Orlando, Florida Impact Fees

Orlando applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $22,808.00 per unit (rates sourced July 17, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Orlando impact fees by project type

Orlando: Single-Family Impact Fees

A new single-family home in Orlando pays at least $22,808.00 per unit in impact fees (rates sourced July 17, 2026). Of that, Orange County-levied fees account for $13,074.00 and municipal or utility fees for $9,734.00.

The largest line items are School Impact Fee (Orange County, SFR) ($9,513.00), Transportation Impact Fee (City of Orlando, SFR) ($7,069.00) and Parks Impact Fee (City of Orlando, SFR) ($2,665.00).

Sewer Benefit Fee (City of Orlando) and Water Connection Fee (OUC - project-specific) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection Fee (OUC - project-specific)
    Orlando Utilities Commission (OUC)
    $0 placeholder. OUC provides water in the City of Orlando. Water connection fees are project-specific, issued via a formal cost letter after plan review — no fixed per-unit SFR rate published. Parallel to MF record. VERIFY: OUC Development Services developmentservices@ouc.com / (407) 423-9018.
    Requires confirmation
Sewer$0.00
  • Sewer Benefit Fee (City of Orlando)
    City of Orlando
    $0 placeholder pending SFR amount. City of Orlando Sewer Benefit Fee applies to new connections within the city (MF per-unit = $1,928.50). SFR-specific amount not confirmed — orlando.gov fee-schedule pages are mid-migration and 404. VERIFY: Orlando Permitting Services impactfees@cityoforlando.net / (407) 246-3529. Do NOT assume SFR = MF per-unit.
    Requires confirmation
City$9,734.00
  • Transportation Impact Fee (City of Orlando, SFR)
    Orlando
    City Code Ch. 56 Part I (Transportation Impact Fee), Sec. 56.08 Exhibit-A Rate Schedule, effective 1/15/2023; rates reflect the 15% policy discount. Code version Mar 6, 2026 (current). CORRECTION 7/13/2026: the stored $3,883 was the MULTI-FAMILY 1-to-3-floor rate, not a single-family rate — an 82% understatement. Single Family (detached) 2,001-3,500 SF = $6,238 in Area 1A (Downtown) and $7,069 in Areas 1B/2/3 (City other); the City-other rate is used as the canonical SFR figure. Other SF tiers: <=1,200 SF $3,898; 1,201-2,000 SF $5,645; >3,500 SF $7,397 (all Area 1B/2/3). Rate varies by Transportation Benefit Area — confirm the parcel's area for a specific project.
    $7,069.00
  • Parks Impact Fee (City of Orlando, SFR)
    City of Orlando
    City Code Ch. 56 Part II (Parks Impact Fee), Sec. 56.35 Tiered Rate Program; rates shown include the 41% policy discount. Code version Mar 6, 2026 (current). CORRECTION 7/13/2026: this record had sat at $0 / unconfirmed — the fee IS codified. Tiers per unit (conditioned SF): <=1,200 $1,633; 1,201-2,000 $2,225; 2,001-2,499 $2,665 (canonical SFR, default); 2,500-2,999 $2,980; 3,000-3,499 $3,267; >=3,500 $3,649. Townhome/Duplex $2,624; Mobile Home $2,063.
    $2,665.00
County$13,074.00
  • School Impact Fee (Orange County, SFR)
    Orange County
    Orange County School Impact Fee, Code Ch. 23 Art. V (Ord. 2016-08), current installment eff 10/1/2022. Applies countywide incl. municipalities. Size-tiered SF Detached: <2,000 sf $8,829; 2,000-2,499 $9,513 (representative); 2,500-2,999 $11,402; 3,000-3,999 $12,015; >=4,000 $9,584. AUDIT FIX 7/1/2026: previously held MF Non-High-Rise amount ($6,751) on an SFR record.
    $9,513.00
  • Parks & Recreation Impact Fee (Orange County, SFR)
    Orange County
    Orange County Parks & Recreation Impact Fee, Code Ch. 23 Art. VI. Applies countywide incl. inside municipalities. SF Detached per dwelling unit, eff 5/1/2026 (prev $2,338). AUDIT FIX 7/1/2026: previously held MF amount ($1,535) on an SFR record.
    $2,434.00
  • Law Enforcement Impact Fee (Orange County, SFR)
    Orange County
    Orange County Law Enforcement Impact Fee, Code Ch. 23 Art. II. Applies countywide incl. inside municipalities. SF Detached per dwelling unit, eff 5/1/2026 (prev $644). AUDIT FIX 7/1/2026: previously held MF amount ($227) on an SFR record.
    $665.00
  • Fire/Rescue Impact Fee (Orange County, SFR)
    Orange County
    Orange County Fire/Rescue Impact Fee, Code Ch. 23 Art. III. Applies countywide incl. inside municipalities. SF Detached per dwelling unit, eff 5/1/2026 (prev $446). AUDIT FIX 7/1/2026: previously held MF amount ($288) on an SFR record.
    $462.00
Total (Orlando): $22,808.00
Sources last checked July 17, 2026Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Orlando: Multifamily Impact Fees

A new multifamily unit in Orlando pays at least $15,148.50 per unit in impact fees (rates sourced July 17, 2026). Of that, Orange County-levied fees account for $8,900.00 and municipal or utility fees for $6,248.50.

