Indialantic impact fees by project type
Indialantic: Single-Family Impact Fees
A new single-family home in Indialantic pays at least $12,538.98 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $2,755.00.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Water Impact Fee (City of Melbourne) ($2,755.00).
Sewer Connection Fee (Indialantic) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (City of Melbourne)$2,755.00City of MelbourneMelbourne provides water to Indialantic. Impact fee $2,755 per Melbourne rate table (in/outside city same rate).
- Sewer Connection Fee (Indialantic)Requires confirmationTown of Indialantic⚠️ VERIFY. Indialantic sewer provider unclear — may be Brevard County or town’s own system. Connection fee not found online.
- City Impact Fees — None found$0.00Town of IndialanticNo city-level impact fees found for Indialantic. Small town (~3,000 pop); no dedicated city impact fee program identified.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public Schools
- Transportation Impact Fee (SFR)$4,353.00Brevard County
- Solid Waste Impact Fee (SFR)$160.00Brevard County
- Correctional Facility Impact Fee (SFR)$71.99Brevard County
- Library Impact Fee (SFR)$63.84Brevard County
- EMS Impact Fee (SFR)$38.65Brevard County
- Fire/Rescue — N/A (Indialantic own fire services)$0.00Brevard CountyCounty Fire/Rescue impact fee is Not Applicable in this city per the Brevard County Residential Impact Fee Schedule (eff. 1/2/2017, still adopted July 2026). $0 confirmed placeholder.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indialantic: Multifamily Impact Fees
A new multifamily unit in Indialantic pays at least $6,837.81 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $2,295.00.
The largest line items are County Transportation Impact Fee (MF) ($2,381.00), Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC ($2,295.00) and County Education Impact Fee (MF) ($1,940.50).
Sewer Connection Fee (Indialantic, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC$2,295.00Multifamily, 2 bedroomsCity of MelbourneIndialantic is served by City of Melbourne water. Melbourne Code §58-131(a)(2) (Ord. 2025-59, 12-9-2025): $2,755/ERC; master-metered multifamily ERC factors 0.500 / 0.583 / 0.833 / 1.000 by unit size. Canonical MF 2BR unit = 0.833 ERC = $2,295. Melbourne's rate table shows the same impact fee for 'Water Outside'. CORRECTED 2026-07-14 from $2,755 (the single-family 1.000-ERC rate).
- Sewer Connection Fee (Indialantic, MF)Requires confirmationTown of Indialantic⚠️ VERIFY. Sewer provider unclear. Fee not found online.
- City Impact Fees — None found$0.00Town of IndialanticNo city-level impact fees found. Small town; no city impact fee program identified.
- County Transportation Impact Fee (MF)$2,381.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B. Apartment 3+ stories. Other county fees (Fire/EMS/Correctional/Library/Solid Waste) differ per interlocal — confirm from full PDF or impact.fees@brevardfl.gov.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories. Fire/Rescue = Not Applicable.
- County Fire/Rescue Impact Fee — N/A (Indialantic own fire services, MF)$0.00Confirmed $0. Brevard County Residential Impact Fee Schedule (eff. 1-2-2017), Table 2: Fire/Rescue = 'Not Applicable'. Added 2026-07-14 for SFR/MF parallelism.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indialantic: Commercial Impact Fees
Commercial development in Indialantic pays $6.64 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $334,883.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft).
Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneCity of Melbourne is the regional potable water provider for this jurisdiction. Melbourne Code § 58-131(a)(5)a (Ord. No. 2025-59, § 2, adopted 12-9-2025): the COMMERCIAL water impact fee = average dependable daily capacity in GPD, certified by a Florida P.E. using the city's potable water concurrency standards (Appendix D, art. IV, ch. 3, § 3.46), × $11.479 per gallon of capacity, MINIMUM $2,755. NOT METER-SIZE BASED — the AWWA meter/ERC table in § 58-133(b)(2) governs MONTHLY SERVICE CHARGES ONLY and must not be applied to the impact fee. The $2,755 stored here is the adopted MINIMUM (the floor); a project with certified demand above ~240 GPD pays more. Includes a true-up: if actual 12-month average daily flow exceeds the capacity paid for, an additional impact fee is assessed; no refund on diminution. The impact fee is identical inside and outside city limits (only monthly rates carry the outside-city surcharge). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Separate: meter installation charges § 58-132 (3/4" $250 / 1" $475 / 1.5" $850 / 2" $1,600; >2" individually determined). Contact: City of Melbourne Public Works & Utilities, (321) 608-7500.
