West Melbourne, Florida Impact Fees

West Melbourne applies its own fee schedule: municipal fees plus the Brevard County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $9,838.06 per unit (rates sourced July 12, 2026). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

West Melbourne impact fees by project type

West Melbourne: Single-Family Impact Fees

A new single-family home in West Melbourne pays at least $9,838.06 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Brevard County.

The largest line items are Education Impact Fee (SFR) ($5,096.50), Transportation Impact Fee (SFR) ($4,353.00) and Solid Waste Impact Fee (SFR) ($160.00).

Water Connection Fee (West Melbourne) and Sewer Connection Fee (West Melbourne) are set by the utility and not published online. City Impact Fees (West Melbourne) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (West Melbourne)
    City of West Melbourne
    ⚠️ VERIFY. West Melbourne water connection fee = Melbourne fee (Sec. 32-71) + West Melbourne component (Sec. 58-110, Ord. 2024-09). Total amount not published online. Call (321) 837-7750.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (West Melbourne)
    City of West Melbourne
    ⚠️ VERIFY. West Melbourne sewer serviced through interlocal with Melbourne (sewer rate visible on Melbourne’s rate table). Sewer connection/impact fee not found online. Call (321) 837-7750.
    Requires confirmation
City$0.00
  • City Impact Fees (West Melbourne)
    City of West Melbourne
    ⚠️ VERIFY. West Melbourne has development impact fees per ORD2025-24 (Exhibit A Schedule of Development Fees). Amounts not found online. Call (321) 837-7750.
    Requires confirmation
County$9,838.06
Total (West Melbourne): $9,838.06
Sources last checked July 12, 2026Official fee schedules:City of West Melbourne Brevard County / Brevard Public Schools Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Melbourne: Multifamily Impact Fees

A new multifamily unit in West Melbourne pays at least $6,113.80 per unit in impact fees (rates sourced July 12, 2026). Of that, Brevard County-levied fees account for $4,573.80 and municipal or utility fees for $1,540.00.

The largest line items are County Transportation Impact Fee (MF) ($2,381.00), County Education Impact Fee (MF) ($1,940.50) and County Solid Waste Impact Fee (MF) ($120.00).

Water Impact Fee (West Melbourne, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (West Melbourne, MF) is set by the utility and not published online. City Impact Fees (West Melbourne, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,540.00
  • Water Impact Fee (West Melbourne, MF)
    City of Melbourne
    ⚠️ UNCONFIRMED. West Melbourne runs its own utility (bulk water/sewer from City of Melbourne under interlocal) but publishes NO connection/impact fee schedule — westmelbourne.org/124/Utility-Services renders with account forms and monthly-billing info only, no capital charges. The stored $1,540 has no traceable source and does not appear in Melbourne's Code §58-131(a)(2) ERC table (which would give $2,295 for a master-metered 2BR MF unit). The SFR West Melbourne water record is $0/unconfirmed, so SFR and MF disagree. A duplicate $0 MF water placeholder was deleted 2026-07-14. Verify with West Melbourne Utility Division, (321) 837-7750.
    $1,540.00Requires confirmation
Sewer$0.00
City$0.00
  • City Impact Fees (West Melbourne, MF)
    City of West Melbourne
    ⚠️ VERIFY. West Melbourne development fees per ORD2025-24. MF rate from Exhibit A. Call (321) 837-7750.
    Requires confirmation
County$4,573.80
  • County Transportation Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A (Unincorporated, West Melbourne, Palm Shores, Grant-Valkaria). Apartment 3+ stories per unit. Fire $30.99, EMS $22.15, Correctional $41.25, Library $37.91, Solid Waste $120, Education $1,940.50 also apply — see separate records.
    $2,381.00
  • County Education Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County / Brevard Public Schools
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
    $1,940.50
  • County Solid Waste Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A. Apartment 3+ stories.
    $120.00
  • County Correctional Facility Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A. Apartment 3+ stories.
    $41.25
  • County Library Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A. Apartment 3+ stories.
    $37.91
  • County Fire/Rescue Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A. Apartment 3+ stories.
    $30.99
  • County EMS Impact Fee (MF)
    Apartment, 3+ stories
    Brevard County
    Brevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group A. Apartment 3+ stories.
    $22.15
Total (West Melbourne): $6,113.80
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Melbourne: Commercial Impact Fees

