A new single-family home in Minneola pays $33,525.80 per unit in impact fees (rates sourced October 19, 2026). Of that, Lake County-levied fees account for $16,765.00 and municipal or utility fees for $16,760.80.
The largest line items are School Impact Fee (Lake County, SFR) ($12,021.00), Water Impact Fee (City of Minneola, SFR) ($7,060.00) and Roads Impact Fee (Lake County, SFR) ($4,356.00).
Sewer (Wastewater) Impact Fee (City of Minneola, SFR) and Parks & Recreation Impact Fee (City of Minneola, SFR) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Minneola Impact Fee Schedule
- Water Impact Fee (City of Minneola, SFR)$7,060.00City of MinneolaCity of Minneola water facilities capital recovery (impact) fee of $7,060 per equivalent residential unit, effective September 29, 2025 (Ord. 2025-07). A single-family home is 1.0 ERU.
- Sewer (Wastewater) Impact Fee (City of Minneola, SFR)$8,560.00Requires confirmationCity of MinneolaCity of Minneola wastewater facilities capital recovery fee of $8,560 per equivalent residential unit, effective September 29, 2025 (Ord. 2025-07). A single-family home is 1.0 ERU. The fee is indexed to the ENR construction cost index and adjusted each October 1.
- Fire Protection Impact Fee (City of Minneola, SFR)$539.40City of MinneolaCity of Minneola fire impact fee, $539.40 per single-family dwelling (1.0 ERU), under City Code Ch. 42.
- Parks & Recreation Impact Fee (City of Minneola, SFR)$410.00Requires confirmationCity of MinneolaCity of Minneola parks and recreation impact fee of $410 per single-family dwelling (Ord. 2016-09, Exhibit A, effective 2016). A proposed increase (Ord. 2026-16) was tabled at second reading in August 2026.
- Police/Public Safety Impact Fee (City of Minneola, SFR)$191.40City of MinneolaCity of Minneola police/public-safety facilities impact fee, $191.40 per single-family dwelling (1.0 ERU), under City Code Ch. 42.
- School Impact Fee (Lake County, SFR)$12,021.00801+ sq ftLake CountyLake County school impact fee (Lake County Code Chapter 22, Ord. 2023-39), charged countywide in unincorporated areas and every city. The $12,021 rate applies to a single-family detached home or townhouse larger than 800 sq ft, effective October 1, 2026, the final step of the four-year phase-in (previously $11,247); homes of 800 sq ft or less pay $6,897. Age-restricted communities approved by the County Attorney are exempt.
- Roads Impact Fee (Lake County, SFR)$4,356.001,500–2,499 sq ftLake CountyLake County road (transportation) impact fee, South Transportation Benefit District, for a single-family detached home. Rates in this district by living area: 800 sq ft or less $1,669, 801 to 1,499 sq ft $3,921, 1,500 to 2,499 sq ft $4,356, 2,500 sq ft or more $4,960. The South district charges the same road rates as the Northeast/Wekiva district, the highest in the county. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
- Library Impact Fee (Lake County, SFR)$263.00801+ sq ftLake CountyLake County library impact fee (Lake County Code Chapter 22, Ord. 2023-51), charged countywide: $217 for a single-family detached home of 800 sq ft or less, $263 for a larger home. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
- Administrative Impact Fee (Lake County, SFR)$125.00Lake CountyLake County administrative charge for processing and collecting county impact fees: a flat $125 per dwelling on the county residential impact fee schedule effective October 1, 2026 (previously $100). Since Ord. 2026-42 the amount is set by the county annual fee resolution.
Where in Lake County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Minneola: Multifamily Impact Fees
A new multifamily unit in Minneola pays $25,650.10 per unit in impact fees (rates sourced October 19, 2026). Of that, Lake County-levied fees account for $13,080.00 and municipal or utility fees for $12,570.10.
The largest line items are School Impact Fee - Multifamily 801+ sf ($10,326.00), Water Impact Fee (City of Minneola, MF) — 0.75 ERU × $7,060/ERU ($5,295.00) and Roads Impact Fee - Multifamily 801+ sf, 4+ Stories ($2,428.00).
Parks & Recreation Impact Fee (City of Minneola, MF) and Sewer (Wastewater) Impact Fee (City of Minneola, MF) — 0.75 ERU × $8,560/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Minneola Impact Fee Schedule
- Water Impact Fee (City of Minneola, MF) — 0.75 ERU × $7,060/ERU$5,295.00City of MinneolaCity of Minneola water facilities capital recovery (impact) fee of $7,060 per equivalent residential unit, effective September 29, 2025 (Ord. 2025-07). A multifamily dwelling unit is 0.75 ERU, so each unit pays $5,295.
