Edgewood impact fees by project type
Edgewood: Single-Family Impact Fees
A new single-family home in Edgewood pays at least $23,997.69 per unit in impact fees (rates sourced August 4, 2026). All of it is levied by Orange County.
The largest line items are Transportation Impact Fee (Orange County, Edgewood SFR) ($11,588.69), School Impact Fee (Orange County, collected by Edgewood, SFR) ($9,513.00) and Parks & Recreation Impact Fee (Orange County, Edgewood SFR) ($2,434.00).
Sewer (City of Edgewood — OCU/septic) and Water Connection Fee (OUC, Edgewood SFR) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Edgewood impact fee schedule
- Water Connection Fee (OUC, Edgewood SFR)Requires confirmationOrlando Utilities Commission (OUC)
- Sewer (City of Edgewood — OCU/septic)Requires confirmationOrange County Utilities / private septic
- City Impact Fees (City of Edgewood — none)$0.00City of Edgewood
- Transportation Impact Fee (Orange County, Edgewood SFR)$11,588.69SF 1,201–2,000 sq ft (Non-Urban/Suburban context)Orange County
- School Impact Fee (Orange County, collected by Edgewood, SFR)$9,513.00Orange County Public Schools
- $2,434.00
- Fire/Rescue Impact Fee (Orange County, Edgewood SFR)$462.00Orange County Fire Rescue
- Law Enforcement Impact Fee (Orange County, Edgewood SFR)$0.00Orange CountyOrange County's law enforcement impact fee applies only in the unincorporated county; municipalities may opt in by interlocal agreement, and Edgewood has not. No county law enforcement impact fee is collected on new construction in Edgewood (County Code Secs. 23-29, 23-34).
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewood: Multifamily Impact Fees
A new multifamily unit in Edgewood pays at least $14,862.71 per unit in impact fees (rates sourced August 4, 2026). All of it is levied by Orange County.
The largest line items are School Impact Fee (Orange County, collected by Edgewood, MF, Non-High Rise) ($6,751.00), Transportation Impact Fee (Orange County, Edgewood MF, Mid-Rise) ($6,196.71) and Parks & Recreation Impact Fee (Orange County, Edgewood MF) ($1,617.00).
Sewer (City of Edgewood — OCU/septic, MF) and Water Connection Fee (OUC, Edgewood MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Edgewood impact fee schedule
- Water Connection Fee (OUC, Edgewood MF)Requires confirmationOrlando Utilities Commission (OUC)
- Sewer (City of Edgewood — OCU/septic, MF)Requires confirmationOrange County Utilities / private septic
- City Impact Fees (City of Edgewood — none, MF)$0.00City of Edgewood
- School Impact Fee (Orange County, collected by Edgewood, MF, Non-High Rise)$6,751.00Orange County Public Schools
- Transportation Impact Fee (Orange County, Edgewood MF, Mid-Rise)$6,196.71Mid-Rise (3-10 floors, ITE 221)Orange County
- $1,617.00
- Fire/Rescue Impact Fee (Orange County, Edgewood MF)$298.00Orange County Fire Rescue
- Law Enforcement Impact Fee (Orange County, Edgewood MF)$0.00Orange CountyOrange County's law enforcement impact fee applies only in the unincorporated county; municipalities may opt in by interlocal agreement, and Edgewood has not. No county law enforcement impact fee is collected on new construction in Edgewood (County Code Secs. 23-29, 23-34).
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewood: Commercial Impact Fees
Commercial development in Edgewood pays $0.48 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).
For a 50,000 sq ft building, that comes to at least $32,110.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).
County Fire Rescue Impact Fee (Orange County, Commercial) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Municipal Impact Fee (City of Edgewood, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Edgewood impact fee schedule
- Water Capacity Charge (Orange County Utilities, Edgewood)$2,790.00 one-timeRequires confirmationFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Sewer Capacity Charge (Orange County Utilities, Edgewood)$5,270.00 one-timeFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Requires confirmation
- County Fire Rescue Impact Fee (Orange County, Commercial)$0.48/sq ftRequires confirmationEffective 5/1/2026.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewood: Industrial Impact Fees
Industrial development in Edgewood pays $0.10 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).
For a 50,000 sq ft building, that comes to at least $13,160.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).
County Fire Rescue Impact Fee (Orange County, Industrial) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Municipal Impact Fee (City of Edgewood, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Edgewood impact fee schedule
- Water Capacity Charge (Orange County Utilities, Edgewood)$2,790.00 one-timeRequires confirmationFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Sewer Capacity Charge (Orange County Utilities, Edgewood)$5,270.00 one-timeFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Requires confirmation
- County Fire Rescue Impact Fee (Orange County, Industrial)$0.10/sq ftRequires confirmationEffective 5/1/2026.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewood: Office Impact Fees
Office development in Edgewood pays $0.43 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).
For a 25,000 sq ft building, that comes to at least $18,735.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).
County Fire Rescue Impact Fee (Orange County, Office) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Municipal Impact Fee (City of Edgewood, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Edgewood impact fee schedule
- Water Capacity Charge (Orange County Utilities, Edgewood)$2,790.00 one-timeRequires confirmationFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Sewer Capacity Charge (Orange County Utilities, Edgewood)$5,270.00 one-timeFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Requires confirmation
- County Fire Rescue Impact Fee (Orange County, Office)$0.43/sq ftRequires confirmationEffective 5/1/2026.
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewood impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Edgewood impact fee FAQs
What are the total impact fees for a single-family home in Edgewood, Florida?
A new single-family home in Edgewood pays at least $23,997.69 per unit in combined impact fees (rates sourced August 4, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Edgewood?
Commercial development in Edgewood pays $0.48 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees, at least $32,110.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Edgewood charge its own impact fees?
Yes. Edgewood levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Edgewood, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Orange County impact fees page.