Melbourne Village: Single-Family Impact Fees
A new single-family home in Melbourne Village pays at least $8,240.06 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $5,485.06 and municipal or utility fees for $2,755.00.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Water Impact Fee (City of Melbourne) ($2,755.00) and Solid Waste Impact Fee (SFR) ($160.00).
Sewer Connection Fee (Melbourne Village) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Impact Fee (City of Melbourne)$2,755.00City of MelbourneMelbourne provides water to Melbourne Village. Impact fee $2,755 per Melbourne rate table.
- Sewer Connection Fee (Melbourne Village)Requires confirmationCity of Melbourne Village⚠️ VERIFY. Melbourne Village is very small (~700 pop); sewer likely provided by Brevard County or Melbourne. Connection fee not found online.
- City Impact Fees — None found$0.00City of Melbourne VillageNo city-level impact fees found for Melbourne Village. Very small municipality (~700 pop); no dedicated city impact fee program identified.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public Schools
- Solid Waste Impact Fee (SFR)$160.00Brevard County
- Correctional Facility Impact Fee (SFR)$71.99Brevard County
- Library Impact Fee (SFR)$63.84Brevard County
- Fire/Rescue Impact Fee (SFR)$54.08Brevard County⚠️ VERIFY. Eff. Jan 2, 2017. Table 5 (Melbourne Village only).
- EMS Impact Fee (SFR)$38.65Brevard County
- Transportation Impact Fee — N/A (Melbourne Village, own transportation program)$0.00Brevard CountyTable 5 (Melbourne Village): County Transportation = NOT APPLICABLE.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Multifamily Impact Fees
A new multifamily unit in Melbourne Village pays at least $4,487.80 per unit in impact fees (rates sourced July 14, 2026). Of that, Brevard County-levied fees account for $2,192.80 and municipal or utility fees for $2,295.00.
The largest line items are Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC ($2,295.00), County Education Impact Fee (MF) ($1,940.50) and County Solid Waste Impact Fee (MF) ($120.00).
Sewer Connection Fee (Melbourne Village, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC$2,295.00Multifamily, 2 bedroomsCity of MelbourneMelbourne Village is served by City of Melbourne water. Melbourne Code §58-131(a)(2) (Ord. 2025-59, 12-9-2025): $2,755/ERC; master-metered multifamily ERC factors 0.500 / 0.583 / 0.833 / 1.000 by unit size. Canonical MF 2BR unit = 0.833 ERC = $2,295. Melbourne's posted rate table shows the same impact fee for 'Water Outside' the city limits. CORRECTED 2026-07-14 from $2,755 (the single-family 1.000-ERC rate).
- Sewer Connection Fee (Melbourne Village, MF)Requires confirmationCity of Melbourne Village⚠️ VERIFY. Sewer likely Brevard County or Melbourne. Fee not found online.
- City Impact Fees — None found$0.00City of Melbourne VillageNo city-level impact fees found. Very small municipality; no city impact fee program identified.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Attached Residential per unit, applies countywide.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group E (Table 4). Apartment 3+ stories.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group E (Table 4). Apartment 3+ stories.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group E (Table 4 – Melbourne Village). Apartment 3+ stories.
- County Fire/Rescue Impact Fee (MF)$30.99Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group E (Table 4 – Melbourne Village). Apartment 3+ stories. Transportation = Not Applicable.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County Residential Impact Fee Schedule eff. Jan 2, 2017. Group E (Table 4). Apartment 3+ stories.
- County Transportation Impact Fee — N/A (Melbourne Village, MF)$0.00Confirmed $0. Brevard County Residential Impact Fee Schedule (eff. 1-2-2017), Table 5 (City of Melbourne Village): Transportation = 'Not Applicable'. Note Melbourne Village DOES pay the county Fire/Rescue fee (unlike the Table 2/3/4 cities). Added 2026-07-14 for SFR/MF parallelism.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Commercial Impact Fees
Commercial development in Melbourne Village pays $0.37 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $21,110.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft) and Fire Rescue Impact Fee (Brevard County, Commercial) ($0.12/sq ft).
