Tavares impact fees by project type
Tavares: Single-Family Impact Fees
A new single-family home in Tavares pays at least $22,089.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Lake County-levied fees account for $16,765.00 and municipal or utility fees for $5,324.00.
The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Fire Impact Fee (Lake County, SFR) ($536.00) and Library Impact Fee (Lake County, SFR) ($263.00).
Wastewater Capital Charge (City of Tavares, SFR), Roads Impact Fee (Lake County, SFR), and Water Capital Charge (City of Tavares, SFR) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Municipal Impact Fees (City of Tavares, SFR) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Capital Charge (City of Tavares, SFR)$1,849.00Requires confirmationCity of TavaresCity of Tavares Ord. 2025-04. Water capital charge $1,849/ERU; SF = 1.0 ERU. Derived from MF record (0.75 ERU = $1,386.75); fee-sheet PDF did not render. ⚠️ VERIFY: City of Tavares Utilities (352) 742-6206.
- Wastewater Capital Charge (City of Tavares, SFR)$3,475.00Requires confirmationCity of TavaresCity of Tavares Ord. 2025-04. Wastewater capital charge $3,475/ERU; SF = 1.0 ERU. Derived from MF record (0.75 ERU = $2,606.25); fee-sheet PDF did not render. ⚠️ VERIFY: City of Tavares Utilities (352) 742-6206.
- Municipal Impact Fees (City of Tavares, SFR)Requires confirmationCity of TavaresCity of Tavares Ord. 2025-04 (fee sheets, eff. 12/11/25). SFR municipal impact fee total (Police + Fire + Parks + General Government) NOT obtained — fee-sheet PDF did not render. MF total = $2,807. $0 placeholder. ⚠️ VERIFY SFR amount: City of Tavares (352) 742-6206 / Planning.
- School Impact Fee (Lake County, SFR)$11,247.00Lake County SchoolsLake County School Impact Fee, Ord. 2023-39. SF Detached 801+ sf = $11,247 (≤800 sf = $6,897). Eff. Jan 2–Sep 30, 2026.
- Roads Impact Fee (Lake County, SFR)$4,356.00Requires confirmationLake CountyLake County Residential Impact Fee Schedule (Jan 2–Sep 30, 2026). Tavares (county seat, central Lake) likely Central/North Central TBD. Value = NE/Wekiva SF Detached 1,500-2,499 sf ($4,356) to parallel existing MF. ⚠️ VERIFY TBD with Lake County (352) 343-9760 — if Central/N.Central, detached 1500-2499 = $3,928.
- Fire Impact Fee (Lake County, SFR)$536.00Lake CountyLake County Fire Impact Fee, Ord. 2023-53. SF Detached: ≤800=$276; 801-1499=$334; 1500+=$536. Value = 1500-2499 tier.
- Library Impact Fee (Lake County, SFR)$263.00Lake CountyLake County Library Impact Fee, Ord. 2023-51. SF Detached 801+=$263 (≤800=$217).
- Parks Impact Fee (Lake County, SFR)$263.00Lake CountyLake County Parks Impact Fee, Ord. 2023-52. SF Detached: ≤800=$136; 801-1499=$165; 1500-2499=$263; 2500+=$305. Value = 1500-2499 tier.
- Administrative Impact Fee (Lake County, SFR)$100.00Lake CountyLake County Impact Fee administrative charge, $100 flat per F.S. 163.31801.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tavares: Multifamily Impact Fees
A new multifamily unit in Tavares pays $19,621.00 per unit in impact fees (rates sourced July 13, 2026). Of that, Lake County-levied fees account for $12,821.00 and municipal or utility fees for $6,800.00.
The largest line items are School Impact Fee - Multifamily 801+ sf, 4+ Stories ($9,543.00), Municipal Impact Fees - Multifamily Total (Police + Fire + Parks + General Government) ($2,807.00) and Wastewater Capital Charge - Multifamily (0.75 ERU per unit) ($2,606.25).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Charge - Multifamily (0.75 ERU per unit)$1,386.75City of TavaresCity of Tavares Ord. 2002-29, Sec. 17-38. Water capital charge = $1,849/ERU (without reclaimed water) or $1,423/ERU (with reclaimed water). Multifamily = 0.75 ERU per unit. 0.75 × $1,849 = $1,386.75. ⚠️ These rates were set in 2002 and may not have been updated — verify current rate at tavaresfl.gov or call (352) 742-6400. With reclaimed water: 0.75 × $1,423 = $1,067.25.
- Wastewater Capital Charge - Multifamily (0.75 ERU per unit)$2,606.25City of TavaresCity of Tavares Ord. 2002-29, Sec. 17-38. Wastewater capital charge = $3,475/ERU. Multifamily = 0.75 ERU per unit. 0.75 × $3,475 = $2,606.25. ⚠️ Rate set in 2002 — verify current rate at tavaresfl.gov or call (352) 742-6400.