The largest line items are School Impact Fee (Orange County, Orlando MF, Non-High Rise) ($6,751.00), Transportation Impact Fee (City of Orlando, MF, 4+ Floors) ($2,562.00) and Sewer Benefit Fee (City of Orlando, MF) ($1,928.50).

Water Connection Fee (OUC - project-specific, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection Fee (OUC - project-specific, MF)
    OUC (Orlando Utilities Commission)
    OUC (Orlando Utilities Commission) provides water service within City of Orlando and parts of Orange County. Water connection fees are project-specific and issued via a formal cost letter after plan review — no fixed per-unit rate is published. Contact OUC Development Services to obtain a cost letter: developmentservices@ouc.com or (407) 423-9018.
    Requires confirmation
Sewer$1,928.50
  • Sewer Benefit Fee (City of Orlando, MF)
    Orlando
    City of Orlando Sewer Benefit Fee applies to new connections within the city. This is a City of Orlando fee, separate from Orange County Utilities which serves unincorporated areas.
    $1,928.50
City$4,320.00
  • Transportation Impact Fee (City of Orlando, MF, 4+ Floors)
    Orlando
    City Code Ch. 56 Part I, Sec. 56.08 Exhibit-A Rate Schedule (eff. 1/15/2023, 15% policy discount), 'Multi-Family 4 floor and Greater' = $2,562/unit in Areas 1B/2/3 (City other); $2,254 in Area 1A (Downtown). DEFAULT tier — the canonical 4-story MF unit falls here. Rate varies by Transportation Benefit Area. Re-verified against the Mar 6, 2026 code version on 7/13/2026.
    $2,562.00
  • Parks Impact Fee (City of Orlando, MF)
    Orlando
    City Code Ch. 56 Part II (Parks Impact Fee), Sec. 56.35 Tiered Rate Program, 'Multi-Family (apartment) Unit' = $1,758.00 per unit (rate includes the 41% policy discount). Code version Mar 6, 2026 (current). CORRECTION 7/13/2026: the stored $825 was a superseded rate; the codified Tiered Rate Program now sets $1,758/unit.
    $1,758.00
County$8,900.00
  • $6,751.00
  • Parks & Recreation Impact Fee (Orange County, Orlando MF)
    Orange County
    Orange County Parks & Recreation Impact Fee, Multi-Family, per dwelling unit. Rate updated to the CURRENT adopted rate effective 5/1/2026 ($1,617); the prior rate ($1,553, eff. 5/1/2025) had been carried forward in error. Source: Orange County Impact Fees at a Glance (rate tables), Code Ch. 23 Art. VI. Verified 7/13/2026.
    $1,617.00
  • Fire/Rescue Impact Fee (Orange County, Orlando MF)
    Orange County
    Orange County Fire/Rescue Services Impact Fee, Multi-Family, per dwelling unit. Rate updated to the CURRENT adopted rate effective 5/1/2026 ($298); the prior rate ($288, eff. 5/1/2025) had been carried forward in error. Source: Orange County Impact Fees at a Glance (rate tables), Code Ch. 23 Art. III. Verified 7/13/2026.
    $298.00
  • Law Enforcement Impact Fee (Orange County, Orlando MF)
    Orange County
    Orange County Law Enforcement Impact Fee, Multi-Family, per dwelling unit. Rate updated to the CURRENT adopted rate effective 5/1/2026 ($234); the prior rate ($227, eff. 5/1/2025) had been carried forward in error. Source: Orange County Impact Fees at a Glance (rate tables), Code Ch. 23 Art. II. Verified 7/13/2026.
    $234.00
Total (Orlando): $15,148.50
Sources last checked July 17, 2026Official fee schedules:OUC (Orlando Utilities Commission) Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Orlando: Commercial Impact Fees

Commercial development in Orlando pays $8.03 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $401,650.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Orlando, Commercial) ($8.03/sq ft).

