Orlando applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $26,146.50 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Orlando impact fees by project type

Orlando: Single-Family Impact Fees

A new single-family home in Orlando pays at least $26,146.50 per unit in impact fees (rates sourced August 5, 2026). Of that, Orange County-levied fees account for $13,074.00 and municipal or utility fees for $13,072.50.

The largest line items are School Impact Fee (Orange County, SFR) ($9,513.00), Transportation Impact Fee (City of Orlando, SFR) ($5,645.00) and Parks Impact Fee (City of Orlando, SFR) ($2,665.00).

Water Connection Fee (OUC - project-specific) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Orlando impact fee schedule
Water$0.00
Sewer$2,537.50
  • Sewer Benefit Fee (City of Orlando)
    City of Orlando
    The City of Orlando charges a sewer benefit (impact) fee of $2,537.50 for a new single-family home connecting to the city sewer system. A $50 connection permit applies, and if the city constructs the sewer lateral there is an additional $2,950 lateral charge.
    $2,537.50
City$10,535.00
Total (Orlando): $26,146.50
Sources last checked Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Orlando: Multifamily Impact Fees

A new multifamily unit in Orlando pays at least $15,148.50 per unit in impact fees (rates sourced August 5, 2026). Of that, Orange County-levied fees account for $8,900.00 and municipal or utility fees for $6,248.50.

The largest line items are School Impact Fee (Orange County, Orlando MF, Non-High Rise) ($6,751.00), Transportation Impact Fee (City of Orlando, MF, 4+ Floors) ($2,562.00) and Sewer Benefit Fee (City of Orlando, MF) ($1,928.50).

Water Connection Fee (OUC - project-specific, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Orlando impact fee schedule
Water$0.00
Sewer$1,928.50
Total (Orlando): $15,148.50
Sources last checked Official fee schedules:OUC (Orlando Utilities Commission) Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Orlando: Commercial Impact Fees

Commercial development in Orlando pays $8.03 per square foot in impact fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to at least $401,650.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Orlando, Commercial) ($8.03/sq ft).

Sewer Benefit Fee (City of Orlando) and Water Connection Fee (OUC, Orlando) — project-specific are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.

View the full Orlando impact fee schedule
Water$0.00
Sewer$0.00
City$8.03/sq ft
  • Transportation Impact Fee (City of Orlando, Commercial)
    Areas 1B/2/3
    City of Orlando
    Rate varies by Transportation Benefit Area; the amount shown is the citywide rate (Areas 1B/2/3), the highest of 2 districts — Area 1A (Downtown) is lower. Includes a 15% policy discount.
    $8.03/sq ft
Total (Orlando): $8.03/sq ft (≈ $401,650.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orlando: Industrial Impact Fees

Industrial development in Orlando pays $2.52 per square foot in impact fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to at least $126,200.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Orlando, Industrial) ($2.52/sq ft).

Sewer Benefit Fee (City of Orlando) and Water Connection Fee (OUC, Orlando) — project-specific are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.

View the full Orlando impact fee schedule
Water$0.00
Sewer$0.00
City$2.52/sq ft
  • Transportation Impact Fee (City of Orlando, Industrial)
    Areas 1B/2/3
    City of Orlando
    Rate varies by Transportation Benefit Area; the amount shown is the citywide rate (Areas 1B/2/3), the highest of 2 districts — Area 1A (Downtown) is lower. Includes a 15% policy discount.
    $2.52/sq ft
Total (Orlando): $2.52/sq ft (≈ $126,200.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orlando: Office Impact Fees

Office development in Orlando pays $5.52 per square foot in impact fees (rates sourced August 5, 2026).

For a 25,000 sq ft building, that comes to at least $137,900.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Orlando, Office) ($5.52/sq ft).

Sewer Benefit Fee (City of Orlando) and Water Connection Fee (OUC, Orlando) — project-specific are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.

View the full Orlando impact fee schedule
Water$0.00
Sewer$0.00
City$5.52/sq ft
  • Transportation Impact Fee (City of Orlando, Office)
    Areas 1B/2/3
    City of Orlando
    Rate varies by Transportation Benefit Area; the amount shown is the citywide rate (Areas 1B/2/3), the highest of 2 districts — Area 1A (Downtown) is lower. Includes a 15% policy discount.
    $5.52/sq ft
County$0.00
Total (Orlando): $5.52/sq ft (≈ $137,900.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Orlando Utilities Commission (OUC) City of Orlando Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orlando impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Orlando impact fee FAQs

What are the total impact fees for a single-family home in Orlando, Florida?

A new single-family home in Orlando pays at least $26,146.50 per unit in combined impact fees (rates sourced August 5, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Orlando?

Commercial development in Orlando pays $8.03 per square foot in impact fees, at least $401,650.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Orlando charge its own impact fees?

Yes. Orlando levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Orlando, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000