Melbourne Village Impact Fees by Project Type
Melbourne Village: Single-Family Impact Fees
A new single-family home in Melbourne Village pays $12,405.06 per unit in impact fees (rates sourced August 6, 2026). Of that, Brevard County-levied fees account for $5,485.06 and municipal or utility fees for $6,920.00.
The largest line items are Education Impact Fee (SFR) ($5,096.50), Sewer Connection Fee (Melbourne Village) ($4,165.00) and Water Impact Fee (City of Melbourne) ($2,755.00).
View the Full Melbourne Village Impact Fee Schedule
- Water Impact Fee (City of Melbourne)$2,755.00City of MelbourneWater service is supplied by the City of Melbourne regional system: one-time water impact fee $2,755 per ERC for a single-family home (Melbourne Code §58-131, Ord. 2025-59), the same rate inside and outside the city; a $250 connection/service charge also applies.
- Sewer Connection Fee (Melbourne Village)$4,165.00City of Melbourne VillageMelbourne Village lies within the City of Melbourne utility service area; many properties are on septic. Where Melbourne sewer is available the city's residential sewer impact fee ($4,165, plus a $100 connection charge) applies; the multifamily per-unit basis is set under Melbourne Code Ch. 58.
- City Impact Fees — None found$0.00City of Melbourne VillageNo municipal (city) impact fees apply in this jurisdiction; only Brevard County overlay impact fees and applicable water/sewer connection charges apply.
- Education Impact Fee (SFR)$5,096.50Brevard County / Brevard Public SchoolsBrevard County educational facilities (school) impact fee, single-family detached: $5,096.50/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Solid Waste Impact Fee (SFR)$160.00Brevard CountyBrevard County solid waste impact fee, single-family detached: $160.00/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Correctional Facility Impact Fee (SFR)$71.99Brevard CountyBrevard County correctional facilities impact fee, single-family detached: $71.99/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Library Impact Fee (SFR)$63.84Brevard CountyBrevard County library facilities impact fee, single-family detached: $63.84/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Fire/Rescue Impact Fee (SFR)$54.08Brevard CountyBrevard County fire/rescue impact fee, single-family detached: $54.08/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- EMS Impact Fee (SFR)$38.65Brevard CountyBrevard County EMS (emergency medical services) impact fee, single-family detached: $38.65/unit. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- Transportation Impact Fee — N/A (Melbourne Village, own transportation program)$0.00Brevard CountyThe Brevard County transportation impact fee is not levied here; this jurisdiction administers its own transportation/road impact fee (shown as a separate city record).
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Multifamily Impact Fees
A new multifamily unit in Melbourne Village pays $7,956.80 per unit in impact fees (rates sourced August 6, 2026). Of that, Brevard County-levied fees account for $2,192.80 and municipal or utility fees for $5,764.00.
The largest line items are Sewer Impact Fee (City of Melbourne serves Melbourne Village, MF) — 0.833 ERC × $4,165/ERC ($3,469.00), Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC ($2,295.00) and County Education Impact Fee (MF) ($1,940.50).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Melbourne Village Impact Fee Schedule
- Water Impact Fee (City of Melbourne, MF) — 0.833 ERC × $2,755/ERC$2,295.00Multifamily, 2 bedroomsCity of MelbourneWater service is supplied by the City of Melbourne. For master-metered multifamily, Melbourne sets the water impact fee by an ERC factor per unit (efficiency 0.500 / 1-BR 0.583 / 2-BR 0.833 / 3+ BR 1.000 × $2,755/ERC). A canonical two-bedroom unit is 0.833 ERC = $2,295 (Melbourne Code §58-131). An individually metered unit is charged a full ERC ($2,755).
- Sewer Impact Fee (City of Melbourne serves Melbourne Village, MF) — 0.833 ERC × $4,165/ERC$3,469.00Multifamily, 2 bedroomsCity of Melbourne VillageWhere City of Melbourne sewer is available, Melbourne sets the multifamily sewer impact fee by an ERC factor per unit (efficiency 0.500 = $2,083 / 1-BR 0.583 = $2,428 / 2-BR 0.833 = $3,469 / 3+ BR 1.000 = $4,165, at $4,165/ERC); a canonical two-bedroom unit is 0.833 ERC = $3,469. Many Melbourne Village parcels are on private septic — confirm sewer availability for the specific parcel.
- City Impact Fees — None found$0.00City of Melbourne VillageNo municipal (city) impact fees apply in this jurisdiction; only Brevard County overlay impact fees and applicable water/sewer connection charges apply.
