Maitland Impact Fees by Project Type
Maitland: Single-Family Impact Fees
A new single-family home in Maitland pays at least $20,241.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Orange County-levied fees account for $9,513.00 and municipal or utility fees for $10,728.00.
The largest line items are School Impact Fee (Orange County, collected by Maitland, SFR) ($9,513.00), Sewer Impact Fee (City of Maitland, SFR) ($4,320.00) and Park Impact Fee (City of Maitland, SFR) ($2,151.00).
Law Enforcement Impact Fee (Orange County, Maitland SFR) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Maitland Impact Fee Schedule
- Water Connection/Impact Fee (City of Maitland, SFR)$1,895.005/8" or 3/4" meterCity of MaitlandCity of Maitland water connection fee for a 5/8" or 3/4" meter: $1,895 (Code Sec. 38-2(a)). A single-family home on a standard meter pays this tier.
- Sewer Impact Fee (City of Maitland, SFR)$4,320.00City of MaitlandThe City of Maitland levies a Sewer Impact Fee of $4,320 for a single-family home (1.0 ERU: $2,775 treatment plus $1,545 transmission), Code Sec. 38-2(b), Ord. 1334. The treatment component follows the City of Altamonte Springs wholesale connection fee.
- Park Impact Fee (City of Maitland, SFR)$2,151.00City of MaitlandThe City of Maitland levies a Park Impact Fee of $2,151 per dwelling unit (Land Development Code Sec. 7.2.1, Ord. 1183). The Orange County parks impact fee applies only in unincorporated Orange County, so it is not charged in Maitland.
- Mobility Impact Fee (City of Maitland, SFR)$2,099.00Mobility Tier 3City of MaitlandCity of Maitland mobility fee for a single-family detached home in the Mobility Tier 3: $2,099 (LDC Table 7.1.4). This is the highest of 3 assessment areas; the CRA and Tiers 1 & 2 pay less.
- Fire Impact Fee (City of Maitland, SFR)$263.00City of MaitlandThe City of Maitland levies a Fire Impact Fee of $263 per single-family dwelling (Code Ch. 18 Art. IV, rates set by resolution under Sec. 18-78(b), Ord. 1431, effective 10/1/2025). The Orange County fire impact fee applies only in unincorporated Orange County, so it is not charged in Maitland.
- School Impact Fee (Orange County, collected by Maitland, SFR)$9,513.00SF Detached 2,000–2,499 sq ftOrange County Public SchoolsOrange County Public Schools impact fee for a single-family detached home of 2,000–2,499 sq ft of heated/cooled living area (the canonical 2,000 sq ft house): $9,513, current rate effective 10/1/2022. Other home sizes pay a different tier (see other tiers). Applies countywide, including within the City of Maitland; assessed at building permit.
- Law Enforcement Impact Fee (Orange County, Maitland SFR)Requires confirmationOrange CountyOrange County's law enforcement impact fee applies in unincorporated Orange County and only reaches a city that has opted in by agreement (County Code Ch. 23), so no county law enforcement impact fee is shown for the City of Maitland.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Multifamily Impact Fees
A new multifamily unit in Maitland pays at least $15,903.00 per unit in impact fees (rates sourced October 21, 2026). Of that, Orange County-levied fees account for $6,751.00 and municipal or utility fees for $9,152.00.
The largest line items are School Impact Fee (Orange County, collected by Maitland, MF, Non-High Rise) ($6,751.00), Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU ($3,456.00) and Park Impact Fee (City of Maitland, MF) ($2,151.00).
Law Enforcement Impact Fee (Orange County, Maitland MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Maitland Impact Fee Schedule
- Water Connection/Impact Fee (City of Maitland, MF)$1,895.005/8" or 3/4" meterCity of MaitlandCity of Maitland water connection fee for a 5/8" or 3/4" meter: $1,895 (Code Sec. 38-2(a)). Multifamily is charged per meter; this is the smallest meter. A building on one master meter pays once for the meter: 3" $28,425, 4" $47,375, 6" $94,750, 8" $151,600, 10" $217,925.
- Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU$3,456.000.80 ERU per unitCity of MaitlandCity of Maitland Sewer impact fee: $3,456 per multi-family unit, based on 0.80 ERU per unit at $4,320/ERU (Code Sec. 38-2). Assessed at building permit.
- Park Impact Fee (City of Maitland, MF)$2,151.00City of MaitlandCity of Maitland Park impact fee: $2,151 per dwelling unit (same for single-family and multifamily), Ord. 1183, Land Development Code Sec. 7.2.1. The Orange County parks impact fee applies only in unincorporated Orange County, so it is not charged in Maitland.
- Mobility Impact Fee (City of Maitland, MF)$1,466.00Mobility Tier 3City of MaitlandCity of Maitland mobility fee for a multifamily apartment unit in the Mobility Tier 3: $1,466 (LDC Table 7.1.4). This is the highest of 3 assessment areas; the CRA and Tiers 1 & 2 pay less.
