Bay Lake, Florida Impact Fees

Bay Lake applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $9,513.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Bay Lake Impact Fees by Project Type

Bay Lake: Single-Family Impact Fees

A new single-family home in Bay Lake pays at least $9,513.00 per unit in impact fees (rates sourced October 21, 2026). All of it is levied by Orange County.

The largest line items are School Impact Fee (Orange County, collected in Bay Lake, SFR) ($9,513.00).

Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR) and Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bay Lake Impact Fee Schedule
Water$0.00
  • Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR)
    Central Florida Tourism Oversight District
    Water service in Bay Lake is provided by the Central Florida Tourism Oversight District (formerly Reedy Creek). The District's published utility rate schedule (effective with billings issued after September 30, 2026) lists no water capacity or impact charge; it sets a $500 connection charge on each application for potable water service.
    Requires confirmation
Sewer$0.00
  • Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR)
    Central Florida Tourism Oversight District
    Sewer service in Bay Lake is provided by the Central Florida Tourism Oversight District (formerly Reedy Creek). The District's published utility rate schedule (effective with billings issued after September 30, 2026) lists no sewer capacity or impact charge, and its $500 service connection charge does not list wastewater service.
    Requires confirmation
City$0.00
County$9,513.00
  • School Impact Fee (Orange County, collected in Bay Lake, SFR)
    SF Detached 2,000–2,499 sq ft
    Orange County Public Schools
    Orange County Public Schools impact fee for a single-family detached home of 2,000–2,499 sq ft of heated/cooled living area (the canonical 2,000 sq ft house): $9,513, current rate effective 10/1/2022. Other home sizes pay a different tier (see other tiers). Applies countywide, including within the City of Bay Lake; assessed at building permit.
    $9,513.00
  • Parks & Recreation Impact Fee (Orange County, Bay Lake SFR)
    Orange County
    Orange County's parks and recreation impact fee applies only in unincorporated Orange County (County Code Ch. 23 Art. VI), so it is not assessed within the City of Bay Lake.
    $0.00
  • Law Enforcement Impact Fee (Orange County, Bay Lake SFR)
    Orange County
    Orange County's law enforcement impact fee applies only in the unincorporated county; municipalities may opt in by interlocal agreement, and the City of Bay Lake has not. No county law enforcement impact fee is collected on new construction in Bay Lake (County Code Secs. 23-29, 23-34).
    $0.00
  • Fire/Rescue Impact Fee (Orange County, Bay Lake SFR)
    Orange County
    Orange County's fire/rescue impact fee applies only in the unincorporated county; municipalities may opt in by interlocal agreement, and the City of Bay Lake has not. No county fire/rescue impact fee is collected on new construction in Bay Lake (County Code Secs. 23-60, 23-64). Fire and EMS service in Bay Lake is provided by the Central Florida Tourism Oversight District.
    $0.00
  • Transportation Impact Fee (Orange County, Bay Lake SFR)
    SF 1,201–2,000 sq ft (Non-Urban/Suburban context)
    Orange County
    Orange County's transportation impact fee applies only in unincorporated Orange County (County Code §23-86(e)), so it is not assessed on new homes within the City of Bay Lake.
    $0.00
Total (Bay Lake): $9,513.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Bay Lake: Multifamily Impact Fees

A new multifamily unit in Bay Lake pays at least $6,751.00 per unit in impact fees (rates sourced October 21, 2026). All of it is levied by Orange County.

The largest line items are School Impact Fee (Orange County, collected in Bay Lake, MF, Non-High Rise) ($6,751.00).

Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF) and Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Bay Lake Impact Fee Schedule
Water$0.00
  • Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF)
    Central Florida Tourism Oversight District
    Water service in Bay Lake is provided by the Central Florida Tourism Oversight District (formerly Reedy Creek). The District's published utility rate schedule (effective with billings issued after September 30, 2026) lists no water capacity or impact charge; it sets a $500 connection charge on each application for potable water service.
    Requires confirmation
Sewer$0.00
  • Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF)
    Central Florida Tourism Oversight District
    Sewer service in Bay Lake is provided by the Central Florida Tourism Oversight District (formerly Reedy Creek). The District's published utility rate schedule (effective with billings issued after September 30, 2026) lists no sewer capacity or impact charge, and its $500 service connection charge does not list wastewater service.
    Requires confirmation
City$0.00
County$6,751.00
  • School Impact Fee (Orange County, collected in Bay Lake, MF, Non-High Rise)
    Orange County Public Schools
    Orange County School impact fee: $6,751 per non-high-rise multi-family unit, effective 10/1/2022 (high-rise buildings over 10 floors are $307/unit). Applies countywide including municipalities; assessed at building permit.
    $6,751.00
  • Fire/Rescue Impact Fee (Orange County, Bay Lake MF)
    Orange County
    Orange County's fire/rescue impact fee applies only in the unincorporated county; municipalities may opt in by interlocal agreement, and the City of Bay Lake has not. No county fire/rescue impact fee is collected on new construction in Bay Lake (County Code Secs. 23-60, 23-64). Fire and EMS service in Bay Lake is provided by the Central Florida Tourism Oversight District.
    $0.00
  • Law Enforcement Impact Fee (Orange County, Bay Lake MF)
    Orange County
    Orange County's law enforcement impact fee applies only in the unincorporated county; municipalities may opt in by interlocal agreement, and the City of Bay Lake has not. No county law enforcement impact fee is collected on new construction in Bay Lake (County Code Secs. 23-29, 23-34).
    $0.00
  • Parks & Recreation Impact Fee (Orange County, Bay Lake MF)
    Orange County
    Orange County's parks and recreation impact fee applies only in unincorporated Orange County (County Code Ch. 23 Art. VI), so it is not assessed within the City of Bay Lake.
    $0.00
  • Transportation Impact Fee (Orange County, Bay Lake MF, Mid-Rise)
    Mid-Rise (3-10 floors, ITE 221)
    Orange County
    Orange County's transportation impact fee applies only in unincorporated Orange County (County Code §23-86(e)), so it is not assessed on new homes within the City of Bay Lake.
    $0.00
Total (Bay Lake): $6,751.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Bay Lake: Commercial Impact Fees

