Minneola, Florida Impact Fees

Minneola applies its own fee schedule: municipal fees plus the Lake County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $18,832.80 per unit (rates sourced July 31, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Minneola impact fees by project type

Minneola: Single-Family Impact Fees

A new single-family home in Minneola pays at least $18,832.80 per unit in impact fees (rates sourced July 31, 2026). Of that, Lake County-levied fees account for $16,765.00 and municipal or utility fees for $2,067.80.

The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Roads Impact Fee (Lake County, SFR) ($4,356.00) and Parks & Recreation Impact Fee (City of Minneola, SFR) ($1,337.00).

Sewer (Wastewater) Impact Fee (City of Minneola, SFR) and Water Impact Fee (City of Minneola, SFR) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Minneola, SFR)
    City of Minneola
    8/4/2026: Minneola DOES charge a Water Facilities Impact Fee (Code Ch. 42 Art. III; SFR = 1.000 ERU). Ord. 2025-07 (adopted 7/1/2025) amended water/wastewater impact fees per the 3/31/2025 impact fee study; new per-ERU amounts not published online/not yet codified. Note: Minneola also has fire, police, and parks impact fees (Ch. 42 Arts. IV-VI) — no municipal placeholder rows exist in this batch for those; consider adding. ⚠️ VERIFY current per-ERU amount: (352) 394-3598.
    Requires confirmation
Sewer$0.00
  • Sewer (Wastewater) Impact Fee (City of Minneola, SFR)
    City of Minneola
    8/4/2026: Minneola DOES charge a Wastewater Facilities Capital Recovery Fee (Code Ch. 42 Art. II; SFR = 1.000 ERU). Amount is set by ordinance: Ord. 2025-07 (2nd reading adopted 7/1/2025) amended water/wastewater connection/impact fees per an updated impact fee study dated 3/31/2025, but the new per-ERU dollar amounts are not published online (ordinance not yet codified; agenda packet not posted). ⚠️ VERIFY current per-ERU amount: Utility Customer Service (352) 394-3598.
    Requires confirmation
City$2,067.80
County$16,765.00
  • School Impact Fee (Lake County, SFR)
    Lake County
    Lake County School Impact Fee, Ord. 2023-39. SF Detached 801+ sf=$11,247 (≤800=$6,897). Eff. Jan 2–Sep 30, 2026.
    $11,247.00
  • Roads Impact Fee (Lake County, SFR)
    Lake County
    Lake County Residential Impact Fee Schedule (Jan 2–Sep 30, 2026). Minneola (south Lake) assumed SOUTH TBD. Value=SF Detached 1,500-2,499 sf=$1,258. ⚠️ VERIFY district (352) 343-9760. CORRECTED 2026-07-31: $1,258 → $4,356 (stored value was the West-district rate; Minneola = South district per county GIS). South SF Detached 1,500-2,499 sf Roads = $4,356 per the Jan 2–Sep 30, 2026 schedule, verified against the county PDF. Unconfirmed cleared. Steps up 10/1/2026.
    $4,356.00
  • Fire Impact Fee (Lake County, SFR)
    Lake County
    Lake County Fire Impact Fee, Ord. 2023-53. SF Detached 1,500+ sf=$536. Eff. Jan 2–Sep 30, 2026.
    $536.00
  • Parks Impact Fee (Lake County, SFR)
    Lake County
    Lake County Parks Impact Fee, Ord. 2023-52. SF Detached 1,500-2,499 sf=$263. Eff. Jan 2–Sep 30, 2026.
    $263.00
  • Library Impact Fee (Lake County, SFR)
    Lake County
    Lake County Library Impact Fee, Ord. 2023-51. SF Detached 801+ sf=$263 (≤800=$217). Eff. Jan 2–Sep 30, 2026.
    $263.00
  • Administrative Impact Fee (Lake County, SFR)
    Lake County
    Lake County Impact Fee administrative charge, $100 flat. Eff. Jan 2–Sep 30, 2026.
    $100.00
Total (Minneola): $18,832.80
Sources last checked July 31, 2026Official fee schedules:City of Minneola Lake County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Minneola: Multifamily Impact Fees

A new multifamily unit in Minneola pays at least $14,371.85 per unit in impact fees (rates sourced July 31, 2026). Of that, Lake County-levied fees account for $12,821.00 and municipal or utility fees for $1,550.85.