- Sewer (Wastewater) Impact Fee (City of Minneola, MF) — 0.75 ERU × $8,560/ERU$6,420.00Requires confirmationCity of MinneolaCity of Minneola wastewater facilities capital recovery fee of $8,560 per equivalent residential unit, effective September 29, 2025 (Ord. 2025-07). A multifamily dwelling unit is 0.75 ERU, so each unit pays $6,420. The fee is indexed to the ENR construction cost index and adjusted each October 1.
- Fire Protection Impact Fee (City of Minneola, MF)$404.55City of MinneolaCity of Minneola fire protection impact fee under Code Ch. 42; a multifamily unit is charged 0.75 ERU ($404.55, versus $539.40 for a single-family home).
- Parks & Recreation Impact Fee (City of Minneola, MF)$307.00Requires confirmationCity of MinneolaCity of Minneola parks and recreation impact fee of $307 per multifamily dwelling unit (Ord. 2016-09, Exhibit A, 0.75 of the single-family rate). A proposed increase (Ord. 2026-16) was tabled at second reading in August 2026.
- Police/Public Safety Impact Fee (City of Minneola, MF)$143.55City of MinneolaCity of Minneola police/public safety facilities impact fee under Code Ch. 42; a multifamily unit is charged 0.75 ERU ($143.55, versus $191.40 for a single-family home).
- School Impact Fee - Multifamily 801+ sf$10,326.00Lake CountyLake County school impact fee (Lake County Code Chapter 22, Ord. 2023-39), charged countywide on multifamily units (apartment, condo, duplex) by unit size: 550 sq ft or less $2,504, 551 to 800 sq ft $6,512, more than 800 sq ft $10,326, the same at any building height. The over-800 sq ft rate took effect October 1, 2026, the final step of the four-year phase-in (previously $9,543). Townhouses pay the single-family school rate. Age-restricted communities approved by the County Attorney are exempt.
- Roads Impact Fee - Multifamily 801+ sf, 4+ Stories$2,428.00Lake CountyLake County road (transportation) impact fee for a multifamily unit (apartment, condo, duplex; townhouses use the same road rates), South Transportation Benefit District, by unit size and building height. 1 to 3 stories: 550 sq ft or less $1,328, 551 to 800 sq ft $1,328, more than 800 sq ft $2,872. 4 or more stories: 550 sq ft or less $1,089, 551 to 800 sq ft $1,089, more than 800 sq ft $2,428. The South district charges the same road rates as the Northeast/Wekiva district, the highest in the county. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
- Library Impact Fee - Multifamily (per unit)$201.00Lake CountyLake County library impact fee (Lake County Code Chapter 22, Ord. 2023-51), charged countywide: $201 per multifamily unit at any size and building height. Unchanged on the county schedule effective October 1, 2026, which runs through January 1, 2027.
- Administrative Fee - Multifamily (all sizes/stories)$125.00Lake CountyLake County administrative charge for processing and collecting county impact fees: a flat $125 per dwelling unit on the county residential impact fee schedule effective October 1, 2026, the same for every unit size and building height (previously $100). Since Ord. 2026-42 the amount is set by the county annual fee resolution.
Where in Lake County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Minneola: Commercial Impact Fees
Commercial development in Minneola pays $5.67 per square foot in impact fees, plus $15,620.00 in one-time water and sewer connection fees (rates sourced October 19, 2026).
For a 50,000 sq ft building, that comes to at least $299,362.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Facilities Impact Fee (City of Minneola) — 1 ERU ($7,060.00 one-time), County Transportation Impact Fee (Lake County, Commercial) ($4.67/sq ft) and Fire Impact Fee (City of Minneola, Commercial) ($0.74/sq ft).
Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Parks and Recreation Impact Fee (City of Minneola, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Minneola Impact Fee Schedule
- Water Facilities Impact Fee (City of Minneola) — 1 ERU$7,060.00 one-timeCity of Minneola (municipal water utility)City of Minneola water facilities capital recovery (impact) fee, charged per equivalent residential unit (ERU). A nonresidential project's ERU count comes from the code's land-use table or its plumbing fixture units divided by 24, so there is no meter-size table. Shown is 1 ERU. Ordinance 2025-07 set the rate at $7,060 per ERU effective September 29, 2025.
- Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU$8,560.00 one-timeRequires confirmationCity of Minneola (municipal wastewater utility)City of Minneola wastewater facilities capital recovery fee, charged per equivalent residential unit (ERU). A nonresidential project's ERU count comes from the code's land-use table or its plumbing fixture units divided by 24, so there is no meter-size table. Shown is 1 ERU. Ordinance 2025-07 set the rate at $8,560 per ERU effective September 29, 2025, indexed each October 1 to the Engineering News-Record construction cost index.