Commercial development in West Melbourne pays $6.76 per square foot in impact fees, plus $17,841.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $355,996.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of West Melbourne) — 1" meter = $2,755 Melbourne minimum + $7,590 West Melbourne ($10,345.00 one-time), Sewer Connection Fee (City of West Melbourne) — 1" meter ($7,496.00 one-time) and Transportation Impact Fee (Brevard County, Commercial) ($6.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$10,345.00 one-time
  • Water Connection Fee (City of West Melbourne) — 1" meter = $2,755 Melbourne minimum + $7,590 West Melbourne
    City of West Melbourne / City of Melbourne
    West Melbourne Code § 58-110(b) (Ord. No. 2024-09, § 2, 3-20-2024). The water connection fee is the SUM of two components: (1) the City of Melbourne fee per the 5-16-2013 interlocal agreement — for commercial, Melbourne Code § 58-131(a)(5)a: certified average dependable daily capacity (GPD, certified by a Florida P.E. under the city's potable water concurrency standards) × $11.479 per gallon, MINIMUM $2,755 (Ord. No. 2025-59, § 2, adopted 12-9-2025); and (2) West Melbourne's own meter-size amount ($7,590 for this meter). STORED AMOUNT USES THE MELBOURNE MINIMUM — a project whose certified GPD exceeds ~240 GPD will pay MORE than the figure stored here. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Meters >4" (non-multifamily) are negotiated by the city. Separate charges: water meter installation fee § 58-106 (0.75" $335 / 1" $440 / 1.5" $610 / 2" $780 / 3" $2,700 / 4" $3,490); capacity reservation application fee § 58-112 ($25/ERU; for nonres 1 ERU = 300 GPD estimated flow; reserves capacity 60 months); § 58-109 extension fees at actual cost. No inside/outside-city differential. Contact: (321) 837-7750.
    $10,345.00 one-time
Sewer$7,496.00 one-time
  • Sewer Connection Fee (City of West Melbourne) — 1" meter
    City of West Melbourne
    West Melbourne Code § 58-111 (Ord. No. 2018-13). West Melbourne's own sewer connection fee by meter size — this is NOT an add-on to a Melbourne fee (unlike the water fee). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Meters >4" (non-multifamily) are negotiated by the city; multifamily $1,217/unit regardless of meter size. Wastewater treatment is provided through an interlocal with the City of Melbourne, but the connection fee is West Melbourne's. No inside/outside-city differential (the Ch. 58 utility zone per § 58-27 does not extend beyond corporate limits). Separate: § 58-112 capacity reservation application fee $25/ERU (nonres 1 ERU = 300 GPD); § 58-109 extension fees at actual cost. Contact: (321) 837-7750.
    $7,496.00 one-time
City$0.00
  • City Impact Fees (West Melbourne, Commercial) — none
    City of West Melbourne
    Confirmed $0. West Melbourne levies NO impact fees. Checked: (1) Municode full-code search for "impact fee" (Code of Ordinances Supp. 29, codified through Ord. 2025-13, 6-17-2025) — 11 hits, all incidental references (Sec. 18-272 permit fees by resolution; Secs. 70-4/70-5 concurrency and school impact fee credit; Secs. 64-02/64-67/64-75/64-82; Secs. 58-407, 86-13, 99-26); NO impact fee chapter exists in the chapter list. (2) City "Development Fees" page — Resolution No. 2026-03, passed 2-17-2026, "Schedule of Land Development Fees" (supersedes Res. 2022-10) is a land development REVIEW fee schedule (annexation, rezoning, site plan review, plat review, concurrency evaluations), not impact fees; the only impact-fee-adjacent line is an administrative "Traffic impact fee agreement — $1,500.00". (3) City fee schedule page — Resolution No. 2026-04, 2-17-2026 — building permit fees only. NOTE: the residential dataset's "ORD2025-24 / Schedule of Development Fees" lead is this review-fee schedule, NOT an impact fee schedule. Brevard County overlay fees do apply in West Melbourne (Table A). Contact if re-verifying: (321) 837-7750.
    $0.00
County$6.76/sq ft
  • Transportation Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
    $6.40/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
    $0.16/sq ft
  • Fire Rescue Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Fire Rescue collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, Melbourne Village. Verified 2026-07-11.
    $0.12/sq ft
  • EMS Impact Fee (Brevard County, Commercial)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
    $0.09/sq ft
  • Solid Waste Impact Fee (Brevard County, Commercial)
    Brevard County
    ⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042. Impact Fees Office: Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
    Requires confirmation
Total (West Melbourne): $6.76/sq ft + $17,841.00 one-time (≈ $355,996.50 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:City of West Melbourne / City of Melbourne City of West Melbourne Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Melbourne: Industrial Impact Fees

