Groveland applies its own fee schedule: municipal fees plus the Lake County-levied fees that apply inside city limits. Combined, a new single-family home pays $30,897.80 per unit (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Groveland impact fees by project type

Groveland: Single-Family Impact Fees

A new single-family home in Groveland pays $30,897.80 per unit in impact fees (rates sourced July 13, 2026). Of that, Lake County-levied fees account for $13,667.00 and municipal or utility fees for $17,230.80.

The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Wastewater Impact Fee (City of Groveland, SFR) ($10,362.00) and Water Impact Fee (City of Groveland, SFR) ($3,933.00).

Roads Impact Fee (Lake County, SFR) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$3,933.00
Sewer$10,362.00
City$2,935.80
County$13,667.00
  • School Impact Fee (Lake County, SFR)
    Lake County Schools
    Lake County School Impact Fee, Ord. 2023-39. SF Detached 801+ sf = $11,247 (≤800 sf = $6,897). Eff. Jan 2–Sep 30, 2026.
    $11,247.00
  • Roads Impact Fee (Lake County, SFR)
    Lake County
    Lake County Residential Impact Fee Schedule (Jan 2–Sep 30, 2026). Groveland is in south Lake County → likely SOUTH Transportation Benefit District. Value = South SF Detached 1,500-2,499 sf ($1,258). NOTE: existing Groveland MF roads records used NE/Wekiva rates ($2,872/$2,428) — those are likely WRONG district. ⚠️ VERIFY TBD with Lake County (352) 343-9760; if confirmed South, also fix MF. South detached: 800-=$457; 801-1499=$1,123; 1500-2499=$1,258; 2500+=$1,435.
    $1,258.00Requires confirmation
  • Fire Impact Fee (Lake County, SFR)
    Lake County
    Lake County Fire Impact Fee, Ord. 2023-53. SF Detached: ≤800=$276; 801-1499=$334; 1500+=$536. Value = 1500-2499 tier. Eff. Jan 2–Sep 30, 2026.
    $536.00
  • Parks Impact Fee (Lake County, SFR)
    Lake County
    Lake County Parks Impact Fee, Ord. 2023-52. SF Detached: ≤800=$136; 801-1499=$165; 1500-2499=$263; 2500+=$305. Value = 1500-2499 tier.
    $263.00
  • Library Impact Fee (Lake County, SFR)
    Lake County
    Lake County Library Impact Fee, Ord. 2023-51. SF Detached 801+=$263 (≤800=$217). Eff. Jan 2–Sep 30, 2026.
    $263.00
  • Administrative Impact Fee (Lake County, SFR)
    Lake County
    Lake County Impact Fee administrative charge, $100 flat per F.S. 163.31801. Eff. Jan 2–Sep 30, 2026.
    $100.00
Total (Groveland): $30,897.80
Sources last checked July 13, 2026Official fee schedules:City of Groveland Lake County Schools Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Groveland: Multifamily Impact Fees

A new multifamily unit in Groveland pays $24,749.80 per unit in impact fees (rates sourced July 13, 2026). Of that, Lake County-levied fees account for $11,091.00 and municipal or utility fees for $13,658.80.

The largest line items are School Impact Fee - Multifamily 801+ sf, 4+ Stories ($9,543.00), Wastewater Impact Fee - Multifamily 1-2BR (0.75 ERU) ($7,772.00) and Water Impact Fee - Multifamily 1-2BR (0.75 ERU) ($2,951.00).

Roads Impact Fee - Multifamily 801+ sf, 4+ Stories is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$2,951.00
Sewer$7,772.00
City$2,935.80
County$11,091.00
Total (Groveland): $24,749.80
Sources last checked July 13, 2026Official fee schedules:City of Groveland Lake County School District Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Groveland: Commercial Impact Fees

Commercial development in Groveland pays $5.74 per square foot in impact fees, plus $14,730.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $301,780.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Commercial) ($4.67/sq ft), Fire Prevention Impact Fee (City of Groveland, Commercial) ($0.70/sq ft) and Law Enforcement Impact Fee (City of Groveland, Commercial) ($0.26/sq ft).

