Skip to content
IMPACTFEES.ORG

Rockledge, Florida Impact Fees

Rockledge applies its own fee schedule: municipal fees plus the Brevard County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $11,833.98 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Rockledge Impact Fees by Project Type

Rockledge: Single-Family Impact Fees

A new single-family home in Rockledge pays at least $11,833.98 per unit in impact fees (rates sourced October 13, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $2,050.00.

The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Water Impact Fee (Cocoa Utilities, SFR) ($1,750.00).

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Rockledge Impact Fee Schedule
Water$1,750.00
  • Water Impact Fee (Cocoa Utilities, SFR)
    City of Cocoa (Cocoa Utilities)
    Water service is supplied by the City of Cocoa (Cocoa Utilities) system: one-time water impact fee $1,750 per ERC (1.0 ERC for a single-family home), per Cocoa's Schedule B as updated October 2026. Where reclaimed water is available the potable rate is $1,300.
    $1,750.00
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    Sewer service is provided by the City of Rockledge (its own system). A one-time sewer connection charge is due before the building permit is issued under City Code Section 32-113, set by ordinance, and no current amount is published by the city.
    Requires confirmation
City$300.00
  • Sanitation Impact Fee (City of Rockledge)
    City of Rockledge
    City of Rockledge sanitation impact fee, $300.00 per single-family home, under Ordinance 1755-2019 (adopted October 16, 2019), paid when the development order is issued. This is a city charge for solid waste facilities, separate from the Brevard County solid waste impact fee.
    $300.00
  • City Impact Fees (Rockledge)
    City of Rockledge
    The City of Rockledge levies no police, fire, parks, transportation or general government impact fee of its own; the county impact fees, the City of Cocoa water charges and the city sewer connection charge are separate items. The city does levy a sanitation impact fee on every new dwelling under Ordinance 1755-2019 (adopted October 16, 2019), due when the development order is issued, which is entered separately.
    $0.00
County$9,783.98
  • Education Impact Fee (SFR)
    Brevard County / Brevard Public Schools
    Brevard County educational facilities (school) impact fee, single-family detached: $5,096.50/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $5,096.50
  • Transportation Impact Fee (SFR)
    Brevard County
    Brevard County transportation impact fee, single-family detached: $4,353.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $4,353.00
  • Solid Waste Impact Fee (SFR)
    Brevard County
    Brevard County solid waste impact fee, single-family detached: $160.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $160.00
  • Correctional Facility Impact Fee (SFR)
    Brevard County
    Brevard County correctional facilities impact fee, single-family detached: $71.99/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $71.99
  • Library Impact Fee (SFR)
    Brevard County
    Brevard County library facilities impact fee, single-family detached: $63.84/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $63.84
  • EMS Impact Fee (SFR)
    Brevard County
    Brevard County EMS (emergency medical services) impact fee, single-family detached: $38.65/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $38.65
  • County Fire/Rescue Impact Fee (Brevard County, within Rockledge)
    Brevard County
    The Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
    $0.00
Total (Rockledge): $11,833.98
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Rockledge: Multifamily Impact Fees

A new multifamily unit in Rockledge pays at least $6,392.81 per unit in impact fees (rates sourced October 13, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $1,850.00.

The largest line items are County Transportation Impact Fee (MF) ($2,381.00), County Education Impact Fee (MF) ($1,940.50) and Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC ($1,750.00).