- Fire Impact Fee (City of Maitland, MF)$184.00City of MaitlandCity of Maitland Fire impact fee: $184 per multifamily unit (single-family $263), Ord. 1431, Code Ch. 18 Art. IV (rates set by resolution under Sec. 18-78(b)), effective 10/1/2025. The Orange County fire impact fee applies only in unincorporated Orange County, so it is not charged in Maitland.
- School Impact Fee (Orange County, collected by Maitland, MF, Non-High Rise)$6,751.00Orange County Public SchoolsOrange County School impact fee: $6,751 per non-high-rise multi-family unit, effective 10/1/2022 (high-rise buildings over 10 floors are $307/unit). Applies countywide including municipalities; assessed at building permit.
- Law Enforcement Impact Fee (Orange County, Maitland MF)Requires confirmationOrange CountyOrange County's law enforcement impact fee applies in unincorporated Orange County and only reaches a city that has opted in by agreement (County Code Ch. 23), so no county law enforcement impact fee is shown for the City of Maitland.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Commercial Impact Fees
Commercial development in Maitland pays $5.06 per square foot in impact fees, plus $9,057.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 50,000 sq ft building, that comes to at least $261,907.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Maitland) — 1" meter ($4,737.00 one-time), Sewer Impact Fee (City of Maitland) ($4,320.00 one-time) and Mobility Impact Fee (City of Maitland, Commercial) — Tier 3 ($4.51/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Maitland Impact Fee Schedule
- Water Connection Fee (City of Maitland) — 1" meter$4,737.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandCharged per equivalent residential unit (ERU); the amount shown is 1 ERU. Shopping centers, retail centers, office buildings and similar establishments are assessed 1 ERU per 2,000 sq ft with a 2 ERU minimum.
- Mobility Impact Fee (City of Maitland, Commercial) — Tier 3$4.51/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.55/sq ft
- County Impact Fees (Orange County, Commercial)Requires confirmationOrange CountyOrange County's transportation and parks impact fees apply only in unincorporated areas, and its fire rescue and law enforcement impact fees apply inside a city only when the city joins by agreement. Maitland collects its own mobility and fire impact fees instead.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Industrial Impact Fees
Industrial development in Maitland pays $1.04 per square foot in impact fees, plus $9,057.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 50,000 sq ft building, that comes to at least $60,857.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Maitland) — 1" meter ($4,737.00 one-time), Sewer Impact Fee (City of Maitland) ($4,320.00 one-time) and Mobility Impact Fee (City of Maitland, Industrial) — Tier 3 ($0.94/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Maitland Impact Fee Schedule
- Water Connection Fee (City of Maitland) — 1" meter$4,737.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandCharged per equivalent residential unit (ERU); the amount shown is 1 ERU. Shopping centers, retail centers, office buildings and similar establishments are assessed 1 ERU per 2,000 sq ft with a 2 ERU minimum.
- Mobility Impact Fee (City of Maitland, Industrial) — Tier 3$0.94/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.10/sq ft
- County Impact Fees (Orange County, Industrial)Requires confirmationOrange CountyOrange County's transportation and parks impact fees apply only in unincorporated areas, and its fire rescue and law enforcement impact fees apply inside a city only when the city joins by agreement. Maitland collects its own mobility and fire impact fees instead.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland: Office Impact Fees
Office development in Maitland pays $2.63 per square foot in impact fees, plus $9,057.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 25,000 sq ft building, that comes to at least $74,732.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Maitland) — 1" meter ($4,737.00 one-time), Sewer Impact Fee (City of Maitland) ($4,320.00 one-time) and Mobility Impact Fee (City of Maitland, Office) — Tier 3 ($2.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Impact Fees (Orange County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Maitland Impact Fee Schedule
- Water Connection Fee (City of Maitland) — 1" meter$4,737.00 one-timeCity of MaitlandFee is set by meter size; the amount shown is for the 1" meter.
- Sewer Impact Fee (City of Maitland)$4,320.00 one-timeCity of MaitlandCharged per equivalent residential unit (ERU); the amount shown is 1 ERU. Shopping centers, retail centers, office buildings and similar establishments are assessed 1 ERU per 2,000 sq ft with a 2 ERU minimum.
- Mobility Impact Fee (City of Maitland, Office) — Tier 3$2.40/sq ftRate varies by mobility assessment area; the amount shown is the highest of 3 areas (Tier 3). Tiers 1 & 2 and the CRA are lower.
- $0.23/sq ft
- County Impact Fees (Orange County, Office)Requires confirmationOrange CountyOrange County's transportation and parks impact fees apply only in unincorporated areas, and its fire rescue and law enforcement impact fees apply inside a city only when the city joins by agreement. Maitland collects its own mobility and fire impact fees instead.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Maitland Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
Pending and Recent Changes
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Maitland Impact Fee FAQs
What are the total impact fees for a single-family home in Maitland, Florida?
A new single-family home in Maitland pays at least $20,241.00 per unit in combined impact fees (rates sourced October 21, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Maitland?
Commercial development in Maitland pays $5.06 per square foot in impact fees, plus $9,057.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $261,907.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Maitland charge its own impact fees?
Yes. Maitland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Maitland, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.