- Fire Impact Fee (City of Minneola, Commercial)$0.74/sq ftCity of MinneolaCity of Minneola fire impact fee for retail space, per 1,000 sq ft (Code Chapter 42, Article IV, Ord. 2016-07; retail factor 1.37362 ERU per 1,000 sq ft). One retail rate regardless of building size.
- Police Public Safety Facilities Impact Fee (City of Minneola, Commercial)$0.26/sq ftCity of MinneolaCity of Minneola police public safety facilities impact fee for retail space, per 1,000 sq ft (Code Chapter 42, Article V, Ord. 2016-08; retail factor 1.37362 ERU per 1,000 sq ft). One retail rate regardless of building size.
- Parks and Recreation Impact Fee (City of Minneola, Commercial)Requires confirmationCity of MinneolaMinneola's parks and recreation impact fee (Code Chapter 42, Article VI, Ord. 2016-09) applies to all new construction in the city, but its adopted rate schedule lists only single-family and multifamily dwellings. For a use the schedule does not list, the ordinance lets the city manager assign the rate of the most nearly comparable use, so a nonresidential project's charge is set case by case.
- County Transportation Impact Fee (Lake County, Commercial)$4.67/sq ft40,000–150,000 sf GLALake County Board of County CommissionersLake County transportation impact fee for a retail or shopping center of 40,000 to 150,000 sq ft, per 1,000 sq ft of gross leasable area, at the South benefit district rate that covers Minneola. Effective January 2, 2026; steps to $5,238 on January 2, 2027 under the county's phase-in. Centers under 40,000 sq ft pay $2,576 and centers over 150,000 sq ft pay $4,827 until that step. The county charges this fee inside every city.
- County Fire Rescue Impact Fee (Lake County, Commercial) — Not Applicable in Minneola$0.00Lake County Board of County CommissionersLake County's fire rescue impact fee does not apply in Minneola, which levies its own fire impact fee. The county charges its fee only in the unincorporated area and in cities that consent by interlocal agreement and take part in the county fire rescue system; its current commercial schedule limits it to the unincorporated area, Howey-in-the-Hills and Lady Lake.
Where in Lake County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Minneola: Industrial Impact Fees
Industrial development in Minneola pays $2.15 per square foot in impact fees, plus $15,620.00 in one-time water and sewer connection fees (rates sourced October 19, 2026).
For a 50,000 sq ft building, that comes to at least $123,299.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Facilities Impact Fee (City of Minneola) — 1 ERU ($7,060.00 one-time), County Transportation Impact Fee (Lake County, Industrial) ($1.91/sq ft) and Fire Impact Fee (City of Minneola, Industrial) ($0.18/sq ft).
Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Parks and Recreation Impact Fee (City of Minneola, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Minneola Impact Fee Schedule
- Water Facilities Impact Fee (City of Minneola) — 1 ERU$7,060.00 one-timeCity of Minneola (municipal water utility)City of Minneola water facilities capital recovery (impact) fee, charged per equivalent residential unit (ERU). A nonresidential project's ERU count comes from the code's land-use table or its plumbing fixture units divided by 24, so there is no meter-size table. Shown is 1 ERU. Ordinance 2025-07 set the rate at $7,060 per ERU effective September 29, 2025.
- Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU$8,560.00 one-timeRequires confirmationCity of Minneola (municipal wastewater utility)City of Minneola wastewater facilities capital recovery fee, charged per equivalent residential unit (ERU). A nonresidential project's ERU count comes from the code's land-use table or its plumbing fixture units divided by 24, so there is no meter-size table. Shown is 1 ERU. Ordinance 2025-07 set the rate at $8,560 per ERU effective September 29, 2025, indexed each October 1 to the Engineering News-Record construction cost index.
- Fire Impact Fee (City of Minneola, Industrial)$0.18/sq ftCity of MinneolaCity of Minneola fire impact fee for industrial space, per 1,000 sq ft (Code Chapter 42, Article IV, Ord. 2016-07; industrial factor 0.33195 ERU per 1,000 sq ft).
- Police Public Safety Facilities Impact Fee (City of Minneola, Industrial)$0.06/sq ftCity of MinneolaCity of Minneola police public safety facilities impact fee for industrial space, per 1,000 sq ft (Code Chapter 42, Article V, Ord. 2016-08; industrial factor 0.33195 ERU per 1,000 sq ft).
- Parks and Recreation Impact Fee (City of Minneola, Industrial)Requires confirmationCity of MinneolaMinneola's parks and recreation impact fee (Code Chapter 42, Article VI, Ord. 2016-09) applies to all new construction in the city, but its adopted rate schedule lists only single-family and multifamily dwellings. For a use the schedule does not list, the ordinance lets the city manager assign the rate of the most nearly comparable use, so a nonresidential project's charge is set case by case.
