Winter Garden Impact Fees by Project Type
Winter Garden: Single-Family Impact Fees
A new single-family home in Winter Garden pays $25,031.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Orange County-levied fees account for $9,513.00 and municipal or utility fees for $15,518.00.
The largest line items are School Impact Fee (Orange County, collected by Winter Garden, SFR) ($9,513.00), Wastewater Impact Fee (City of Winter Garden) ($5,843.00) and Road Impact Fee (City of Winter Garden, SFR) ($3,517.00).
View the Full Winter Garden Impact Fee Schedule
- Irrigation Meter Impact Fee (City of Winter Garden, SFR)$2,685.00City of Winter GardenWinter Garden charges an irrigation impact fee of $2,685 per 3/4-inch irrigation connection. It applies to homes on dual-metered service, which is the configuration the city uses in its own single-family fee example, and is additional to the $1,343 potable water impact fee. A single-metered home instead pays $1,880 for water and no irrigation fee.
- Water Impact Fee (City of Winter Garden)$1,343.00City of Winter GardenWinter Garden's potable water impact fee for a standard single-family connection is $1,343, adopted in December 2025 as part of a citywide update of utility impact fees. A separate irrigation-meter impact fee of $2,685 applies if an irrigation connection is installed.
- Wastewater Impact Fee (City of Winter Garden)$5,843.00City of Winter GardenWinter Garden's wastewater (sewer) impact fee for a standard single-family connection is $5,843, adopted in December 2025 to fund expansion of the city's wastewater treatment and water reclamation facilities.
- Road Impact Fee (City of Winter Garden, SFR)$3,517.00City of Winter GardenThe City of Winter Garden levies a Road Impact Fee of $3,517 per single-family dwelling (Ord. 10-01). Because Winter Garden imposes its own road fee, the Orange County transportation impact fee does not apply.
- Parks & Recreation Impact Fee (City of Winter Garden, SFR)$1,300.00City of Winter GardenThe City of Winter Garden levies a Parks & Recreation Impact Fee of $1,300 per single-family dwelling (Ord. 98-87, updated by Ord. 15-11). Because Winter Garden imposes its own parks fee, the Orange County parks impact fee does not apply.
- Fire Impact Fee (City of Winter Garden, SFR)$491.00City of Winter GardenThe City of Winter Garden levies a Fire Impact Fee of $491 per dwelling unit for all residential types (Ord. 98-86, updated by Ord. 15-11). Because Winter Garden imposes its own fire fee, the Orange County fire impact fee does not apply.
- Police Impact Fee (City of Winter Garden, SFR)$339.00City of Winter GardenThe City of Winter Garden levies a Police Impact Fee of $339 per dwelling unit for all residential types (Ord. 98-85, updated by Ord. 15-11). Because Winter Garden imposes its own police fee, the Orange County law enforcement impact fee does not apply.
- School Impact Fee (Orange County, collected by Winter Garden, SFR)$9,513.00Orange County Public SchoolsOrange County School Impact Fee: $9,513 for the representative 2,000-2,499 sf single-family home, assessed at building permit (Ord. 2016-08, eff. 10/1/2022). The fee applies countywide, including within municipalities, and other size brackets differ.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winter Garden: Multifamily Impact Fees
A new multifamily unit in Winter Garden pays at least $11,210.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Orange County-levied fees account for $6,751.00 and municipal or utility fees for $4,459.00.
The largest line items are School Impact Fee (Orange County, collected by Winter Garden, MF, Non-High Rise) ($6,751.00), Road Impact Fee (City of Winter Garden, MF) ($2,470.00) and Parks & Recreation Impact Fee (City of Winter Garden, MF) ($1,159.00).
Wastewater Impact Fee (City of Winter Garden, MF) and Water Impact Fee (City of Winter Garden, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Winter Garden Impact Fee Schedule
- Water Impact Fee (City of Winter Garden, MF)Requires confirmationCity of Winter GardenCity of Winter Garden potable water impact fee: $1,343 per standard 3/4-inch meter connection under Ord. 25-36 (adopted 12/11/2025). Multi-family is assessed by meter size/ERU rather than per dwelling unit, so no per-unit figure is stated.
- Wastewater Impact Fee (City of Winter Garden, MF)Requires confirmationCity of Winter GardenCity of Winter Garden wastewater impact fee: $5,843 per standard 3/4-inch meter connection under Ord. 25-36 (adopted 12/11/2025). Multi-family is assessed by meter size/ERU rather than per dwelling unit, so no per-unit figure is stated.
- Road Impact Fee (City of Winter Garden, MF)$2,470.00City of Winter GardenCity of Winter Garden Road impact fee: $2,470 per multi-family unit (single-family $3,517), Ord. 10-01. Winter Garden assesses its own road fee, so no Orange County transportation fee applies.
- Parks & Recreation Impact Fee (City of Winter Garden, MF)$1,159.00City of Winter GardenCity of Winter Garden Parks & Recreation impact fee: $1,159 per multi-family unit, Ord. 15-11. Winter Garden assesses its own parks fee, so no Orange County parks fee applies.
