Maitland, Florida Impact Fees

Maitland applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays $19,926.00 per unit (rates sourced August 4, 2026). The full breakdown is below.

Maitland impact fees by project type

Maitland: Single-Family Impact Fees

A new single-family home in Maitland pays $19,926.00 per unit in impact fees (rates sourced August 4, 2026). Of that, Orange County-levied fees account for $9,513.00 and municipal or utility fees for $10,413.00.

The largest line items are School Impact Fee (Orange County, collected by Maitland, SFR) ($9,513.00), Sewer Impact Fee (City of Maitland, SFR) ($4,320.00) and Park Impact Fee (City of Maitland, SFR) ($2,151.00).

View the full fee schedule
Water$1,895.00
  • Water Connection/Impact Fee (City of Maitland, SFR)
    City of Maitland
    AMOUNT CORRECTED 8/3/2026 from $1,035 (city Impact Fees webpage — STALE, still shows the superseded Ord. 1334/2018 table) to $1,895.00 per current code: Sec. 38-2(a) 'Connection fees' (recodified from §20-2; Supp. 1 through Ord. 1447 7-28-2025), Water Connection Fees table 5/8" and 3/4" = $1,895 (1" $4,737; 2" $15,160); last substantive fee amendment Ord. 1393 (1-10-2022). Same evidence applied to the MF sibling. Sewer sibling unaffected ($4,320/ERU verified current). (407) 539-6211.
    $1,895.00
Sewer$4,320.00
  • Sewer Impact Fee (City of Maitland, SFR)
    City of Maitland
    City of Maitland Sewer Impact Fee, Ord. 1334, Code Ch. 20 Art. III. Per ERU $4,320 (Treatment $2,775 + Transmission $1,545). SFR = 1.0 ERU. MF per ERU formula (Sec. 20-2).
    $4,320.00
City$4,198.00
  • Park Impact Fee (City of Maitland, SFR)
    City of Maitland
    City of Maitland Park Impact Fee, Ord. 1183 (6/22/2009), Code Ch. 11 Art. III. $2,151/unit (SF and MF). Own parks fee -> no Orange County Parks overlay.
    $2,151.00
  • Mobility Impact Fee (City of Maitland, SFR)
    City of Maitland
    City of Maitland Mobility (Transportation) Impact Fee, Ord. 1314 (9/26/2016), Code Ch. 12 Art. VI. SF Detached by mobility area: CRA $1,574; Tiers 1&2 $1,784 (representative); Tier 3 $2,009. Own mobility fee -> no Orange County Transportation overlay.
    $1,784.00
  • Fire Impact Fee (City of Maitland, SFR)
    City of Maitland
    City of Maitland Fire Impact Fee, Ord. 1431 (9/23/2024), Code Ch. 6 Art. IV. Single-Family $263/unit eff 10/1/2025 (MF $184). Own fire dept + fire fee -> no Orange County Fire overlay.
    $263.00
County$9,513.00
  • School Impact Fee (Orange County, collected by Maitland, SFR)
    Orange County Public Schools
    Orange County School Impact Fee, collected by City of Maitland, eff 10/1/2022. Size-tiered SF Detached: <2,000 sf $8,829; 2,000-2,499 $9,513 (representative, +$195.75 admin); 2,500-2,999 $11,402; 3,000-3,999 $12,015; >=4,000 $9,584. Countywide.
    $9,513.00
  • Law Enforcement Impact Fee (Orange County, Maitland SFR)
    Orange County
    $0 — CONVERTED FROM REMOVAL CANDIDATE 8/4/2026 (owner-approved, Horry-style documented-not-applicable). Secs. 23-29/23-34: fee is unincorporated-only with municipal opt-in by IGA; no Maitland IGA. Former county rate for reference: $665 SFR eff. 5/1/2026. 407-836-5691.
    $0.00
Total (Maitland): $19,926.00
Sources last checked August 4, 2026Official fee schedules:City of Maitland Orange County Public Schools Orange County

Maitland: Multifamily Impact Fees

A new multifamily unit in Maitland pays $15,917.00 per unit in impact fees (rates sourced August 4, 2026). Of that, Orange County-levied fees account for $6,985.00 and municipal or utility fees for $8,932.00.

The largest line items are School Impact Fee (Orange County, collected by Maitland, MF, Non-High Rise) ($6,751.00), Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU ($3,456.00) and Park Impact Fee (City of Maitland, MF) ($2,151.00).