Industrial development in West Melbourne pays no per-square-foot impact fees, but owes $17,841.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $17,841.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of West Melbourne) — 1" meter = $2,755 Melbourne minimum + $7,590 West Melbourne ($10,345.00 one-time) and Sewer Connection Fee (City of West Melbourne) — 1" meter ($7,496.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$10,345.00 one-time
  • Water Connection Fee (City of West Melbourne) — 1" meter = $2,755 Melbourne minimum + $7,590 West Melbourne
    City of West Melbourne / City of Melbourne
    West Melbourne Code § 58-110(b) (Ord. No. 2024-09, § 2, 3-20-2024). The water connection fee is the SUM of two components: (1) the City of Melbourne fee per the 5-16-2013 interlocal agreement — for commercial, Melbourne Code § 58-131(a)(5)a: certified average dependable daily capacity (GPD, certified by a Florida P.E. under the city's potable water concurrency standards) × $11.479 per gallon, MINIMUM $2,755 (Ord. No. 2025-59, § 2, adopted 12-9-2025); and (2) West Melbourne's own meter-size amount ($7,590 for this meter). STORED AMOUNT USES THE MELBOURNE MINIMUM — a project whose certified GPD exceeds ~240 GPD will pay MORE than the figure stored here. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Meters >4" (non-multifamily) are negotiated by the city. Separate charges: water meter installation fee § 58-106 (0.75" $335 / 1" $440 / 1.5" $610 / 2" $780 / 3" $2,700 / 4" $3,490); capacity reservation application fee § 58-112 ($25/ERU; for nonres 1 ERU = 300 GPD estimated flow; reserves capacity 60 months); § 58-109 extension fees at actual cost. No inside/outside-city differential. Contact: (321) 837-7750.
    $10,345.00 one-time
Sewer$7,496.00 one-time
  • Sewer Connection Fee (City of West Melbourne) — 1" meter
    City of West Melbourne
    West Melbourne Code § 58-111 (Ord. No. 2018-13). West Melbourne's own sewer connection fee by meter size — this is NOT an add-on to a Melbourne fee (unlike the water fee). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Meters >4" (non-multifamily) are negotiated by the city; multifamily $1,217/unit regardless of meter size. Wastewater treatment is provided through an interlocal with the City of Melbourne, but the connection fee is West Melbourne's. No inside/outside-city differential (the Ch. 58 utility zone per § 58-27 does not extend beyond corporate limits). Separate: § 58-112 capacity reservation application fee $25/ERU (nonres 1 ERU = 300 GPD); § 58-109 extension fees at actual cost. Contact: (321) 837-7750.
    $7,496.00 one-time
City$0.00
  • City Impact Fees (West Melbourne, Industrial) — none
    City of West Melbourne
    Confirmed $0. West Melbourne levies NO impact fees. Checked: (1) Municode full-code search for "impact fee" (Code of Ordinances Supp. 29, codified through Ord. 2025-13, 6-17-2025) — 11 hits, all incidental references (Sec. 18-272 permit fees by resolution; Secs. 70-4/70-5 concurrency and school impact fee credit; Secs. 64-02/64-67/64-75/64-82; Secs. 58-407, 86-13, 99-26); NO impact fee chapter exists in the chapter list. (2) City "Development Fees" page — Resolution No. 2026-03, passed 2-17-2026, "Schedule of Land Development Fees" (supersedes Res. 2022-10) is a land development REVIEW fee schedule (annexation, rezoning, site plan review, plat review, concurrency evaluations), not impact fees; the only impact-fee-adjacent line is an administrative "Traffic impact fee agreement — $1,500.00". (3) City fee schedule page — Resolution No. 2026-04, 2-17-2026 — building permit fees only. NOTE: the residential dataset's "ORD2025-24 / Schedule of Development Fees" lead is this review-fee schedule, NOT an impact fee schedule. Brevard County overlay fees do apply in West Melbourne (Table A). Contact if re-verifying: (321) 837-7750.
    $0.00
County$0.00
  • County Impact Fees (Brevard County, Industrial) — exempt
    Brevard County
    Confirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. This covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) rates in the code, for reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential.
    $0.00
  • Solid Waste Impact Fee (Brevard County, Industrial)
    Brevard County
    ⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3. NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption covers Transportation, Fire Rescue, EMS and Correctional only. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
    Requires confirmation
Total (West Melbourne): $17,841.00 one-time (≈ $17,841.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:City of West Melbourne / City of Melbourne City of West Melbourne Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Melbourne: Office Impact Fees

