Skip to content
IMPACTFEES.ORG

Titusville, Florida Impact Fees

Titusville applies its own fee schedule: municipal fees plus the Brevard County-levied fees that apply inside city limits. Combined, a new single-family home pays $15,261.14 per unit (rates sourced ). The full breakdown is below.

Titusville Impact Fees by Project Type

Titusville: Single-Family Impact Fees

A new single-family home in Titusville pays $15,261.14 per unit in impact fees (rates sourced October 9, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $5,477.16.

The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Sewer Connection Fee (City of Titusville) ($2,450.00).

View the Full Titusville Impact Fee Schedule
Water$2,100.00
  • Water Connection Fee (City of Titusville)
    City of Titusville
    Water is provided by the City of Titusville (its own wells plus wholesale supply from the City of Cocoa): one-time water connection fee $2,100 per ERC for a standard 5/8 to 3/4 inch meter, effective October 1, 2026 (Land Development Regulations Section 34-442, Ordinance 18-2025). Collected when the utility service account is established.
    $2,100.00
Sewer$2,450.00
  • Sewer Connection Fee (City of Titusville)
    City of Titusville
    Sewer is provided by the City of Titusville: one-time sewer connection fee $2,450 per ERC for a standard 5/8 to 3/4 inch meter, effective October 1, 2026 (Land Development Regulations Section 34-441, Ordinance 18-2025). Collected when the utility service account is established.
    $2,450.00
City$927.16
  • Police Impact Fee (City of Titusville)
    City of Titusville
    City of Titusville police impact fee, $407.00 per dwelling unit (Ord. 19-2025, effective October 1, 2025). Flat across the adopted schedule through October 2028.
    $407.00
  • Fire Impact Fee (City of Titusville)
    City of Titusville
    City of Titusville fire impact fee, $375.83 per dwelling unit, effective October 1, 2026 (Land Development Regulations Section 34-424, Ordinance 19-2025). Steps to $397.42 on October 1, 2027 and $419.00 on October 1, 2028. Paid at building permit issuance.
    $375.83
  • Public Works Impact Fee (City of Titusville)
    City of Titusville
    City of Titusville public works impact fee, $133.49 per dwelling unit, effective October 1, 2026 (Land Development Regulations Section 34-424, Ordinance 19-2025). Steps to $142.75 on October 1, 2027 and $152.00 on October 1, 2028. Paid at building permit issuance.
    $133.49
  • General Government (City Hall) Impact Fee (City of Titusville)
    City of Titusville
    City of Titusville general government (city hall) impact fee, $10.84 per dwelling unit, effective October 1, 2026 (Land Development Regulations Section 34-424, Ordinance 19-2025). Steps to $11.92 on October 1, 2027 and $13.00 on October 1, 2028. Paid at building permit issuance.
    $10.84
  • Parks Impact Fee (City of Titusville)
    City of Titusville
    The City of Titusville parks impact fee is currently $0 in the adopted schedule (Ord. 19-2025, effective October 1, 2025).
    $0.00
County$9,783.98
  • Education Impact Fee (SFR)
    Brevard County / Brevard Public Schools
    Brevard County educational facilities (school) impact fee, single-family detached: $5,096.50/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $5,096.50
  • Transportation Impact Fee (SFR)
    Brevard County
    Brevard County transportation impact fee, single-family detached: $4,353.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $4,353.00
  • Solid Waste Impact Fee (SFR)
    Brevard County
    Brevard County solid waste impact fee, single-family detached: $160.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $160.00
  • Correctional Facility Impact Fee (SFR)
    Brevard County
    Brevard County correctional facilities impact fee, single-family detached: $71.99/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $71.99
  • Library Impact Fee (SFR)
    Brevard County
    Brevard County library facilities impact fee, single-family detached: $63.84/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $63.84
  • EMS Impact Fee (SFR)
    Brevard County
    Brevard County EMS (emergency medical services) impact fee, single-family detached: $38.65/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $38.65
  • County Fire/Rescue Impact Fee (Brevard County, within Titusville)
    Brevard County
    The Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
    $0.00
Total (Titusville): $15,261.14
Sources last checked Official fee schedules:City of Titusville Brevard County / Brevard Public Schools Brevard County

Titusville: Multifamily Impact Fees

A new multifamily unit in Titusville pays $9,337.47 per unit in impact fees (rates sourced October 9, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $4,794.66.

