IMPACTFEES.ORG

Montverde, Florida Impact Fees

Montverde applies its own fee schedule: municipal fees plus the Lake County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $13,667.00 per unit (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Montverde impact fees by project type

Montverde: Single-Family Impact Fees

A new single-family home in Montverde pays at least $13,667.00 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lake County.

The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Fire Impact Fee (Lake County, SFR) ($536.00) and Parks Impact Fee (Lake County, SFR) ($263.00).

Roads Impact Fee (Lake County, SFR) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Town of Montverde, SFR) and Water Connection/Capacity Fee (Town of Montverde, SFR) are set by the utility and not published online. Municipal Impact Fees (Town of Montverde, SFR) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
Sewer$0.00
  • Sewer Connection Fee (Town of Montverde, SFR)
    Town of Montverde
    Town of Montverde currently has NO public sewer; ~700 homes on septic (town sewer project planned ~2026). No sewer impact fee currently. $0 placeholder. ⚠️ VERIFY status/fee: Town Hall (407) 469-2681.
    Requires confirmation
City$0.00
County$13,667.00
Total (Montverde): $13,667.00
Sources last checked July 13, 2026Official fee schedules:Town of Montverde Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Montverde: Multifamily Impact Fees

A new multifamily unit in Montverde pays at least $11,091.00 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lake County.

The largest line items are School Impact Fee - Multifamily 801+ sf ($9,543.00), Fire Impact Fee - Multifamily 801+ sf ($336.00) and Parks Impact Fee - Multifamily 801+ sf ($213.00).

Roads Impact Fee - Multifamily 801+ sf, 4+ Stories is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection/Capacity Fee (Town of Montverde, MF) and Sewer Connection Fee (Town of Montverde, MF) are set by the utility and not published online. Municipal Impact Fees (Town of Montverde, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
Sewer$0.00
  • Sewer Connection Fee (Town of Montverde, MF)
    Town of Montverde
    Town of Montverde currently NO public sewer (~700 homes septic; sewer project ~2026). No sewer impact fee currently. $0 placeholder. ⚠️ VERIFY: (407) 469-2681.
    Requires confirmation
City$0.00
County$11,091.00
Total (Montverde): $11,091.00
Sources last checked July 13, 2026Official fee schedules:Town of Montverde Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Montverde: Commercial Impact Fees

Commercial development in Montverde pays $11.95 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $608,530.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Commercial) ($4.67/sq ft), Transportation Impact Fee (Town of Montverde, Commercial) ($4.66/sq ft) and Administrative Impact Fee (Town of Montverde, Commercial) ($2.04/sq ft).

Water Impact Fee (Town of Montverde) — 1 ERU and Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$6,150.00 one-time
  • Water Impact Fee (Town of Montverde) — 1 ERU
    Town of Montverde (municipal water utility)
    Town of Montverde adopted Fee Schedule, Impact Fees section, eff. 07/01/2026 (rev. 07/06/2026): 'Water Impact Fee – Per ERU' = $6,150.00. CPI-adjusted each April per Town Codes. NO meter-size ladder and NO published nonres ERU-conversion factor (per sq ft / fixture / flow) — value entered is the 1-ERU base. Separate Potable Water Meter Install Fee = $2,100 (plus 'commercial meters over 1 inch pay for the meter per Town spec'); Connection Fee to Water Main = actual cost + $250. ⚠️ UNCONFIRMED: nonres ERU multiplier. VERIFY: Town Hall (407) 469-2681.
    $6,150.00 one-timeRequires confirmation
Sewer$4,830.00 one-time
  • Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU
    City of Clermont (wastewater treatment) collected by Town of Montverde
    Town of Montverde Fee Schedule eff. 07/01/2026: 'Clermont Sewer Impact Fees' = $4,830.00. Montverde has no wastewater plant — sewer is served by the Clermont Connection (see Sewer Rates section). Schedule also lists 'Oakland Impact Fees' = $4,865.00 (Town of Oakland, Orange County) for parcels served by that connection. Separate Sewer Connection/Inspection Fee = $850. ⚠️ UNCONFIRMED: no nonres ERU-conversion basis published, and the schedule does not say which parcels take the Clermont vs Oakland figure. VERIFY: Town Hall (407) 469-2681.
    $4,830.00 one-timeRequires confirmation
City$7.28/sq ft
  • Transportation Impact Fee (Town of Montverde, Commercial)
    Town of Montverde
    Town of Montverde adopted Fee Schedule, Impact Fees section, effective 07/01/2026 (revised 07/06/2026). Row: 'Transportation Impact Fee – Non-Residential' = $4.66 per sq ft. Single nonres rate — no category split in schedule (Institutional/Governmental is a separate $1.82 row). Increases yearly in April per CPI per Town Codes. This is IN ADDITION to the Lake County countywide transportation impact fee.
    $4.66/sq ft
  • Administrative Impact Fee (Town of Montverde, Commercial)
    Town of Montverde
    Montverde Fee Schedule eff. 07/01/2026: 'Administrative Impact Fee – Non-Residential' = $2.04 per sq ft (Institutional/Governmental $0.41). Single nonres rate. CPI-adjusted each April.
    $2.04/sq ft
  • Fire Protection Impact Fee (Town of Montverde, Commercial)
    Town of Montverde
    Montverde Fee Schedule eff. 07/01/2026: 'Fire Protection Fee – Non-Residential' = $0.58 per sq ft. Single nonres rate. CPI-adjusted each April. (The separate Fire Assessment, Code §10-24, is a recurring annual assessment — not an impact fee, not entered.)
    $0.58/sq ft
County$4.67/sq ft
Total (Montverde): $11.95/sq ft + $10,980.00 one-time (≈ $608,530.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Montverde: Industrial Impact Fees

Industrial development in Montverde pays $9.19 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to about $470,530.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Town of Montverde, Industrial) ($4.66/sq ft), Administrative Impact Fee (Town of Montverde, Industrial) ($2.04/sq ft) and County Transportation Impact Fee (Lake County, Industrial) ($1.91/sq ft).