- Municipal Impact Fees - Multifamily Total (Police + Fire + Parks + General Government)$2,807.00City of TavaresCity of Tavares Ord. 2025-04, adopted May 7, 2025. Total multifamily per-unit rate = $2,807 (up from $806 last set in 2006). Includes Police, Fire, Parks & Recreation, and General Government impact fees. Individual MF per-fee breakdown not available from public sources — contact City of Tavares Community Development at (352) 742-6209 for breakdown. SFR total = $3,512. Note: Large MF developments (100+ rental units) may qualify for a 50% deferral for 24 months per Sec. 23-14(b).
- School Impact Fee - Multifamily 801+ sf, 4+ Stories$9,543.00Lake County School DistrictLake County Ord. 2023-39. Jan 2 – Sep 30, 2026.
- Roads Impact Fee - Multifamily 801+ sf, 4+ Stories$2,428.00Lake CountyLake County Central/North Central Transportation Benefit District. Jan 2 – Sep 30, 2026.
- $336.00
- $213.00
- Library Impact Fee - Multifamily 801+ sf, 4+ Stories$201.00Lake CountyLake County Ord. 2023-51. $201 flat. Jan 2 – Sep 30, 2026.
- Administrative Fee - Multifamily (all sizes/stories)$100.00Lake CountyF.S. 163.31801. Flat $100/unit. Jan 2 – Sep 30, 2026.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tavares: Commercial Impact Fees
Commercial development in Tavares pays $8.28 per square foot in impact fees, plus $5,324.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $419,524.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Fee (City of Tavares) — 1 ERU (250 gpd) ($3,475.00 one-time), Water Connection Fee (City of Tavares) — 1 ERU (325 gpd) ($1,849.00 one-time) and County Transportation Impact Fee (Lake County, Commercial) ($4.20/sq ft).
View the full fee schedule
- Water Connection Fee (City of Tavares) — 1 ERU (325 gpd)$1,849.00 one-timeCity of TavaresCity of Tavares Code §17-38 (Ord. No. 2022-16, 11-2-2022). NO meter-size table — connection fees are ERU-based. Water = $1,849.00/ERU without reclaimed water (325 gpd/ERU); $1,423.00/ERU where reclaimed water is provided (250 gpd/ERU). Nonres ERU factors are in §17-41(A): General Retail/Merchandise 0.200 per 1,000 sq ft; Office Building 0.334 per 1,000 sq ft gross; Department Store 0.700 per 1,000 sq ft; INDUSTRIAL and INSTITUTIONAL are "based on Design Engineer's certified estimate of gallons per day" (no published factor). Establishments not listed: ERU = AWWA fixture units ÷ 20. Value entered = the published 1-ERU (no-reclaim) rate. Separate meter installation charges apply (§17-56(E): 3/4" $270, 1" $414, 1.5" $623, 2" $895; above 2" = actual cost + installation). Reclaimed-water connection fee $717/EIC (300 gpd/EIC) not entered.
- Wastewater Connection Fee (City of Tavares) — 1 ERU (250 gpd)$3,475.00 one-timeCity of TavaresCity of Tavares Code §17-38 (Ord. No. 2022-16, 11-2-2022). NO meter-size table — ERU-based. Wastewater = $3,475.00/ERU (250 gpd/ERU). Nonres ERU factors in §17-41(A): General Retail/Merchandise 0.200 per 1,000 sq ft; Office Building 0.334 per 1,000 sq ft gross; Industrial/Institutional = Design Engineer's certified gpd estimate (no published factor). Establishments not listed: ERU = AWWA fixture units ÷ 20. §17-41(E) lets the Utilities Director adjust the ERU count up or down on demonstrated usage. Value entered = the published 1-ERU rate.
- General Government Impact Fee (City of Tavares, Commercial)$1.50/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — General Government Impact Fee Schedule (May 7, 2025). Schedule row: "Retail" (untiered). Impact unit: 1,000 sq ft. Total Tavares nonres city fee for Retail = $4,081/1,000 sf ($1,262 police + $1,319 fire + $1,500 gen gov).
- Fire Impact Fee (City of Tavares, Commercial)$1.32/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — Fire Impact Fee Schedule (May 7, 2025). Schedule row: "Retail" (untiered). Impact unit: 1,000 sq ft.
- Police Impact Fee (City of Tavares, Commercial)$1.26/sq ftCity of TavaresCity of Tavares Impact Fee Ordinance 2025-04, Appendix A — Police Impact Fee Schedule, dated May 7, 2025 (fee sheets PDF posted 12/11/2025). Schedule row: "Retail" (untiered; Restaurant/Bar/Lounge $3,185 is a separate row, not used). Impact unit: 1,000 sq ft. Tavares's nonres city impact fees are Police + Fire + General Government; the Parks & Recreation schedule has RESIDENTIAL ROWS ONLY.