The largest line items are County Transportation Impact Fee (MF) ($2,381.00), Sewer Connection Fee (City of Titusville, MF) ($2,082.50) and County Education Impact Fee (MF) ($1,940.50).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Titusville Impact Fee Schedule
Water$1,785.00
  • Water Connection Fee (City of Titusville, MF)
    City of Titusville
    Water is provided by the City of Titusville: multifamily water connection fee $1,785 per unit (0.85 ERC times $2,100 per ERC), effective October 1, 2026 (Land Development Regulations Section 34-442, Ordinance 18-2025). Collected when the utility service account is established.
    $1,785.00
Sewer$2,082.50
  • Sewer Connection Fee (City of Titusville, MF)
    City of Titusville
    Sewer is provided by the City of Titusville: multifamily sewer connection fee $2,082.50 per unit (0.85 ERC times $2,450 per ERC), effective October 1, 2026 (Land Development Regulations Section 34-441, Ordinance 18-2025). Collected when the utility service account is established.
    $2,082.50
City$927.16
  • Police Impact Fee (City of Titusville, MF)
    City of Titusville
    City of Titusville police impact fee, $407.00 per dwelling unit (Ord. 19-2025, effective October 1, 2025). Flat across the adopted schedule through October 2028. Municipal impact fees are the same per unit for multifamily as single-family.
    $407.00
  • Fire Impact Fee (City of Titusville, MF)
    City of Titusville
    City of Titusville fire impact fee, $375.83 per dwelling unit, effective October 1, 2026 (Land Development Regulations Section 34-424, Ordinance 19-2025); the same per unit for multifamily. Steps to $397.42 on October 1, 2027 and $419.00 on October 1, 2028. Paid at building permit issuance.
    $375.83
  • Public Works Impact Fee (City of Titusville, MF)
    City of Titusville
    City of Titusville public works impact fee, $133.49 per dwelling unit, effective October 1, 2026 (Land Development Regulations Section 34-424, Ordinance 19-2025); the same per unit for multifamily. Steps to $142.75 on October 1, 2027 and $152.00 on October 1, 2028. Paid at building permit issuance.
    $133.49
  • General Government (City Hall) Impact Fee (City of Titusville, MF)
    City of Titusville
    City of Titusville general government (city hall) impact fee, $10.84 per dwelling unit, effective October 1, 2026 (Land Development Regulations Section 34-424, Ordinance 19-2025); the same per unit for multifamily. Steps to $11.92 on October 1, 2027 and $13.00 on October 1, 2028. Paid at building permit issuance.
    $10.84
  • Parks Impact Fee (City of Titusville, MF)
    City of Titusville
    The City of Titusville parks impact fee is currently $0 in the adopted schedule (Ord. 19-2025, effective October 1, 2025).
    $0.00
County$4,542.81
  • County Transportation Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County transportation impact fee, per apartment/multifamily unit: $2,381.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $2,381.00
  • County Education Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County / Brevard Public Schools
    Brevard County educational facilities (school) impact fee, per apartment/multifamily unit: $1,940.50/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $1,940.50
  • County Solid Waste Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County solid waste impact fee, per apartment/multifamily unit: $120.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $120.00
  • County Correctional Facility Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County correctional facilities impact fee, per apartment/multifamily unit: $41.25/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $41.25
  • County Library Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County library facilities impact fee, per apartment/multifamily unit: $37.91/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $37.91
  • County EMS Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County EMS (emergency medical services) impact fee, per apartment/multifamily unit: $22.15/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $22.15
  • County Fire/Rescue Impact Fee (Brevard County, within Titusville, MF)
    Brevard County
    The Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
    $0.00
Total (Titusville): $9,337.47
Sources last checked Official fee schedules:City of Titusville Brevard County Brevard County / Brevard Public Schools

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Titusville: Commercial Impact Fees

Commercial development in Titusville pays $7.10 per square foot in impact fees, plus $11,375.00 in one-time water and sewer connection fees (rates sourced October 9, 2026).