- County Education Impact Fee (MF)$1,940.50Apartment, 3+ storiesBrevard County / Brevard Public SchoolsBrevard County educational facilities (school) impact fee, per apartment/multifamily unit: $1,940.50/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Solid Waste Impact Fee (MF)$120.00Apartment, 3+ storiesBrevard CountyBrevard County solid waste impact fee, per apartment/multifamily unit: $120.00/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Correctional Facility Impact Fee (MF)$41.25Apartment, 3+ storiesBrevard CountyBrevard County correctional facilities impact fee, per apartment/multifamily unit: $41.25/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Library Impact Fee (MF)$37.91Apartment, 3+ storiesBrevard CountyBrevard County library facilities impact fee, per apartment/multifamily unit: $37.91/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Fire/Rescue Impact Fee (MF)$30.99Apartment, 3+ storiesBrevard CountyBrevard County fire/rescue impact fee, per apartment/multifamily unit: $30.99/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County EMS Impact Fee (MF)$22.15Apartment, 3+ storiesBrevard CountyBrevard County EMS (emergency medical services) impact fee, per apartment/multifamily unit: $22.15/unit for a building of 3 or more stories. Rate effective January 2, 2017 and unchanged as of August 2026; collected by Brevard County before power release / certificate of occupancy under an interlocal agreement with the local government.
- County Transportation Impact Fee — N/A (Melbourne Village, MF)$0.00The Brevard County transportation impact fee is not levied here; this jurisdiction administers its own transportation/road impact fee (shown as a separate city record).
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Commercial Impact Fees
Commercial development in Melbourne Village pays $0.37 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).
For a 50,000 sq ft building, that comes to at least $21,110.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Correctional Facilities Impact Fee (Brevard County, Commercial) ($0.16/sq ft) and Fire Rescue Impact Fee (Brevard County, Commercial) ($0.12/sq ft).
Sewer Connection Fee (Melbourne Village) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Melbourne Village Impact Fee Schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneEffective per City of Melbourne Ord. No. 2025-59 (adopted December 9, 2025): the commercial water impact fee = P.E.-certified average dependable daily capacity (GPD) × $11.479 per gallon, minimum $2,755. It is flow-based, not meter-size based, so the $2,755 shown is the minimum and any project certified above roughly 240 GPD pays more (e.g. 1,000 GPD = $11,479). The fee is identical inside and outside city limits and includes a true-up if actual 12-month flow exceeds the capacity paid for. City of Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores, and unincorporated Brevard south of the Pineda Causeway.
- Sewer Connection Fee (Melbourne Village)Requires confirmationCity of Melbourne / Brevard County Utility ServicesIn Melbourne Village the sanitary sewer provider is either the City of Melbourne or Brevard County Utility Services, depending on the parcel. If City of Melbourne: the commercial sewer impact fee = P.E.-certified GPD × $17.354/gal, minimum $4,165 (Ord. No. 2025-59, adopted December 9, 2025). If Brevard County: the connection fee is set by county resolution and is not published.
- City Impact Fees (Melbourne Village, Commercial) — none$0.00Town of Melbourne VillageThe Town of Melbourne Village levies no municipal development impact fees. Brevard County overlay impact fees still apply — Fire Rescue, EMS, Correctional, and Solid Waste — but the county Transportation impact fee does not apply here.
- Correctional Facilities Impact Fee (Brevard County, Commercial)$0.16/sq ftBrevard CountyBrevard County correctional facilities impact fee — $160.44 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- Fire Rescue Impact Fee (Brevard County, Commercial)$0.12/sq ftBrevard CountyBrevard County fire rescue impact fee — $120.54 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule; still the current adopted rate). This county fire fee is collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, and Melbourne Village; the other cities run their own fire departments and the county fee does not apply there.
- EMS Impact Fee (Brevard County, Commercial)$0.09/sq ftBrevard CountyBrevard County EMS impact fee — $86.13 per 1,000 sq ft of gross floor area for retail of 50,000–99,999 sq ft (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- Solid Waste Impact Fee (Brevard County, Commercial)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Industrial Impact Fees
Industrial development in Melbourne Village pays no per-square-foot impact fees, but owes $2,755.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).
For a 50,000 sq ft building, that comes to at least $2,755.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time).
Sewer Connection Fee (Melbourne Village) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Melbourne Village Impact Fee Schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneEffective per City of Melbourne Ord. No. 2025-59 (adopted December 9, 2025): the commercial water impact fee = P.E.-certified average dependable daily capacity (GPD) × $11.479 per gallon, minimum $2,755. It is flow-based, not meter-size based, so the $2,755 shown is the minimum and any project certified above roughly 240 GPD pays more (e.g. 1,000 GPD = $11,479). The fee is identical inside and outside city limits and includes a true-up if actual 12-month flow exceeds the capacity paid for. City of Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores, and unincorporated Brevard south of the Pineda Causeway.
- Sewer Connection Fee (Melbourne Village)Requires confirmationCity of Melbourne / Brevard County Utility ServicesIn Melbourne Village the sanitary sewer provider is either the City of Melbourne or Brevard County Utility Services, depending on the parcel. If City of Melbourne: the commercial sewer impact fee = P.E.-certified GPD × $17.354/gal, minimum $4,165 (Ord. No. 2025-59, adopted December 9, 2025). If Brevard County: the connection fee is set by county resolution and is not published.