- County Transportation Impact Fee (Lake County, Commercial)$4.20/sq ftLake CountyLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026; Code Ch. 22 Art. III §22-37(f). §22-1(1): transportation impact fees apply COUNTYWIDE — the county fee STACKS on top of Tavares's own police/fire/general-government impact fees (the city's own permitting sheet directs applicants to the county commercial schedule). Tavares = NORTH CENTRAL Benefit District. Schedule row: "Retail/Shopping (40,000-150,000 SFGLA)" — general retail row nearest 50,000 sq ft. Basis: SFGLA (gross LEASABLE area). Other district rates same row: NE/Wekiva & South $4,671; West $1,350. Next step-up 1/2/2027, then flat from 1/2/2028.
- County Fire Rescue Impact Fee (Lake County, Commercial) — Not Applicable in Tavares$0.00Lake CountyConfirmed $0. Code §22-1(2) + the adopted Commercial Impact Fee Schedule's FIRE column, expressly limited to "All unincorporated areas, including Howey-in-the-Hills and Lady Lake." Tavares runs its own fire department and levies its own municipal Fire Impact Fee (Ord. 2025-04). NOTE: Lake County's Educational, Library and Park impact fees are RESIDENTIAL-ONLY — Transportation is the only county nonres fee in Tavares.
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tavares: Industrial Impact Fees
Industrial development in Tavares pays $1.83 per square foot in impact fees, plus $5,324.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 50,000 sq ft building, that comes to about $96,974.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Fee (City of Tavares) — 1 ERU (250 gpd) ($3,475.00 one-time), Water Connection Fee (City of Tavares) — 1 ERU (325 gpd) ($1,849.00 one-time) and County Transportation Impact Fee (Lake County, Industrial) ($1.64/sq ft).
View the full fee schedule
- Water Connection Fee (City of Tavares) — 1 ERU (325 gpd)$1,849.00 one-timeCity of TavaresCity of Tavares Code §17-38 (Ord. No. 2022-16, 11-2-2022). NO meter-size table — connection fees are ERU-based. Water = $1,849.00/ERU without reclaimed water (325 gpd/ERU); $1,423.00/ERU where reclaimed water is provided (250 gpd/ERU). Nonres ERU factors are in §17-41(A): General Retail/Merchandise 0.200 per 1,000 sq ft; Office Building 0.334 per 1,000 sq ft gross; Department Store 0.700 per 1,000 sq ft; INDUSTRIAL and INSTITUTIONAL are "based on Design Engineer's certified estimate of gallons per day" (no published factor). Establishments not listed: ERU = AWWA fixture units ÷ 20. Value entered = the published 1-ERU (no-reclaim) rate. Separate meter installation charges apply (§17-56(E): 3/4" $270, 1" $414, 1.5" $623, 2" $895; above 2" = actual cost + installation). Reclaimed-water connection fee $717/EIC (300 gpd/EIC) not entered.
- Wastewater Connection Fee (City of Tavares) — 1 ERU (250 gpd)$3,475.00 one-timeCity of TavaresCity of Tavares Code §17-38 (Ord. No. 2022-16, 11-2-2022). NO meter-size table — ERU-based. Wastewater = $3,475.00/ERU (250 gpd/ERU). Nonres ERU factors in §17-41(A): General Retail/Merchandise 0.200 per 1,000 sq ft; Office Building 0.334 per 1,000 sq ft gross; Industrial/Institutional = Design Engineer's certified gpd estimate (no published factor). Establishments not listed: ERU = AWWA fixture units ÷ 20. §17-41(E) lets the Utilities Director adjust the ERU count up or down on demonstrated usage. Value entered = the published 1-ERU rate.
- General Government Impact Fee (City of Tavares, Industrial)$0.07/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — General Government Impact Fee Schedule (May 7, 2025). Schedule row: "Industrial." Impact unit: 1,000 sq ft. Total Tavares nonres city fee for Industrial = $193/1,000 sf.
- Fire Impact Fee (City of Tavares, Industrial)$0.06/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — Fire Impact Fee Schedule (May 7, 2025). Schedule row: "Industrial." Impact unit: 1,000 sq ft.
- Police Impact Fee (City of Tavares, Industrial)$0.06/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — Police Impact Fee Schedule (May 7, 2025). Schedule row: "Industrial" (one combined row; no separate warehouse row). Impact unit: 1,000 sq ft.
- County Transportation Impact Fee (Lake County, Industrial)$1.64/sq ftLake CountyLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026; Code §22-37(f). Countywide per §22-1(1). Tavares = NORTH CENTRAL Benefit District. Schedule row: "General Light Industrial/Manufacturing" (Warehouse rows separate, not used). Other district rates same row: NE/Wekiva & South $1,911; West $540. Next step-up 1/2/2027, then flat from 1/2/2028.
