Astatula, Florida Impact Fees

Astatula applies its own fee schedule: municipal fees plus the Lake County-levied fees that apply inside city limits. Combined, a new single-family home pays $19,812.50 per unit (rates sourced ). The full breakdown is below.

Astatula Impact Fees by Project Type

Astatula: Single-Family Impact Fees

A new single-family home in Astatula pays $19,812.50 per unit in impact fees (rates sourced October 19, 2026). Of that, Lake County-levied fees account for $16,873.00 and municipal or utility fees for $2,939.50.

The largest line items are School Impact Fee (Lake County, SFR) ($12,021.00), Roads Impact Fee (Lake County, SFR) ($3,928.00) and Water Connection/Capacity Fee (Town of Astatula, SFR) ($957.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Astatula Impact Fee Schedule
Water$957.00
  • Water Connection/Capacity Fee (Town of Astatula, SFR)
    Town of Astatula
    The Town of Astatula charges a one-time water utility impact fee of $957 per home when connecting to town water. A separate physical hook-up charge (roughly $597 to $1,997 depending on connection type) and customer deposits also apply.
    $957.00
Sewer$0.00
  • Sewer Connection Fee (Town of Astatula, SFR)
    Town of Astatula
    The Town of Astatula does not operate a sanitary sewer system; homes are served by private septic systems, so no town sewer connection or impact fee applies.
    $0.00
City$1,982.50
County$16,873.00
  • School Impact Fee (Lake County, SFR)
    801+ sq ft
    Lake County
    Lake County school impact fee (Lake County Code Chapter 22, Ord. 2023-39), charged countywide in unincorporated areas and every city. The $12,021 rate applies to a single-family detached home or townhouse larger than 800 sq ft, effective October 1, 2026, the final step of the four-year phase-in (previously $11,247); homes of 800 sq ft or less pay $6,897. Age-restricted communities approved by the County Attorney are exempt.
    $12,021.00
  • Roads Impact Fee (Lake County, SFR)
    1,500–2,499 sq ft
    Lake County
    Lake County road (transportation) impact fee, Central and North Central Transportation Benefit District, for a single-family detached home. Rates in this district by living area: 800 sq ft or less $1,441, 801 to 1,499 sq ft $3,601, 1,500 to 2,499 sq ft $3,928, 2,500 sq ft or more $4,459. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
    $3,928.00
  • Fire Impact Fee (Lake County, SFR)
    1,500+ sq ft
    Lake County
    Lake County fire impact fee (Lake County Code Chapter 22, Ord. 2023-53) for a single-family detached home, by living area: 800 sq ft or less $276, 801 to 1,499 sq ft $334, 1,500 sq ft or more $536. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
    $536.00
  • Library Impact Fee (Lake County, SFR)
    801+ sq ft
    Lake County
    Lake County library impact fee (Lake County Code Chapter 22, Ord. 2023-51), charged countywide: $217 for a single-family detached home of 800 sq ft or less, $263 for a larger home. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
    $263.00
  • Administrative Impact Fee (Lake County, SFR)
    Lake County
    Lake County administrative charge for processing and collecting county impact fees: a flat $125 per dwelling on the county residential impact fee schedule effective October 1, 2026 (previously $100). Since Ord. 2026-42 the amount is set by the county annual fee resolution.
    $125.00
Total (Astatula): $19,812.50
Sources last checked Official fee schedules:Town of Astatula Lake County

Astatula: Multifamily Impact Fees

A new multifamily unit in Astatula pays $16,143.50 per unit in impact fees (rates sourced October 19, 2026). Of that, Lake County-levied fees account for $13,204.00 and municipal or utility fees for $2,939.50.