- County Transportation Impact Fee (Lake County, Industrial)$1.91/sq ftLake County Board of County CommissionersLake County transportation impact fee for general light industrial or manufacturing space, per 1,000 sq ft, at the South benefit district rate that covers Minneola. Effective January 2, 2026; steps to $1,972 on January 2, 2027 under the county's phase-in.
- County Fire Rescue Impact Fee (Lake County, Industrial) — Not Applicable in Minneola$0.00Lake County Board of County CommissionersLake County's fire rescue impact fee does not apply in Minneola, which levies its own fire impact fee. The county charges its fee only in the unincorporated area and in cities that consent by interlocal agreement and take part in the county fire rescue system; its current commercial schedule limits it to the unincorporated area, Howey-in-the-Hills and Lady Lake.
Where in Lake County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Minneola: Office Impact Fees
Office development in Minneola pays $4.40 per square foot in impact fees, plus $15,620.00 in one-time water and sewer connection fees (rates sourced October 19, 2026).
For a 25,000 sq ft building, that comes to at least $125,700.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Facilities Impact Fee (City of Minneola) — 1 ERU ($7,060.00 one-time), County Transportation Impact Fee (Lake County, Office) ($4.00/sq ft) and Fire Impact Fee (City of Minneola, Office) ($0.30/sq ft).
Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Parks and Recreation Impact Fee (City of Minneola, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Minneola Impact Fee Schedule
- Water Facilities Impact Fee (City of Minneola) — 1 ERU$7,060.00 one-timeCity of Minneola (municipal water utility)City of Minneola water facilities capital recovery (impact) fee, charged per equivalent residential unit (ERU). A nonresidential project's ERU count comes from the code's land-use table or its plumbing fixture units divided by 24, so there is no meter-size table. Shown is 1 ERU. Ordinance 2025-07 set the rate at $7,060 per ERU effective September 29, 2025.
- Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU$8,560.00 one-timeRequires confirmationCity of Minneola (municipal wastewater utility)City of Minneola wastewater facilities capital recovery fee, charged per equivalent residential unit (ERU). A nonresidential project's ERU count comes from the code's land-use table or its plumbing fixture units divided by 24, so there is no meter-size table. Shown is 1 ERU. Ordinance 2025-07 set the rate at $8,560 per ERU effective September 29, 2025, indexed each October 1 to the Engineering News-Record construction cost index.
- Fire Impact Fee (City of Minneola, Office)$0.30/sq ftCity of MinneolaCity of Minneola fire impact fee for office space, per 1,000 sq ft (Code Chapter 42, Article IV, Ord. 2016-07; office factor 0.55860 ERU per 1,000 sq ft).
- Police Public Safety Facilities Impact Fee (City of Minneola, Office)$0.11/sq ftCity of MinneolaCity of Minneola police public safety facilities impact fee for office space, per 1,000 sq ft (Code Chapter 42, Article V, Ord. 2016-08; office factor 0.55860 ERU per 1,000 sq ft).
- Parks and Recreation Impact Fee (City of Minneola, Office)Requires confirmationCity of MinneolaMinneola's parks and recreation impact fee (Code Chapter 42, Article VI, Ord. 2016-09) applies to all new construction in the city, but its adopted rate schedule lists only single-family and multifamily dwellings. For a use the schedule does not list, the ordinance lets the city manager assign the rate of the most nearly comparable use, so a nonresidential project's charge is set case by case.
- County Transportation Impact Fee (Lake County, Office)$4.00/sq ftLake County Board of County CommissionersLake County transportation impact fee for general office space, per 1,000 sq ft, at the South benefit district rate that covers Minneola. Effective January 2, 2026; steps to $4,481 on January 2, 2027 under the county's phase-in.
- County Fire Rescue Impact Fee (Lake County, Office) — Not Applicable in Minneola$0.00Lake County Board of County CommissionersLake County's fire rescue impact fee does not apply in Minneola, which levies its own fire impact fee. The county charges its fee only in the unincorporated area and in cities that consent by interlocal agreement and take part in the county fire rescue system; its current commercial schedule limits it to the unincorporated area, Howey-in-the-Hills and Lady Lake.
Where in Lake County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Minneola Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Minneola Impact Fee FAQs
What are the total impact fees for a single-family home in Minneola, Florida?
A new single-family home in Minneola pays $33,525.80 per unit in combined impact fees (rates sourced October 19, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Minneola?
Commercial development in Minneola pays $5.67 per square foot in impact fees, plus $15,620.00 in one-time water and sewer connection fees, at least $299,362.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Minneola charge its own impact fees?
Yes. Minneola levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Minneola, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Lake County impact fees page.