The largest line items are School Impact Fee - Multifamily 801+ sf ($9,543.00), Roads Impact Fee - Multifamily 801+ sf, 4+ Stories ($2,428.00) and Fire Protection Impact Fee (City of Minneola, MF) ($404.55).

Parks & Recreation Impact Fee (City of Minneola, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Impact Fee (City of Minneola, MF) and Sewer (Wastewater) Impact Fee (City of Minneola, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Impact Fee (City of Minneola, MF)
    City of Minneola
    8/4/2026: Minneola charges a Water Facilities Impact Fee (Code Ch. 42 Art. III; Multifamily = 0.750 ERU per living unit, Sec. 42-98). Ord. 2025-07 (adopted 7/1/2025) amended the amounts per the 3/31/2025 study; new per-ERU dollars not published online/not yet codified. Minneola also levies fire/police/parks impact fees (Ch. 42 Arts. IV-VI) with no MF municipal placeholder in this batch — consider adding. ⚠️ VERIFY: (352) 394-3598.
    Requires confirmation
Sewer$0.00
  • Sewer (Wastewater) Impact Fee (City of Minneola, MF)
    City of Minneola
    8/4/2026: Minneola charges a Wastewater Facilities Capital Recovery Fee (Code Ch. 42 Art. II; Multifamily = 0.750 ERU per living unit, Sec. 42-38). Ord. 2025-07 (adopted 7/1/2025) amended water/wastewater impact fees per the 3/31/2025 impact fee study; new per-ERU amounts not published online/not yet codified. ⚠️ VERIFY current per-ERU amount: (352) 394-3598.
    Requires confirmation
City$1,550.85
  • Parks & Recreation Impact Fee (City of Minneola, MF)
    City of Minneola
    ⚠️ DERIVATION UNSUPPORTED — EXHIBIT A UNPUBLISHED + WRONG-ARTICLE FACTOR (re-checked 8/3/2026). Sec. 42-150 (Ord. 2016-09) sets parks & rec rates only in 'Exhibit A' — NOT codified in Municode (Supp. 25) and NOT posted on minneola.us; neither the $1,337 SF figure nor any MF rate is verifiable online. Worse: the 0.750 MF factor this record borrows exists only in the WATER/WASTEWATER ERU tables (Secs. 42-38/42-98) — the parks article has no ERU factor at all. Phone-only: (352) 394-3598.
    $1,002.75Requires confirmation
  • Fire Protection Impact Fee (City of Minneola, MF)
    City of Minneola
    City of Minneola Fire Impact Fee, Code Ch. 42. MF $404.55/dwelling (0.75 ERU; SF $539.40).
    $404.55
  • Police/Public Safety Impact Fee (City of Minneola, MF)
    City of Minneola
    City of Minneola Police Public Safety Facilities Impact Fee, Code Ch. 42. MF $143.55/dwelling (0.75 ERU; SF $191.40).
    $143.55
County$12,821.00
Total (Minneola): $14,371.85
Sources last checked July 31, 2026Official fee schedules:City of Minneola Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Minneola: Commercial Impact Fees

Commercial development in Minneola pays $5.67 per square foot in impact fees, plus $7,029.00 in one-time water and sewer connection fees (rates sourced July 31, 2026).

For a 50,000 sq ft building, that comes to at least $290,771.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Commercial) ($4.67/sq ft), Fire Impact Fee (City of Minneola, Commercial) ($0.74/sq ft) and Police Public Safety Facilities Impact Fee (City of Minneola, Commercial) ($0.26/sq ft).

