Skip to content
IMPACTFEES.ORG

Indian Harbour Beach, Florida Impact Fees

Indian Harbour Beach applies its own fee schedule: municipal fees plus the Brevard County-levied fees that apply inside city limits. Combined, a new single-family home pays $15,189.46 per unit (rates sourced ). The full breakdown is below.

Indian Harbour Beach Impact Fees by Project Type

Indian Harbour Beach: Single-Family Impact Fees

A new single-family home in Indian Harbour Beach pays $15,189.46 per unit in impact fees (rates sourced August 7, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $5,405.48.

The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Water Impact Fee (City of Melbourne) ($2,755.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Indian Harbour Beach Impact Fee Schedule
Water$2,755.00
  • Water Impact Fee (City of Melbourne)
    City of Melbourne
    Water service is supplied by the City of Melbourne regional system: one-time water impact fee $2,755 per ERC for a single-family home (Melbourne Code §58-131, Ord. 2025-59), the same rate inside and outside the city; a $250 connection/service charge also applies.
    $2,755.00
Sewer$2,650.48
  • Sewer Connection Fee (Indian Harbour Beach)
    1-3 bedrooms
    City of Indian Harbour Beach
    Sewer service is provided by Brevard County Utility Services. The one-time sewer connection charge is set per dwelling unit by bedroom count: $2,257 for 1-3 bedrooms, $2,610 for 4 bedrooms, and $2,962 for 5+ bedrooms, plus a one-time single-family capacity reservation fee of $393.48. A typical 3-bedroom home falls in the 1-3 bedroom tier at $2,257. A county rate increase is proposed effective September 1, 2026.
    $2,257.00
  • Sewer Capacity Reservation Fee (Indian Harbour Beach)
    Sewer service is provided by Brevard County Utility Services. In addition to the sewer connection charge, a one-time capacity reservation fee of $393.48 applies per single-family home. A county rate increase is proposed effective September 1, 2026.
    $393.48
City$0.00
  • City Impact Fees — None found
    City of Indian Harbour Beach
    No municipal (city) impact fees apply in this jurisdiction; only Brevard County overlay impact fees and applicable water/sewer connection charges apply.
    $0.00
County$9,783.98
  • Education Impact Fee (SFR)
    Brevard County / Brevard Public Schools
    Brevard County educational facilities (school) impact fee, single-family detached: $5,096.50/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $5,096.50
  • Transportation Impact Fee (SFR)
    Brevard County
    Brevard County transportation impact fee, single-family detached: $4,353.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $4,353.00
  • Solid Waste Impact Fee (SFR)
    Brevard County
    Brevard County solid waste impact fee, single-family detached: $160.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $160.00
  • Correctional Facility Impact Fee (SFR)
    Brevard County
    Brevard County correctional facilities impact fee, single-family detached: $71.99/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $71.99
  • Library Impact Fee (SFR)
    Brevard County
    Brevard County library facilities impact fee, single-family detached: $63.84/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $63.84
  • EMS Impact Fee (SFR)
    Brevard County
    Brevard County EMS (emergency medical services) impact fee, single-family detached: $38.65/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $38.65
  • Fire/Rescue — N/A (Indian Harbour Beach own fire services)
    Brevard County
    The Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
    $0.00
Total (Indian Harbour Beach): $15,189.46

Indian Harbour Beach: Multifamily Impact Fees

A new multifamily unit in Indian Harbour Beach pays $9,432.85 per unit in impact fees (rates sourced August 7, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $4,890.04.