Commercial development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (CFTOD, Bay Lake) ($500.00 one-time).

View the Full Bay Lake Impact Fee Schedule
Water$500.00 one-time
  • Water Connection Charge (CFTOD, Bay Lake)
    The Central Florida Tourism Oversight District charges no water capacity or impact fee. A $500 connection charge applies to each application for electric, potable water, reclaimed water, natural gas or conditioned water service (rates effective with billings after 9/30/2026).
    $500.00 one-time
Sewer$0.00
  • Sewer Connection Charge (CFTOD, Bay Lake)
    The Central Florida Tourism Oversight District, which provides sewer service in Bay Lake, has no sewer capacity or impact fee, and its connection charge does not apply to sewer service.
    $0.00
City$0.00
County$0.00
  • County Impact Fees (Orange County, Commercial)
    Orange County's transportation and parks impact fees apply only in unincorporated areas, and its fire rescue and law enforcement impact fees apply inside a city only when the city joins by agreement. Fire and EMS service in Bay Lake comes from the Central Florida Tourism Oversight District.
    $0.00
Total (Bay Lake): $500.00 one-time (≈ $500.00 at 50,000 sq ft)
Sources last checked

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bay Lake: Industrial Impact Fees

Industrial development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to about $500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (CFTOD, Bay Lake) ($500.00 one-time).

View the Full Bay Lake Impact Fee Schedule
Water$500.00 one-time
  • Water Connection Charge (CFTOD, Bay Lake)
    The Central Florida Tourism Oversight District charges no water capacity or impact fee. A $500 connection charge applies to each application for electric, potable water, reclaimed water, natural gas or conditioned water service (rates effective with billings after 9/30/2026).
    $500.00 one-time
Sewer$0.00
  • Sewer Connection Charge (CFTOD, Bay Lake)
    The Central Florida Tourism Oversight District, which provides sewer service in Bay Lake, has no sewer capacity or impact fee, and its connection charge does not apply to sewer service.
    $0.00
City$0.00
County$0.00
  • County Impact Fees (Orange County, Industrial)
    Orange County's transportation and parks impact fees apply only in unincorporated areas, and its fire rescue and law enforcement impact fees apply inside a city only when the city joins by agreement. Fire and EMS service in Bay Lake comes from the Central Florida Tourism Oversight District.
    $0.00
Total (Bay Lake): $500.00 one-time (≈ $500.00 at 50,000 sq ft)
Sources last checked

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bay Lake: Office Impact Fees

Office development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to about $500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (CFTOD, Bay Lake) ($500.00 one-time).

View the Full Bay Lake Impact Fee Schedule
Water$500.00 one-time
  • Water Connection Charge (CFTOD, Bay Lake)
    The Central Florida Tourism Oversight District charges no water capacity or impact fee. A $500 connection charge applies to each application for electric, potable water, reclaimed water, natural gas or conditioned water service (rates effective with billings after 9/30/2026).
    $500.00 one-time
Sewer$0.00
  • Sewer Connection Charge (CFTOD, Bay Lake)
    The Central Florida Tourism Oversight District, which provides sewer service in Bay Lake, has no sewer capacity or impact fee, and its connection charge does not apply to sewer service.
    $0.00
City$0.00
County$0.00
  • County Impact Fees (Orange County, Office)
    Orange County's transportation and parks impact fees apply only in unincorporated areas, and its fire rescue and law enforcement impact fees apply inside a city only when the city joins by agreement. Fire and EMS service in Bay Lake comes from the Central Florida Tourism Oversight District.
    $0.00
Total (Bay Lake): $500.00 one-time (≈ $500.00 at 25,000 sq ft)
Sources last checked

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Bay Lake Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

Pending and Recent Changes

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Bay Lake Impact Fee FAQs

What are the total impact fees for a single-family home in Bay Lake, Florida?

A new single-family home in Bay Lake pays at least $9,513.00 per unit in combined impact fees (rates sourced October 21, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Bay Lake?

Commercial development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees.

Does Bay Lake charge its own impact fees?

Yes. Bay Lake levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bay Lake, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.