IMPACTFEES.ORG

Montverde, Florida Impact Fees

Montverde applies its own fee schedule: municipal fees plus the Lake County-levied fees that apply inside city limits. Combined, a new single-family home pays $25,865.00 per unit (rates sourced ). The full breakdown is below.

Montverde impact fees by project type

Montverde: Single-Family Impact Fees

A new single-family home in Montverde pays $25,865.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Lake County-levied fees account for $16,765.00 and municipal or utility fees for $9,100.00.

The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Water Impact Fee (Town of Montverde, SFR) ($6,150.00) and Roads Impact Fee (Lake County, SFR) ($4,356.00).

View the full Montverde impact fee schedule
Water$8,250.00
  • Water Impact Fee (Town of Montverde, SFR)
    Town of Montverde
    The Town of Montverde charges a water impact fee of $6,150 for each equivalent residential unit, based on 450 gallons of capacity per day for a single-family home on a standard 3/4-inch or 1-inch meter. It is payable in addition to all other connection charges, including the town's $2,100 meter installation fee.
    $6,150.00
  • Water Connection/Meter Installation Fee (Town of Montverde, SFR)
    Town of Montverde
    The Town of Montverde charges $2,100 to install a potable water meter for a new single-family connection. A separate water impact fee of $6,150 per equivalent residential unit also applies, along with the line connection at actual cost plus $250, so a new home pays at least $8,250 before line costs.
    $2,100.00
Sewer$850.00
  • Sewer Connection Fee (Town of Montverde, SFR)
    Town of Montverde
    The Town of Montverde charges an $850 fee (including inspection) to connect to a town sewer line where sewer service is available. Sewer currently serves only limited areas of town; most homes remain on septic systems.
    $850.00
City$0.00
  • Municipal Impact Fees (Town of Montverde, SFR)
    Town of Montverde
    The Town of Montverde does not charge its own municipal impact fees on new homes. Only Lake County's countywide impact fees and the town's utility hook-up charges (listed separately) apply.
    $0.00
Total (Montverde): $25,865.00
Sources last checked Official fee schedules:Town of Montverde Lake County

Montverde: Multifamily Impact Fees

A new multifamily unit in Montverde pays at least $12,821.00 per unit in impact fees (rates sourced August 5, 2026). All of it is levied by Lake County.

The largest line items are School Impact Fee - Multifamily 801+ sf ($9,543.00), Roads Impact Fee - Multifamily 801+ sf, 4+ Stories ($2,428.00) and Fire Impact Fee - Multifamily 801+ sf ($336.00).

Water Connection/Capacity Fee (Town of Montverde, MF) and Sewer Connection Fee (Town of Montverde, MF) are set by the utility and not published online. Municipal Impact Fees (Town of Montverde, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Montverde impact fee schedule
Water$0.00
Sewer$0.00
City$0.00
Total (Montverde): $12,821.00
Sources last checked Official fee schedules:Town of Montverde Lake County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Montverde: Commercial Impact Fees

Commercial development in Montverde pays $11.95 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $608,530.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Commercial) ($4.67/sq ft), Transportation Impact Fee (Town of Montverde, Commercial) ($4.66/sq ft) and Administrative Impact Fee (Town of Montverde, Commercial) ($2.04/sq ft).

Water Impact Fee (Town of Montverde) — 1 ERU and Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Montverde impact fee schedule
Water$6,150.00 one-time
Sewer$4,830.00 one-time
County$4.67/sq ft
Total (Montverde): $11.95/sq ft + $10,980.00 one-time (≈ $608,530.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Montverde: Industrial Impact Fees

Industrial development in Montverde pays $9.19 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $470,530.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Town of Montverde, Industrial) ($4.66/sq ft), Administrative Impact Fee (Town of Montverde, Industrial) ($2.04/sq ft) and County Transportation Impact Fee (Lake County, Industrial) ($1.91/sq ft).

Water Impact Fee (Town of Montverde) — 1 ERU and Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Montverde impact fee schedule
Water$6,150.00 one-time
Sewer$4,830.00 one-time
County$1.91/sq ft
Total (Montverde): $9.19/sq ft + $10,980.00 one-time (≈ $470,530.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Montverde: Office Impact Fees

Office development in Montverde pays $11.27 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 25,000 sq ft building, that comes to about $292,855.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Town of Montverde, Office) ($4.66/sq ft), County Transportation Impact Fee (Lake County, Office) ($4.00/sq ft) and Administrative Impact Fee (Town of Montverde, Office) ($2.04/sq ft).

Water Impact Fee (Town of Montverde) — 1 ERU and Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Montverde impact fee schedule
Water$6,150.00 one-time
Sewer$4,830.00 one-time
County$4.00/sq ft
Total (Montverde): $11.27/sq ft + $10,980.00 one-time (≈ $292,855.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Montverde impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Montverde impact fee FAQs

What are the total impact fees for a single-family home in Montverde, Florida?

A new single-family home in Montverde pays $25,865.00 per unit in combined impact fees (rates sourced August 5, 2026).

How much are commercial impact fees in Montverde?

Commercial development in Montverde pays $11.95 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees, about $608,530.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Montverde charge its own impact fees?

Yes. Montverde levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Montverde, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lake County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.