Sewer Connection Fee (Rockledge, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Rockledge Impact Fee Schedule
Water$1,750.00
  • Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC
    City of Cocoa (Cocoa Utilities)
    Water service is supplied by the City of Cocoa (Cocoa Utilities). An apartment/condo unit with two or more bathrooms is 1.00 ERC = $1,750 per unit (Cocoa Schedule B, updated October 2026); a one-bathroom unit is 0.80 ERC = $1,400.
    $1,750.00
Sewer$0.00
  • Sewer Connection Fee (Rockledge, MF)
    City of Rockledge
    Sewer service is provided by the City of Rockledge (its own system). A one-time sewer connection charge is due before the building permit is issued under City Code Section 32-113, set by ordinance; neither the amount nor the per-unit basis for a multifamily building is published by the city.
    Requires confirmation
City$100.00
  • Sanitation Impact Fee (City of Rockledge, MF)
    City of Rockledge
    City of Rockledge sanitation impact fee, $100.00 per apartment unit, under Ordinance 1755-2019 (adopted October 16, 2019), paid when the development order is issued. This is a city charge for solid waste facilities, separate from the Brevard County solid waste impact fee.
    $100.00
  • City Impact Fees (Rockledge, MF)
    City of Rockledge
    The City of Rockledge levies no police, fire, parks, transportation or general government impact fee of its own; the county impact fees, the City of Cocoa water charges and the city sewer connection charge are separate items. The city does levy a sanitation impact fee on every new apartment unit under Ordinance 1755-2019 (adopted October 16, 2019), due when the development order is issued, which is entered separately.
    $0.00
County$4,542.81
  • County Transportation Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County transportation impact fee, per apartment/multifamily unit: $2,381.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $2,381.00
  • County Education Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County / Brevard Public Schools
    Brevard County educational facilities (school) impact fee, per apartment/multifamily unit: $1,940.50/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $1,940.50
  • County Solid Waste Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County solid waste impact fee, per apartment/multifamily unit: $120.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $120.00
  • County Correctional Facility Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County correctional facilities impact fee, per apartment/multifamily unit: $41.25/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $41.25
  • County Library Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County library facilities impact fee, per apartment/multifamily unit: $37.91/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $37.91
  • County EMS Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County EMS (emergency medical services) impact fee, per apartment/multifamily unit: $22.15/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
    $22.15
  • County Fire/Rescue Impact Fee (Brevard County, within Rockledge, MF)
    Brevard County
    The Brevard County fire/rescue impact fee is not levied here; it applies only in unincorporated Brevard and the municipalities served by county fire/rescue. This jurisdiction is served by its own fire service.
    $0.00
Total (Rockledge): $6,392.81
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge: Commercial Impact Fees

Commercial development in Rockledge pays $7.14 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to at least $361,503.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Sanitation Impact Fee (City of Rockledge, Commercial) ($0.50/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Rockledge Impact Fee Schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Effective per Cocoa Utilities Schedule B (updated October 2026): the commercial water impact fee is 2.50 ERC × $1,750/ERC = $4,375 for a 1" meter. The meter-size amount is a floor; the fee is the greater of this or the ERCs calculated under the Utilities Handbook. The reclaimed-water discount applies to single-family only; nonresidential receives no discount, and there is no inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, and much of unincorporated central Brevard.
    $4,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    The City of Rockledge operates its own sewer system, and new connections pay the sewer connection charge required by City Code Section 32-113 at permit; the city publishes no dollar amount or nonresidential basis for it.
    Requires confirmation
City$0.50/sq ft
  • Sanitation Impact Fee (City of Rockledge, Commercial)
    City of Rockledge
    City of Rockledge sanitation impact fee: $0.50 per square foot of new commercial construction under Ord. No. 1755-2019 (effective October 2019), due on receipt of a development order. Brevard County overlay impact fees also apply by interlocal agreement.
    $0.50/sq ft
County$6.64/sq ft
  • Transportation Impact Fee (Brevard County, Commercial)
    Retail 50,000 to 99,999 sq ft
    Brevard County
    Brevard County transportation impact fee: $6,396 per 1,000 sq ft of gross floor area for retail of 50,000 to 99,999 sq ft (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead, and Melbourne Village, where the county schedule does not collect it. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $6.40/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Commercial)
    Retail 10,001 to 100,000 sq ft
    Brevard County
    Brevard County correctional facilities impact fee: $160.44 per 1,000 sq ft of gross floor area for retail of 10,001 to 100,000 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.16/sq ft
  • EMS Impact Fee (Brevard County, Commercial)
    Retail 10,001 to 100,000 sq ft
    Brevard County
    Brevard County EMS impact fee: $86.13 per 1,000 sq ft of gross floor area for retail of 10,001 to 100,000 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.09/sq ft
  • Solid Waste Impact Fee (Brevard County, Commercial)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Rockledge): $7.14/sq ft + $4,375.00 one-time (≈ $361,503.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cocoa (Cocoa Utilities) City of Rockledge Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge: Industrial Impact Fees