- Sewer Connection Fee (Brevard County Utilities)Requires confirmationBrevard County Utility Services⚠️ VERIFY — NOT PUBLISHED. Brevard County Utility Services is the sanitary sewer provider for this jurisdiction. Code Ch. 110 Art. II sets rates 'by resolution' with no schedule in the code; the Utility Development Fees page publishes only plan-review / site-plan / inspection fees; the County Rates page publishes only MONTHLY sewer rates (commercial base $32.79 + $6.93/1,000 gal, no maximum); web search finds no adopted nonres capacity schedule. The one-time nonres sewer connection/capacity charge appears to be set administratively per project. AUDIT 2026-07-14: re-verified again — the Utility Development Fees page still shows ONLY Res. 2024-1158 (adopted 10-22-2024, eff. 1-1-2025) plan-review/inspection/site-plan fees, with no capacity or connection charge of any kind; no successor resolution has been posted. Flag stands; resolvable only by contacting the utility. CONFIRM: Brevard County Utility Services Development, Utility.Development@BrevardFL.gov, (321) 633-2091; Director Edward Fontanin.
- City Impact Fees (Indialantic, Commercial) — none$0.00Town of IndialanticConfirmed $0. Indialantic levies NO impact fees — and affirmatively PROHIBITS one. The Town code has a Chapter 109 — IMPACT FEES, but it contains exactly one section, Sec. 109-1 "Emergency services impact fee," which reads verbatim: "No impact fee for emergency services facilities expansion, including, but not limited to, fire and ambulance emergency response, shall be collected within the jurisdictional limits of the town except those impact fees imposed and utilized for emergency medical services transport services." (Code 1993, § 6-181; Ord. No. 89-20, § 1, 8-15-1988; Ord. No. 05-13, § 1, 8-16-2005.) Municode full-code search for "impact fee" returns 7 hits; Ch. 109 is the only impact fee chapter and it imposes nothing. Brevard County overlay fees do apply in Indialantic (Table B; note the county EMS fee IS collected — it is an EMS transport fee).
- Transportation Impact Fee (Brevard County, Commercial)$6.40/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard County⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County's solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indialantic: Industrial Impact Fees
Industrial development in Indialantic pays no per-square-foot impact fees, but owes $2,755.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $2,755.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time).
Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneCity of Melbourne is the regional potable water provider for this jurisdiction. Melbourne Code § 58-131(a)(5)a (Ord. No. 2025-59, § 2, adopted 12-9-2025): the COMMERCIAL water impact fee = average dependable daily capacity in GPD, certified by a Florida P.E. using the city's potable water concurrency standards (Appendix D, art. IV, ch. 3, § 3.46), × $11.479 per gallon of capacity, MINIMUM $2,755. NOT METER-SIZE BASED — the AWWA meter/ERC table in § 58-133(b)(2) governs MONTHLY SERVICE CHARGES ONLY and must not be applied to the impact fee. The $2,755 stored here is the adopted MINIMUM (the floor); a project with certified demand above ~240 GPD pays more. Includes a true-up: if actual 12-month average daily flow exceeds the capacity paid for, an additional impact fee is assessed; no refund on diminution. The impact fee is identical inside and outside city limits (only monthly rates carry the outside-city surcharge). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Separate: meter installation charges § 58-132 (3/4" $250 / 1" $475 / 1.5" $850 / 2" $1,600; >2" individually determined). Contact: City of Melbourne Public Works & Utilities, (321) 608-7500.
- Sewer Connection Fee (Brevard County Utilities)Requires confirmationBrevard County Utility Services⚠️ VERIFY — NOT PUBLISHED. Brevard County Utility Services is the sanitary sewer provider for this jurisdiction. Code Ch. 110 Art. II sets rates 'by resolution' with no schedule in the code; the Utility Development Fees page publishes only plan-review / site-plan / inspection fees; the County Rates page publishes only MONTHLY sewer rates (commercial base $32.79 + $6.93/1,000 gal, no maximum); web search finds no adopted nonres capacity schedule. The one-time nonres sewer connection/capacity charge appears to be set administratively per project. AUDIT 2026-07-14: re-verified again — the Utility Development Fees page still shows ONLY Res. 2024-1158 (adopted 10-22-2024, eff. 1-1-2025) plan-review/inspection/site-plan fees, with no capacity or connection charge of any kind; no successor resolution has been posted. Flag stands; resolvable only by contacting the utility. CONFIRM: Brevard County Utility Services Development, Utility.Development@BrevardFL.gov, (321) 633-2091; Director Edward Fontanin.