Sewer Connection Fee (Melbourne Village) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneCity of Melbourne is the regional potable water provider for Melbourne Village. Melbourne Code § 58-131(a)(5)a (Ord. No. 2025-59, § 2, adopted 12-9-2025): the COMMERCIAL water impact fee = average dependable daily capacity in GPD, certified by a Florida P.E. using the city's potable water concurrency standards (Appendix D, art. IV, ch. 3, § 3.46), × $11.479 per gallon of capacity, MINIMUM $2,755. NOT METER-SIZE BASED — the AWWA meter/ERC table in § 58-133(b)(2) (0.75"=1, 1"=3, 1.5"=5, 2"=8, 3"=15, 4"=25, 6"=50) governs MONTHLY SERVICE CHARGES ONLY and must NOT be applied to the impact fee. The $2,755 stored here is the adopted MINIMUM (the floor); a project with certified demand above ~240 GPD pays more (e.g. 1,000 GPD = $11,479; 5,000 GPD = $57,395; 10,000 GPD = $114,790). Includes a true-up: if actual 12-month average daily flow exceeds the capacity paid for, an additional impact fee is assessed; no refund on diminution. The impact fee is identical inside and outside city limits (only monthly rates carry the § 180.191 outside-city surcharge); payment timing differs (inside = at meter set/CO; outside = at waterline clearance). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores and unincorporated Brevard south of the Pineda Causeway. Separate: meter installation charges § 58-132 (3/4" $250 / 1" $475 / 1.5" $850 / 2" $1,600; >2" individually determined). Contact: (321) 608-7500.
- Sewer Connection Fee (Melbourne Village)Requires confirmationCity of Melbourne / Brevard County Utility Services⚠️ VERIFY — PROVIDER AND AMOUNT BOTH UNRESOLVED. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Melbourne Village is a very small municipality (~700 pop.); the sanitary sewer provider is either the City of Melbourne or Brevard County Utility Services and must be verified per parcel (Melbourne bills the water for Melbourne Village, but Melbourne's rate table lists "Sewer Brevard County" as a pass-through billing category — the sewer provider is the entity named). If BREVARD COUNTY: the connection fee is set by BOCC rate resolution under County Code § 110-68(b) ("Such connection fee shall be established by resolution or ordinance passed from time to time by the county") and the dollar amounts are NOT in the code and NOT posted online — contact Brevard County Utility Services, Development Section, (321) 633-2091, Utility.Development@BrevardFL.gov. If CITY OF MELBOURNE: Melbourne Code § 58-242(a)(5)a — commercial sewer impact fee = certified GPD × $17.354/gallon, minimum $4,165 (Ord. No. 2025-59, § 3, 12-9-2025). Verify the provider per parcel at https://gis.brevardfl.gov/utility_services/service_area/. Town contact: Town of Melbourne Village, (321) 723-8300.
- City Impact Fees (Melbourne Village, Commercial) — none$0.00Town of Melbourne VillageConfirmed $0. Melbourne Village levies NO development impact fees. The Town does not use a commercial codifier; the code is posted as individual chapter PDFs. Full chapter list checked — NO impact fee chapter exists: Ch. 1 General Provisions; 2 Administration; 2.5 Alarms; 3 Animals; 4 Building; 4.5 Comp Plan; 5 Elections; 6 Electricity; 6.5 Finances; 7 Fire; 7.5 Flood; 8 Garbage; 9 Gas; 9.5 Improvement; 10 Licenses; 11 Noise; 11.5 Nuisances; 12 Offenses; 13 Peddlers; 14 Pensions; 15 Planning; 16 Plumbing; 16.5 Signs; 17 Streets; 18 Subdivision; 18.5 Pools; 19 Taxation; 20 Traffic; 21 Trees; 22 Water; 23 Zoning. Brevard County overlay fees do apply in Melbourne Village (Fire Rescue, EMS, Correctional and Solid Waste; county Transportation is NOT applicable).
