Bay Lake impact fees by project type
Bay Lake: Single-Family Impact Fees
A new single-family home in Bay Lake pays at least $26,910.98 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Orange County.
The largest line items are School Impact Fee (Orange County, collected in Bay Lake, SFR) ($9,513.00).
Parks & Recreation Impact Fee (Orange County, Bay Lake SFR), Law Enforcement Impact Fee (Orange County, Bay Lake SFR), and Transportation Impact Fee (Orange County, Bay Lake SFR) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR) and Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR)Requires confirmationCentral Florida Tourism Oversight DistrictCity of Bay Lake is a Disney-controlled municipality within the Central Florida Tourism Oversight District (CFTOD, formerly Reedy Creek Improvement District), which owns and operates the water & wastewater treatment facilities. Water capacity/impact fees are set by the district and not conventionally web-published. $0 placeholder. VERIFY: CFTOD 407-828-2034.
- Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake SFR)Requires confirmationCentral Florida Tourism Oversight DistrictCFTOD (formerly Reedy Creek) owns/operates wastewater collection & treatment serving Bay Lake. Sewer capacity/impact fee set by the district, not web-published. $0 placeholder. VERIFY: CFTOD 407-828-2034.
- City Impact Fees (City of Bay Lake — none)$0.00City of Bay LakeBay Lake (resident pop ~20) is a Disney-controlled city governed in tandem with CFTOD; no traditional municipal impact fees. County School/Law/Parks/Transportation overlays apply; fire is provided by the CFTOD (Reedy Creek) Fire Department, so no Orange County Fire overlay is entered. VERIFY: CFTOD 407-828-2034.
- Transportation Impact Fee (Orange County, Bay Lake SFR)$14,298.98Requires confirmationOrange CountyOrange County Transportation (Mobility) Impact Fee, eff 1/1/2026. Bay Lake has no municipal transportation fee, though CFTOD maintains its own roads. Representative SF Detached 2,001-3,500 sf Suburban = $14,298.98. VERIFY county-fee applicability within CFTOD: 407-836-5691.
- School Impact Fee (Orange County, collected in Bay Lake, SFR)$9,513.00Orange County Public SchoolsOrange County School Impact Fee (Ord. 2016-08), eff 10/1/2022, countywide incl. Disney-district cities. Size-tiered SF Detached, rep 2,000-2,499 sf = $9,513.
- Parks & Recreation Impact Fee (Orange County, Bay Lake SFR)$2,434.00Requires confirmationOrange CountyOrange County Parks & Recreation Impact Fee, SF Detached $2,434/unit eff 5/1/2026. Bay Lake has no municipal parks fee; county overlay assumed. VERIFY applicability within CFTOD: 407-836-5691.
- Law Enforcement Impact Fee (Orange County, Bay Lake SFR)$665.00Requires confirmationOrange CountyOrange County Law Enforcement Impact Fee, SF Detached $665/unit eff 5/1/2026. Bay Lake has no municipal police (Orange County Sheriff jurisdiction), so county overlay applies. VERIFY county-overlay applicability within CFTOD: 407-836-5691.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Lake: Multifamily Impact Fees
A new multifamily unit in Bay Lake pays at least $14,798.71 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Orange County.
The largest line items are School Impact Fee (Orange County, collected in Bay Lake, MF, Non-High Rise) ($6,751.00).
Law Enforcement Impact Fee (Orange County, Bay Lake MF), Parks & Recreation Impact Fee (Orange County, Bay Lake MF), and Transportation Impact Fee (Orange County, Bay Lake MF, Mid-Rise) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF) and Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF)Requires confirmationCentral Florida Tourism Oversight DistrictBay Lake within CFTOD (formerly Reedy Creek); CFTOD owns/operates water & wastewater treatment. Capacity/impact fees set by district, not web-published. $0 placeholder. VERIFY: CFTOD 407-828-2034.
- Sewer Capacity Fee (CFTOD/Reedy Creek, Bay Lake MF)Requires confirmationCentral Florida Tourism Oversight DistrictCFTOD owns/operates wastewater treatment serving Bay Lake. Sewer capacity/impact fee set by district, not web-published. $0 placeholder. VERIFY: CFTOD 407-828-2034.
- City Impact Fees (City of Bay Lake — none, MF)$0.00City of Bay LakeDisney-controlled city governed with CFTOD; no traditional municipal impact fees. County School/Law/Parks/Transportation overlays apply; fire via CFTOD (Reedy Creek) FD, so no county Fire. VERIFY: CFTOD 407-828-2034.
- School Impact Fee (Orange County, collected in Bay Lake, MF, Non-High Rise)$6,751.00Orange County Public SchoolsOrange County School Impact Fee, eff 10/1/2022. MF Non-High Rise $6,751/unit.
- Transportation Impact Fee (Orange County, Bay Lake MF, Mid-Rise)$6,196.71Requires confirmationOrange CountyOrange County Transportation Impact Fee, eff 1/1/2026, Suburban. Mid-Rise MF $6,196.71/unit. VERIFY within CFTOD: 407-836-5691.
- Parks & Recreation Impact Fee (Orange County, Bay Lake MF)$1,617.00Requires confirmationOrange CountyOrange County Parks & Recreation Impact Fee, MF $1,617/unit eff 5/1/2026. Bay Lake has no municipal parks fee. VERIFY applicability within CFTOD: 407-836-5691.