Water Connection/Impact Fee (City of Maitland, MF) — 3/4" meter per unit and Law Enforcement Impact Fee (Orange County, Maitland MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,895.00
  • Water Connection/Impact Fee (City of Maitland, MF) — 3/4" meter per unit
    per ERU (1.0 basis)
    City of Maitland
    RATE CITED FROM CODE, RE-STAMP (8/4/2026; Maitland family — Sec. 38-2 connection/impact fees; the sewer sibling's 0.80 MF factor is codified but WATER is charged per 3/4" meter per unit at $1,895 per the code table). Re-verify at next annual pass. (407) 539-6218.
    $1,895.00Requires confirmation
Sewer$3,456.00
  • Sewer Impact Fee (City of Maitland, MF) — 0.80 ERU/unit × $4,320/ERU
    per ERU (1.0 basis)
    City of Maitland
    AMOUNT CORRECTED 8/3/2026 from $4,320 (1 ERU) to $3,456.00 — the code itself sets the MF factor: Sec. 38-2(b)(3)a (recodified from §20-2; rates Ord. 1334, amended Ord. 1403 8-8-2022, current in Municode): 'multiple-family dwelling units, apartment buildings or complexes … shall pay … 80 percent of an ERU per unit. One unit equals 0.80 ERU' → 0.80 × $4,320 ($2,775 treatment + $1,545 transmission) = $3,456/unit. CAVEAT: the treatment component auto-adjusts dollar-for-dollar with Altamonte Springs' wholesale connection fee — recheck periodically.
    $3,456.00
City$3,581.00
  • Park Impact Fee (City of Maitland, MF)
    City of Maitland
    City of Maitland Park Impact Fee, Ord. 1183, Ch. 11 Art. III. $2,151/unit (same SF and MF). Own parks -> no county Parks overlay.
    $2,151.00
  • Mobility Impact Fee (City of Maitland, MF)
    Mobility Tiers 1&2 (rep)
    City of Maitland
    City of Maitland Mobility Impact Fee, Ord. 1314, Ch. 12 Art. VI. MF per dwelling: CRA $1,100; Tiers 1&2 $1,246 (representative); Tier 3 $1,466. Own mobility -> no county Transportation overlay.
    $1,246.00
  • Fire Impact Fee (City of Maitland, MF)
    City of Maitland
    City of Maitland Fire Impact Fee, Ord. 1431, Ch. 6 Art. IV. MF $184/unit eff 10/1/2025 (SF $263). Own fire -> no county Fire overlay.
    $184.00
County$6,985.00
Total (Maitland): $15,917.00
Sources last checked August 4, 2026Official fee schedules:City of Maitland Orange County Public Schools Orange County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Maitland: Commercial Impact Fees

Commercial development in Maitland pays $4.38 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $225,950.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Commercial) ($3.83/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Impact Fees (Orange County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,580.00 one-time
Sewer$4,320.00 one-time
  • Sewer Impact Fee (City of Maitland)
    City of Maitland
    Maitland Sewer Impact Fee, Ord. 1334, Code Ch. 20 Art. III. $4,320 per ERU (Treatment $2,775 + Transmission $1,545). SFR = 1.0 ERU; nonres ERU by land-use formula in Code Sec. 20-2. No meter ladder for sewer.
    $4,320.00 one-time
City$4.38/sq ft
  • Mobility Impact Fee (City of Maitland, Commercial)
    City of Maitland
    City of Maitland Mobility (Transportation) Impact Fee, Ord. 1314 (9/26/2016), Code Ch. 12 Art. VI. Schedule row: Community Retail (10,000-100,000 sf), Mobility Tiers 1&2 (default) $3,831 per 1,000 sq ft; CRA $3,380; Tier 3 $4,507. Own mobility fee -> no Orange County transportation overlay. Assessment-area map by request (407) 539-6211.
    $3.83/sq ft
  • Fire Impact Fee (City of Maitland, Commercial)
    City of Maitland
    City of Maitland Fire Impact Fee, Ord. 1431 (9/23/2024), Code Ch. 6 Art. IV; rate eff. 10/1/2025. Schedule row: Retail (incl. Leisure/Outdoor/Restaurant/Bar/Lounge), $550 per 1,000 sq ft. Maitland runs its own fire dept and fire fee (no Orange County fire overlay).
    $0.55/sq ft
County$0.00
  • County Impact Fees (Orange County, Commercial)
    Orange County
    Orange County overlay = $0 in Maitland. County Fire Rescue N/A (Maitland has own fire dept + fire impact fee); County Transportation N/A (Maitland has own mobility fee); County Law Enforcement §23-29(a) imposed 'upon all new development in the unincorporated area' only, municipal opt-in via §23-34 interlocal (none found for Maitland). VERIFY law opt-in: Impact Fee Admin 407-836-5691.
    Requires confirmation
Total (Maitland): $4.38/sq ft + $6,900.00 one-time (≈ $225,950.00 at 50,000 sq ft)
Sources last checked August 4, 2026Official fee schedules:City of Maitland Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Maitland: Industrial Impact Fees