The largest line items are School Impact Fee - Multifamily 801+ sf ($10,326.00), Roads Impact Fee - Multifamily 801+ sf, 4+ Stories ($2,216.00) and Water Connection/Capacity Fee (Town of Astatula, MF) ($957.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Astatula Impact Fee Schedule
Water$957.00
  • Water Connection/Capacity Fee (Town of Astatula, MF)
    Town of Astatula
    The Town of Astatula charges a one-time water utility impact fee of $957 per dwelling unit for residential development connecting to town water. Physical hook-up charges and deposits are additional, and larger master meters are priced by meter size.
    $957.00
Sewer$0.00
  • Sewer Connection Fee (Town of Astatula, MF)
    Town of Astatula
    The Town of Astatula does not operate a sanitary sewer system; properties are served by private septic systems, so no town sewer connection or impact fee applies.
    $0.00
City$1,982.50
County$13,204.00
  • School Impact Fee - Multifamily 801+ sf
    Lake County
    Lake County school impact fee (Lake County Code Chapter 22, Ord. 2023-39), charged countywide on multifamily units (apartment, condo, duplex) by unit size: 550 sq ft or less $2,504, 551 to 800 sq ft $6,512, more than 800 sq ft $10,326, the same at any building height. The over-800 sq ft rate took effect October 1, 2026, the final step of the four-year phase-in (previously $9,543). Townhouses pay the single-family school rate. Age-restricted communities approved by the County Attorney are exempt.
    $10,326.00
  • Roads Impact Fee - Multifamily 801+ sf, 4+ Stories
    Lake County
    Lake County road (transportation) impact fee for a multifamily unit (apartment, condo, duplex; townhouses use the same road rates), Central and North Central Transportation Benefit District, by unit size and building height. 1 to 3 stories: 550 sq ft or less $1,121, 551 to 800 sq ft $1,121, more than 800 sq ft $2,660. 4 or more stories: 550 sq ft or less $941, 551 to 800 sq ft $941, more than 800 sq ft $2,216. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
    $2,216.00
  • Fire Impact Fee - Multifamily 801+ sf
    Lake County
    Lake County fire impact fee (Lake County Code Chapter 22, Ord. 2023-53) for a multifamily unit, by unit size at any building height: 800 sq ft or less $244, more than 800 sq ft $336. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
    $336.00
  • Library Impact Fee - Multifamily (per unit)
    Lake County
    Lake County library impact fee (Lake County Code Chapter 22, Ord. 2023-51), charged countywide: $201 per multifamily unit at any size and building height. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
    $201.00
  • Administrative Fee - Multifamily (all sizes/stories)
    Lake County
    Lake County administrative charge for processing and collecting county impact fees: a flat $125 per dwelling unit on the county residential impact fee schedule effective October 1, 2026, the same for every unit size and building height (previously $100). Since Ord. 2026-42 the amount is set by the county annual fee resolution.
    $125.00
Total (Astatula): $16,143.50
Sources last checked Official fee schedules:Town of Astatula Lake County

Astatula: Commercial Impact Fees

Commercial development in Astatula pays $5.14 per square foot in impact fees, plus $2,392.50 in one-time water and sewer connection fees (rates sourced October 19, 2026).

