Leesburg impact fees by project type
Leesburg: Single-Family Impact Fees
A new single-family home in Leesburg pays at least $16,337.00 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lake County.
The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Fire Impact Fee (Lake County, SFR) ($536.00) and Library Impact Fee (Lake County, SFR) ($263.00).
Roads Impact Fee (Lake County, SFR) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Impact/Capacity Fee (City of Leesburg, SFR) and Water Impact/Capacity Fee (City of Leesburg, SFR) are set by the utility and not published online. Municipal Impact Fees (City of Leesburg, SFR) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact/Capacity Fee (City of Leesburg, SFR)Requires confirmationCity of LeesburgCity of Leesburg operates its own water+sewer (+electric+gas). Water capacity/impact fee uses 300 gpd/ERU LOS. Current per-ERU amount not published in extractable form; city staff recommended a one-time ~50% increase (not yet confirmed adopted) — do not enter proposed figures. $0 placeholder. ⚠️ VERIFY current adopted amount: Customer Service (352) 728-9800.
- Sewer Impact/Capacity Fee (City of Leesburg, SFR)Requires confirmationCity of LeesburgCity of Leesburg own sewer. Wastewater capacity/impact fee uses 250 gpd/ERU LOS. Current per-ERU amount not published in extractable form; staff recommended increase not yet confirmed adopted. $0 placeholder. ⚠️ VERIFY: (352) 728-9800.
- Municipal Impact Fees (City of Leesburg, SFR)Requires confirmationCity of LeesburgCity of Leesburg municipal (non-utility) impact fees not confirmed against adopted schedule; transportation via Lake County. $0 placeholder. ⚠️ VERIFY: City Hall (352) 728-9700.
- School Impact Fee (Lake County, SFR)$11,247.00Lake CountyLake County School Impact Fee, Ord. 2023-39. SF Detached 801+ sf=$11,247 (≤800=$6,897). Eff. Jan 2–Sep 30, 2026.
- Roads Impact Fee (Lake County, SFR)$3,928.00Requires confirmationLake CountyLake County Residential Impact Fee Schedule (Jan 2–Sep 30, 2026). Leesburg (central Lake) assumed Central/N.Central TBD. Value=SF Detached 1,500-2,499 sf=$3,928. ⚠️ VERIFY district (352) 343-9760.
- Fire Impact Fee (Lake County, SFR)$536.00Lake CountyLake County Fire Impact Fee, Ord. 2023-53. SF Detached 1,500+ sf=$536. Eff. Jan 2–Sep 30, 2026.
- Library Impact Fee (Lake County, SFR)$263.00Lake CountyLake County Library Impact Fee, Ord. 2023-51. SF Detached 801+ sf=$263 (≤800=$217). Eff. Jan 2–Sep 30, 2026.
- Parks Impact Fee (Lake County, SFR)$263.00Lake CountyLake County Parks Impact Fee, Ord. 2023-52. SF Detached 1,500-2,499 sf=$263. Eff. Jan 2–Sep 30, 2026.
- Administrative Impact Fee (Lake County, SFR)$100.00Lake CountyLake County Impact Fee administrative charge, $100 flat. Eff. Jan 2–Sep 30, 2026.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Multifamily Impact Fees
A new multifamily unit in Leesburg pays at least $12,609.00 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lake County.
The largest line items are School Impact Fee - Multifamily 801+ sf ($9,543.00), Fire Impact Fee - Multifamily 801+ sf ($336.00) and Parks Impact Fee - Multifamily 801+ sf ($213.00).
Roads Impact Fee - Multifamily 801+ sf, 4+ Stories is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Impact/Capacity Fee (City of Leesburg, MF) and Water Impact/Capacity Fee (City of Leesburg, MF) are set by the utility and not published online. Municipal Impact Fees (City of Leesburg, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact/Capacity Fee (City of Leesburg, MF)Requires confirmationCity of LeesburgCity of Leesburg own water (300 gpd/ERU LOS). Per-ERU amount not published; proposed increase not confirmed adopted. $0 placeholder. ⚠️ VERIFY + MF sizing: (352) 728-9800.
- Sewer Impact/Capacity Fee (City of Leesburg, MF)Requires confirmationCity of LeesburgCity of Leesburg own sewer (250 gpd/ERU LOS). Per-ERU amount not published; proposed increase not confirmed. $0 placeholder. ⚠️ VERIFY: (352) 728-9800.
- Municipal Impact Fees (City of Leesburg, MF)Requires confirmationCity of LeesburgCity of Leesburg municipal (non-utility) impact fees not confirmed against adopted schedule. $0 placeholder. ⚠️ VERIFY: City Hall (352) 728-9700.
- School Impact Fee - Multifamily 801+ sf$9,543.00Lake CountyLake County School Impact Fee. MF 801+ sf=$9,543. Default size tier. Eff. Jan 2–Sep 30, 2026.
