Edgewood applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $19,376.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Edgewood Impact Fees by Project Type

Edgewood: Single-Family Impact Fees

A new single-family home in Edgewood pays at least $19,376.00 per unit in impact fees (rates sourced September 25, 2026). Of that, Orange County-levied fees account for $14,783.00 and municipal or utility fees for $4,593.00.

The largest line items are School Impact Fee (Orange County, collected by Edgewood, SFR) ($9,513.00), Sewer Capital Charge (Orange County Utilities, Edgewood SFR) ($5,270.00) and Water System Development Charge (OUC, Edgewood) ($2,325.00).

Fire/Rescue Impact Fee (Orange County, Edgewood SFR) and Law Enforcement Impact Fee (Orange County, Edgewood SFR) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Edgewood Impact Fee Schedule
Water$2,325.00
  • Water System Development Charge (OUC, Edgewood)
    5/8" meter, no reclaim
    OUC
    OUC (Orlando Utilities Commission) water system development charge for a single-family home, 5/8" meter, no reclaim: $2,325, effective 1/1/2026. A separate meter/service connection charge also applies.
    $2,325.00
Sewer$5,270.00
  • Sewer Capital Charge (Orange County Utilities, Edgewood SFR)
    Orange County Utilities / private septic
    Sewer in Edgewood is provided by Orange County Utilities (city code requires connection to the county sewer system). Wastewater capital charge: $5,270 for a single-family home (1 ERU), County Code Sec. 37-5.
    $5,270.00
City$2,268.00
County$9,513.00
  • School Impact Fee (Orange County, collected by Edgewood, SFR)
    SF Detached 2,000–2,499 sq ft
    Orange County Public Schools
    Orange County Public Schools impact fee for a single-family detached home of 2,000–2,499 sq ft of heated/cooled living area (the canonical 2,000 sq ft house): $9,513, current rate effective 10/1/2022. Other home sizes pay a different tier (see other tiers). Applies countywide, including within the City of Edgewood; assessed at building permit.
    $9,513.00
  • Parks & Recreation Impact Fee (Orange County, Edgewood SFR)
    Orange County
    Orange County's parks and recreation impact fee applies only in unincorporated Orange County (County Code Ch. 23 Art. VI), so it is not assessed within the City of Edgewood.
    $0.00
  • Transportation Impact Fee (Orange County, Edgewood SFR)
    SF 1,201–2,000 sq ft, Suburban
    Orange County
    Orange County's transportation impact fee applies only in unincorporated Orange County (County Code §23-86(e)), so it is not assessed on new homes within the City of Edgewood.
    $0.00
  • Fire/Rescue Impact Fee (Orange County, Edgewood SFR)
    Orange County Fire Rescue
    Orange County's fire/rescue impact fee applies in unincorporated Orange County and only reaches a city that has opted in by agreement (County Code Ch. 23), so no county fire/rescue impact fee is shown for the City of Edgewood.
    Requires confirmation
  • Law Enforcement Impact Fee (Orange County, Edgewood SFR)
    Orange County
    Orange County's law enforcement impact fee applies in unincorporated Orange County and only reaches a city that has opted in by agreement (County Code Ch. 23), so no county law enforcement impact fee is shown for the City of Edgewood.
    Requires confirmation
Total (Edgewood): $19,376.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Edgewood: Multifamily Impact Fees

A new multifamily unit in Edgewood pays at least $13,803.91 per unit in impact fees (rates sourced September 25, 2026). Of that, Orange County-levied fees account for $11,140.91 and municipal or utility fees for $2,663.00.

The largest line items are School Impact Fee (Orange County, collected by Edgewood, MF, Non-High Rise) ($6,751.00), Sewer Capital Charge (Orange County Utilities, Edgewood MF) ($4,389.91) and Transportation Impact Fee (City of Edgewood, MF) ($1,439.00).