Water Facilities Impact Fee (City of Minneola) — 1 ERU and Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Parks and Recreation Impact Fee (City of Minneola, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,429.00 one-time
  • Water Facilities Impact Fee (City of Minneola) — 1 ERU
    City of Minneola (municipal water utility)
    Minneola Code Ch. 42 Art. III §42-96 (eff. 4-25-2006): water facilities capital recovery fee = $2,429.00 per ERU. NO meter-size fee ladder — nonres ERUs come from the codified §42-98 land-use/fixture-unit factor table (e.g. Department store 0.700 per 1,000 sq ft; Industrial building 0.050 ERU/employee without showers, 0.117 with; many uses 'use fixture units', ERU = fixture units ÷ 24). Value entered is the 1-ERU base. ⚠️ UNCONFIRMED: §42-96 mandates ENR-indexed adjustment effective October 1 EVERY YEAR, documented by the city manager — no adjusted schedule is published on minneola.us or in Municode, so the codified $2,429 is almost certainly superseded. VERIFY current rate: Minneola Utilities (352) 394-3598.
    $2,429.00 one-timeRequires confirmation
Sewer$4,600.00 one-time
  • Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU
    City of Minneola (municipal wastewater utility)
    Minneola Code Ch. 42 Art. II §42-37 (Ord. 2004-29, eff. 1-11-2005): wastewater facilities capital recovery fee = $4,600.00 per ERU. Formula (§§42-36/42-38): total ERU value × current capital charge; nonres ERU = fixture units ÷ 24, or the codified land-use factor table (Department store 0.700/1,000 sq ft; Industrial 0.050 ERU/employee without showers, 0.117 with; warehouse-office = fixture units for warehouse area + office factors). Value entered is the 1-ERU base. ⚠️ UNCONFIRMED: §42-37 mandates ENR-indexed adjustment each October 1, documented by the city manager — no adjusted schedule published in Municode or on minneola.us, so the codified $4,600 is likely superseded. VERIFY: Minneola Utilities (352) 394-3598.
    $4,600.00 one-timeRequires confirmation
City$1.00/sq ft
  • Fire Impact Fee (City of Minneola, Commercial)
    City of Minneola
    Minneola Code Ch. 42 Art. IV (Fire Protection) codified fee schedule. Nonres rows are by ERU factor per 1,000 sq ft: Retail 1.37362 → $740.93; Office 0.55860 → $301.30; Industrial 0.33195 → $179.05; Institutional 0.73566 → $396.81. Schedule row used: Retail (no size tiers). SFR base = $539.40/dwelling.
    $0.74/sq ft
  • Police Public Safety Facilities Impact Fee (City of Minneola, Commercial)
    City of Minneola
    Minneola Code Ch. 42 Art. V (Police Public Safety Facilities) codified fee schedule. Schedule row: Retail, ERU factor 1.37362 per 1,000 sq ft. Office 0.55860 → $106.92; Industrial 0.33195 → $63.54. SFR base = $191.40/dwelling.
    $0.26/sq ft
  • Parks and Recreation Impact Fee (City of Minneola, Commercial)
    City of Minneola
    ⚠️ UNCONFIRMED. Minneola Code Ch. 42 Art. VI (Ord. 2016-09) levies parks & recreation impact fees on 'all new construction within the city limits' — nonres is NOT expressly exempted — but §42-150 puts every rate in an unpublished Exhibit 'A' that is not codified in Municode and is not posted on minneola.us. Sources checked: Municode Ch. 42 (all 6 articles), minneola.us Building and Planning & Zoning fee schedules, utility billing pages. VERIFY whether nonres pays and at what rate: Minneola City Hall (352) 394-3598.
    Requires confirmation
County$4.67/sq ft
Total (Minneola): $5.67/sq ft + $7,029.00 one-time (≈ $290,771.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Minneola: Industrial Impact Fees

Industrial development in Minneola pays $2.15 per square foot in impact fees, plus $7,029.00 in one-time water and sewer connection fees (rates sourced July 31, 2026).

For a 50,000 sq ft building, that comes to at least $114,708.50. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Industrial) ($1.91/sq ft), Fire Impact Fee (City of Minneola, Industrial) ($0.18/sq ft) and Police Public Safety Facilities Impact Fee (City of Minneola, Industrial) ($0.06/sq ft).

