Maitland Impact Fees by Project Type
Maitland: Single-Family Impact Fees
A new single-family home in Maitland pays $20,591.00 per unit in impact fees (rates sourced August 31, 2026). Of that, Orange County-levied fees account for $10,178.00 and municipal or utility fees for $10,413.00.
The largest line items are School Impact Fee (Orange County, collected by Maitland, SFR) ($9,513.00), Sewer Impact Fee (City of Maitland, SFR) ($4,320.00) and Park Impact Fee (City of Maitland, SFR) ($2,151.00).
View the Full Maitland Impact Fee Schedule
- Water Connection/Impact Fee (City of Maitland, SFR)$1,895.00City of MaitlandThe City of Maitland levies a Water Connection Fee of $1,895 for a single-family home (5/8" and 3/4" meter) (Code Sec. 38-2(a)).
- Sewer Impact Fee (City of Maitland, SFR)$4,320.00City of MaitlandThe City of Maitland levies a Sewer Impact Fee of $4,320 for a single-family home (1.0 ERU) (Code Ch. 20 Art. III, Ord. 1334).
- Park Impact Fee (City of Maitland, SFR)$2,151.00City of MaitlandThe City of Maitland levies a Park Impact Fee of $2,151 per dwelling unit (Code Ch. 11 Art. III, Ord. 1183). Because Maitland imposes its own parks fee, the Orange County parks impact fee does not apply.
- Mobility Impact Fee (City of Maitland, SFR)$1,784.00City of MaitlandThe City of Maitland levies a Mobility (Transportation) Impact Fee of $1,784 per single-family detached home (Tiers 1 & 2; CRA $1,574, Tier 3 $2,009) (Code Ch. 12 Art. VI, Ord. 1314). Because Maitland imposes its own mobility fee, the Orange County transportation impact fee does not apply.
- Fire Impact Fee (City of Maitland, SFR)$263.00City of MaitlandThe City of Maitland levies a Fire Impact Fee of $263 per single-family dwelling (Code Ch. 6 Art. IV, Ord. 1431, eff. 10/1/2025). Because Maitland has its own fire department, the Orange County fire impact fee does not apply.
- School Impact Fee (Orange County, collected by Maitland, SFR)$9,513.00Orange County Public SchoolsOrange County School Impact Fee: $9,513 for the representative 2,000-2,499 sf single-family home, assessed at building permit (Ord. 2016-08, eff. 10/1/2022). The fee applies countywide, including within municipalities, and other size brackets differ.
- Law Enforcement Impact Fee (Orange County, Maitland SFR)$665.00Orange CountyOrange County Law Enforcement impact fee, assessed within Maitland because the city levies no municipal police impact fee. $665 per single-family dwelling under the Orange County schedule published May 1, 2026; the county rate steps each May 1. Maitland's own Fire and Park impact fees displace the county Fire and Parks fees, which are not collected here.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Multifamily Impact Fees
A new multifamily unit in Maitland pays $15,917.00 per unit in impact fees (rates sourced August 31, 2026). Of that, Orange County-levied fees account for $6,985.00 and municipal or utility fees for $8,932.00.
The largest line items are School Impact Fee (Orange County, collected by Maitland, MF, Non-High Rise) ($6,751.00), Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU ($3,456.00) and Park Impact Fee (City of Maitland, MF) ($2,151.00).
Water Connection/Impact Fee (City of Maitland, MF) — 3/4" meter per unit is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Maitland Impact Fee Schedule
- Water Connection/Impact Fee (City of Maitland, MF) — 3/4" meter per unit$1,895.00Requires confirmationper ERU (1.0 basis)City of MaitlandCity of Maitland Water connection/impact fee: $1,895 per multi-family unit, based on a 3/4-inch meter per unit (Code Sec. 38-2). Assessed at building permit.
- Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU$3,456.00per ERU (1.0 basis)City of MaitlandCity of Maitland Sewer impact fee: $3,456 per multi-family unit, based on 0.80 ERU per unit at $4,320/ERU (Code Sec. 38-2). Assessed at building permit.
- Park Impact Fee (City of Maitland, MF)$2,151.00City of MaitlandCity of Maitland Park impact fee: $2,151 per dwelling unit (same for single- and multi-family), Ord. 1183 (Code Ch. 11 Art. III). Maitland assesses its own park fee, so no Orange County parks fee applies.
- Mobility Impact Fee (City of Maitland, MF)$1,246.00Mobility Tiers 1&2 (rep)City of MaitlandCity of Maitland Mobility impact fee: $1,246 per multi-family unit for Mobility Tiers 1 & 2 (representative), Ord. 1314 (Code Ch. 12 Art. VI); rate varies by area (CRA $1,100, Tier 3 $1,466). Maitland assesses its own mobility fee, so no Orange County transportation fee applies.
- Fire Impact Fee (City of Maitland, MF)$184.00City of MaitlandCity of Maitland Fire impact fee: $184 per multi-family unit (single-family $263), Ord. 1431 (Code Ch. 6 Art. IV), effective 10/1/2025. Maitland provides its own fire protection, so no Orange County fire impact fee applies.
- School Impact Fee (Orange County, collected by Maitland, MF, Non-High Rise)$6,751.00Orange County Public SchoolsOrange County School impact fee: $6,751 per non-high-rise multi-family unit, effective 10/1/2022 (high-rise buildings over 10 floors are $307/unit). Applies countywide including municipalities; assessed at building permit.
- Law Enforcement Impact Fee (Orange County, Maitland MF)$234.00Orange CountyOrange County Law Enforcement impact fee, assessed within Maitland because the city levies no municipal police impact fee. $234 per multifamily dwelling unit under the Orange County schedule published May 1, 2026; the county rate steps each May 1. Maitland's own Fire and Park impact fees displace the county Fire and Parks fees.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Commercial Impact Fees
Commercial development in Maitland pays $5.06 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 31, 2026).
For a 50,000 sq ft building, that comes to at least $259,750.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Commercial) — Tier 3 ($4.51/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Maitland Impact Fee Schedule
- Water Connection Fee (City of Maitland) — 1" meter$2,580.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Mobility Impact Fee (City of Maitland, Commercial) — Tier 3$4.51/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.55/sq ft
- County Impact Fees (Orange County, Commercial)Requires confirmationOrange County
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Industrial Impact Fees
Industrial development in Maitland pays $1.04 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 31, 2026).
For a 50,000 sq ft building, that comes to at least $58,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Industrial) — Tier 3 ($0.94/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Maitland Impact Fee Schedule
- Water Connection Fee (City of Maitland) — 1" meter$2,580.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Mobility Impact Fee (City of Maitland, Industrial) — Tier 3$0.94/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.10/sq ft
- County Impact Fees (Orange County, Industrial)Requires confirmationOrange County
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Office Impact Fees
Office development in Maitland pays $2.63 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 31, 2026).
For a 25,000 sq ft building, that comes to at least $72,575.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Office) — Tier 3 ($2.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Maitland Impact Fee Schedule
- Water Connection Fee (City of Maitland) — 1" meter$2,580.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandFee is capacity-based (per ERC/ERU or flow); the amount shown is the published minimum.
- Mobility Impact Fee (City of Maitland, Office) — Tier 3$2.40/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.23/sq ft
- County Impact Fees (Orange County, Office)Requires confirmationOrange County
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
Pending and Recent Changes
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Maitland Impact Fee FAQs
What are the total impact fees for a single-family home in Maitland, Florida?
A new single-family home in Maitland pays $20,591.00 per unit in combined impact fees (rates sourced August 31, 2026).
How much are commercial impact fees in Maitland?
Commercial development in Maitland pays $5.06 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $259,750.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Maitland charge its own impact fees?
Yes. Maitland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Maitland, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.