For a 50,000 sq ft building, that comes to at least $366,503.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($6,125.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,250.00 one-time) and Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Titusville Impact Fee Schedule
Water$5,250.00 one-time
  • Water Connection Fee (City of Titusville) — 1" meter
    City of Titusville
    Effective October 1, 2026 per City of Titusville Ord. No. 18-2025: the water connection fee is 2.5 ERC × $2,100/ERC = $5,250 for a 1" meter. Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. The same meter schedule applies to every development. Titusville operates its own water distribution system (supplied wholesale by Cocoa Utilities), with no inside/outside-city differential.
    $5,250.00 one-time
Sewer$6,125.00 one-time
  • Sewer Connection Fee (City of Titusville) — 1" meter
    City of Titusville
    Effective October 1, 2026 per City of Titusville Ord. No. 18-2025: the sewer connection fee is 2.5 ERC × $2,450/ERC = $6,125 for a 1" meter. Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. The same meter schedule applies to every development. Titusville operates its own sewer system, with no inside/outside-city differential.
    $6,125.00 one-time
City$0.46/sq ft
  • City Impact Fees (City of Titusville, Commercial)
    City of Titusville
    Rate $0.46/sq ft effective October 1, 2026 (police $0.30, fire $0.11, city hall $0.0125, public works $0.0375). Scheduled step-ups: $0.475/sq ft on October 1, 2027; $0.49/sq ft on October 1, 2028. A single nonresidential rate applies to commercial, office, and industrial uses alike. Roads are covered by the separate Brevard County transportation impact fee; the city levies no separate road fee. Nonresidential parks impact fee is $0.
    $0.46/sq ft
County$6.64/sq ft
  • Transportation Impact Fee (Brevard County, Commercial)
    Retail 50,000 to 99,999 sq ft
    Brevard County
    Brevard County transportation impact fee: $6,396 per 1,000 sq ft of gross floor area for retail of 50,000 to 99,999 sq ft (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead, and Melbourne Village, where the county schedule does not collect it. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $6.40/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Commercial)
    Retail 10,001 to 100,000 sq ft
    Brevard County
    Brevard County correctional facilities impact fee: $160.44 per 1,000 sq ft of gross floor area for retail of 10,001 to 100,000 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.16/sq ft
  • EMS Impact Fee (Brevard County, Commercial)
    Retail 10,001 to 100,000 sq ft
    Brevard County
    Brevard County EMS impact fee: $86.13 per 1,000 sq ft of gross floor area for retail of 10,001 to 100,000 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.09/sq ft
  • Solid Waste Impact Fee (Brevard County, Commercial)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Titusville): $7.10/sq ft + $11,375.00 one-time (≈ $366,503.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Titusville Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Titusville: Industrial Impact Fees

Industrial development in Titusville pays $0.46 per square foot in impact fees, plus $11,375.00 in one-time water and sewer connection fees (rates sourced October 9, 2026).

For a 50,000 sq ft building, that comes to at least $34,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($6,125.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,250.00 one-time) and City Impact Fees (City of Titusville, Industrial) ($0.46/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Titusville Impact Fee Schedule
Water$5,250.00 one-time
  • Water Connection Fee (City of Titusville) — 1" meter
    City of Titusville
    Effective October 1, 2026 per City of Titusville Ord. No. 18-2025: the water connection fee is 2.5 ERC × $2,100/ERC = $5,250 for a 1" meter. Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. The same meter schedule applies to every development. Titusville operates its own water distribution system (supplied wholesale by Cocoa Utilities), with no inside/outside-city differential.
    $5,250.00 one-time
Sewer$6,125.00 one-time
  • Sewer Connection Fee (City of Titusville) — 1" meter
    City of Titusville
    Effective October 1, 2026 per City of Titusville Ord. No. 18-2025: the sewer connection fee is 2.5 ERC × $2,450/ERC = $6,125 for a 1" meter. Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. The same meter schedule applies to every development. Titusville operates its own sewer system, with no inside/outside-city differential.
    $6,125.00 one-time
City$0.46/sq ft
  • City Impact Fees (City of Titusville, Industrial)
    City of Titusville
    Rate $0.46/sq ft effective October 1, 2026 (police $0.30, fire $0.11, city hall $0.0125, public works $0.0375). Scheduled step-ups: $0.475/sq ft on October 1, 2027; $0.49/sq ft on October 1, 2028. A single nonresidential rate applies to commercial, office, and industrial uses alike (the city rate is not waived for industrial). Roads are covered by the separate Brevard County transportation impact fee; the city levies no separate road fee. Nonresidential parks impact fee is $0.
    $0.46/sq ft
County$0.00
  • County Impact Fees (Brevard County, Industrial)
    Brevard County
    Brevard County exempts industrial land uses (general industrial, manufacturing, warehousing and similar uses) from its Transportation, Fire Rescue, EMS, and Correctional impact fees, so those county impact fees are $0 for industrial development. The county solid waste impact fee is not exempt and is listed separately. Any applicable city impact fees still apply.
    $0.00
  • Solid Waste Impact Fee (Brevard County, Industrial)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Titusville): $0.46/sq ft + $11,375.00 one-time (≈ $34,375.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Titusville Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Titusville: Office Impact Fees