For a 50,000 sq ft building, that comes to about $259,542.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Utility Impact Fee (Town of Astatula) — 1" meter ($2,392.50 one-time), County Transportation Impact Fee (Lake County, Commercial) ($4.20/sq ft) and Police Impact Fee (Town of Astatula, Commercial) ($0.45/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Astatula Impact Fee Schedule
Water$2,392.50 one-time
  • Water Utility Impact Fee (Town of Astatula) — 1" meter
    Town of Astatula
    Town of Astatula water utility impact fee by meter size (Code Chapter 39, Ord. 2020-11, effective December 1, 2020); shown for a 1 inch meter at 2.5 times the 5/8 inch base, on standard AWWA meter factors.
    $2,392.50 one-time
Sewer$0.00
City$0.94/sq ft
  • Police Impact Fee (Town of Astatula, Commercial)
    Town of Astatula
    Town of Astatula police impact fee on nonresidential construction, per square foot of interior floor area (Code Chapter 39, Ord. 2020-11, effective December 1, 2020). Astatula's nonresidential impact fees total $0.94 per sq ft (police, public building and administrative charge); its parks impact fee exempts nonresidential development.
    $0.45/sq ft
  • Public Building Impact Fee (Town of Astatula, Commercial)
    Town of Astatula
    Town of Astatula public building impact fee on nonresidential construction, per square foot of interior floor area (Code Chapter 39, Ord. 2020-11, effective December 1, 2020).
    $0.35/sq ft
  • Impact Fee Administrative Charge (Town of Astatula, Commercial)
    Town of Astatula
    Town of Astatula impact fee administrative charge on nonresidential construction, per square foot (Code Chapter 39, Ord. 2020-11, effective December 1, 2020), collected with the town's police and public building impact fees.
    $0.14/sq ft
County$4.20/sq ft
  • County Transportation Impact Fee (Lake County, Commercial)
    40,000–150,000 sf GLA
    Lake County
    Lake County transportation impact fee for a retail or shopping center of 40,000 to 150,000 sq ft, per 1,000 sq ft of gross leasable area, at the Central and North Central benefit district rate that covers Astatula. Effective January 2, 2026; steps to $5,238 on January 2, 2027 under the county's phase-in. Centers under 40,000 sq ft pay $2,225 and centers over 150,000 sq ft pay $4,359 until that step. The county charges this fee inside every city.
    $4.20/sq ft
  • County Fire Rescue Impact Fee (Lake County, Commercial) — Not Applicable in Astatula
    Lake County
    Lake County's fire rescue impact fee does not apply in Astatula. The county charges it only in the unincorporated area and in cities that consent by interlocal agreement and take part in the county fire rescue system; its current commercial schedule limits it to the unincorporated area, Howey-in-the-Hills and Lady Lake.
    $0.00
Total (Astatula): $5.14/sq ft + $2,392.50 one-time (≈ $259,542.50 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Astatula Lake County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lake County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Astatula: Industrial Impact Fees

Industrial development in Astatula pays $2.58 per square foot in impact fees, plus $2,392.50 in one-time water and sewer connection fees (rates sourced October 19, 2026).

For a 50,000 sq ft building, that comes to about $131,392.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Utility Impact Fee (Town of Astatula) — 1" meter ($2,392.50 one-time), County Transportation Impact Fee (Lake County, Industrial) ($1.64/sq ft) and Police Impact Fee (Town of Astatula, Industrial) ($0.45/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Astatula Impact Fee Schedule
Water$2,392.50 one-time
  • Water Utility Impact Fee (Town of Astatula) — 1" meter
    Town of Astatula
    Town of Astatula water utility impact fee by meter size (Code Chapter 39, Ord. 2020-11, effective December 1, 2020); shown for a 1 inch meter at 2.5 times the 5/8 inch base, on standard AWWA meter factors.
    $2,392.50 one-time
Sewer$0.00
City$0.94/sq ft
  • Police Impact Fee (Town of Astatula, Industrial)
    Town of Astatula
    Town of Astatula police impact fee on nonresidential construction, per square foot of interior floor area (Code Chapter 39, Ord. 2020-11, effective December 1, 2020). Astatula's nonresidential impact fees total $0.94 per sq ft (police, public building and administrative charge); its parks impact fee exempts nonresidential development.
    $0.45/sq ft
  • Public Building Impact Fee (Town of Astatula, Industrial)
    Town of Astatula
    Town of Astatula public building impact fee on nonresidential construction, per square foot of interior floor area (Code Chapter 39, Ord. 2020-11, effective December 1, 2020).
    $0.35/sq ft
  • Impact Fee Administrative Charge (Town of Astatula, Industrial)
    Town of Astatula
    Town of Astatula impact fee administrative charge on nonresidential construction, per square foot (Code Chapter 39, Ord. 2020-11, effective December 1, 2020), collected with the town's police and public building impact fees.
    $0.14/sq ft
County$1.64/sq ft
  • County Transportation Impact Fee (Lake County, Industrial)
    Lake County
    Lake County transportation impact fee for general light industrial or manufacturing space, per 1,000 sq ft, at the Central and North Central benefit district rate that covers Astatula. Effective January 2, 2026; steps to $1,972 on January 2, 2027 under the county's phase-in.
    $1.64/sq ft
  • County Fire Rescue Impact Fee (Lake County, Industrial) — Not Applicable in Astatula
    Lake County
    Lake County's fire rescue impact fee does not apply in Astatula. The county charges it only in the unincorporated area and in cities that consent by interlocal agreement and take part in the county fire rescue system; its current commercial schedule limits it to the unincorporated area, Howey-in-the-Hills and Lady Lake.
    $0.00
Total (Astatula): $2.58/sq ft + $2,392.50 one-time (≈ $131,392.50 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Astatula Lake County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lake County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Astatula: Office Impact Fees