- City Impact Fees (Melbourne Village, Industrial) — none$0.00Town of Melbourne VillageThe Town of Melbourne Village levies no municipal development impact fees. Brevard County overlay impact fees still apply — Fire Rescue, EMS, Correctional, and Solid Waste — but the county Transportation impact fee does not apply here.
- County Impact Fees (Brevard County, Industrial) — exempt$0.00Brevard CountyBrevard County exempts all industrial land uses (NAICS sectors 21, 22, 23, 31–33, 48–49, and subsector 562 — covering general industrial, manufacturing, warehouse, and mini-warehouse) from its Transportation, Fire Rescue, EMS, and Correctional impact fees, so the county nonresidential impact fee for industrial development is $0. Any applicable city impact fees still apply.
- Solid Waste Impact Fee (Brevard County, Industrial)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village: Office Impact Fees
Office development in Melbourne Village pays $0.08 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees (rates sourced August 6, 2026).
For a 25,000 sq ft building, that comes to at least $4,709.75. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal ($2,755.00 one-time), Correctional Facilities Impact Fee (Brevard County, Office) ($0.03/sq ft) and Fire Rescue Impact Fee (Brevard County, Office) ($0.03/sq ft).
Sewer Connection Fee (Melbourne Village) is set by the utility and not published online. Solid Waste Impact Fee (Brevard County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Melbourne Village Impact Fee Schedule
- Water Impact Fee (City of Melbourne) — minimum; certified GPD × $11.479/gal$2,755.00 one-timeCity of MelbourneEffective per City of Melbourne Ord. No. 2025-59 (adopted December 9, 2025): the commercial water impact fee = P.E.-certified average dependable daily capacity (GPD) × $11.479 per gallon, minimum $2,755. It is flow-based, not meter-size based, so the $2,755 shown is the minimum and any project certified above roughly 240 GPD pays more (e.g. 1,000 GPD = $11,479). The fee is identical inside and outside city limits and includes a true-up if actual 12-month flow exceeds the capacity paid for. City of Melbourne is the regional potable water provider for Melbourne, Melbourne Beach, Indialantic, Indian Harbour Beach, Satellite Beach, Melbourne Village, Palm Shores, and unincorporated Brevard south of the Pineda Causeway.
- Sewer Connection Fee (Melbourne Village)Requires confirmationCity of Melbourne / Brevard County Utility ServicesIn Melbourne Village the sanitary sewer provider is either the City of Melbourne or Brevard County Utility Services, depending on the parcel. If City of Melbourne: the commercial sewer impact fee = P.E.-certified GPD × $17.354/gal, minimum $4,165 (Ord. No. 2025-59, adopted December 9, 2025). If Brevard County: the connection fee is set by county resolution and is not published.
- City Impact Fees (Melbourne Village, Office) — none$0.00Town of Melbourne VillageThe Town of Melbourne Village levies no municipal development impact fees. Brevard County overlay impact fees still apply — Fire Rescue, EMS, Correctional, and Solid Waste — but the county Transportation impact fee does not apply here.
- Correctional Facilities Impact Fee (Brevard County, Office)$0.03/sq ftBrevard CountyBrevard County correctional facilities impact fee — $34.17 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- Fire Rescue Impact Fee (Brevard County, Office)$0.03/sq ftBrevard CountyBrevard County fire rescue impact fee — $25.67 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). This county fire fee is collected only in unincorporated Brevard, West Melbourne, Palm Shores, Grant-Valkaria, and Melbourne Village; the other cities run their own fire departments and the county fee does not apply there.
- EMS Impact Fee (Brevard County, Office)$0.02/sq ftBrevard CountyBrevard County EMS impact fee — $18.35 per 1,000 sq ft of gross floor area for office of 10,000 sq ft and over (2007 county commercial schedule; still the current adopted rate). Collected countywide across all municipalities and the unincorporated area.
- Solid Waste Impact Fee (Brevard County, Office)Requires confirmationBrevard CountyBrevard County's solid waste impact fee is not a flat per-sq-ft rate — it is set per project from estimated annual waste volume (× $4.06/cu yd non-compacted or $15.30/cu yd compacted), subject to a minimum of one billing unit ($467.20). Retail at any size, office over 20,000 sq ft, warehouse over 15,000 sq ft, and restaurants over 9,000 sq ft each require an individual volume determination. It applies in both incorporated and unincorporated Brevard.
Where in Brevard County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melbourne Village Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Melbourne Village Impact Fee FAQs
What are the total impact fees for a single-family home in Melbourne Village, Florida?
A new single-family home in Melbourne Village pays $12,405.06 per unit in combined impact fees (rates sourced August 6, 2026).
How much are commercial impact fees in Melbourne Village?
Commercial development in Melbourne Village pays $0.37 per square foot in impact fees, plus $2,755.00 in one-time water and sewer connection fees, at least $21,110.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Melbourne Village charge its own impact fees?
Yes. Melbourne Village levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Melbourne Village, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brevard County impact fees page.