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- Fire Rescue Impact Fee (Brevard County, Commercial)$0.12/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. Fire Rescue collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, Melbourne Village. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Retail 50,000 to 99,999 square feet'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard County⚠️ VERIFY. Applies to all nonresidential categories (Commercial, Office, Industrial) — entered once under Commercial as the carrier category. Brevard County's solid waste impact fee is adopted separately under Code Ch. 94, Art. IV, Div. 3 and set by annual BOCC rate resolution, applying in both incorporated and unincorporated areas. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021 (no FY23–FY26 resolution posted). Commercial base rate $467.20 per billing unit. Retail/shopping center at any size, office >20,000 sq ft, warehousing >15,000 sq ft and restaurants >9,000 sq ft all require an INDIVIDUAL VOLUME CALCULATION (estimated annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists. CONFIRM: current-year rate resolution and the project-specific volume determination. Contact: Brevard County Solid Waste Management, Thomas Mulligan, Director, (321) 633-2042; Impact Fees Office, Naomi Adkins-Hicks, (321) 633-2068, impact.fees@brevardfl.gov.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Industrial Impact Fees
Industrial development in Melbourne Village pays no per-square-foot impact fees, but owes $2,755.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $2,755.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time).
Sewer Connection Fee (Melbourne Village) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneCity of Melbourne is the regional potable water provider for Melbourne Village. Melbourne Code § 58-131(a)(5)a (Ord. No. 2025-59, § 2, adopted 12-9-2025): the COMMERCIAL water impact fee = average dependable daily capacity in GPD, certified by a Florida P.E. using the city's potable water concurrency standards (Appendix D, art. IV, ch. 3, § 3.46), × $11.479 per gallon of capacity, MINIMUM $2,755. NOT METER-SIZE BASED — the AWWA meter/ERC table in § 58-133(b)(2) (0.75"=1, 1"=3, 1.5"=5, 2"=8, 3"=15, 4"=25, 6"=50) governs MONTHLY SERVICE CHARGES ONLY and must NOT be applied to the impact fee. The $2,755 stored here is the adopted MINIMUM (the floor); a project with certified demand above ~240 GPD pays more (e.g. 1,000 GPD = $11,479; 5,000 GPD = $57,395; 10,000 GPD = $114,790). Includes a true-up: if actual 12-month average daily flow exceeds the capacity paid for, an additional impact fee is assessed; no refund on diminution. The impact fee is identical inside and outside city limits (only monthly rates carry the § 180.191 outside-city surcharge); payment timing differs (inside = at meter set/CO; outside = at waterline clearance). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores and unincorporated Brevard south of the Pineda Causeway. Separate: meter installation charges § 58-132 (3/4" $250 / 1" $475 / 1.5" $850 / 2" $1,600; >2" individually determined). Contact: (321) 608-7500.
- Sewer Connection Fee (Melbourne Village)Requires confirmationCity of Melbourne / Brevard County Utility Services⚠️ VERIFY — PROVIDER AND AMOUNT BOTH UNRESOLVED. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Melbourne Village is a very small municipality (~700 pop.); the sanitary sewer provider is either the City of Melbourne or Brevard County Utility Services and must be verified per parcel (Melbourne bills the water for Melbourne Village, but Melbourne's rate table lists "Sewer Brevard County" as a pass-through billing category — the sewer provider is the entity named). If BREVARD COUNTY: the connection fee is set by BOCC rate resolution under County Code § 110-68(b) ("Such connection fee shall be established by resolution or ordinance passed from time to time by the county") and the dollar amounts are NOT in the code and NOT posted online — contact Brevard County Utility Services, Development Section, (321) 633-2091, Utility.Development@BrevardFL.gov. If CITY OF MELBOURNE: Melbourne Code § 58-242(a)(5)a — commercial sewer impact fee = certified GPD × $17.354/gallon, minimum $4,165 (Ord. No. 2025-59, § 3, 12-9-2025). Verify the provider per parcel at https://gis.brevardfl.gov/utility_services/service_area/. Town contact: Town of Melbourne Village, (321) 723-8300.
