Lake Buena Vista, Florida Impact Fees

Lake Buena Vista applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $26,910.98 per unit (rates sourced July 17, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Lake Buena Vista impact fees by project type

Lake Buena Vista: Single-Family Impact Fees

A new single-family home in Lake Buena Vista pays at least $26,910.98 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Orange County.

The largest line items are School Impact Fee (Orange County, collected in Lake Buena Vista, SFR) ($9,513.00).

Transportation Impact Fee (Orange County, Lake Buena Vista SFR), Parks & Recreation Impact Fee (Orange County, Lake Buena Vista SFR), and Law Enforcement Impact Fee (Orange County, Lake Buena Vista SFR) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Capacity Fee (CFTOD/Reedy Creek, Lake Buena Vista SFR) and Sewer Capacity Fee (CFTOD/Reedy Creek, Lake Buena Vista SFR) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Capacity Fee (CFTOD/Reedy Creek, Lake Buena Vista SFR)
    Central Florida Tourism Oversight District
    City of Lake Buena Vista is a Disney-controlled municipality within CFTOD (formerly Reedy Creek), which owns/operates the water & wastewater treatment facilities. Water capacity/impact fees set by the district, not web-published. $0 placeholder. VERIFY: CFTOD 407-828-2034.
    Requires confirmation
Sewer$0.00
  • Sewer Capacity Fee (CFTOD/Reedy Creek, Lake Buena Vista SFR)
    Central Florida Tourism Oversight District
    CFTOD owns/operates wastewater collection & treatment serving Lake Buena Vista. Sewer capacity/impact fee set by the district, not web-published. $0 placeholder. VERIFY: CFTOD 407-828-2034.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Lake Buena Vista — none)
    City of Lake Buena Vista
    Lake Buena Vista (resident pop ~10) is a Disney-controlled city governed in tandem with CFTOD; no traditional municipal impact fees. County School/Law/Parks/Transportation overlays apply; fire provided by CFTOD (Reedy Creek) Fire Department, so no Orange County Fire overlay. VERIFY: CFTOD 407-828-2034.
    $0.00
County$26,910.98
Total (Lake Buena Vista): $26,910.98
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Lake Buena Vista: Multifamily Impact Fees

A new multifamily unit in Lake Buena Vista pays at least $14,798.71 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Orange County.

The largest line items are School Impact Fee (Orange County, collected in Lake Buena Vista, MF, Non-High Rise) ($6,751.00).

Transportation Impact Fee (Orange County, Lake Buena Vista MF, Mid-Rise), Law Enforcement Impact Fee (Orange County, Lake Buena Vista MF), and Parks & Recreation Impact Fee (Orange County, Lake Buena Vista MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Capacity Fee (CFTOD/Reedy Creek, Lake Buena Vista MF) and Water Capacity Fee (CFTOD/Reedy Creek, Lake Buena Vista MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Capacity Fee (CFTOD/Reedy Creek, Lake Buena Vista MF)
    Central Florida Tourism Oversight District
    Lake Buena Vista within CFTOD; CFTOD owns/operates water & wastewater treatment. Capacity/impact fees set by district, not web-published. $0 placeholder. VERIFY: CFTOD 407-828-2034.
    Requires confirmation
Sewer$0.00
City$0.00
  • City Impact Fees (City of Lake Buena Vista — none, MF)
    City of Lake Buena Vista
    Disney-controlled city governed with CFTOD; no traditional municipal impact fees. County School/Law/Parks/Transportation overlays apply; fire via CFTOD (Reedy Creek) FD, so no county Fire. VERIFY: CFTOD 407-828-2034.
    $0.00
County$14,798.71
Total (Lake Buena Vista): $14,798.71
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Lake Buena Vista: Commercial Impact Fees

Commercial development in Lake Buena Vista pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (CFTOD, Lake Buena Vista) ($500.00 one-time).