The largest line items are County Transportation Impact Fee (MF) ($2,381.00), Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC ($2,295.00) and Sewer Connection Fee (Indian Harbour Beach, MF) ($2,257.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Indian Harbour Beach Impact Fee Schedule
Water$2,295.00
  • Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC
    Multifamily, 2 bedrooms
    City of Melbourne
    Water service is supplied by the City of Melbourne. For master-metered multifamily, Melbourne sets the water impact fee by an ERC factor per unit (efficiency 0.500 / 1-BR 0.583 / 2-BR 0.833 / 3+ BR 1.000 × $2,755/ERC). A canonical two-bedroom unit is 0.833 ERC = $2,295 (Melbourne Code §58-131). An individually metered unit is charged a full ERC ($2,755).
    $2,295.00
Sewer$2,595.04
  • Sewer Connection Fee (Indian Harbour Beach, MF)
    1-3 bedrooms
    City of Indian Harbour Beach
    Sewer service is provided by Brevard County Utility Services. The one-time sewer connection charge is set per dwelling unit by bedroom count (same for single-family and multifamily): $2,257 for 1-3 bedrooms, $2,610 for 4 bedrooms, and $2,962 for 5+ bedrooms, plus a one-time multifamily capacity reservation fee of $338.04. A typical 2-bedroom unit falls in the 1-3 bedroom tier at $2,257. A county rate increase is proposed effective September 1, 2026.
    $2,257.00
  • Sewer Capacity Reservation Fee (Indian Harbour Beach, MF)
    Sewer service is provided by Brevard County Utility Services. In addition to the sewer connection charge, a one-time capacity reservation fee of $338.04 applies per multifamily unit. A county rate increase is proposed effective September 1, 2026.
    $338.04
City$0.00
  • City Impact Fees — None found
    City of Indian Harbour Beach
    No municipal (city) impact fees apply in this jurisdiction; only Brevard County overlay impact fees and applicable water/sewer connection charges apply.
    $0.00
County$4,542.81
  • County Transportation Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County transportation impact fee, per apartment/multifamily unit: $2,381.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $2,381.00
  • County Education Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County / Brevard Public Schools
    Brevard County educational facilities (school) impact fee, per apartment/multifamily unit: $1,940.50/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $1,940.50
  • County Solid Waste Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County solid waste impact fee, per apartment/multifamily unit: $120.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $120.00
  • County Correctional Facility Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County correctional facilities impact fee, per apartment/multifamily unit: $41.25/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $41.25
  • County Library Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County library facilities impact fee, per apartment/multifamily unit: $37.91/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $37.91
  • County EMS Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County EMS (emergency medical services) impact fee, per apartment/multifamily unit: $22.15/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $22.15
  • County Fire/Rescue Impact Fee — N/A (Indian Harbour Beach own fire services, MF)
    The Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
    $0.00
Total (Indian Harbour Beach): $9,432.85

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Indian Harbour Beach: Commercial Impact Fees

Commercial development in Indian Harbour Beach pays $6.64 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced August 7, 2026).

For a 50,000 sq ft building, that comes to at least $334,883.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft).

Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Indian Harbour Beach Impact Fee Schedule
Water$2,755.00 one-time
  • Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal
    City of Melbourne
    Effective per City of Melbourne Ord. No. 2025-59 (adopted December 9, 2025): the commercial water impact fee = P.E.-certified average dependable daily capacity (GPD) × $11.479 per gallon, minimum $2,755. It is flow-based, not meter-size based, so the $2,755 shown is the minimum and any project certified above roughly 240 GPD pays more (e.g. 1,000 GPD = $11,479). The fee is identical inside and outside city limits and includes a true-up if actual 12-month flow exceeds the capacity paid for. City of Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores, and unincorporated Brevard south of the Pineda Causeway.
    $2,755.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Brevard County Utilities)
    Brevard County Utility Services
    Brevard County Utility Services is the sanitary sewer provider here, but the county publishes no nonresidential sewer connection or capacity fee schedule — only monthly sewer rates and plan-review/inspection fees are published. The one-time nonresidential capacity charge is set administratively on a per-project basis.
    Requires confirmation
City$0.00
County$6.64/sq ft
  • Transportation Impact Fee (Brevard County, Commercial)
    Brevard County
    Brevard County transportation impact fee — $6,396 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead.
    $6.40/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Commercial)
    Brevard County
    Brevard County correctional facilities impact fee — $160.44 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
    $0.16/sq ft
  • EMS Impact Fee (Brevard County, Commercial)
    Brevard County
    Brevard County EMS impact fee — $86.13 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
    $0.09/sq ft
  • Solid Waste Impact Fee (Brevard County, Commercial)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Indian Harbour Beach): $6.64/sq ft + $2,755.00 one-time (≈ $334,883.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Melbourne Brevard County Utility Services City of Indian Harbour Beach Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Indian Harbour Beach: Industrial Impact Fees

Industrial development in Indian Harbour Beach pays no per-square-foot impact fees, but owes $2,755.00 in one-time water and sewer connection fees (rates sourced August 7, 2026).