Industrial development in Rockledge pays $0.50 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 50,000 sq ft building, that comes to at least $29,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sanitation Impact Fee (City of Rockledge, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Rockledge Impact Fee Schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Effective per Cocoa Utilities Schedule B (updated October 2026): the commercial water impact fee is 2.50 ERC × $1,750/ERC = $4,375 for a 1" meter. The meter-size amount is a floor; the fee is the greater of this or the ERCs calculated under the Utilities Handbook. The reclaimed-water discount applies to single-family only; nonresidential receives no discount, and there is no inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, and much of unincorporated central Brevard.
    $4,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    The City of Rockledge operates its own sewer system, and new connections pay the sewer connection charge required by City Code Section 32-113 at permit; the city publishes no dollar amount or nonresidential basis for it.
    Requires confirmation
City$0.50/sq ft
  • Sanitation Impact Fee (City of Rockledge, Industrial)
    City of Rockledge
    City of Rockledge sanitation impact fee: $0.50 per square foot of new nonresidential construction under Ord. No. 1755-2019 (effective October 2019), which applies to all new construction and sets the per-square-foot rate in its commercial class; due on receipt of a development order. Brevard County overlay impact fees also apply by interlocal agreement.
    $0.50/sq ftRequires confirmation
County$0.00
  • County Impact Fees (Brevard County, Industrial)
    Brevard County
    Brevard County exempts industrial land uses (general industrial, manufacturing, warehousing and similar uses) from its Transportation, Fire Rescue, EMS, and Correctional impact fees, so those county impact fees are $0 for industrial development. The county solid waste impact fee is not exempt and is listed separately. Any applicable city impact fees still apply.
    $0.00
  • Solid Waste Impact Fee (Brevard County, Industrial)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Rockledge): $0.50/sq ft + $4,375.00 one-time (≈ $29,375.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cocoa (Cocoa Utilities) City of Rockledge Brevard County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge: Office Impact Fees

Office development in Rockledge pays $5.61 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced October 13, 2026).

For a 25,000 sq ft building, that comes to at least $144,638.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sanitation Impact Fee (City of Rockledge, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Rockledge Impact Fee Schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Effective per Cocoa Utilities Schedule B (updated October 2026): the commercial water impact fee is 2.50 ERC × $1,750/ERC = $4,375 for a 1" meter. The meter-size amount is a floor; the fee is the greater of this or the ERCs calculated under the Utilities Handbook. The reclaimed-water discount applies to single-family only; nonresidential receives no discount, and there is no inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, and much of unincorporated central Brevard.
    $4,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    The City of Rockledge operates its own sewer system, and new connections pay the sewer connection charge required by City Code Section 32-113 at permit; the city publishes no dollar amount or nonresidential basis for it.
    Requires confirmation
City$0.50/sq ft
  • Sanitation Impact Fee (City of Rockledge, Office)
    City of Rockledge
    City of Rockledge sanitation impact fee: $0.50 per square foot of new nonresidential construction under Ord. No. 1755-2019 (effective October 2019), which applies to all new construction and sets the per-square-foot rate in its commercial class; due on receipt of a development order. Brevard County overlay impact fees also apply by interlocal agreement.
    $0.50/sq ftRequires confirmation
County$5.11/sq ft
  • Transportation Impact Fee (Brevard County, Office)
    Office 10,000 sq ft and over
    Brevard County
    Brevard County transportation impact fee: $5,058 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule, adopted under Ord. No. 06-044; still the current adopted rate). Assessed and collected by Brevard County across the county under interlocal agreement, except in Palm Bay and Melbourne, which levy their own transportation impact fees instead, and Melbourne Village, where the county schedule does not collect it. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $5.06/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Office)
    Office 10,000 sq ft and over
    Brevard County
    Brevard County correctional facilities impact fee: $34.17 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.03/sq ft
  • EMS Impact Fee (Brevard County, Office)
    Office 10,000 sq ft and over
    Brevard County
    Brevard County EMS impact fee: $18.35 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area. Brevard County adopted an impact fee update study on July 21, 2026; any new rates take effect only after a public hearing on an amending ordinance.
    $0.02/sq ft
  • Solid Waste Impact Fee (Brevard County, Office)
    Brevard County
    Brevard County's solid waste impact fee is not a flat per-sq-ft rate; it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
    Requires confirmation
Total (Rockledge): $5.61/sq ft + $4,375.00 one-time (≈ $144,638.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Cocoa (Cocoa Utilities) City of Rockledge Brevard County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

Pending and Recent Changes

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Rockledge Impact Fee FAQs

What are the total impact fees for a single-family home in Rockledge, Florida?

A new single-family home in Rockledge pays at least $11,833.98 per unit in combined impact fees (rates sourced October 13, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Rockledge?

Commercial development in Rockledge pays $7.14 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $361,503.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Rockledge charge its own impact fees?

Yes. Rockledge levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Rockledge, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brevard County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000