Rockledge, Florida Impact Fees

Rockledge applies its own fee schedule: municipal fees plus the Brevard County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $11,533.98 per unit (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Rockledge impact fees by project type

Rockledge: Single-Family Impact Fees

A new single-family home in Rockledge pays at least $11,533.98 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $9,783.98 and municipal or utility fees for $1,750.00.

The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Water Impact Fee (Cocoa Utilities, SFR) ($1,750.00).

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. City Impact Fees (Rockledge) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$1,750.00
  • Water Impact Fee (Cocoa Utilities, SFR)
    City of Cocoa (Cocoa Utilities)
    CONFIRMED 2026-07-14 (Unconfirmed box cleared). Rockledge is served by Cocoa Utilities water. Cocoa Schedule B — Utility Impact & Connection Fees, updated October 2025: Water Service Impact Fee, single family residence = 1.00 ERC = $1,750 (reclaimed water not available); $1,300 where reclaimed water is available.
    $1,750.00
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    ⚠️ VERIFY. Rockledge operates its own wastewater treatment facility. Connection/impact fee not found online. Call Rockledge Wastewater at (321) 221-7540.
    Requires confirmation
City$0.00
  • City Impact Fees (Rockledge)
    City of Rockledge
    ⚠️ VERIFY. Rockledge has a sanitation impact fee per 2019 ordinance. May have additional city impact fees. Call (321) 221-7540 or (321) 604-3017.
    Requires confirmation
County$9,783.98
Total (Rockledge): $11,533.98
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge: Multifamily Impact Fees

A new multifamily unit in Rockledge pays at least $6,292.81 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $4,542.81 and municipal or utility fees for $1,750.00.

The largest line items are County Transportation Impact Fee (MF) ($2,381.00), County Education Impact Fee (MF) ($1,940.50) and Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC ($1,750.00).

Sewer Connection Fee (Rockledge, MF) is set by the utility and not published online. City Impact Fees (Rockledge, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,750.00
  • Water Impact Fee (Cocoa Utilities, MF) — 2+ bath, 1.00 ERC
    City of Cocoa (Cocoa Utilities)
    CONFIRMED 2026-07-14. Rockledge is served by Cocoa Utilities water. Cocoa Schedule B (updated October 2025): 'Apartment or Condo: 2 or more bath' = 1.00 ERC = $1,750. Canonical MF unit (2BR/2BA) is in this tier; MF = SFR by design (both 1.00 ERC).
    $1,750.00
Sewer$0.00
City$0.00
County$4,542.81
  • County Transportation Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B. Apartment 3+ stories. Other county fees differ per interlocal — confirm full PDF or impact.fees@brevardfl.gov.
    $2,381.00
  • County Education Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County / Brevard Public Schools
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
    $1,940.50
  • County Solid Waste Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
    $120.00
  • County Correctional Facility Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
    $41.25
  • County Library Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories.
    $37.91
  • County EMS Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group B (Table 1). Apartment 3+ stories. Fire/Rescue = Not Applicable.
    $22.15
  • County Fire/Rescue Impact Fee — N/A (Rockledge own fire services, MF)
    Confirmed $0. Brevard County Residential Impact Fee Schedule (eff. 1-2-2017), Table 2: Fire/Rescue = 'Not Applicable'. Added 2026-07-14 for SFR/MF parallelism.
    $0.00
Total (Rockledge): $6,292.81
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge: Commercial Impact Fees