- City Impact Fees (Melbourne Village, Industrial) — none$0.00Town of Melbourne VillageConfirmed $0. Melbourne Village levies NO development impact fees. The Town does not use a commercial codifier; the code is posted as individual chapter PDFs. Full chapter list checked — NO impact fee chapter exists: Ch. 1 General Provisions; 2 Administration; 2.5 Alarms; 3 Animals; 4 Building; 4.5 Comp Plan; 5 Elections; 6 Electricity; 6.5 Finances; 7 Fire; 7.5 Flood; 8 Garbage; 9 Gas; 9.5 Improvement; 10 Licenses; 11 Noise; 11.5 Nuisances; 12 Offenses; 13 Peddlers; 14 Pensions; 15 Planning; 16 Plumbing; 16.5 Signs; 17 Streets; 18 Subdivision; 18.5 Pools; 19 Taxation; 20 Traffic; 21 Trees; 22 Water; 23 Zoning. Brevard County overlay fees do apply in Melbourne Village (Fire Rescue, EMS, Correctional and Solid Waste; county Transportation is NOT applicable).
- County Impact Fees (Brevard County, Industrial) — exempt$0.00Brevard CountyConfirmed $0. Brevard County exempts ALL industrial land uses from Transportation (§ 62-815(a)(6)), Fire Rescue (§ 62-735(a)(6)), EMS (§ 62-855(a)(6)) and Correctional impact fees — NAICS Sectors 21 Mining, 22 Utilities, 23 Construction, 31-33 Manufacturing, 48-49 Transportation and Warehousing, and Subsector 562 Waste Management. Covers General Industrial, Manufacturing, Warehouse and Mini-warehouse. Nominal (exempt-footnoted) code rates, reference only: Transportation $3,124 / Fire $14.64 / EMS $10.46 / Correctional $19.48 per 1,000 sq ft. Library and Educational also N/A to nonresidential. NOTE: this exemption is for the COUNTY fees only — the city's own impact fees (Fee Type = City) DO apply to industrial development.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3. The 2007 county schedule expressly footnotes: "Melbourne Village requires payment of Fire/Rescue, Emergency Medical Services, Solid Waste, and Correctional impact fees." NOTE: solid waste is NOT among the fees industrial uses are exempt from — the NAICS-based industrial exemption covers Transportation, Fire Rescue, EMS and Correctional only. Solid Waste Impact Fees are determined on a project by project basis. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Warehousing >15,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Office Impact Fees
Office development in Melbourne Village pays $0.08 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $4,709.75. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft) and Fire Rescue Impact Fee (Brevard County, Office) ($0.03/sq ft).
Sewer Connection Fee (Melbourne Village) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneCity of Melbourne is the regional potable water provider for Melbourne Village. Melbourne Code § 58-131(a)(5)a (Ord. No. 2025-59, § 2, adopted 12-9-2025): the COMMERCIAL water impact fee = average dependable daily capacity in GPD, certified by a Florida P.E. using the city's potable water concurrency standards (Appendix D, art. IV, ch. 3, § 3.46), × $11.479 per gallon of capacity, MINIMUM $2,755. NOT METER-SIZE BASED — the AWWA meter/ERC table in § 58-133(b)(2) (0.75"=1, 1"=3, 1.5"=5, 2"=8, 3"=15, 4"=25, 6"=50) governs MONTHLY SERVICE CHARGES ONLY and must NOT be applied to the impact fee. The $2,755 stored here is the adopted MINIMUM (the floor); a project with certified demand above ~240 GPD pays more (e.g. 1,000 GPD = $11,479; 5,000 GPD = $57,395; 10,000 GPD = $114,790). Includes a true-up: if actual 12-month average daily flow exceeds the capacity paid for, an additional impact fee is assessed; no refund on diminution. The impact fee is identical inside and outside city limits (only monthly rates carry the § 180.191 outside-city surcharge); payment timing differs (inside = at meter set/CO; outside = at waterline clearance). Applies to all nonresidential categories — entered once under Commercial as the carrier category. Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores and unincorporated Brevard south of the Pineda Causeway. Separate: meter installation charges § 58-132 (3/4" $250 / 1" $475 / 1.5" $850 / 2" $1,600; >2" individually determined). Contact: (321) 608-7500.