- Fire Impact Fee (City of Winter Garden, MF)$491.00City of Winter GardenCity of Winter Garden Fire impact fee: $491 per multi-family unit (flat), Ord. 15-11. Winter Garden assesses its own fire fee, so no Orange County fire impact fee applies.
- Police Impact Fee (City of Winter Garden, MF)$339.00City of Winter GardenCity of Winter Garden Police impact fee: $339 per multi-family unit (flat), Ord. 15-11. Winter Garden assesses its own police fee, so no Orange County law enforcement fee applies.
- School Impact Fee (Orange County, collected by Winter Garden, MF, Non-High Rise)$6,751.00Orange County Public SchoolsOrange County School impact fee: $6,751 per non-high-rise multi-family unit, effective 10/1/2022 (high-rise buildings over 10 floors are $307/unit). Applies countywide including municipalities; assessed at building permit.
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winter Garden: Commercial Impact Fees
Commercial development in Winter Garden pays $14.22 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $730,105.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Commercial) ($12.72/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Winter Garden Impact Fee Schedule
- Water Impact Fee (City of Winter Garden) — 1" meter$4,699.00 one-timeCity of Winter GardenEffective 4/1/2026. Fee is set by meter size; the amount shown is for the 1" meter.
- Wastewater Impact Fee (City of Winter Garden) — 1" meter$14,606.00 one-timeCity of Winter GardenEffective 4/1/2026. Fee is set by meter size; the amount shown is for the 1" meter.
- Road Impact Fee (City of Winter Garden, Commercial)$12.72/sq ftCity of Winter Garden
- Fire Impact Fee (City of Winter Garden, Commercial)$0.85/sq ftCity of Winter GardenAssessed per 1,000 sq ft of gross floor area (GFA).
- Police Impact Fee (City of Winter Garden, Commercial)$0.65/sq ftCity of Winter GardenAssessed per 1,000 sq ft of gross floor area (GFA).
- County Impact Fees (Orange County, Commercial)$0.00Orange County
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winter Garden: Industrial Impact Fees
Industrial development in Winter Garden pays $2.90 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $164,505.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Industrial) ($1.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Winter Garden Impact Fee Schedule
- Water Impact Fee (City of Winter Garden) — 1" meter$4,699.00 one-timeCity of Winter GardenEffective 4/1/2026. Fee is set by meter size; the amount shown is for the 1" meter.
- Wastewater Impact Fee (City of Winter Garden) — 1" meter$14,606.00 one-timeCity of Winter GardenEffective 4/1/2026. Fee is set by meter size; the amount shown is for the 1" meter.
- Road Impact Fee (City of Winter Garden, Industrial)$1.40/sq ftCity of Winter Garden
- Fire Impact Fee (City of Winter Garden, Industrial)$0.85/sq ftCity of Winter GardenAssessed per 1,000 sq ft of gross floor area (GFA).
- Police Impact Fee (City of Winter Garden, Industrial)$0.65/sq ftCity of Winter GardenAssessed per 1,000 sq ft of gross floor area (GFA).
- County Impact Fees (Orange County, Industrial)$0.00Orange County
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winter Garden: Office Impact Fees
Office development in Winter Garden pays $7.25 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 25,000 sq ft building, that comes to about $200,505.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Office) ($5.75/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Winter Garden Impact Fee Schedule
- Water Impact Fee (City of Winter Garden) — 1" meter$4,699.00 one-timeCity of Winter GardenEffective 4/1/2026. Fee is set by meter size; the amount shown is for the 1" meter.
- Wastewater Impact Fee (City of Winter Garden) — 1" meter$14,606.00 one-timeCity of Winter GardenEffective 4/1/2026. Fee is set by meter size; the amount shown is for the 1" meter.
- Road Impact Fee (City of Winter Garden, Office)$5.75/sq ftCity of Winter Garden
- Fire Impact Fee (City of Winter Garden, Office)$0.85/sq ftCity of Winter GardenAssessed per 1,000 sq ft of gross floor area (GFA).
- Police Impact Fee (City of Winter Garden, Office)$0.65/sq ftCity of Winter GardenAssessed per 1,000 sq ft of gross floor area (GFA).
- County Impact Fees (Orange County, Office)$0.00Orange County
Where in Orange County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Winter Garden Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
Pending and Recent Changes
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Winter Garden Impact Fee FAQs
What are the total impact fees for a single-family home in Winter Garden, Florida?
A new single-family home in Winter Garden pays $25,031.00 per unit in combined impact fees (rates sourced August 5, 2026).
How much are commercial impact fees in Winter Garden?
Commercial development in Winter Garden pays $14.22 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $730,105.00 for a 50,000 sq ft building.
Does Winter Garden charge its own impact fees?
Yes. Winter Garden levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Winter Garden, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Orange County impact fees page.