Leesburg impact fees by project type
Leesburg: Single-Family Impact Fees
A new single-family home in Leesburg pays $22,943.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Lake County-levied fees account for $16,337.00 and municipal or utility fees for $6,606.00.
The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Sewer Impact/Capacity Fee (City of Leesburg, SFR) ($4,567.00) and Roads Impact Fee (Lake County, SFR) ($3,928.00).
View the full fee schedule
- Water Impact/Capacity Fee (City of Leesburg, SFR)$2,039.00City of LeesburgUPDATED 2026-08-05 from $820 to $2,039/ERU, and unflagged. Leesburg Ordinance 25-66 passed second reading 4-0 on 10/13/2025 and took effect 12:01 a.m. 11 January 2026, raising the Sec. 22-324 water impact fee from $820 to $2,039/ERU (and the Sec. 22-325 wastewater fee from $1,940 to $4,567). Adopted via the Florida Impact Fee Act extraordinary-circumstances path after workshops 8/11 and 8/25/2025 on the Raftelis study of 9/4/2025. Two independent retrievals via the CivicClerk OData API: the adopted 10/13/25 minutes recording 'ADOPTED ORDINANCE 25-66' with roll call, and the 10/13/25 agenda packet carrying the strike-through amendments. WHY IT WAS STALE: Municode still shows $820/$1,940 because Leesburg is codified only through Ord. 24-62 (10/14/2024) - a codification lag of over a year. The ordinance also REMOVES automatic indexing (retires Sec. 22-327), so no annual escalation should be assumed. This same increase also affects the Mascotte wholesale pass-through note, which has been updated. Round-3 2026-08-05; docs/verify-r3-mixed.json.
- Sewer Impact/Capacity Fee (City of Leesburg, SFR)$4,567.00City of LeesburgUPDATED 2026-08-05 from $1,940 to $4,567/ERU, and unflagged. Same adopting instrument as the water row recfT9q3c7lJ0V7RM: Leesburg Ordinance 25-66, second reading 4-0 on 10/13/2025, effective 11 January 2026, raising the Sec. 22-325 wastewater impact fee from $1,940 to $4,567/ERU. The SFR wastewater figure is unambiguous in the adopted packet. Two independent retrievals (adopted minutes + agenda packet) via the CivicClerk OData API. Municode showed the old $1,940 only because the code is supplemented through Ord. 24-62 (10/2024). Automatic indexing removed. Round-3 2026-08-05; docs/verify-r3-mixed.json.
- Municipal Impact Fees (City of Leesburg, SFR)$0.00City of Leesburg8/4/2026: CONFIRMED $0 — Full Leesburg Code of Ordinances review: the only impact fees are the water/wastewater system capacity impact fees in Ch. 22 Art. VII (tracked on separate rows). No police, fire, parks, or general-government impact fee chapter exists, and the Building Dept fee schedule lists none. Transportation/school/library are Lake County countywide fees. City Hall (352) 728-9700.
- School Impact Fee (Lake County, SFR)$11,247.00Lake CountyLake County School Impact Fee, Ord. 2023-39. SF Detached 801+ sf=$11,247 (≤800=$6,897). Eff. Jan 2–Sep 30, 2026.
- Roads Impact Fee (Lake County, SFR)$3,928.00Lake CountyLake County Residential Impact Fee Schedule (Jan 2–Sep 30, 2026): SF Detached 1,500–2,499 sf, Roads = $3,928. District verified 8/3/2026 via county GIS Transportation Impact Fee Zones layer (lakegis MapServer/41): Leesburg returns CENTRAL Benefit District → $3,928 confirmed.
- Fire Impact Fee (Lake County, SFR)$536.00Lake CountyLake County Fire Impact Fee, Ord. 2023-53. SF Detached 1,500+ sf=$536. Eff. Jan 2–Sep 30, 2026.
- Library Impact Fee (Lake County, SFR)$263.00Lake CountyLake County Library Impact Fee, Ord. 2023-51. SF Detached 801+ sf=$263 (≤800=$217). Eff. Jan 2–Sep 30, 2026.
- Parks Impact Fee (Lake County, SFR)$263.00Lake CountyLake County Parks Impact Fee, Ord. 2023-52. SF Detached 1,500-2,499 sf=$263. Eff. Jan 2–Sep 30, 2026.