- Sewer Connection Fee (Melbourne Village)Requires confirmationCity of Melbourne / Brevard County Utility Services⚠️ VERIFY — PROVIDER AND AMOUNT BOTH UNRESOLVED. Applies to all nonresidential categories — entered once under Commercial as the carrier category. Melbourne Village is a very small municipality (~700 pop.); the sanitary sewer provider is either the City of Melbourne or Brevard County Utility Services and must be verified per parcel (Melbourne bills the water for Melbourne Village, but Melbourne's rate table lists "Sewer Brevard County" as a pass-through billing category — the sewer provider is the entity named). If BREVARD COUNTY: the connection fee is set by BOCC rate resolution under County Code § 110-68(b) ("Such connection fee shall be established by resolution or ordinance passed from time to time by the county") and the dollar amounts are NOT in the code and NOT posted online — contact Brevard County Utility Services, Development Section, (321) 633-2091, Utility.Development@BrevardFL.gov. If CITY OF MELBOURNE: Melbourne Code § 58-242(a)(5)a — commercial sewer impact fee = certified GPD × $17.354/gallon, minimum $4,165 (Ord. No. 2025-59, § 3, 12-9-2025). Verify the provider per parcel at https://gis.brevardfl.gov/utility_services/service_area/. Town contact: Town of Melbourne Village, (321) 723-8300.
- City Impact Fees (Melbourne Village, Office) — none$0.00Town of Melbourne VillageConfirmed $0. Melbourne Village levies NO development impact fees. The Town does not use a commercial codifier; the code is posted as individual chapter PDFs. Full chapter list checked — NO impact fee chapter exists: Ch. 1 General Provisions; 2 Administration; 2.5 Alarms; 3 Animals; 4 Building; 4.5 Comp Plan; 5 Elections; 6 Electricity; 6.5 Finances; 7 Fire; 7.5 Flood; 8 Garbage; 9 Gas; 9.5 Improvement; 10 Licenses; 11 Noise; 11.5 Nuisances; 12 Offenses; 13 Peddlers; 14 Pensions; 15 Planning; 16 Plumbing; 16.5 Signs; 17 Streets; 18 Subdivision; 18.5 Pools; 19 Taxation; 20 Traffic; 21 Trees; 22 Water; 23 Zoning. Brevard County overlay fees do apply in Melbourne Village (Fire Rescue, EMS, Correctional and Solid Waste; county Transportation is NOT applicable).
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Correctional Facility fee collected countywide. Verified 2026-07-11.
- Fire Rescue Impact Fee (Brevard County, Office)$0.03/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. Fire Rescue collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, Melbourne Village. Verified 2026-07-11.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftBrevard County2007 Brevard County Commercial Impact Fee Schedule. Schedule row: 'Office 10,000 square feet and over'; unit = per 1,000 square feet GFA. Entered as published. EMS collected countywide. Verified 2026-07-11.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard County⚠️ VERIFY. Brevard County solid waste impact fee, Code Ch. 94, Art. IV, Div. 3; set by annual BOCC rate resolution. The 2007 county schedule expressly footnotes: "Melbourne Village requires payment of Fire/Rescue, Emergency Medical Services, Solid Waste, and Correctional impact fees." Solid Waste Impact Fees are determined on a project by project basis. Latest posted: FY22 Impact Fee Rate Resolution, adopted 8-3-2021, eff. 10-1-2021. Office >20,000 sq ft requires an INDIVIDUAL VOLUME CALCULATION (annual volume × $4.06/cu yd non-compacted or $15.30/cu yd compacted; minimum 1 billing unit = $467.20) — no flat per-sq-ft rate exists, so $0 is a placeholder. CONFIRM: current-year rate resolution + project-specific volume determination. Contact: Solid Waste Management (321) 633-2042; Impact Fees Office (321) 633-2068. Audit 2026-07-12: created to replace the retired single-Commercial "carrier category" row.
Where in Brevard County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Melbourne Village
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Melbourne Village, Florida?
A new single-family home in Melbourne Village pays at least $8,240.06 per unit in combined impact fees (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Melbourne Village?
Commercial development in Melbourne Village pays $0.37 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees, at least $21,110.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Melbourne Village charge its own impact fees?
Yes. Melbourne Village levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Melbourne Village, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.