Law Enforcement Impact Fee (Orange County, Edgewood MF) and Fire/Rescue Impact Fee (Orange County, Edgewood MF) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Edgewood Impact Fee Schedule
Water$1,163.00
  • Water System Development Charge (OUC, Edgewood, MF)
    MF 2 BR (0.50 ERC)
    OUC
    OUC (Orlando Utilities Commission) water system development charge for a multifamily unit, MF 2 BR (0.50 ERC): $1,163, effective 1/1/2026. A separate meter/service connection charge also applies.
    $1,163.00
Sewer$4,389.91
  • Sewer Capital Charge (Orange County Utilities, Edgewood MF)
    MF 2+ BR (0.833 ERC)
    Orange County Utilities / private septic
    Orange County Utilities wastewater capital charge for a 2-bedroom (or larger) apartment: $4,389.91 per unit (0.833 of the $5,270 single-family charge, County Code Sec. 37-5). Efficiency and 1-bedroom units pay 0.500.
    $4,389.91
City$1,500.00
County$6,751.00
  • School Impact Fee (Orange County, collected by Edgewood, MF, Non-High Rise)
    Orange County Public Schools
    Orange County School impact fee: $6,751 per non-high-rise multi-family unit, effective 10/1/2022 (high-rise buildings over 10 floors are $307/unit). Applies countywide including municipalities; assessed at building permit.
    $6,751.00
  • Transportation Impact Fee (Orange County, Edgewood MF)
    MF Mid-Rise (3-10 fl), Suburban
    Orange County
    Orange County's transportation impact fee applies only in unincorporated Orange County (County Code §23-86(e)), so it is not assessed on new homes within the City of Edgewood.
    $0.00
  • Parks & Recreation Impact Fee (Orange County, Edgewood MF)
    Orange County
    Orange County's parks and recreation impact fee applies only in unincorporated Orange County (County Code Ch. 23 Art. VI), so it is not assessed within the City of Edgewood.
    $0.00
  • Law Enforcement Impact Fee (Orange County, Edgewood MF)
    Orange County
    Orange County's law enforcement impact fee applies in unincorporated Orange County and only reaches a city that has opted in by agreement (County Code Ch. 23), so no county law enforcement impact fee is shown for the City of Edgewood.
    Requires confirmation
  • Fire/Rescue Impact Fee (Orange County, Edgewood MF)
    Orange County Fire Rescue
    Orange County's fire/rescue impact fee applies in unincorporated Orange County and only reaches a city that has opted in by agreement (County Code Ch. 23), so no county fire/rescue impact fee is shown for the City of Edgewood.
    Requires confirmation
Total (Edgewood): $13,803.91
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Edgewood: Commercial Impact Fees

Commercial development in Edgewood pays $0.48 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced September 25, 2026).

For a 50,000 sq ft building, that comes to at least $32,110.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).

County Fire Rescue Impact Fee (Orange County, Commercial) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal Impact Fee (City of Edgewood, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Edgewood Impact Fee Schedule
Water$2,790.00 one-time
Sewer$5,270.00 one-time
County$0.48/sq ft
Total (Edgewood): $0.48/sq ft + $8,060.00 one-time (≈ $32,110.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edgewood: Industrial Impact Fees

Industrial development in Edgewood pays $0.10 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced September 25, 2026).

For a 50,000 sq ft building, that comes to at least $13,160.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).

County Fire Rescue Impact Fee (Orange County, Industrial) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal Impact Fee (City of Edgewood, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Edgewood Impact Fee Schedule
Water$2,790.00 one-time
Sewer$5,270.00 one-time
County$0.10/sq ft
Total (Edgewood): $0.10/sq ft + $8,060.00 one-time (≈ $13,160.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edgewood: Office Impact Fees

Office development in Edgewood pays $0.43 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees (rates sourced September 25, 2026).

For a 25,000 sq ft building, that comes to at least $18,735.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Charge (Orange County Utilities, Edgewood) ($5,270.00 one-time).

County Fire Rescue Impact Fee (Orange County, Office) and Water Capacity Charge (Orange County Utilities, Edgewood) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal Impact Fee (City of Edgewood, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Edgewood Impact Fee Schedule
Water$2,790.00 one-time
Sewer$5,270.00 one-time
County$0.43/sq ft
Total (Edgewood): $0.43/sq ft + $8,060.00 one-time (≈ $18,735.00 at 25,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Edgewood Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

Pending and Recent Changes

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Edgewood Impact Fee FAQs

What are the total impact fees for a single-family home in Edgewood, Florida?

A new single-family home in Edgewood pays at least $19,376.00 per unit in combined impact fees (rates sourced September 25, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Edgewood?

Commercial development in Edgewood pays $0.48 per square foot in impact fees, plus $8,060.00 in one-time water and sewer connection fees, at least $32,110.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Edgewood charge its own impact fees?

Yes. Edgewood levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Edgewood, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000