- Administrative Impact Fee (Lake County, SFR)$100.00Lake CountyLake County Impact Fee administrative charge, $100 flat. Eff. Jan 2–Sep 30, 2026.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Multifamily Impact Fees
A new multifamily unit in Leesburg pays $18,111.80 per unit in impact fees (rates sourced August 5, 2026). Of that, Lake County-levied fees account for $12,609.00 and municipal or utility fees for $5,502.80.
The largest line items are School Impact Fee - Multifamily 801+ sf ($9,543.00), Roads Impact Fee - Multifamily 801+ sf, 4+ Stories ($2,216.00) and Water Impact/Capacity Fee (City of Leesburg, MF) ($1,698.49).
Sewer Impact/Capacity Fee (City of Leesburg, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact/Capacity Fee (City of Leesburg, MF)$1,698.49City of LeesburgUPDATED 2026-08-05 from $683 to $1,698.49, and unflagged. Leesburg Ordinance 25-66 (adopted 10/13/2025, effective 11 January 2026) raised the water impact fee to $2,039/ERU. The city's published multifamily factor is 0.833 ERU per unit, so 2,039 x 0.833 = $1,698.49. This is the SAME methodology already in the base - the prior $683 was 820 x 0.833 - applied to the new adopted rate, and the finding records all water figures as unambiguous. Two independent retrievals (adopted minutes + agenda packet) via the CivicClerk OData API. Round-3 2026-08-05; docs/verify-r3-mixed.json.
- Sewer Impact/Capacity Fee (City of Leesburg, MF)$3,804.31Requires confirmationCity of LeesburgUPDATED 2026-08-05 to $3,804.31 but KEPT FLAGGED - the one cell in the Leesburg increase with a residual ambiguity. Leesburg Ordinance 25-66 (effective 11 January 2026) raised the wastewater impact fee to $4,567/ERU. Applying the city's published 0.833 multifamily factor - the SAME method the base already used ($1,616 was 1,940 x 0.833) - gives 4,567 x 0.833 = $3,804.31, and the adopted packet's Duplex line at the same 0.833 factor prints $3,804, which corroborates this reading. THE AMBIGUITY: the packet's Multi-Family 1-2 bedroom line prints $3,046, which is inconsistent with its own 0.833 factor (0.833 x 4,567 = 3,804, not 3,046) - the verifier judged this a column-alignment artifact or scrivener's error in the strike-through table. Because two readings exist ($3,804.31 by the city's own factor vs $3,046 as printed on the MF line), this cell stays flagged until confirmed against the codified or executed ordinance. The figure carried ($3,804.31) is the factor-consistent one; do not present it as settled. SFR wastewater ($4,567) and all water figures are unambiguous and were unflagged. Round-3 2026-08-05; docs/verify-r3-mixed.json.
- Municipal Impact Fees (City of Leesburg, MF)$0.00City of Leesburg8/4/2026: CONFIRMED $0 — Full Leesburg Code review: only impact fees are the Ch. 22 Art. VII water/wastewater capacity impact fees (separate rows). No police/fire/parks/general-government impact fee exists; Building Dept fee schedule lists none. City Hall (352) 728-9700.
- School Impact Fee - Multifamily 801+ sf$9,543.00Lake CountyLake County School Impact Fee. MF 801+ sf=$9,543. Default size tier. Eff. Jan 2–Sep 30, 2026.
- Roads Impact Fee - Multifamily 801+ sf, 4+ Stories$2,216.00Lake CountyCentral/N.Central TBD. MF 801+ sf 4+ St Roads=$2,216. Default MF tier. ⚠️ VERIFY (352) 343-9760. Confirmed $2,216 for MF 801+ sf 4+ Stories per Lake County schedule, Central & North Central TBD (Leesburg = Central district per county GIS), eff. Jan 2-Sep 30, 2026 (verified 2026-07-31).
- Fire Impact Fee - Multifamily 801+ sf$336.00Lake CountyLake County Fire Impact Fee. MF 801+ sf=$336. Default tier. Eff. Jan 2–Sep 30, 2026.
- Parks Impact Fee - Multifamily 801+ sf$213.00Lake CountyLake County Parks Impact Fee. MF 801+ sf=$213. Default tier. Eff. Jan 2–Sep 30, 2026.
- Library Impact Fee - Multifamily (per unit)$201.00Lake CountyLake County Library Impact Fee. MF flat $201/unit. Eff. Jan 2–Sep 30, 2026.
