Edgewood, Florida Impact Fees

Edgewood applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $27,372.98 per unit (rates sourced July 17, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Edgewood impact fees by project type

Edgewood: Single-Family Impact Fees

A new single-family home in Edgewood pays at least $27,372.98 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Orange County.

The largest line items are Transportation Impact Fee (Orange County, Edgewood SFR) ($14,298.98), School Impact Fee (Orange County, collected by Edgewood, SFR) ($9,513.00) and Parks & Recreation Impact Fee (Orange County, Edgewood SFR) ($2,434.00).

Law Enforcement Impact Fee (Orange County, Edgewood SFR) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer (City of Edgewood — OCU/septic) and Water Connection Fee (OUC, Edgewood SFR) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (OUC, Edgewood SFR)
    Orlando Utilities Commission (OUC)
    City of Edgewood is served by Orlando Utilities Commission (OUC) for water (OUC territory, S. Orange Ave corridor). OUC water connection fees are project-specific via a cost letter after plan review — no fixed per-unit rate published. Confirm provider by parcel (some edges may be OCU). $0 placeholder. VERIFY: OUC Dev Svcs 407-423-9018.
    Requires confirmation
Sewer$0.00
  • Sewer (City of Edgewood — OCU/septic)
    Orange County Utilities / private septic
    Edgewood sewer provider unconfirmed — Orange County Utilities (capital charge $5,270/ERU) or private septic depending on parcel. Edgewood has no municipal sewer utility. $0 placeholder. VERIFY: City of Edgewood 407-851-2920 / OCU 407-836-5503.
    Requires confirmation
City$0.00
County$27,372.98
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Edgewood: Multifamily Impact Fees

A new multifamily unit in Edgewood pays at least $15,096.71 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Orange County.

The largest line items are School Impact Fee (Orange County, collected by Edgewood, MF, Non-High Rise) ($6,751.00), Transportation Impact Fee (Orange County, Edgewood MF, Mid-Rise) ($6,196.71) and Parks & Recreation Impact Fee (Orange County, Edgewood MF) ($1,617.00).

Law Enforcement Impact Fee (Orange County, Edgewood MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer (City of Edgewood — OCU/septic, MF) and Water Connection Fee (OUC, Edgewood MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection Fee (OUC, Edgewood MF)
    Orlando Utilities Commission (OUC)
    Edgewood served by OUC for water; connection fees project-specific via cost letter, no fixed per-unit rate. $0 placeholder. VERIFY: OUC Dev Svcs 407-423-9018.
    Requires confirmation
Sewer$0.00
  • Sewer (City of Edgewood — OCU/septic, MF)
    Orange County Utilities / private septic
    Edgewood sewer provider unconfirmed — OCU ($5,270/ERU) or septic. $0 placeholder. VERIFY: 407-851-2920 / OCU 407-836-5503.
    Requires confirmation
City$0.00
County$15,096.71
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Edgewood: Commercial Impact Fees

Commercial development in Edgewood pays $0.48 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $32,110.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).

County Fire Rescue Impact Fee (Orange County, Commercial) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal Impact Fee (City of Edgewood, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,790.00 one-time
  • Water Capacity Charge (Orange County Utilities, Edgewood)
    Edgewood served by Orange County Utilities (OCU) for wastewater (per residential-pass source); water provider assumed OCU but not confirmed (could be OUC/Orlando). OCU water capital charge = $2,790 per ERC (Orange County Code Ch. 37); ERC-based, no nonres meter ladder published; nonres = per-ERC × assigned ERC count (min 1 ERU/meter). 1-ERC base entered. Verify provider & confirm w/ OCU 407-836-5503.
    $2,790.00 one-timeRequires confirmation
Sewer$5,270.00 one-time
  • Sewer Capacity Charge (Orange County Utilities, Edgewood)
    Edgewood wastewater served by Orange County Utilities (OCU). OCU wastewater capital charge = $5,270 per ERU (Orange County Code Ch. 37); ERU-based, no nonres meter ladder; nonres = per-ERU × assigned ERU count (min 1 ERU/meter). 1-ERU base entered. Contact OCU 407-836-5503.
    $5,270.00 one-time
City$0.00
  • Municipal Impact Fee (City of Edgewood, Commercial)
    No municipal nonres impact-fee chapter found in Edgewood Code of Ordinances (codified thru Ord. 2025-13, 12/16/2025) or in web search; this small city relies on county impact fees. $0 Unconfirmed — verify w/ City (407) 851-2920.
    Requires confirmation
County$0.48/sq ft
  • County Fire Rescue Impact Fee (Orange County, Commercial)
    Orange County Fire Rescue Impact Fee §23-60, eff 5/1/2026: Commercial $481 per 1,000 sf living area. OCFR serves Edgewood (no municipal FD) — county fire likely applies (as Belle Isle), UNCONFIRMED whether the city collects §23-60. County law $0 (Edgewood has own PD); county transportation not levied in-city; Parks/School residential-only. Verify (407) 851-2920.
    $0.48/sq ftRequires confirmation
Total (Edgewood): $0.48/sq ft + $8,060.00 one-time (≈ $32,110.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edgewood: Industrial Impact Fees

