CountyBrevard County correctional facilities impact fee — $160.44 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftBrevard CountyBrevard County EMS impact fee — $86.13 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Industrial Impact Fees
Industrial development in Titusville pays $0.45 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $33,137.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($5,800.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,087.50 one-time) and City Impact Fees (City of Titusville, Industrial) ($0.45/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Titusville Impact Fee Schedule
- Water Connection Fee (City of Titusville) — 1" meter$5,087.50 one-timeCity of TitusvilleEffective October 1, 2025 per City of Titusville Ord. No. 18-2025: the water connection fee is 2.5 ERC × $2,035/ERC = $5,087.50 for a 1" meter. Phase-in: the per-ERC rate rises to $2,100 effective October 1, 2026 (making this meter $5,250). Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. Titusville operates its own water distribution system (supplied wholesale by Cocoa Utilities), with no inside/outside-city differential.
- Sewer Connection Fee (City of Titusville) — 1" meter$5,800.00 one-timeCity of TitusvilleEffective October 1, 2025 per City of Titusville Ord. No. 18-2025: the sewer connection fee is 2.5 ERC × $2,320/ERC = $5,800 for a 1" meter. Phase-in: the per-ERC rate rises to $2,450 effective October 1, 2026 (making this meter $6,125). Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. Titusville operates its own sewer system, with no inside/outside-city differential.
- City Impact Fees (City of Titusville, Industrial)$0.45/sq ftCity of TitusvilleCurrent rate $0.445/sq ft effective October 1, 2025. Scheduled annual step-ups: $0.460/sq ft on October 1, 2026; $0.475/sq ft on October 1, 2027; $0.490/sq ft on October 1, 2028. A single nonresidential rate applies to commercial, office, and industrial uses alike (the city rate is not waived for industrial). Roads are covered by the separate Brevard County transportation impact fee; the city levies no separate road fee. Nonresidential parks impact fee is $0.
- County Impact Fees (Brevard County, Industrial) — exempt$0.00Brevard CountyBrevard County exempts all industrial land uses (NAICS sectors 21, 22, 23, 31–33, 48–49, and subsector 562 — covering general industrial, manufacturing, warehouse, and mini-warehouse) from its Transportation, Fire Rescue, EMS, and Correctional impact fees, so the county nonresidential impact fee for industrial development is $0. Any applicable city impact fees still apply.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville: Office Impact Fees
Office development in Titusville pays $5.56 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $149,775.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($5,800.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,087.50 one-time) and Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Titusville Impact Fee Schedule
- Water Connection Fee (City of Titusville) — 1" meter$5,087.50 one-timeCity of TitusvilleEffective October 1, 2025 per City of Titusville Ord. No. 18-2025: the water connection fee is 2.5 ERC × $2,035/ERC = $5,087.50 for a 1" meter. Phase-in: the per-ERC rate rises to $2,100 effective October 1, 2026 (making this meter $5,250). Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. Titusville operates its own water distribution system (supplied wholesale by Cocoa Utilities), with no inside/outside-city differential.
- Sewer Connection Fee (City of Titusville) — 1" meter$5,800.00 one-timeCity of TitusvilleEffective October 1, 2025 per City of Titusville Ord. No. 18-2025: the sewer connection fee is 2.5 ERC × $2,320/ERC = $5,800 for a 1" meter. Phase-in: the per-ERC rate rises to $2,450 effective October 1, 2026 (making this meter $6,125). Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. Titusville operates its own sewer system, with no inside/outside-city differential.
- City Impact Fees (City of Titusville, Office)$0.45/sq ftCity of TitusvilleCurrent rate $0.445/sq ft effective October 1, 2025. Scheduled annual step-ups: $0.460/sq ft on October 1, 2026; $0.475/sq ft on October 1, 2027; $0.490/sq ft on October 1, 2028. A single nonresidential rate applies to commercial, office, and industrial uses alike. Roads are covered by the separate Brevard County transportation impact fee; the city levies no separate road fee. Nonresidential parks impact fee is $0.
- Transportation Impact Fee (Brevard County, Office)$5.06/sq ftBrevard CountyBrevard County transportation impact fee — $5,058 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead.
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftBrevard CountyBrevard County correctional facilities impact fee — $34.17 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftBrevard CountyBrevard County EMS impact fee — $18.35 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Titusville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Titusville Impact Fee FAQs
What are the total impact fees for a single-family home in Titusville, Florida?
A new single-family home in Titusville pays $15,034.22 per unit in combined impact fees (rates sourced July 14, 2026).
How much are commercial impact fees in Titusville?
Commercial development in Titusville pays $7.09 per square foot in impact fees, plus $10,887.50 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $365,266.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Titusville charge its own impact fees?
Yes. Titusville levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Titusville, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.