Office development in West Melbourne pays $5.14 per square foot in impact fees, plus $17,841.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to at least $146,245.75. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of West Melbourne) — 1" meter = $2,755 Melbourne minimum + $7,590 West Melbourne ($10,345.00 one-time), Sewer Connection Fee (City of West Melbourne) — 1" meter ($7,496.00 one-time) and Transportation Impact Fee (Brevard County, Office) ($5.06/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$10,345.00 one-time
  • Water Connection Fee (City of West Melbourne) — 1" meter = $2,755 Melbourne minimum + $7,590 West Melbourne
    City of West Melbourne / City of Melbourne
    West Melbourne Code § 58-110(b) (Ord. No. 2024-09, § 2, 3-20-2024). The water connection fee is the SUM of two components: (1) the City of Melbourne fee per the 5-16-2013 interlocal agreement — for commercial, Melbourne Code § 58-131(a)(5)a: certified average dependable daily capacity (GPD, certified by a Florida P.E. under the city's potable water concurrency standards) × $11.479 per gallon, MINIMUM $2,755 (Ord. No. 2025-59, § 2, adopted 12-9-2025); and (2) West Melbourne's own meter-size amount ($7,590 for this meter). STORED AMOUNT USES THE MELBOURNE MINIMUM — a project whose certified GPD exceeds ~240 GPD will pay MORE than the figure stored here. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Meters >4" (non-multifamily) are negotiated by the city. Separate charges: water meter installation fee § 58-106 (0.75" $335 / 1" $440 / 1.5" $610 / 2" $780 / 3" $2,700 / 4" $3,490); capacity reservation application fee § 58-112 ($25/ERU; for nonres 1 ERU = 300 GPD estimated flow; reserves capacity 60 months); § 58-109 extension fees at actual cost. No inside/outside-city differential. Contact: (321) 837-7750.
    $10,345.00 one-time
Sewer$7,496.00 one-time
  • Sewer Connection Fee (City of West Melbourne) — 1" meter
    City of West Melbourne
    West Melbourne Code § 58-111 (Ord. No. 2018-13). West Melbourne's own sewer connection fee by meter size — this is NOT an add-on to a Melbourne fee (unlike the water fee). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Meters >4" (non-multifamily) are negotiated by the city; multifamily $1,217/unit regardless of meter size. Wastewater treatment is provided through an interlocal with the City of Melbourne, but the connection fee is West Melbourne's. No inside/outside-city differential (the Ch. 58 utility zone per § 58-27 does not extend beyond corporate limits). Separate: § 58-112 capacity reservation application fee $25/ERU (nonres 1 ERU = 300 GPD); § 58-109 extension fees at actual cost. Contact: (321) 837-7750.
    $7,496.00 one-time
City$0.00
  • City Impact Fees (West Melbourne, Office) — none
    City of West Melbourne
    Confirmed $0. West Melbourne levies NO impact fees. Checked: (1) Municode full-code search for "impact fee" (Code of Ordinances Supp. 29, codified through Ord. 2025-13, 6-17-2025) — 11 hits, all incidental references (Sec. 18-272 permit fees by resolution; Secs. 70-4/70-5 concurrency and school impact fee credit; Secs. 64-02/64-67/64-75/64-82; Secs. 58-407, 86-13, 99-26); NO impact fee chapter exists in the chapter list. (2) City "Development Fees" page — Resolution No. 2026-03, passed 2-17-2026, "Schedule of Land Development Fees" (supersedes Res. 2022-10) is a land development REVIEW fee schedule (annexation, rezoning, site plan review, plat review, concurrency evaluations), not impact fees; the only impact-fee-adjacent line is an administrative "Traffic impact fee agreement — $1,500.00". (3) City fee schedule page — Resolution No. 2026-04, 2-17-2026 — building permit fees only. NOTE: the residential dataset's "ORD2025-24 / Schedule of Development Fees" lead is this review-fee schedule, NOT an impact fee schedule. Brevard County overlay fees do apply in West Melbourne (Table A). Contact if re-verifying: (321) 837-7750.
    $0.00
County$5.14/sq ft
  • Transportation Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule (transportation rates codified at Code of Ordinances §62-818; Ord. 06-044). Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published (no manual conversion). Source verified 2026-07-11 on brevardfl.gov Impact Fees page.
    $5.06/sq ft
  • Correctional Facilities Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
    $0.03/sq ft
  • Fire Rescue Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Fire Rescue collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, Melbourne Village. Verified 2026-07-11.
    $0.03/sq ft
  • EMS Impact Fee (Brevard County, Office)
    Brevard County
    2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
    $0.02/sq ft
  • Solid Waste Impact Fee (Brevard County, Office)
    Brevard County
    ⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution. All three 2007 county commercial schedules state: "Solid Waste Impact Fees are determined on a project by project basis." Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
    Requires confirmation
Total (West Melbourne): $5.14/sq ft + $17,841.00 one-time (≈ $146,245.75 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:City of West Melbourne / City of Melbourne City of West Melbourne Brevard County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brevard County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in West Melbourne

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in West Melbourne, Florida?

A new single-family home in West Melbourne pays at least $9,838.06 per unit in combined impact fees (rates sourced July 12, 2026). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in West Melbourne?

Commercial development in West Melbourne pays $6.76 per square foot in impact fees, plus $17,841.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $355,996.50 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does West Melbourne charge its own impact fees?

Yes. West Melbourne levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in West Melbourne, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brevard County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.