Office development in Titusville pays $5.57 per square foot in impact fees, plus $11,375.00 in one-time water and sewer connection fees (rates sourced October 9, 2026).

For a 25,000 sq ft building, that comes to at least $150,638.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (City of Titusville) — 1" meter ($6,125.00 one-time), Water Connection Fee (City of Titusville) — 1" meter ($5,250.00 one-time) and Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Titusville Impact Fee Schedule
Water$5,250.00 one-time
  • Water Connection Fee (City of Titusville) — 1" meter
    City of Titusville
    Effective October 1, 2026 per City of Titusville Ord. No. 18-2025: the water connection fee is 2.5 ERC × $2,100/ERC = $5,250 for a 1" meter. Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. The same meter schedule applies to every development. Titusville operates its own water distribution system (supplied wholesale by Cocoa Utilities), with no inside/outside-city differential.
    $5,250.00 one-time
Sewer$6,125.00 one-time
  • Sewer Connection Fee (City of Titusville) — 1" meter
    City of Titusville
    Effective October 1, 2026 per City of Titusville Ord. No. 18-2025: the sewer connection fee is 2.5 ERC × $2,450/ERC = $6,125 for a 1" meter. Minimum 1 ERC; meter sizes not listed are set as ERCs × the per-ERC rate. The same meter schedule applies to every development. Titusville operates its own sewer system, with no inside/outside-city differential.
    $6,125.00 one-time
City$0.46/sq ft
  • City Impact Fees (City of Titusville, Office)
    City of Titusville
    Rate $0.46/sq ft effective October 1, 2026 (police $0.30, fire $0.11, city hall $0.0125, public works $0.0375). Scheduled step-ups: $0.475/sq ft on October 1, 2027; $0.49/sq ft on October 1, 2028. A single nonresidential rate applies to commercial, office, and industrial uses alike. Roads are covered by the separate Brevard County transportation impact fee; the city levies no separate road fee. Nonresidential parks impact fee is $0.
    $0.46/sq ft
County$5.11/sq ft
  • Transportation Impact Fee (Brevard County, Office)
    Office 10,000 sq ft and over
    Brevard County
    Brevard County transportation impact fee: $5,058 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead, and Melbourne Village, where the county schedule does not collect it. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $5.06/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Office)
    Office 10,000 sq ft and over
    Brevard County
    Brevard County correctional facilities impact fee: $34.17 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.03/sq ft
  • EMS Impact Fee (Brevard County, Office)
    Office 10,000 sq ft and over
    Brevard County
    Brevard County EMS impact fee: $18.35 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.02/sq ft
  • Solid Waste Impact Fee (Brevard County, Office)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Titusville): $5.57/sq ft + $11,375.00 one-time (≈ $150,638.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Titusville Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Titusville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

Pending and Recent Changes

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Titusville Impact Fee FAQs

What are the total impact fees for a single-family home in Titusville, Florida?

A new single-family home in Titusville pays $15,261.14 per unit in combined impact fees (rates sourced October 9, 2026).

How much are commercial impact fees in Titusville?

Commercial development in Titusville pays $7.10 per square foot in impact fees, plus $11,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $366,503.50 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Titusville charge its own impact fees?

Yes. Titusville levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Titusville, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brevard County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000