For a 50,000 sq ft building, that comes to at least $2,755.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time).

Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Indian Harbour Beach Impact Fee Schedule
Water$2,755.00 one-time
  • Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal
    City of Melbourne
    Effective per City of Melbourne Ord. No. 2025-59 (adopted December 9, 2025): the commercial water impact fee = P.E.-certified average dependable daily capacity (GPD) × $11.479 per gallon, minimum $2,755. It is flow-based, not meter-size based, so the $2,755 shown is the minimum and any project certified above roughly 240 GPD pays more (e.g. 1,000 GPD = $11,479). The fee is identical inside and outside city limits and includes a true-up if actual 12-month flow exceeds the capacity paid for. City of Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores, and unincorporated Brevard south of the Pineda Causeway.
    $2,755.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Brevard County Utilities)
    Brevard County Utility Services
    Brevard County Utility Services is the sanitary sewer provider here, but the county publishes no nonresidential sewer connection or capacity fee schedule — only monthly sewer rates and plan-review/inspection fees are published. The one-time nonresidential capacity charge is set administratively on a per-project basis.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fees (Brevard County, Industrial) — exempt
    Brevard County
    Brevard County exempts all industrial land uses (NAICS sectors 21, 22, 23, 31–33, 48–49, and subsector 562 — covering general industrial, manufacturing, warehouse, and mini-warehouse) from its Transportation, Fire Rescue, EMS, and Correctional impact fees, so the county nonresidential impact fee for industrial development is $0. Any applicable city impact fees still apply.
    $0.00
  • Solid Waste Impact Fee (Brevard County, Industrial)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Indian Harbour Beach): $2,755.00 one-time (≈ $2,755.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Melbourne Brevard County Utility Services City of Indian Harbour Beach Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Indian Harbour Beach: Office Impact Fees

Office development in Indian Harbour Beach pays $5.11 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced August 7, 2026).

For a 25,000 sq ft building, that comes to at least $130,518.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).

Sewer Connection Fee (Brevard County Utilities) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Indian Harbour Beach Impact Fee Schedule
Water$2,755.00 one-time
  • Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal
    City of Melbourne
    Effective per City of Melbourne Ord. No. 2025-59 (adopted December 9, 2025): the commercial water impact fee = P.E.-certified average dependable daily capacity (GPD) × $11.479 per gallon, minimum $2,755. It is flow-based, not meter-size based, so the $2,755 shown is the minimum and any project certified above roughly 240 GPD pays more (e.g. 1,000 GPD = $11,479). The fee is identical inside and outside city limits and includes a true-up if actual 12-month flow exceeds the capacity paid for. City of Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores, and unincorporated Brevard south of the Pineda Causeway.
    $2,755.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Brevard County Utilities)
    Brevard County Utility Services
    Brevard County Utility Services is the sanitary sewer provider here, but the county publishes no nonresidential sewer connection or capacity fee schedule — only monthly sewer rates and plan-review/inspection fees are published. The one-time nonresidential capacity charge is set administratively on a per-project basis.
    Requires confirmation
City$0.00
County$5.11/sq ft
  • Transportation Impact Fee (Brevard County, Office)
    Brevard County
    Brevard County transportation impact fee — $5,058 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead.
    $5.06/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Office)
    Brevard County
    Brevard County correctional facilities impact fee — $34.17 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
    $0.03/sq ft
  • EMS Impact Fee (Brevard County, Office)
    Brevard County
    Brevard County EMS impact fee — $18.35 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
    $0.02/sq ft
  • Solid Waste Impact Fee (Brevard County, Office)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Indian Harbour Beach): $5.11/sq ft + $2,755.00 one-time (≈ $130,518.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Melbourne Brevard County Utility Services City of Indian Harbour Beach Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Indian Harbour Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Indian Harbour Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Indian Harbour Beach, Florida?

A new single-family home in Indian Harbour Beach pays $15,189.46 per unit in combined impact fees (rates sourced August 7, 2026).

How much are commercial impact fees in Indian Harbour Beach?

Commercial development in Indian Harbour Beach pays $6.64 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees, at least $334,883.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Indian Harbour Beach charge its own impact fees?

Yes. Indian Harbour Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Indian Harbour Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brevard County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000