Maitland impact fees by project type
Maitland: Single-Family Impact Fees
A new single-family home in Maitland pays $19,926.00 per unit in impact fees (rates sourced August 14, 2026). Of that, Orange County-levied fees account for $9,513.00 and municipal or utility fees for $10,413.00.
The largest line items are School Impact Fee (Orange County, collected by Maitland, SFR) ($9,513.00), Sewer Impact Fee (City of Maitland, SFR) ($4,320.00) and Park Impact Fee (City of Maitland, SFR) ($2,151.00).
View the full Maitland impact fee schedule
- Water Connection/Impact Fee (City of Maitland, SFR)$1,895.00City of Maitland
- Sewer Impact Fee (City of Maitland, SFR)$4,320.00City of Maitland
- Park Impact Fee (City of Maitland, SFR)$2,151.00City of Maitland
- Mobility Impact Fee (City of Maitland, SFR)$1,784.00City of Maitland
- Fire Impact Fee (City of Maitland, SFR)$263.00City of Maitland
- School Impact Fee (Orange County, collected by Maitland, SFR)$9,513.00Orange County Public Schools
- Law Enforcement Impact Fee (Orange County, Maitland SFR)$0.00Orange CountyOrange County's law enforcement impact fee applies only in the unincorporated county; municipalities may opt in by interlocal agreement, and Maitland has not. No county law enforcement impact fee is collected on new construction in Maitland (County Code Secs. 23-29, 23-34).
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Multifamily Impact Fees
A new multifamily unit in Maitland pays $15,917.00 per unit in impact fees (rates sourced August 14, 2026). Of that, Orange County-levied fees account for $6,985.00 and municipal or utility fees for $8,932.00.
The largest line items are School Impact Fee (Orange County, collected by Maitland, MF, Non-High Rise) ($6,751.00), Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU ($3,456.00) and Park Impact Fee (City of Maitland, MF) ($2,151.00).
Water Connection/Impact Fee (City of Maitland, MF) — 3/4" meter per unit and Law Enforcement Impact Fee (Orange County, Maitland MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Maitland impact fee schedule
- Water Connection/Impact Fee (City of Maitland, MF) — 3/4" meter per unit$1,895.00Requires confirmationper ERU (1.0 basis)City of Maitland
- Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU$3,456.00per ERU (1.0 basis)City of Maitland
- Park Impact Fee (City of Maitland, MF)$2,151.00City of Maitland
- $1,246.00
- Fire Impact Fee (City of Maitland, MF)$184.00City of Maitland
- School Impact Fee (Orange County, collected by Maitland, MF, Non-High Rise)$6,751.00Orange County Public Schools
- $234.00Requires confirmation
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Commercial Impact Fees
Commercial development in Maitland pays $5.06 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).
For a 50,000 sq ft building, that comes to at least $259,750.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Commercial) — Tier 3 ($4.51/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Maitland impact fee schedule
- Water Connection Fee (City of Maitland) — 1" meter$2,580.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Mobility Impact Fee (City of Maitland, Commercial) — Tier 3$4.51/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.55/sq ft
- County Impact Fees (Orange County, Commercial)Requires confirmationOrange County
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Industrial Impact Fees
Industrial development in Maitland pays $1.04 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).
For a 50,000 sq ft building, that comes to at least $58,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Industrial) — Tier 3 ($0.94/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Maitland impact fee schedule
- Water Connection Fee (City of Maitland) — 1" meter$2,580.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Mobility Impact Fee (City of Maitland, Industrial) — Tier 3$0.94/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.10/sq ft
- County Impact Fees (Orange County, Industrial)Requires confirmationOrange County
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Office Impact Fees
Office development in Maitland pays $2.63 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 14, 2026).
For a 25,000 sq ft building, that comes to at least $72,575.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Office) — Tier 3 ($2.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Maitland impact fee schedule
- Water Connection Fee (City of Maitland) — 1" meter$2,580.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Mobility Impact Fee (City of Maitland, Office) — Tier 3$2.40/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.23/sq ft
- County Impact Fees (Orange County, Office)Requires confirmationOrange County
Where in Orange County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Maitland impact fee FAQs
What are the total impact fees for a single-family home in Maitland, Florida?
A new single-family home in Maitland pays $19,926.00 per unit in combined impact fees (rates sourced August 14, 2026).
How much are commercial impact fees in Maitland?
Commercial development in Maitland pays $5.06 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $259,750.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Maitland charge its own impact fees?
Yes. Maitland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Maitland, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Orange County impact fees page.