Sewer Benefit Fee (City of Orlando) and Water Connection Fee (OUC, Orlando) — project-specific are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (OUC, Orlando) — project-specific
    Orlando Utilities Commission (OUC)
    $0 placeholder. OUC provides water in Orlando. Nonres water connection/capacity fees are project-specific, issued via a formal cost letter after plan review - no published fixed nonres rate. VERIFY: OUC Development Services developmentservices@ouc.com / (407) 423-9018.
    Requires confirmation
Sewer$0.00
  • Sewer Benefit Fee (City of Orlando)
    City of Orlando
    $0 placeholder pending nonres amount. City of Orlando Sewer Benefit Fee applies to new connections within the city; residential MF reference = $1,928.50/unit. Nonres amount is by ERU/fixture and not published (orlando.gov fee-schedule pages mid-migration/404). VERIFY: Orlando Permitting Services impactfees@cityoforlando.net / (407) 246-3529. Do NOT assume nonres = MF per-unit.
    Requires confirmation
City$8.03/sq ft
  • Transportation Impact Fee (City of Orlando, Commercial)
    City of Orlando
    City of Orlando Transportation Impact Fee, Code Ch. 56 Part I, Sec. 56.08 Exhibit-A (eff. 1/15/2023, incl. 15% policy discount). Schedule row: Retail 40,001-150,000 SF, Area 1B/2/3 (City other, default) $8,033 per 1,000 sq ft; Area 1A (Downtown) $7,061. Rate varies by Transportation Benefit Area - confirm parcel area. Orlando has own transportation fee -> no county transportation overlay.
    $8.03/sq ft
County$0.00
  • County Impact Fees (Orange County, Commercial)
    Orange County
    Orange County overlay = $0 in Orlando. County Fire Rescue N/A (Orlando has own fire dept); County Law Enforcement §23-29 unincorporated-only (Orlando has own police dept); County Transportation N/A (Orlando own transportation fee). Confirmed $0.
    $0.00
Total (Orlando): $8.03/sq ft (≈ $401,650.00 at 50,000 sq ft)
Sources last checked July 17, 2026Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orlando: Industrial Impact Fees

Industrial development in Orlando pays $2.52 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $126,200.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Orlando, Industrial) ($2.52/sq ft).

Sewer Benefit Fee (City of Orlando) and Water Connection Fee (OUC, Orlando) — project-specific are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (OUC, Orlando) — project-specific
    Orlando Utilities Commission (OUC)
    $0 placeholder. OUC provides water in Orlando. Nonres water connection/capacity fees are project-specific, issued via a formal cost letter after plan review - no published fixed nonres rate. VERIFY: OUC Development Services developmentservices@ouc.com / (407) 423-9018.
    Requires confirmation
Sewer$0.00
  • Sewer Benefit Fee (City of Orlando)
    City of Orlando
    $0 placeholder pending nonres amount. City of Orlando Sewer Benefit Fee applies to new connections within the city; residential MF reference = $1,928.50/unit. Nonres amount is by ERU/fixture and not published (orlando.gov fee-schedule pages mid-migration/404). VERIFY: Orlando Permitting Services impactfees@cityoforlando.net / (407) 246-3529. Do NOT assume nonres = MF per-unit.
    Requires confirmation
City$2.52/sq ft
  • Transportation Impact Fee (City of Orlando, Industrial)
    City of Orlando
    City of Orlando Transportation Impact Fee, Ch. 56 Part I, Sec. 56.08 Exhibit-A (incl. 15% policy discount). Schedule row: General Industrial - Light, Area 1B/2/3 (default) $2,524 per 1,000 sq ft; Area 1A (Downtown) $2,224. Parks Impact Fee (Ch. 56 Part II) is residential-only.
    $2.52/sq ft
County$0.00
Total (Orlando): $2.52/sq ft (≈ $126,200.00 at 50,000 sq ft)
Sources last checked July 17, 2026Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orlando: Office Impact Fees

Office development in Orlando pays $5.52 per square foot in impact fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $137,900.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Orlando, Office) ($5.52/sq ft).

Sewer Benefit Fee (City of Orlando) and Water Connection Fee (OUC, Orlando) — project-specific are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (OUC, Orlando) — project-specific
    Orlando Utilities Commission (OUC)
    $0 placeholder. OUC provides water in Orlando. Nonres water connection/capacity fees are project-specific, issued via a formal cost letter after plan review - no published fixed nonres rate. VERIFY: OUC Development Services developmentservices@ouc.com / (407) 423-9018.
    Requires confirmation
Sewer$0.00
  • Sewer Benefit Fee (City of Orlando)
    City of Orlando
    $0 placeholder pending nonres amount. City of Orlando Sewer Benefit Fee applies to new connections within the city; residential MF reference = $1,928.50/unit. Nonres amount is by ERU/fixture and not published (orlando.gov fee-schedule pages mid-migration/404). VERIFY: Orlando Permitting Services impactfees@cityoforlando.net / (407) 246-3529. Do NOT assume nonres = MF per-unit.
    Requires confirmation
City$5.52/sq ft
  • Transportation Impact Fee (City of Orlando, Office)
    City of Orlando
    City of Orlando Transportation Impact Fee, Ch. 56 Part I, Sec. 56.08 Exhibit-A (incl. 15% policy discount). Schedule row: General Office, Area 1B/2/3 (default) $5,516 per 1,000 sq ft; Area 1A (Downtown) $4,848.
    $5.52/sq ft
County$0.00
  • County Impact Fees (Orange County, Office)
    Orange County
    Orange County overlay = $0 in Orlando. Fire N/A (own fire dept); Law unincorporated-only (own police dept); Transportation N/A (own fee). Confirmed $0.
    $0.00
Total (Orlando): $5.52/sq ft (≈ $137,900.00 at 25,000 sq ft)
Sources last checked July 17, 2026Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Orlando

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Orlando, Florida?

A new single-family home in Orlando pays at least $22,808.00 per unit in combined impact fees (rates sourced July 17, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Orlando?

Commercial development in Orlando pays $8.03 per square foot in impact fees, at least $401,650.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Orlando charge its own impact fees?

Yes. Orlando levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Orlando, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000