- Roads Impact Fee - Multifamily 801+ sf, 4+ Stories$2,216.00Requires confirmationLake CountyCentral/N.Central TBD. MF 801+ sf 4+ St Roads=$2,216. Default MF tier. ⚠️ VERIFY (352) 343-9760.
- Fire Impact Fee - Multifamily 801+ sf$336.00Lake CountyLake County Fire Impact Fee. MF 801+ sf=$336. Default tier. Eff. Jan 2–Sep 30, 2026.
- Parks Impact Fee - Multifamily 801+ sf$213.00Lake CountyLake County Parks Impact Fee. MF 801+ sf=$213. Default tier. Eff. Jan 2–Sep 30, 2026.
- Library Impact Fee - Multifamily (per unit)$201.00Lake CountyLake County Library Impact Fee. MF flat $201/unit. Eff. Jan 2–Sep 30, 2026.
- Administrative Fee - Multifamily (all sizes/stories)$100.00Lake CountyLake County administrative charge, $100 flat. Eff. Jan 2–Sep 30, 2026.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Commercial Impact Fees
Commercial development in Leesburg pays $4.20 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $212,910.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd) ($1,940.00 one-time), Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd) ($820.00 one-time) and County Transportation Impact Fee (Lake County, Commercial) ($4.20/sq ft).
View the full fee schedule
- Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd)$820.00 one-timeCity of Leesburg (municipal water utility)Leesburg Code Ch. 22 Art. VII §22-324 (Ord. 89-9 as amended by Ord. 89-19, 89-23). $820.00 per ERU; 1 ERU = 300 gpd. NO nonres meter-size table — nonres fee is computed from the codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($55); Retail Establishment 0.067 ERU/employee ($55); Industrial Building 0.067 ERU/employee without showers ($55), 0.117 with showers ($96). §22-324(b): for uses not listed, provisional fee = estimated average daily demand ÷ 300 gpd × $820. Value entered is the 1-ERU base. WATCH: an Aug–Sep 2025 consultant study recommended a ~67% increase under the F.S. 163.31801 extraordinary-circumstances path; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd)$1,940.00 one-timeCity of Leesburg (municipal wastewater utility)Leesburg Code Ch. 22 Art. VII §22-325 (Ord. 89-9 as amended). $1,940.00 per ERU; 1 ERU = 250 gpd. NO nonres meter-size table — codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($130); Retail Establishment 0.067 ERU/employee ($130); Industrial Building 0.067 ERU/employee without showers ($130), 0.117 with showers ($227). §22-325(b): unlisted uses = estimated ADF ÷ 250 gpd × $1,940 for domestic-strength waste. Value entered is the 1-ERU base. WATCH: 2025 consultant study recommended a ~67% increase; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Municipal Impact Fees (City of Leesburg, Commercial) — None Levied$0.00City of LeesburgConfirmed $0. Leesburg's Code of Ordinances has no impact-fee chapter — the only capital charges are the Ch. 22 Art. VII water/wastewater capacity impact fees (entered in the W/S table). The Building Permit Fee Schedule eff. 10/1/2025 is cost-recovery permit fees only ($0.70/sq ft commercial), not an impact fee. Transportation/fire capital is covered by the Lake County countywide transportation impact fee.
- County Transportation Impact Fee (Lake County, Commercial)$4.20/sq ftLake County Board of County CommissionersLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026 (Code Ch. 22; Ord. 2019-3). Transportation applies countywide including inside all municipalities. Schedule row: Retail/Shopping (40,000–150,000 SFGLA), basis GLA. Leesburg sits in the CENTRAL Benefit District (confirmed by point query of county GIS Transportation Impact Fee Zones layer 41). Central & North Central rate column. NE/Wekiva & South = $4,671; West = $1,350.
- County Fire Rescue Impact Fee (Lake County, Commercial) — Not Applicable in Leesburg$0.00Lake County Board of County CommissionersConfirmed $0. The county Fire column of the adopted Commercial Impact Fee Schedule applies only to 'All unincorporated areas, including Howey-in-the-Hills and Lady Lake' (Code §22-1(2)). Leesburg is not in that group; it has its own fire department. Documented $0, not a gap.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Industrial Impact Fees
Industrial development in Leesburg pays $1.64 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $84,760.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd) ($1,940.00 one-time), Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd) ($820.00 one-time) and County Transportation Impact Fee (Lake County, Industrial) ($1.64/sq ft).