Water Impact Fee (City of Groveland) — 1 ERU (9,600 gal) and Wastewater Impact Fee (City of Groveland) — 1 ERU (8,000 gal) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$3,830.00 one-time
  • Water Impact Fee (City of Groveland) — 1 ERU (9,600 gal)
    City of Groveland
    Ord. 2024-04 (2024 Utility Rate & Connection Fee Report, Raftelis), new LDC Sec. 125-25, eff. 10/1/2024. Nonres water connection fee (aka impact fee) = $3,830.00 per ERU; 9,600 gallons = 1 ERU. No meter-size table - ERU count is flow-based. UNCONFIRMED: Sec. 125-29 requires an annual CPI adjustment effective each Oct 1 beginning 10/1/2025; no adjusted schedule is published, so this is the adopted base rate and is likely one CPI step stale. Municode Appendix A still shows the fully superseded $2,336.92 figure. Confirm current rate: Groveland Building Division (352) 429-2141 opt. 2.
    $3,830.00 one-timeRequires confirmation
Sewer$10,900.00 one-time
  • Wastewater Impact Fee (City of Groveland) — 1 ERU (8,000 gal)
    City of Groveland
    Ord. 2024-04, new LDC Sec. 125-25, eff. 10/1/2024. Nonres wastewater connection fee (aka impact fee) = $10,900.00 per ERU; 8,000 gallons = 1 ERU. Flow-based, no meter ladder. UNCONFIRMED: Sec. 125-29 CPI adjustment effective each Oct 1 beginning 10/1/2025 - no adjusted schedule published. Municode Appendix A still shows the superseded $4,478.40 figure. Confirm: (352) 429-2141 opt. 2.
    $10,900.00 one-timeRequires confirmation
City$1.07/sq ft
  • Fire Prevention Impact Fee (City of Groveland, Commercial)
    City of Groveland
    Code Appendix A Fee Schedule, Sec. 125-54 (Ord. No. 2022-02, § 2, 3-7-2022). Fully phased-in 'Total Increase Adjustment' rate; both annual increments complete. Basis: per sq ft of nonresidential development (GFA). Appendix A also still displays the superseded pre-2022 rate ($0.39/sf) above the Ord. 2022-02 table. Appendix A authorizes annual upward MCI indexing; no indexed schedule is published. Parks & Recreation impact fee ($1,650.76) is per residential dwelling unit only - no nonres row.
    $0.70/sq ft
  • Law Enforcement Impact Fee (City of Groveland, Commercial)
    City of Groveland
    Code Appendix A Fee Schedule, Sec. 125-89 (Ord. No. 2022-02, § 2, 3-7-2022). Schedule row: 'Non-residential' $0.26/sq ft (fully phased-in Total Increase Adjustment). NOTE: the 2022 study LOWERED the nonres LE rate - Appendix A still displays the superseded pre-2022 Commercial rate ($0.60/sf) above the Ord. 2022-02 table.
    $0.26/sq ft
  • Administrative Impact Fee (City of Groveland, Commercial)
    City of Groveland
    Code Appendix A Fee Schedule, Sec. 125-149 (Ord. No. 2022-02, § 2, 3-7-2022). Schedule row: 'Non-Residential' $0.11 per sq ft (fully phased-in Total Increase Adjustment). No category split.
    $0.11/sq ft
County$4.67/sq ft
  • County Transportation Impact Fee (Lake County, Commercial)
    Lake County
    Lake County Commercial Impact Fee Schedule, eff. Jan 2 - Sep 30, 2026. Countywide incl. all cities (Code §22-1(1)). Schedule row: Retail/Shopping (40,000-150,000 SFGLA), per 1,000 SF of gross leasable area. Transportation benefit district = SOUTH (confirmed by point query of the county GIS Transportation Impact Fee Zones layer, gis.lakecountyfl.gov/lakegis/rest/services/InteractiveMap/MapServer/41); the NE/Wekiva & South column applies.
    $4.67/sq ft
  • County Fire Rescue Impact Fee (Lake County, Commercial) — Not Applicable in Groveland
    Lake County
    Confirmed $0: the county Fire column of the Lake County Commercial Impact Fee Schedule (eff. Jan 2 - Sep 30, 2026) applies only to 'All unincorporated areas, including Howey-in-the-Hills and Lady Lake' (Code §22-1(2)). Groveland is not in the county fire impact fee area.
    $0.00
Total (Groveland): $5.74/sq ft + $14,730.00 one-time (≈ $301,780.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Groveland Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Groveland: Industrial Impact Fees

Industrial development in Groveland pays $2.43 per square foot in impact fees, plus $14,730.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $136,280.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Industrial) ($1.91/sq ft), Fire Prevention Impact Fee (City of Groveland, Industrial) ($0.30/sq ft) and Law Enforcement Impact Fee (City of Groveland, Industrial) ($0.11/sq ft).