Industrial development in Edgewood pays $0.10 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $13,160.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).

County Fire Rescue Impact Fee (Orange County, Industrial) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal Impact Fee (City of Edgewood, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,790.00 one-time
  • Water Capacity Charge (Orange County Utilities, Edgewood)
    Edgewood served by Orange County Utilities (OCU) for wastewater (per residential-pass source); water provider assumed OCU but not confirmed (could be OUC/Orlando). OCU water capital charge = $2,790 per ERC (Orange County Code Ch. 37); ERC-based, no nonres meter ladder published; nonres = per-ERC × assigned ERC count (min 1 ERU/meter). 1-ERC base entered. Verify provider & confirm w/ OCU 407-836-5503.
    $2,790.00 one-timeRequires confirmation
Sewer$5,270.00 one-time
  • Sewer Capacity Charge (Orange County Utilities, Edgewood)
    Edgewood wastewater served by Orange County Utilities (OCU). OCU wastewater capital charge = $5,270 per ERU (Orange County Code Ch. 37); ERU-based, no nonres meter ladder; nonres = per-ERU × assigned ERU count (min 1 ERU/meter). 1-ERU base entered. Contact OCU 407-836-5503.
    $5,270.00 one-time
City$0.00
County$0.10/sq ft
Total (Edgewood): $0.10/sq ft + $8,060.00 one-time (≈ $13,160.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edgewood: Office Impact Fees

Office development in Edgewood pays $0.43 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $18,735.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).

County Fire Rescue Impact Fee (Orange County, Office) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal Impact Fee (City of Edgewood, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,790.00 one-time
  • Water Capacity Charge (Orange County Utilities, Edgewood)
    Edgewood served by Orange County Utilities (OCU) for wastewater (per residential-pass source); water provider assumed OCU but not confirmed (could be OUC/Orlando). OCU water capital charge = $2,790 per ERC (Orange County Code Ch. 37); ERC-based, no nonres meter ladder published; nonres = per-ERC × assigned ERC count (min 1 ERU/meter). 1-ERC base entered. Verify provider & confirm w/ OCU 407-836-5503.
    $2,790.00 one-timeRequires confirmation
Sewer$5,270.00 one-time
  • Sewer Capacity Charge (Orange County Utilities, Edgewood)
    Edgewood wastewater served by Orange County Utilities (OCU). OCU wastewater capital charge = $5,270 per ERU (Orange County Code Ch. 37); ERU-based, no nonres meter ladder; nonres = per-ERU × assigned ERU count (min 1 ERU/meter). 1-ERU base entered. Contact OCU 407-836-5503.
    $5,270.00 one-time
City$0.00
County$0.43/sq ft
Total (Edgewood): $0.43/sq ft + $8,060.00 one-time (≈ $18,735.00 at 25,000 sq ft)
Sources last checked July 17, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Edgewood

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Edgewood, Florida?

A new single-family home in Edgewood pays at least $27,372.98 per unit in combined impact fees (rates sourced July 17, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Edgewood?

Commercial development in Edgewood pays $0.48 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees, at least $32,110.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Edgewood charge its own impact fees?

Yes. Edgewood levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Edgewood, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.