View the full fee schedule
- Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd)$820.00 one-timeCity of Leesburg (municipal water utility)Leesburg Code Ch. 22 Art. VII §22-324 (Ord. 89-9 as amended by Ord. 89-19, 89-23). $820.00 per ERU; 1 ERU = 300 gpd. NO nonres meter-size table — nonres fee is computed from the codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($55); Retail Establishment 0.067 ERU/employee ($55); Industrial Building 0.067 ERU/employee without showers ($55), 0.117 with showers ($96). §22-324(b): for uses not listed, provisional fee = estimated average daily demand ÷ 300 gpd × $820. Value entered is the 1-ERU base. WATCH: an Aug–Sep 2025 consultant study recommended a ~67% increase under the F.S. 163.31801 extraordinary-circumstances path; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd)$1,940.00 one-timeCity of Leesburg (municipal wastewater utility)Leesburg Code Ch. 22 Art. VII §22-325 (Ord. 89-9 as amended). $1,940.00 per ERU; 1 ERU = 250 gpd. NO nonres meter-size table — codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($130); Retail Establishment 0.067 ERU/employee ($130); Industrial Building 0.067 ERU/employee without showers ($130), 0.117 with showers ($227). §22-325(b): unlisted uses = estimated ADF ÷ 250 gpd × $1,940 for domestic-strength waste. Value entered is the 1-ERU base. WATCH: 2025 consultant study recommended a ~67% increase; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Municipal Impact Fees (City of Leesburg, Industrial) — None Levied$0.00City of LeesburgConfirmed $0. No impact-fee chapter in the Leesburg Code; only Ch. 22 Art. VII utility capacity impact fees (in W/S table). Building permit fees are cost-recovery.
- County Transportation Impact Fee (Lake County, Industrial)$1.64/sq ftLake County Board of County CommissionersLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026. Schedule row: General Light Industrial/Manufacturing. Leesburg = CENTRAL Benefit District (county GIS layer 41). NE/Wekiva & South = $1,911; West = $540.
- County Fire Rescue Impact Fee (Lake County, Industrial) — Not Applicable in Leesburg$0.00Lake County Board of County CommissionersConfirmed $0. County Fire column applies only to unincorporated areas plus Howey-in-the-Hills and Lady Lake. Leesburg excluded.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Office Impact Fees
Office development in Leesburg pays $3.60 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 25,000 sq ft building, that comes to about $92,660.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd) ($1,940.00 one-time), Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd) ($820.00 one-time) and County Transportation Impact Fee (Lake County, Office) ($3.60/sq ft).
View the full fee schedule
- Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd)$820.00 one-timeCity of Leesburg (municipal water utility)Leesburg Code Ch. 22 Art. VII §22-324 (Ord. 89-9 as amended by Ord. 89-19, 89-23). $820.00 per ERU; 1 ERU = 300 gpd. NO nonres meter-size table — nonres fee is computed from the codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($55); Retail Establishment 0.067 ERU/employee ($55); Industrial Building 0.067 ERU/employee without showers ($55), 0.117 with showers ($96). §22-324(b): for uses not listed, provisional fee = estimated average daily demand ÷ 300 gpd × $820. Value entered is the 1-ERU base. WATCH: an Aug–Sep 2025 consultant study recommended a ~67% increase under the F.S. 163.31801 extraordinary-circumstances path; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd)$1,940.00 one-timeCity of Leesburg (municipal wastewater utility)Leesburg Code Ch. 22 Art. VII §22-325 (Ord. 89-9 as amended). $1,940.00 per ERU; 1 ERU = 250 gpd. NO nonres meter-size table — codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($130); Retail Establishment 0.067 ERU/employee ($130); Industrial Building 0.067 ERU/employee without showers ($130), 0.117 with showers ($227). §22-325(b): unlisted uses = estimated ADF ÷ 250 gpd × $1,940 for domestic-strength waste. Value entered is the 1-ERU base. WATCH: 2025 consultant study recommended a ~67% increase; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Municipal Impact Fees (City of Leesburg, Office) — None Levied$0.00City of LeesburgConfirmed $0. No impact-fee chapter in the Leesburg Code; only Ch. 22 Art. VII utility capacity impact fees (in W/S table). Building permit fees are cost-recovery.
- County Transportation Impact Fee (Lake County, Office)$3.60/sq ftLake County Board of County CommissionersLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026. Schedule row: General Office. Leesburg = CENTRAL Benefit District (county GIS layer 41). NE/Wekiva & South = $3,995; West = $1,154.
- County Fire Rescue Impact Fee (Lake County, Office) — Not Applicable in Leesburg$0.00Lake County Board of County CommissionersConfirmed $0. County Fire column applies only to unincorporated areas plus Howey-in-the-Hills and Lady Lake. Leesburg excluded.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Leesburg
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Leesburg, Florida?
A new single-family home in Leesburg pays at least $16,337.00 per unit in combined impact fees (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Leesburg?
Commercial development in Leesburg pays $4.20 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees, about $212,910.00 for a 50,000 sq ft building.
Does Leesburg charge its own impact fees?
Yes. Leesburg levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Leesburg, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.