- Administrative Fee - Multifamily (all sizes/stories)$100.00Lake CountyLake County administrative charge, $100 flat. Eff. Jan 2–Sep 30, 2026.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Commercial Impact Fees
Commercial development in Leesburg pays $4.20 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $212,910.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd) ($1,940.00 one-time), Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd) ($820.00 one-time) and County Transportation Impact Fee (Lake County, Commercial) ($4.20/sq ft).
View the full fee schedule
- Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd)$820.00 one-timeCity of Leesburg (municipal water utility)Leesburg Code Ch. 22 Art. VII §22-324 (Ord. 89-9 as amended by Ord. 89-19, 89-23). $820.00 per ERU; 1 ERU = 300 gpd. NO nonres meter-size table — nonres fee is computed from the codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($55); Retail Establishment 0.067 ERU/employee ($55); Industrial Building 0.067 ERU/employee without showers ($55), 0.117 with showers ($96). §22-324(b): for uses not listed, provisional fee = estimated average daily demand ÷ 300 gpd × $820. Value entered is the 1-ERU base. WATCH: an Aug–Sep 2025 consultant study recommended a ~67% increase under the F.S. 163.31801 extraordinary-circumstances path; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd)$1,940.00 one-timeCity of Leesburg (municipal wastewater utility)Leesburg Code Ch. 22 Art. VII §22-325 (Ord. 89-9 as amended). $1,940.00 per ERU; 1 ERU = 250 gpd. NO nonres meter-size table — codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($130); Retail Establishment 0.067 ERU/employee ($130); Industrial Building 0.067 ERU/employee without showers ($130), 0.117 with showers ($227). §22-325(b): unlisted uses = estimated ADF ÷ 250 gpd × $1,940 for domestic-strength waste. Value entered is the 1-ERU base. WATCH: 2025 consultant study recommended a ~67% increase; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Municipal Impact Fees (City of Leesburg, Commercial) — None Levied$0.00City of LeesburgConfirmed $0. Leesburg's Code of Ordinances has no impact-fee chapter — the only capital charges are the Ch. 22 Art. VII water/wastewater capacity impact fees (entered in the W/S table). The Building Permit Fee Schedule eff. 10/1/2025 is cost-recovery permit fees only ($0.70/sq ft commercial), not an impact fee. Transportation/fire capital is covered by the Lake County countywide transportation impact fee.
- County Transportation Impact Fee (Lake County, Commercial)$4.20/sq ftLake County Board of County CommissionersLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026 (Code Ch. 22; Ord. 2019-3). Transportation applies countywide including inside all municipalities. Schedule row: Retail/Shopping (40,000–150,000 SFGLA), basis GLA. Leesburg sits in the CENTRAL Benefit District (confirmed by point query of county GIS Transportation Impact Fee Zones layer 41). Central & North Central rate column. NE/Wekiva & South = $4,671; West = $1,350.
- County Fire Rescue Impact Fee (Lake County, Commercial) — Not Applicable in Leesburg$0.00Lake County Board of County CommissionersConfirmed $0. The county Fire column of the adopted Commercial Impact Fee Schedule applies only to 'All unincorporated areas, including Howey-in-the-Hills and Lady Lake' (Code §22-1(2)). Leesburg is not in that group; it has its own fire department. Documented $0, not a gap.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Industrial Impact Fees
Industrial development in Leesburg pays $1.64 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $84,760.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd) ($1,940.00 one-time), Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd) ($820.00 one-time) and County Transportation Impact Fee (Lake County, Industrial) ($1.64/sq ft).
View the full fee schedule
- Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd)$820.00 one-timeCity of Leesburg (municipal water utility)Leesburg Code Ch. 22 Art. VII §22-324 (Ord. 89-9 as amended by Ord. 89-19, 89-23). $820.00 per ERU; 1 ERU = 300 gpd. NO nonres meter-size table — nonres fee is computed from the codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($55); Retail Establishment 0.067 ERU/employee ($55); Industrial Building 0.067 ERU/employee without showers ($55), 0.117 with showers ($96). §22-324(b): for uses not listed, provisional fee = estimated average daily demand ÷ 300 gpd × $820. Value entered is the 1-ERU base. WATCH: an Aug–Sep 2025 consultant study recommended a ~67% increase under the F.S. 163.31801 extraordinary-circumstances path; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd)$1,940.00 one-timeCity of Leesburg (municipal wastewater utility)Leesburg Code Ch. 22 Art. VII §22-325 (Ord. 89-9 as amended). $1,940.00 per ERU; 1 ERU = 250 gpd. NO nonres meter-size table — codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($130); Retail Establishment 0.067 ERU/employee ($130); Industrial Building 0.067 ERU/employee without showers ($130), 0.117 with showers ($227). §22-325(b): unlisted uses = estimated ADF ÷ 250 gpd × $1,940 for domestic-strength waste. Value entered is the 1-ERU base. WATCH: 2025 consultant study recommended a ~67% increase; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Municipal Impact Fees (City of Leesburg, Industrial) — None Levied$0.00City of LeesburgConfirmed $0. No impact-fee chapter in the Leesburg Code; only Ch. 22 Art. VII utility capacity impact fees (in W/S table). Building permit fees are cost-recovery.