Commercial development in Rockledge pays $6.64 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $336,503.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft) and Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
    $4,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    ⚠️ VERIFY — FEE NOT PUBLISHED. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Rockledge operates its own wastewater treatment / water reclamation plant. Rockledge Code Chapter 36 — FEES (the consolidated fee schedule) lists the connection fee VERBATIM as: § 32-169 "Application for connection to system" — "TBD". The fee is literally listed as TBD in the adopted code; there is no published amount and no meter-size table anywhere in the Rockledge code or on cityofrockledge.org. (Sewer provisions moved to Ch. 32 — Utilities in the 2022/2025 recodification; the old Ch. 17 / LDR § 102-307 citations are obsolete. Online content updated 7-1-2025, Ord. 1924-2025.) Recent sewer legislation is rate-only: Ord. No. 1936-2025 (adopted 9-17-2025) raises the BASE MONTHLY sewer service charge 10%/yr for 5 years and does not touch connection fees. Exhausted: Municode full code, cityofrockledge.org, web search. CONFIRM the adopted nonresidential sewer connection/impact fee. Contacts: City of Rockledge Wastewater Treatment & Water Reclamation Dept., 1700 Jack Oates Blvd, (321) 690-3978; Public Works Dept., (321) 221-7540 / (321) 204-6355.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Rockledge, Commercial) — none
    City of Rockledge
    Confirmed $0. Rockledge levies NO city impact fees — it collects the COUNTY schedule by interlocal agreement. Rockledge LDR § 102-307 "Impact fees" does not create a city fee; it states "(1) Transportation/correctional as required by interlocal agreement with Brevard County … as of September 30, 2001," and prints an "Incorporated Impact Fee Schedule for the County." Subsections (2) and (3) are water (Cocoa interlocal) and sewer connection charges — utility fees, tracked separately. Ord. history: LDR 1990 § 39.17; Ords. 1013-91, 1098-95, 1120-96, 1268-2002 (4-3-2002), 1755-2019 (10-16-2019). Also checked LDR Chapter 124 — FEES in full (building permit, board of adjustment, site plan, rezoning, annexation, comp plan, tree removal, plat fees) — NO impact fee line. NOTE: the residential dataset's "sanitation impact fee per a 2019 ordinance" lead is NOT an impact fee — full-code search for "sanitation impact fee" returns nothing; the 2019-era garbage ordinances (Ord. 1866-2022, Ord. 1935-2025) amend MONTHLY garbage collection service charges, which are recurring rates, not impact fees. Code recodified through Ords. 1854-2022 / 1867-2022; content updated 7-1-2025.
    $0.00
County$6.64/sq ft
  • Transportation Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
    $6.40/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
    $0.16/sq ft
  • EMS Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
    $0.09/sq ft
  • Solid Waste Impact Fee (Brevard County, Commercial)
    Brevard County
    ⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County's solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
    Requires confirmation
Total (Rockledge): $6.64/sq ft + $4,375.00 one-time (≈ $336,503.50 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Cocoa (Cocoa Utilities) City of Rockledge Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge: Industrial Impact Fees

Industrial development in Rockledge pays no per-square-foot impact fees, but owes $4,375.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $4,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
    $4,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    ⚠️ VERIFY — FEE NOT PUBLISHED. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Rockledge operates its own wastewater treatment / water reclamation plant. Rockledge Code Chapter 36 — FEES (the consolidated fee schedule) lists the connection fee VERBATIM as: § 32-169 "Application for connection to system" — "TBD". The fee is literally listed as TBD in the adopted code; there is no published amount and no meter-size table anywhere in the Rockledge code or on cityofrockledge.org. (Sewer provisions moved to Ch. 32 — Utilities in the 2022/2025 recodification; the old Ch. 17 / LDR § 102-307 citations are obsolete. Online content updated 7-1-2025, Ord. 1924-2025.) Recent sewer legislation is rate-only: Ord. No. 1936-2025 (adopted 9-17-2025) raises the BASE MONTHLY sewer service charge 10%/yr for 5 years and does not touch connection fees. Exhausted: Municode full code, cityofrockledge.org, web search. CONFIRM the adopted nonresidential sewer connection/impact fee. Contacts: City of Rockledge Wastewater Treatment & Water Reclamation Dept., 1700 Jack Oates Blvd, (321) 690-3978; Public Works Dept., (321) 221-7540 / (321) 204-6355.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Rockledge, Industrial) — none
    City of Rockledge
    Confirmed $0. Rockledge levies NO city impact fees — it collects the COUNTY schedule by interlocal agreement. Rockledge LDR § 102-307 "Impact fees" does not create a city fee; it states "(1) Transportation/correctional as required by interlocal agreement with Brevard County … as of September 30, 2001," and prints an "Incorporated Impact Fee Schedule for the County." Subsections (2) and (3) are water (Cocoa interlocal) and sewer connection charges — utility fees, tracked separately. Ord. history: LDR 1990 § 39.17; Ords. 1013-91, 1098-95, 1120-96, 1268-2002 (4-3-2002), 1755-2019 (10-16-2019). Also checked LDR Chapter 124 — FEES in full (building permit, board of adjustment, site plan, rezoning, annexation, comp plan, tree removal, plat fees) — NO impact fee line. NOTE: the residential dataset's "sanitation impact fee per a 2019 ordinance" lead is NOT an impact fee — full-code search for "sanitation impact fee" returns nothing; the 2019-era garbage ordinances (Ord. 1866-2022, Ord. 1935-2025) amend MONTHLY garbage collection service charges, which are recurring rates, not impact fees. Code recodified through Ords. 1854-2022 / 1867-2022; content updated 7-1-2025.
    $0.00
County$0.00
  • County Impact Fees (Brevard County, Industrial) — exempt
    Brevard County
    Confirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. Covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) code rates, reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential.
    $0.00
  • Solid Waste Impact Fee (Brevard County, Industrial)
    Brevard County
    ⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3. NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption covers Transportation, Fire Rescue, EMS and Correctional only. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
    Requires confirmation
Total (Rockledge): $4,375.00 one-time (≈ $4,375.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Cocoa (Cocoa Utilities) City of Rockledge Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rockledge: Office Impact Fees