Water Impact Fee (Town of Montverde) — 1 ERU and Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$6,150.00 one-time
  • Water Impact Fee (Town of Montverde) — 1 ERU
    Town of Montverde (municipal water utility)
    Town of Montverde adopted Fee Schedule, Impact Fees section, eff. 07/01/2026 (rev. 07/06/2026): 'Water Impact Fee – Per ERU' = $6,150.00. CPI-adjusted each April per Town Codes. NO meter-size ladder and NO published nonres ERU-conversion factor (per sq ft / fixture / flow) — value entered is the 1-ERU base. Separate Potable Water Meter Install Fee = $2,100 (plus 'commercial meters over 1 inch pay for the meter per Town spec'); Connection Fee to Water Main = actual cost + $250. ⚠️ UNCONFIRMED: nonres ERU multiplier. VERIFY: Town Hall (407) 469-2681.
    $6,150.00 one-timeRequires confirmation
Sewer$4,830.00 one-time
  • Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU
    City of Clermont (wastewater treatment) collected by Town of Montverde
    Town of Montverde Fee Schedule eff. 07/01/2026: 'Clermont Sewer Impact Fees' = $4,830.00. Montverde has no wastewater plant — sewer is served by the Clermont Connection (see Sewer Rates section). Schedule also lists 'Oakland Impact Fees' = $4,865.00 (Town of Oakland, Orange County) for parcels served by that connection. Separate Sewer Connection/Inspection Fee = $850. ⚠️ UNCONFIRMED: no nonres ERU-conversion basis published, and the schedule does not say which parcels take the Clermont vs Oakland figure. VERIFY: Town Hall (407) 469-2681.
    $4,830.00 one-timeRequires confirmation
City$7.28/sq ft
County$1.91/sq ft
Total (Montverde): $9.19/sq ft + $10,980.00 one-time (≈ $470,530.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Montverde: Office Impact Fees

Office development in Montverde pays $11.27 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to about $292,855.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Town of Montverde, Office) ($4.66/sq ft), County Transportation Impact Fee (Lake County, Office) ($4.00/sq ft) and Administrative Impact Fee (Town of Montverde, Office) ($2.04/sq ft).

Water Impact Fee (Town of Montverde) — 1 ERU and Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$6,150.00 one-time
  • Water Impact Fee (Town of Montverde) — 1 ERU
    Town of Montverde (municipal water utility)
    Town of Montverde adopted Fee Schedule, Impact Fees section, eff. 07/01/2026 (rev. 07/06/2026): 'Water Impact Fee – Per ERU' = $6,150.00. CPI-adjusted each April per Town Codes. NO meter-size ladder and NO published nonres ERU-conversion factor (per sq ft / fixture / flow) — value entered is the 1-ERU base. Separate Potable Water Meter Install Fee = $2,100 (plus 'commercial meters over 1 inch pay for the meter per Town spec'); Connection Fee to Water Main = actual cost + $250. ⚠️ UNCONFIRMED: nonres ERU multiplier. VERIFY: Town Hall (407) 469-2681.
    $6,150.00 one-timeRequires confirmation
Sewer$4,830.00 one-time
  • Sewer Impact Fee (Clermont Connection, via Town of Montverde) — 1 ERU
    City of Clermont (wastewater treatment) collected by Town of Montverde
    Town of Montverde Fee Schedule eff. 07/01/2026: 'Clermont Sewer Impact Fees' = $4,830.00. Montverde has no wastewater plant — sewer is served by the Clermont Connection (see Sewer Rates section). Schedule also lists 'Oakland Impact Fees' = $4,865.00 (Town of Oakland, Orange County) for parcels served by that connection. Separate Sewer Connection/Inspection Fee = $850. ⚠️ UNCONFIRMED: no nonres ERU-conversion basis published, and the schedule does not say which parcels take the Clermont vs Oakland figure. VERIFY: Town Hall (407) 469-2681.
    $4,830.00 one-timeRequires confirmation
City$7.28/sq ft
County$4.00/sq ft
Total (Montverde): $11.27/sq ft + $10,980.00 one-time (≈ $292,855.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Montverde

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Montverde, Florida?

A new single-family home in Montverde pays at least $13,667.00 per unit in combined impact fees (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Montverde?

Commercial development in Montverde pays $11.95 per square foot in impact fees, plus $10,980.00 in one-time water and sewer connection fees, about $608,530.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Montverde charge its own impact fees?

Yes. Montverde levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Montverde, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lake County impact fees page.

Missing a jurisdiction? Get in touch.