- County Transportation Impact Fee (Lake County, Industrial)$1.64/sq ftLake County Board of County CommissionersLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026. Schedule row: General Light Industrial/Manufacturing. Leesburg = CENTRAL Benefit District (county GIS layer 41). NE/Wekiva & South = $1,911; West = $540.
- County Fire Rescue Impact Fee (Lake County, Industrial) — Not Applicable in Leesburg$0.00Lake County Board of County CommissionersConfirmed $0. County Fire column applies only to unincorporated areas plus Howey-in-the-Hills and Lady Lake. Leesburg excluded.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Leesburg: Office Impact Fees
Office development in Leesburg pays $3.60 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 25,000 sq ft building, that comes to about $92,660.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd) ($1,940.00 one-time), Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd) ($820.00 one-time) and County Transportation Impact Fee (Lake County, Office) ($3.60/sq ft).
View the full fee schedule
- Water System Capacity Impact Fee (City of Leesburg) — 1 ERU (300 gpd)$820.00 one-timeCity of Leesburg (municipal water utility)Leesburg Code Ch. 22 Art. VII §22-324 (Ord. 89-9 as amended by Ord. 89-19, 89-23). $820.00 per ERU; 1 ERU = 300 gpd. NO nonres meter-size table — nonres fee is computed from the codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($55); Retail Establishment 0.067 ERU/employee ($55); Industrial Building 0.067 ERU/employee without showers ($55), 0.117 with showers ($96). §22-324(b): for uses not listed, provisional fee = estimated average daily demand ÷ 300 gpd × $820. Value entered is the 1-ERU base. WATCH: an Aug–Sep 2025 consultant study recommended a ~67% increase under the F.S. 163.31801 extraordinary-circumstances path; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Wastewater System Capacity Impact Fee (City of Leesburg) — 1 ERU (250 gpd)$1,940.00 one-timeCity of Leesburg (municipal wastewater utility)Leesburg Code Ch. 22 Art. VII §22-325 (Ord. 89-9 as amended). $1,940.00 per ERU; 1 ERU = 250 gpd. NO nonres meter-size table — codified ERU-factor table by land use: Office Building 0.067 ERU/employee ($130); Retail Establishment 0.067 ERU/employee ($130); Industrial Building 0.067 ERU/employee without showers ($130), 0.117 with showers ($227). §22-325(b): unlisted uses = estimated ADF ÷ 250 gpd × $1,940 for domestic-strength waste. Value entered is the 1-ERU base. WATCH: 2025 consultant study recommended a ~67% increase; no amending ordinance found adopted as of 2026-07-13 — recheck each cycle.
- Municipal Impact Fees (City of Leesburg, Office) — None Levied$0.00City of LeesburgConfirmed $0. No impact-fee chapter in the Leesburg Code; only Ch. 22 Art. VII utility capacity impact fees (in W/S table). Building permit fees are cost-recovery.
- County Transportation Impact Fee (Lake County, Office)$3.60/sq ftLake County Board of County CommissionersLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026. Schedule row: General Office. Leesburg = CENTRAL Benefit District (county GIS layer 41). NE/Wekiva & South = $3,995; West = $1,154.
- County Fire Rescue Impact Fee (Lake County, Office) — Not Applicable in Leesburg$0.00Lake County Board of County CommissionersConfirmed $0. County Fire column applies only to unincorporated areas plus Howey-in-the-Hills and Lady Lake. Leesburg excluded.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Leesburg
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Leesburg, Florida?
A new single-family home in Leesburg pays $22,943.00 per unit in combined impact fees (rates sourced August 5, 2026).
How much are commercial impact fees in Leesburg?
Commercial development in Leesburg pays $4.20 per square foot in impact fees, plus $2,760.00 in one-time water and sewer connection fees, about $212,910.00 for a 50,000 sq ft building.
Does Leesburg charge its own impact fees?
Yes. Leesburg levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Leesburg, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Lake County impact fees page.