Industrial development in Maitland pays $0.90 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $51,700.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Industrial) ($0.80/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Impact Fees (Orange County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,580.00 one-time
Sewer$4,320.00 one-time
  • Sewer Impact Fee (City of Maitland)
    City of Maitland
    Maitland Sewer Impact Fee, Ord. 1334, Code Ch. 20 Art. III. $4,320 per ERU (Treatment $2,775 + Transmission $1,545). SFR = 1.0 ERU; nonres ERU by land-use formula in Code Sec. 20-2. No meter ladder for sewer.
    $4,320.00 one-time
City$0.90/sq ft
  • Mobility Impact Fee (City of Maitland, Industrial)
    City of Maitland
    City of Maitland Mobility Impact Fee, Ord. 1314, Code Ch. 12 Art. VI. Schedule row: Warehousing/Manufacturing/Industrial, Mobility Tiers 1&2 (default) $795 per 1,000 sq ft; CRA $702; Tier 3 $935.
    $0.80/sq ft
  • Fire Impact Fee (City of Maitland, Industrial)
    City of Maitland
    City of Maitland Fire Impact Fee, Ord. 1431 (9/23/2024), Code Ch. 6 Art. IV; rate eff. 10/1/2025. Schedule row: Industrial (incl. Manufacturing/Storage/Warehouse), $101 per 1,000 sq ft.
    $0.10/sq ft
County$0.00
  • County Impact Fees (Orange County, Industrial)
    Orange County
    Orange County overlay = $0 in Maitland. Fire N/A (own fire dept+fee); Transportation N/A (own mobility fee); Law Enforcement §23-29 unincorporated-only, municipal opt-in via §23-34 (none found). VERIFY opt-in 407-836-5691.
    Requires confirmation
Total (Maitland): $0.90/sq ft + $6,900.00 one-time (≈ $51,700.00 at 50,000 sq ft)
Sources last checked August 4, 2026Official fee schedules:City of Maitland Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Maitland: Office Impact Fees

Office development in Maitland pays $2.27 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 25,000 sq ft building, that comes to at least $63,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Maitland) ($4,320.00 one-time), Water Connection Fee (City of Maitland) — 1" meter ($2,580.00 one-time) and Mobility Impact Fee (City of Maitland, Office) ($2.04/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

County Impact Fees (Orange County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,580.00 one-time
Sewer$4,320.00 one-time
  • Sewer Impact Fee (City of Maitland)
    City of Maitland
    Maitland Sewer Impact Fee, Ord. 1334, Code Ch. 20 Art. III. $4,320 per ERU (Treatment $2,775 + Transmission $1,545). SFR = 1.0 ERU; nonres ERU by land-use formula in Code Sec. 20-2. No meter ladder for sewer.
    $4,320.00 one-time
City$2.27/sq ft
  • Mobility Impact Fee (City of Maitland, Office)
    City of Maitland
    City of Maitland Mobility Impact Fee, Ord. 1314, Code Ch. 12 Art. VI. Schedule row: Office, Mobility Tiers 1&2 (default) $2,036 per 1,000 sq ft; CRA $1,796; Tier 3 $2,395.
    $2.04/sq ft
  • Fire Impact Fee (City of Maitland, Office)
    City of Maitland
    City of Maitland Fire Impact Fee, Ord. 1431 (9/23/2024), Code Ch. 6 Art. IV; rate eff. 10/1/2025. Schedule row: Office Building, $232 per 1,000 sq ft.
    $0.23/sq ft
County$0.00
  • County Impact Fees (Orange County, Office)
    Orange County
    Orange County overlay = $0 in Maitland. Fire N/A (own fire dept+fee); Transportation N/A (own mobility fee); Law Enforcement §23-29 unincorporated-only, municipal opt-in via §23-34 (none found). VERIFY opt-in 407-836-5691.
    Requires confirmation
Total (Maitland): $2.27/sq ft + $6,900.00 one-time (≈ $63,600.00 at 25,000 sq ft)
Sources last checked August 4, 2026Official fee schedules:City of Maitland Orange County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Maitland

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Maitland, Florida?

A new single-family home in Maitland pays $19,926.00 per unit in combined impact fees (rates sourced August 4, 2026).

How much are commercial impact fees in Maitland?

Commercial development in Maitland pays $4.38 per square foot in impact fees, plus $6,900.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $225,950.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Maitland charge its own impact fees?

Yes. Maitland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Maitland, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000