Water Impact Fee (City of Groveland) — 1 ERU (9,600 gal) and Wastewater Impact Fee (City of Groveland) — 1 ERU (8,000 gal) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$3,830.00 one-time
  • Water Impact Fee (City of Groveland) — 1 ERU (9,600 gal)
    City of Groveland
    Ord. 2024-04 (2024 Utility Rate & Connection Fee Report, Raftelis), new LDC Sec. 125-25, eff. 10/1/2024. Nonres water connection fee (aka impact fee) = $3,830.00 per ERU; 9,600 gallons = 1 ERU. No meter-size table - ERU count is flow-based. UNCONFIRMED: Sec. 125-29 requires an annual CPI adjustment effective each Oct 1 beginning 10/1/2025; no adjusted schedule is published, so this is the adopted base rate and is likely one CPI step stale. Municode Appendix A still shows the fully superseded $2,336.92 figure. Confirm current rate: Groveland Building Division (352) 429-2141 opt. 2.
    $3,830.00 one-timeRequires confirmation
Sewer$10,900.00 one-time
  • Wastewater Impact Fee (City of Groveland) — 1 ERU (8,000 gal)
    City of Groveland
    Ord. 2024-04, new LDC Sec. 125-25, eff. 10/1/2024. Nonres wastewater connection fee (aka impact fee) = $10,900.00 per ERU; 8,000 gallons = 1 ERU. Flow-based, no meter ladder. UNCONFIRMED: Sec. 125-29 CPI adjustment effective each Oct 1 beginning 10/1/2025 - no adjusted schedule published. Municode Appendix A still shows the superseded $4,478.40 figure. Confirm: (352) 429-2141 opt. 2.
    $10,900.00 one-timeRequires confirmation
City$0.52/sq ft
County$1.91/sq ft
Total (Groveland): $2.43/sq ft + $14,730.00 one-time (≈ $136,280.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Groveland Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Groveland: Office Impact Fees

Office development in Groveland pays $5.07 per square foot in impact fees, plus $14,730.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $141,355.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Office) ($4.00/sq ft), Fire Prevention Impact Fee (City of Groveland, Office) ($0.70/sq ft) and Law Enforcement Impact Fee (City of Groveland, Office) ($0.26/sq ft).

Water Impact Fee (City of Groveland) — 1 ERU (9,600 gal) and Wastewater Impact Fee (City of Groveland) — 1 ERU (8,000 gal) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$3,830.00 one-time
  • Water Impact Fee (City of Groveland) — 1 ERU (9,600 gal)
    City of Groveland
    Ord. 2024-04 (2024 Utility Rate & Connection Fee Report, Raftelis), new LDC Sec. 125-25, eff. 10/1/2024. Nonres water connection fee (aka impact fee) = $3,830.00 per ERU; 9,600 gallons = 1 ERU. No meter-size table - ERU count is flow-based. UNCONFIRMED: Sec. 125-29 requires an annual CPI adjustment effective each Oct 1 beginning 10/1/2025; no adjusted schedule is published, so this is the adopted base rate and is likely one CPI step stale. Municode Appendix A still shows the fully superseded $2,336.92 figure. Confirm current rate: Groveland Building Division (352) 429-2141 opt. 2.
    $3,830.00 one-timeRequires confirmation
Sewer$10,900.00 one-time
  • Wastewater Impact Fee (City of Groveland) — 1 ERU (8,000 gal)
    City of Groveland
    Ord. 2024-04, new LDC Sec. 125-25, eff. 10/1/2024. Nonres wastewater connection fee (aka impact fee) = $10,900.00 per ERU; 8,000 gallons = 1 ERU. Flow-based, no meter ladder. UNCONFIRMED: Sec. 125-29 CPI adjustment effective each Oct 1 beginning 10/1/2025 - no adjusted schedule published. Municode Appendix A still shows the superseded $4,478.40 figure. Confirm: (352) 429-2141 opt. 2.
    $10,900.00 one-timeRequires confirmation
City$1.07/sq ft
  • Fire Prevention Impact Fee (City of Groveland, Office)
    City of Groveland
    Code Appendix A Fee Schedule, Sec. 125-54 (Ord. No. 2022-02, § 2, 3-7-2022). Schedule row: 'Non-residential' $0.70/sq ft (fully phased-in Total Increase Adjustment). Office falls in the general Non-residential row - the schedule's only split is Industrial/Warehouse/Manufacturing.
    $0.70/sq ft
  • Law Enforcement Impact Fee (City of Groveland, Office)
    City of Groveland
    Code Appendix A Fee Schedule, Sec. 125-89 (Ord. No. 2022-02, § 2, 3-7-2022). Schedule row: 'Non-residential' $0.26/sq ft (fully phased-in). Only split is Industrial/Warehouse.
    $0.26/sq ft
  • Administrative Impact Fee (City of Groveland, Office)
    City of Groveland
    Code Appendix A Fee Schedule, Sec. 125-149 (Ord. No. 2022-02, § 2, 3-7-2022). Schedule row: 'Non-Residential' $0.11 per sq ft. No category split.
    $0.11/sq ft
County$4.00/sq ft
Total (Groveland): $5.07/sq ft + $14,730.00 one-time (≈ $141,355.00 at 25,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:City of Groveland Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Groveland

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Groveland, Florida?

A new single-family home in Groveland pays $30,897.80 per unit in combined impact fees (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Groveland?

Commercial development in Groveland pays $5.74 per square foot in impact fees, plus $14,730.00 in one-time water and sewer connection fees, about $301,780.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Groveland charge its own impact fees?

Yes. Groveland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Groveland, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lake County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000