Water Facilities Impact Fee (City of Minneola) — 1 ERU and Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Parks and Recreation Impact Fee (City of Minneola, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,429.00 one-time
  • Water Facilities Impact Fee (City of Minneola) — 1 ERU
    City of Minneola (municipal water utility)
    Minneola Code Ch. 42 Art. III §42-96 (eff. 4-25-2006): water facilities capital recovery fee = $2,429.00 per ERU. NO meter-size fee ladder — nonres ERUs come from the codified §42-98 land-use/fixture-unit factor table (e.g. Department store 0.700 per 1,000 sq ft; Industrial building 0.050 ERU/employee without showers, 0.117 with; many uses 'use fixture units', ERU = fixture units ÷ 24). Value entered is the 1-ERU base. ⚠️ UNCONFIRMED: §42-96 mandates ENR-indexed adjustment effective October 1 EVERY YEAR, documented by the city manager — no adjusted schedule is published on minneola.us or in Municode, so the codified $2,429 is almost certainly superseded. VERIFY current rate: Minneola Utilities (352) 394-3598.
    $2,429.00 one-timeRequires confirmation
Sewer$4,600.00 one-time
  • Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU
    City of Minneola (municipal wastewater utility)
    Minneola Code Ch. 42 Art. II §42-37 (Ord. 2004-29, eff. 1-11-2005): wastewater facilities capital recovery fee = $4,600.00 per ERU. Formula (§§42-36/42-38): total ERU value × current capital charge; nonres ERU = fixture units ÷ 24, or the codified land-use factor table (Department store 0.700/1,000 sq ft; Industrial 0.050 ERU/employee without showers, 0.117 with; warehouse-office = fixture units for warehouse area + office factors). Value entered is the 1-ERU base. ⚠️ UNCONFIRMED: §42-37 mandates ENR-indexed adjustment each October 1, documented by the city manager — no adjusted schedule published in Municode or on minneola.us, so the codified $4,600 is likely superseded. VERIFY: Minneola Utilities (352) 394-3598.
    $4,600.00 one-timeRequires confirmation
City$0.24/sq ft
County$1.91/sq ft
Total (Minneola): $2.15/sq ft + $7,029.00 one-time (≈ $114,708.50 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Minneola: Office Impact Fees

Office development in Minneola pays $4.40 per square foot in impact fees, plus $7,029.00 in one-time water and sewer connection fees (rates sourced July 31, 2026).

For a 25,000 sq ft building, that comes to at least $117,109.50. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Office) ($4.00/sq ft), Fire Impact Fee (City of Minneola, Office) ($0.30/sq ft) and Police Public Safety Facilities Impact Fee (City of Minneola, Office) ($0.11/sq ft).

Water Facilities Impact Fee (City of Minneola) — 1 ERU and Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Parks and Recreation Impact Fee (City of Minneola, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,429.00 one-time
  • Water Facilities Impact Fee (City of Minneola) — 1 ERU
    City of Minneola (municipal water utility)
    Minneola Code Ch. 42 Art. III §42-96 (eff. 4-25-2006): water facilities capital recovery fee = $2,429.00 per ERU. NO meter-size fee ladder — nonres ERUs come from the codified §42-98 land-use/fixture-unit factor table (e.g. Department store 0.700 per 1,000 sq ft; Industrial building 0.050 ERU/employee without showers, 0.117 with; many uses 'use fixture units', ERU = fixture units ÷ 24). Value entered is the 1-ERU base. ⚠️ UNCONFIRMED: §42-96 mandates ENR-indexed adjustment effective October 1 EVERY YEAR, documented by the city manager — no adjusted schedule is published on minneola.us or in Municode, so the codified $2,429 is almost certainly superseded. VERIFY current rate: Minneola Utilities (352) 394-3598.
    $2,429.00 one-timeRequires confirmation
Sewer$4,600.00 one-time
  • Wastewater Facilities Capital Recovery Fee (City of Minneola) — 1 ERU
    City of Minneola (municipal wastewater utility)
    Minneola Code Ch. 42 Art. II §42-37 (Ord. 2004-29, eff. 1-11-2005): wastewater facilities capital recovery fee = $4,600.00 per ERU. Formula (§§42-36/42-38): total ERU value × current capital charge; nonres ERU = fixture units ÷ 24, or the codified land-use factor table (Department store 0.700/1,000 sq ft; Industrial 0.050 ERU/employee without showers, 0.117 with; warehouse-office = fixture units for warehouse area + office factors). Value entered is the 1-ERU base. ⚠️ UNCONFIRMED: §42-37 mandates ENR-indexed adjustment each October 1, documented by the city manager — no adjusted schedule published in Municode or on minneola.us, so the codified $4,600 is likely superseded. VERIFY: Minneola Utilities (352) 394-3598.
    $4,600.00 one-timeRequires confirmation
City$0.41/sq ft
County$4.00/sq ft
Total (Minneola): $4.40/sq ft + $7,029.00 one-time (≈ $117,109.50 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Minneola

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Minneola, Florida?

A new single-family home in Minneola pays at least $18,832.80 per unit in combined impact fees (rates sourced July 31, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Minneola?

Commercial development in Minneola pays $5.67 per square foot in impact fees, plus $7,029.00 in one-time water and sewer connection fees, at least $290,771.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Minneola charge its own impact fees?

Yes. Minneola levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Minneola, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lake County impact fees page.