- Law Enforcement Impact Fee (Orange County, Bay Lake MF)$234.00Requires confirmationOrange CountyOrange County Law Enforcement Impact Fee, MF $234/unit eff 5/1/2026. Bay Lake has no municipal police (OCSO jurisdiction). VERIFY county-overlay applicability within CFTOD: 407-836-5691.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Lake: Commercial Impact Fees
Commercial development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Charge (CFTOD, Bay Lake) ($500.00 one-time).
Municipal Impact Fee (City of Bay Lake, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Charge (CFTOD, Bay Lake)$500.00 one-timeCFTOD (ex-Reedy Creek) Schedule of Connection Charges: a single $500.00 connection charge applies to all applications for service (Electric, Potable Water, Reclaimed Water, Sewer). This is an administrative connection charge, NOT a per-meter/capacity or ERC-based impact fee — the District funds utility capacity through ad valorem & utility assessments and revenue bonds on District landowners, with no separate capacity/impact fee. Serves Bay Lake.
- Sewer Connection Charge (CFTOD, Bay Lake)$0.00Sewer service is included in the single $500 CFTOD connection charge entered on the Water record (applies to all service applications). No separate sewer capacity/impact fee — District funds capacity via assessments/bonds. Confirmed $0 additional.
- Municipal Impact Fee (City of Bay Lake, Commercial)Requires confirmationCity of Bay Lake is governed by the Central Florida Tourism Oversight District (CFTOD, ex-Reedy Creek Improvement District); all development is Walt Disney World. No municipal nonres impact-fee ordinance published (District handles land use/zoning, roads, fire, utilities via assessments). $0 Unconfirmed — contact CFTOD (407) 828-2034.
- County Impact Fees (Orange County, Commercial)$0.00Confirmed $0 in-city. Orange County nonres impact fees (Fire §23-60(a), Law §23-29(a)) apply in unincorporated area only; Parks & School residential-only. CFTOD provides fire & roads within Bay Lake.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Lake: Industrial Impact Fees
Industrial development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Charge (CFTOD, Bay Lake) ($500.00 one-time).
Municipal Impact Fee (City of Bay Lake, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Charge (CFTOD, Bay Lake)$500.00 one-timeCFTOD (ex-Reedy Creek) Schedule of Connection Charges: a single $500.00 connection charge applies to all applications for service (Electric, Potable Water, Reclaimed Water, Sewer). This is an administrative connection charge, NOT a per-meter/capacity or ERC-based impact fee — the District funds utility capacity through ad valorem & utility assessments and revenue bonds on District landowners, with no separate capacity/impact fee. Serves Bay Lake.
- Sewer Connection Charge (CFTOD, Bay Lake)$0.00Sewer service is included in the single $500 CFTOD connection charge entered on the Water record (applies to all service applications). No separate sewer capacity/impact fee — District funds capacity via assessments/bonds. Confirmed $0 additional.
- Municipal Impact Fee (City of Bay Lake, Industrial)Requires confirmationCity of Bay Lake governed by CFTOD (ex-Reedy Creek); no municipal nonres impact-fee ordinance published. $0 Unconfirmed — contact CFTOD (407) 828-2034.
- County Impact Fees (Orange County, Industrial)$0.00Confirmed $0 in-city. Orange County nonres impact fees (Fire §23-60(a), Law §23-29(a)) apply in unincorporated area only; Parks & School residential-only.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Lake: Office Impact Fees
Office development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to at least $500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Charge (CFTOD, Bay Lake) ($500.00 one-time).
Municipal Impact Fee (City of Bay Lake, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Connection Charge (CFTOD, Bay Lake)$500.00 one-timeCFTOD (ex-Reedy Creek) Schedule of Connection Charges: a single $500.00 connection charge applies to all applications for service (Electric, Potable Water, Reclaimed Water, Sewer). This is an administrative connection charge, NOT a per-meter/capacity or ERC-based impact fee — the District funds utility capacity through ad valorem & utility assessments and revenue bonds on District landowners, with no separate capacity/impact fee. Serves Bay Lake.
- Sewer Connection Charge (CFTOD, Bay Lake)$0.00Sewer service is included in the single $500 CFTOD connection charge entered on the Water record (applies to all service applications). No separate sewer capacity/impact fee — District funds capacity via assessments/bonds. Confirmed $0 additional.
- Municipal Impact Fee (City of Bay Lake, Office)Requires confirmationCity of Bay Lake governed by CFTOD (ex-Reedy Creek); no municipal nonres impact-fee ordinance published. $0 Unconfirmed — contact CFTOD (407) 828-2034.
- County Impact Fees (Orange County, Office)$0.00Confirmed $0 in-city. Orange County nonres impact fees (Fire §23-60(a), Law §23-29(a)) apply in unincorporated area only; Parks & School residential-only.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Bay Lake
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Bay Lake, Florida?
A new single-family home in Bay Lake pays at least $26,910.98 per unit in combined impact fees (rates sourced July 17, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Bay Lake?
Commercial development in Bay Lake pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Bay Lake charge its own impact fees?
Yes. Bay Lake levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bay Lake, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Orange County impact fees page.