- City Impact Fees (Indialantic, Industrial) — none$0.00Town of IndialanticConfirmed $0. Indialantic levies NO impact fees — and affirmatively PROHIBITS one. The Town code has a Chapter 109 — IMPACT FEES, but it contains exactly one section, Sec. 109-1 "Emergency services impact fee," which reads verbatim: "No impact fee for emergency services facilities expansion, including, but not limited to, fire and ambulance emergency response, shall be collected within the jurisdictional limits of the town except those impact fees imposed and utilized for emergency medical services transport services." (Code 1993, § 6-181; Ord. No. 89-20, § 1, 8-15-1988; Ord. No. 05-13, § 1, 8-16-2005.) Municode full-code search for "impact fee" returns 7 hits; Ch. 109 is the only impact fee chapter and it imposes nothing. Brevard County overlay fees do apply in Indialantic (Table B; note the county EMS fee IS collected — it is an EMS transport fee).
- County Impact Fees (Brevard County, Industrial) — exempt$0.00Brevard CountyConfirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. Covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) code rates, reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3. NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption covers Transportation, Fire Rescue, EMS and Correctional only. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indialantic: Office Impact Fees
Office development in Indialantic pays $5.11 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $130,518.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).
Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneCity of Melbourne is the regional potable water provider for this jurisdiction. Melbourne Code § 58-131(a)(5)a (Ord. No. 2025-59, § 2, adopted 12-9-2025): the COMMERCIAL water impact fee = average dependable daily capacity in GPD, certified by a Florida P.E. using the city's potable water concurrency standards (Appendix D, art. IV, ch. 3, § 3.46), × $11.479 per gallon of capacity, MINIMUM $2,755. NOT METER-SIZE BASED — the AWWA meter/ERC table in § 58-133(b)(2) governs MONTHLY SERVICE CHARGES ONLY and must not be applied to the impact fee. The $2,755 stored here is the adopted MINIMUM (the floor); a project with certified demand above ~240 GPD pays more. Includes a true-up: if actual 12-month average daily flow exceeds the capacity paid for, an additional impact fee is assessed; no refund on diminution. The impact fee is identical inside and outside city limits (only monthly rates carry the outside-city surcharge). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Separate: meter installation charges § 58-132 (3/4" $250 / 1" $475 / 1.5" $850 / 2" $1,600; >2" individually determined). Contact: City of Melbourne Public Works & Utilities, (321) 608-7500.
- Sewer Connection Fee (Brevard County Utilities)Requires confirmationBrevard County Utility Services⚠️ VERIFY — NOT PUBLISHED. Brevard County Utility Services is the sanitary sewer provider for this jurisdiction. Code Ch. 110 Art. II sets rates 'by resolution' with no schedule in the code; the Utility Development Fees page publishes only plan-review / site-plan / inspection fees; the County Rates page publishes only MONTHLY sewer rates (commercial base $32.79 + $6.93/1,000 gal, no maximum); web search finds no adopted nonres capacity schedule. The one-time nonres sewer connection/capacity charge appears to be set administratively per project. AUDIT 2026-07-14: re-verified again — the Utility Development Fees page still shows ONLY Res. 2024-1158 (adopted 10-22-2024, eff. 1-1-2025) plan-review/inspection/site-plan fees, with no capacity or connection charge of any kind; no successor resolution has been posted. Flag stands; resolvable only by contacting the utility. CONFIRM: Brevard County Utility Services Development, Utility.Development@BrevardFL.gov, (321) 633-2091; Director Edward Fontanin.
- City Impact Fees (Indialantic, Office) — none$0.00Town of IndialanticConfirmed $0. Indialantic levies NO impact fees — and affirmatively PROHIBITS one. The Town code has a Chapter 109 — IMPACT FEES, but it contains exactly one section, Sec. 109-1 "Emergency services impact fee," which reads verbatim: "No impact fee for emergency services facilities expansion, including, but not limited to, fire and ambulance emergency response, shall be collected within the jurisdictional limits of the town except those impact fees imposed and utilized for emergency medical services transport services." (Code 1993, § 6-181; Ord. No. 89-20, § 1, 8-15-1988; Ord. No. 05-13, § 1, 8-16-2005.) Municode full-code search for "impact fee" returns 7 hits; Ch. 109 is the only impact fee chapter and it imposes nothing. Brevard County overlay fees do apply in Indialantic (Table B; note the county EMS fee IS collected — it is an EMS transport fee).
- Transportation Impact Fee (Brevard County, Office)$5.06/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Indialantic
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Indialantic, Florida?
A new single-family home in Indialantic pays at least $12,538.98 per unit in combined impact fees (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Indialantic?
Commercial development in Indialantic pays $6.64 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees, at least $334,883.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Indialantic charge its own impact fees?
Yes. Indialantic levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Indialantic, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.