Office development in Astatula pays $4.54 per square foot in impact fees, plus $2,392.50 in one-time water and sewer connection fees (rates sourced October 19, 2026).

For a 25,000 sq ft building, that comes to about $115,792.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Utility Impact Fee (Town of Astatula) — 1" meter ($2,392.50 one-time), County Transportation Impact Fee (Lake County, Office) ($3.60/sq ft) and Police Impact Fee (Town of Astatula, Office) ($0.45/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Astatula Impact Fee Schedule
Water$2,392.50 one-time
  • Water Utility Impact Fee (Town of Astatula) — 1" meter
    Town of Astatula
    Town of Astatula water utility impact fee by meter size (Code Chapter 39, Ord. 2020-11, effective December 1, 2020); shown for a 1 inch meter at 2.5 times the 5/8 inch base, on standard AWWA meter factors.
    $2,392.50 one-time
Sewer$0.00
City$0.94/sq ft
  • Police Impact Fee (Town of Astatula, Office)
    Town of Astatula
    Town of Astatula police impact fee on nonresidential construction, per square foot of interior floor area (Code Chapter 39, Ord. 2020-11, effective December 1, 2020). Astatula's nonresidential impact fees total $0.94 per sq ft (police, public building and administrative charge); its parks impact fee exempts nonresidential development.
    $0.45/sq ft
  • Public Building Impact Fee (Town of Astatula, Office)
    Town of Astatula
    Town of Astatula public building impact fee on nonresidential construction, per square foot of interior floor area (Code Chapter 39, Ord. 2020-11, effective December 1, 2020).
    $0.35/sq ft
  • Impact Fee Administrative Charge (Town of Astatula, Office)
    Town of Astatula
    Town of Astatula impact fee administrative charge on nonresidential construction, per square foot (Code Chapter 39, Ord. 2020-11, effective December 1, 2020), collected with the town's police and public building impact fees.
    $0.14/sq ft
County$3.60/sq ft
  • County Transportation Impact Fee (Lake County, Office)
    Lake County
    Lake County transportation impact fee for general office space, per 1,000 sq ft, at the Central and North Central benefit district rate that covers Astatula. Effective January 2, 2026; steps to $4,481 on January 2, 2027 under the county's phase-in.
    $3.60/sq ft
  • County Fire Rescue Impact Fee (Lake County, Office) — Not Applicable in Astatula
    Lake County
    Lake County's fire rescue impact fee does not apply in Astatula. The county charges it only in the unincorporated area and in cities that consent by interlocal agreement and take part in the county fire rescue system; its current commercial schedule limits it to the unincorporated area, Howey-in-the-Hills and Lady Lake.
    $0.00
Total (Astatula): $4.54/sq ft + $2,392.50 one-time (≈ $115,792.50 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Astatula Lake County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lake County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Astatula Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Astatula Impact Fee FAQs

What are the total impact fees for a single-family home in Astatula, Florida?

A new single-family home in Astatula pays $19,812.50 per unit in combined impact fees (rates sourced October 19, 2026).

How much are commercial impact fees in Astatula?

Commercial development in Astatula pays $5.14 per square foot in impact fees, plus $2,392.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $259,542.50 for a 50,000 sq ft building.

Does Astatula charge its own impact fees?

Yes. Astatula levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Astatula, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lake County impact fees page.