Municipal Impact Fee (City of Lake Buena Vista, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$500.00 one-time
  • Water Connection Charge (CFTOD, Lake Buena Vista)
    CFTOD (ex-Reedy Creek) Schedule of Connection Charges: a single $500.00 connection charge applies to all applications for service (Electric, Potable Water, Reclaimed Water, Sewer). Administrative connection charge, NOT a per-meter/capacity/ERC impact fee — District funds capacity via assessments & revenue bonds. Serves Lake Buena Vista.
    $500.00 one-time
Sewer$0.00
  • Sewer Connection Charge (CFTOD, Lake Buena Vista)
    Sewer service included in the single $500 CFTOD connection charge entered on the Water record. No separate sewer capacity/impact fee — District funds capacity via assessments/bonds. Confirmed $0 additional.
    $0.00
City$0.00
  • Municipal Impact Fee (City of Lake Buena Vista, Commercial)
    City of Lake Buena Vista is governed by the Central Florida Tourism Oversight District (CFTOD, ex-Reedy Creek); all development is Walt Disney World. No municipal nonres impact-fee ordinance published (District handles land use, roads, fire, utilities via assessments). $0 Unconfirmed — contact CFTOD (407) 828-2034.
    Requires confirmation
County$0.00
  • County Impact Fees (Orange County, Commercial)
    Confirmed $0 in-city. Orange County nonres impact fees (Fire §23-60(a), Law §23-29(a)) apply in unincorporated area only; Parks & School residential-only. CFTOD provides fire & roads within Lake Buena Vista.
    $0.00
Total (Lake Buena Vista): $500.00 one-time (≈ $500.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Buena Vista: Industrial Impact Fees

Industrial development in Lake Buena Vista pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (CFTOD, Lake Buena Vista) ($500.00 one-time).

Municipal Impact Fee (City of Lake Buena Vista, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$500.00 one-time
  • Water Connection Charge (CFTOD, Lake Buena Vista)
    CFTOD (ex-Reedy Creek) Schedule of Connection Charges: a single $500.00 connection charge applies to all applications for service (Electric, Potable Water, Reclaimed Water, Sewer). Administrative connection charge, NOT a per-meter/capacity/ERC impact fee — District funds capacity via assessments & revenue bonds. Serves Lake Buena Vista.
    $500.00 one-time
Sewer$0.00
  • Sewer Connection Charge (CFTOD, Lake Buena Vista)
    Sewer service included in the single $500 CFTOD connection charge entered on the Water record. No separate sewer capacity/impact fee — District funds capacity via assessments/bonds. Confirmed $0 additional.
    $0.00
City$0.00
County$0.00
Total (Lake Buena Vista): $500.00 one-time (≈ $500.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Buena Vista: Office Impact Fees

Office development in Lake Buena Vista pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $500.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (CFTOD, Lake Buena Vista) ($500.00 one-time).

Municipal Impact Fee (City of Lake Buena Vista, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$500.00 one-time
  • Water Connection Charge (CFTOD, Lake Buena Vista)
    CFTOD (ex-Reedy Creek) Schedule of Connection Charges: a single $500.00 connection charge applies to all applications for service (Electric, Potable Water, Reclaimed Water, Sewer). Administrative connection charge, NOT a per-meter/capacity/ERC impact fee — District funds capacity via assessments & revenue bonds. Serves Lake Buena Vista.
    $500.00 one-time
Sewer$0.00
  • Sewer Connection Charge (CFTOD, Lake Buena Vista)
    Sewer service included in the single $500 CFTOD connection charge entered on the Water record. No separate sewer capacity/impact fee — District funds capacity via assessments/bonds. Confirmed $0 additional.
    $0.00
City$0.00
County$0.00
Total (Lake Buena Vista): $500.00 one-time (≈ $500.00 at 25,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Lake Buena Vista

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Lake Buena Vista, Florida?

A new single-family home in Lake Buena Vista pays at least $26,910.98 per unit in combined impact fees (rates sourced July 17, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Lake Buena Vista?

Commercial development in Lake Buena Vista pays no per-square-foot impact fees, but owes $500.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Lake Buena Vista charge its own impact fees?

Yes. Lake Buena Vista levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lake Buena Vista, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.

Missing a jurisdiction? Get in touch.