Office development in Rockledge pays $5.11 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to at least $132,138.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (Cocoa Utilities) — 1" meter ($4,375.00 one-time), Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft) and Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Rockledge) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$4,375.00 one-time
  • Water Impact Fee (Cocoa Utilities) — 1" meter
    City of Cocoa (Cocoa Utilities)
    Cocoa Utilities Schedule B — Miscellaneous Rates, Fees & Charges, updated October 2025. Commercial (non-SFR) water impact fee by meter size; 2.50 ERC × $1,750/ERC. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. GOVERNING RULE (Schedule B, verbatim): "Impact fees will be based on either the calculated ERC's per the Utilities Handbook or the base impact fee listed above, whichever is higher" — the meter table is a FLOOR, not a cap. The reclaimed-water discount applies to SFR only; commercial gets no discount. No inside/outside-city differential. Cocoa Utilities is the potable water provider for Cocoa, Cocoa Beach, Cape Canaveral, Rockledge, much of unincorporated central Brevard, and wholesale to Titusville. Separate charges may apply: plan review & construction inspection $750; reclaimed connection charge (5/8-3/4" $301, 1" $425, 1.5" $700, 2" $1,000).
    $4,375.00 one-time
Sewer$0.00
  • Sewer Connection Fee (City of Rockledge)
    City of Rockledge
    ⚠️ VERIFY — FEE NOT PUBLISHED. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Rockledge operates its own wastewater treatment / water reclamation plant. Rockledge Code Chapter 36 — FEES (the consolidated fee schedule) lists the connection fee VERBATIM as: § 32-169 "Application for connection to system" — "TBD". The fee is literally listed as TBD in the adopted code; there is no published amount and no meter-size table anywhere in the Rockledge code or on cityofrockledge.org. (Sewer provisions moved to Ch. 32 — Utilities in the 2022/2025 recodification; the old Ch. 17 / LDR § 102-307 citations are obsolete. Online content updated 7-1-2025, Ord. 1924-2025.) Recent sewer legislation is rate-only: Ord. No. 1936-2025 (adopted 9-17-2025) raises the BASE MONTHLY sewer service charge 10%/yr for 5 years and does not touch connection fees. Exhausted: Municode full code, cityofrockledge.org, web search. CONFIRM the adopted nonresidential sewer connection/impact fee. Contacts: City of Rockledge Wastewater Treatment & Water Reclamation Dept., 1700 Jack Oates Blvd, (321) 690-3978; Public Works Dept., (321) 221-7540 / (321) 204-6355.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Rockledge, Office) — none
    City of Rockledge
    Confirmed $0. Rockledge levies NO city impact fees — it collects the COUNTY schedule by interlocal agreement. Rockledge LDR § 102-307 "Impact fees" does not create a city fee; it states "(1) Transportation/correctional as required by interlocal agreement with Brevard County … as of September 30, 2001," and prints an "Incorporated Impact Fee Schedule for the County." Subsections (2) and (3) are water (Cocoa interlocal) and sewer connection charges — utility fees, tracked separately. Ord. history: LDR 1990 § 39.17; Ords. 1013-91, 1098-95, 1120-96, 1268-2002 (4-3-2002), 1755-2019 (10-16-2019). Also checked LDR Chapter 124 — FEES in full (building permit, board of adjustment, site plan, rezoning, annexation, comp plan, tree removal, plat fees) — NO impact fee line. NOTE: the residential dataset's "sanitation impact fee per a 2019 ordinance" lead is NOT an impact fee — full-code search for "sanitation impact fee" returns nothing; the 2019-era garbage ordinances (Ord. 1866-2022, Ord. 1935-2025) amend MONTHLY garbage collection service charges, which are recurring rates, not impact fees. Code recodified through Ords. 1854-2022 / 1867-2022; content updated 7-1-2025.
    $0.00
County$5.11/sq ft
  • Transportation Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
    $5.06/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
    $0.03/sq ft
  • EMS Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
    $0.02/sq ft
  • Solid Waste Impact Fee (Brevard County, Office)
    Brevard County
    ⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
    Requires confirmation
Total (Rockledge): $5.11/sq ft + $4,375.00 one-time (≈ $132,138.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Cocoa (Cocoa Utilities) City of Rockledge Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Rockledge

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Rockledge, Florida?

A new single-family home in Rockledge pays at least $11,533.98 per unit in combined impact fees (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Rockledge?

Commercial development in Rockledge pays $6.64 per square foot in impact fees, plus $4,375.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $336,503.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Rockledge charge its own impact fees?

Yes. Rockledge levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Rockledge, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brevard County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000