- County Fire Rescue Impact Fee (Lake County, Industrial) — Not Applicable in Tavares$0.00Lake CountyConfirmed $0. Code §22-1(2) + the schedule's FIRE column limit. Tavares has its own fire department and its own municipal Fire Impact Fee (Ord. 2025-04).
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tavares: Office Impact Fees
Office development in Tavares pays $5.24 per square foot in impact fees, plus $5,324.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).
For a 25,000 sq ft building, that comes to about $136,224.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Fee (City of Tavares) — 1 ERU (250 gpd) ($3,475.00 one-time), Water Connection Fee (City of Tavares) — 1 ERU (325 gpd) ($1,849.00 one-time) and County Transportation Impact Fee (Lake County, Office) ($3.60/sq ft).
View the full fee schedule
- Water Connection Fee (City of Tavares) — 1 ERU (325 gpd)$1,849.00 one-timeCity of TavaresCity of Tavares Code §17-38 (Ord. No. 2022-16, 11-2-2022). NO meter-size table — connection fees are ERU-based. Water = $1,849.00/ERU without reclaimed water (325 gpd/ERU); $1,423.00/ERU where reclaimed water is provided (250 gpd/ERU). Nonres ERU factors are in §17-41(A): General Retail/Merchandise 0.200 per 1,000 sq ft; Office Building 0.334 per 1,000 sq ft gross; Department Store 0.700 per 1,000 sq ft; INDUSTRIAL and INSTITUTIONAL are "based on Design Engineer's certified estimate of gallons per day" (no published factor). Establishments not listed: ERU = AWWA fixture units ÷ 20. Value entered = the published 1-ERU (no-reclaim) rate. Separate meter installation charges apply (§17-56(E): 3/4" $270, 1" $414, 1.5" $623, 2" $895; above 2" = actual cost + installation). Reclaimed-water connection fee $717/EIC (300 gpd/EIC) not entered.
- Wastewater Connection Fee (City of Tavares) — 1 ERU (250 gpd)$3,475.00 one-timeCity of TavaresCity of Tavares Code §17-38 (Ord. No. 2022-16, 11-2-2022). NO meter-size table — ERU-based. Wastewater = $3,475.00/ERU (250 gpd/ERU). Nonres ERU factors in §17-41(A): General Retail/Merchandise 0.200 per 1,000 sq ft; Office Building 0.334 per 1,000 sq ft gross; Industrial/Institutional = Design Engineer's certified gpd estimate (no published factor). Establishments not listed: ERU = AWWA fixture units ÷ 20. §17-41(E) lets the Utilities Director adjust the ERU count up or down on demonstrated usage. Value entered = the published 1-ERU rate.
- General Government Impact Fee (City of Tavares, Office)$0.60/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — General Government Impact Fee Schedule (May 7, 2025). Schedule row: "Office Building." Impact unit: 1,000 sq ft. Total Tavares nonres city fee for Office = $1,640/1,000 sf.
- Fire Impact Fee (City of Tavares, Office)$0.53/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — Fire Impact Fee Schedule (May 7, 2025). Schedule row: "Office Building" (untiered). Impact unit: 1,000 sq ft.
- Police Impact Fee (City of Tavares, Office)$0.51/sq ftCity of TavaresCity of Tavares Ord. 2025-04, Appendix A — Police Impact Fee Schedule (May 7, 2025). Schedule row: "Office Building" (untiered; "Institutional" $412 is a separate row, not used). Impact unit: 1,000 sq ft.
- County Transportation Impact Fee (Lake County, Office)$3.60/sq ftLake CountyLake County Commercial Impact Fee Schedule eff. 1/2/2026–9/30/2026; Code §22-37(f). Countywide per §22-1(1). Tavares = NORTH CENTRAL Benefit District. Schedule row: "General Office" (untiered). Other district rates same row: NE/Wekiva & South $3,995; West $1,154. Next step-up 1/2/2027, then flat from 1/2/2028.
- County Fire Rescue Impact Fee (Lake County, Office) — Not Applicable in Tavares$0.00Lake CountyConfirmed $0. Code §22-1(2) + the schedule's FIRE column limit. Tavares has its own fire department and its own municipal Fire Impact Fee (Ord. 2025-04).
Where in Lake County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Tavares
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Tavares, Florida?
A new single-family home in Tavares pays at least $22,089.00 per unit in combined impact fees (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Tavares?
Commercial development in Tavares pays $8.28 per square foot in impact fees, plus $5,324.00 in one-time water and sewer connection fees, about $419,524.00 for a 50,000 sq ft building.
Does Tavares charge its own impact fees?
Yes. Tavares levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Tavares, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.