Winter Garden, Florida Impact Fees

Winter Garden applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays $25,031.00 per unit (rates sourced ). The full breakdown is below.

Winter Garden Impact Fees by Project Type

Winter Garden: Single-Family Impact Fees

A new single-family home in Winter Garden pays $25,031.00 per unit in impact fees (rates sourced September 25, 2026). Of that, Orange County-levied fees account for $9,513.00 and municipal or utility fees for $15,518.00.

The largest line items are School Impact Fee (Orange County, collected by Winter Garden, SFR) ($9,513.00), Wastewater Impact Fee (City of Winter Garden) ($5,843.00) and Road Impact Fee (City of Winter Garden, SFR) ($3,517.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Winter Garden Impact Fee Schedule
Water$4,028.00
  • Irrigation Meter Impact Fee (City of Winter Garden, SFR)
    3/4" irrigation meter
    City of Winter Garden
    Winter Garden charges an irrigation impact fee of $2,685 per 3/4-inch irrigation connection. It applies to homes on dual-metered service, which is the configuration the city uses in its own single-family fee example, and is additional to the $1,343 potable water impact fee. A single-metered home instead pays $1,880 for water and no irrigation fee.
    $2,685.00
  • Water Impact Fee (City of Winter Garden)
    3/4" meter, dual-metered
    City of Winter Garden
    Winter Garden potable water impact fee for a single-family home on dual-metered service (separate irrigation meter): $1,343 per 3/4-inch meter (Ord. 25-36, brochure dated 4/1/2026). A separate $2,685 irrigation impact fee applies to the irrigation meter; a single-metered home pays $1,880 instead and no irrigation fee.
    $1,343.00
Sewer$5,843.00
  • Wastewater Impact Fee (City of Winter Garden)
    3/4" meter
    City of Winter Garden
    Winter Garden's wastewater (sewer) impact fee for a standard single-family connection is $5,843, adopted in December 2025 to fund expansion of the city's wastewater treatment and water reclamation facilities.
    $5,843.00
City$5,647.00
  • Road Impact Fee (City of Winter Garden, SFR)
    City of Winter Garden
    The City of Winter Garden levies a Road Impact Fee of $3,517 per single-family dwelling (Ord. 10-01). Because Winter Garden imposes its own road fee, the Orange County transportation impact fee does not apply.
    $3,517.00
  • Parks & Recreation Impact Fee (City of Winter Garden, SFR)
    City of Winter Garden
    The City of Winter Garden levies a Parks & Recreation Impact Fee of $1,300 per single-family dwelling (Ord. 98-87, updated by Ord. 15-11). Because Winter Garden imposes its own parks fee, the Orange County parks impact fee does not apply.
    $1,300.00
  • Fire Impact Fee (City of Winter Garden, SFR)
    City of Winter Garden
    The City of Winter Garden levies a Fire Impact Fee of $491 per dwelling unit for all residential types (Ord. 98-86, updated by Ord. 15-11). Because Winter Garden imposes its own fire fee, the Orange County fire impact fee does not apply.
    $491.00
  • Police Impact Fee (City of Winter Garden, SFR)
    City of Winter Garden
    The City of Winter Garden levies a Police Impact Fee of $339 per dwelling unit for all residential types (Ord. 98-85, updated by Ord. 15-11). Because Winter Garden imposes its own police fee, the Orange County law enforcement impact fee does not apply.
    $339.00
County$9,513.00
  • School Impact Fee (Orange County, collected by Winter Garden, SFR)
    SF Detached 2,000–2,499 sq ft
    Orange County Public Schools
    Orange County Public Schools impact fee for a single-family detached home of 2,000–2,499 sq ft of heated/cooled living area (the canonical 2,000 sq ft house): $9,513, current rate effective 10/1/2022. Other home sizes pay a different tier (see other tiers). Applies countywide, including within the City of Winter Garden; assessed at building permit.
    $9,513.00
Total (Winter Garden): $25,031.00
Sources last checked Official fee schedules:City of Winter Garden Orange County Public Schools

Winter Garden: Multifamily Impact Fees

A new multifamily unit in Winter Garden pays $18,396.00 per unit in impact fees (rates sourced September 25, 2026). Of that, Orange County-levied fees account for $6,751.00 and municipal or utility fees for $11,645.00.

The largest line items are School Impact Fee (Orange County, collected by Winter Garden, MF, Non-High Rise) ($6,751.00), Wastewater Impact Fee (City of Winter Garden, MF) ($5,843.00) and Road Impact Fee (City of Winter Garden, MF) ($2,470.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Winter Garden Impact Fee Schedule
Water$1,343.00
  • Water Impact Fee (City of Winter Garden, MF)
    3/4" meter (dual-metered)
    City of Winter Garden
    City of Winter Garden water impact fee per 3/4" meter on dual-metered service: $1,343 (Ord. 25-36, brochure dated 4/1/2026). Multifamily is charged per meter; this smallest-meter tier applies where each unit has its own meter, and a building on a larger master meter pays the larger-meter tier.
    $1,343.00
Sewer$5,843.00
  • Wastewater Impact Fee (City of Winter Garden, MF)
    3/4" meter
    City of Winter Garden
    City of Winter Garden wastewater impact fee per 3/4" meter: $5,843 (Ord. 25-36, brochure dated 4/1/2026). Multifamily is charged per meter; this smallest-meter tier applies where each unit has its own meter, and a building on a larger master meter pays the larger-meter tier.
    $5,843.00
City$4,459.00
  • Road Impact Fee (City of Winter Garden, MF)
    City of Winter Garden
    City of Winter Garden Road impact fee: $2,470 per multi-family unit (single-family $3,517), Ord. 10-01. Winter Garden assesses its own road fee, so no Orange County transportation fee applies.
    $2,470.00
  • Parks & Recreation Impact Fee (City of Winter Garden, MF)
    City of Winter Garden
    City of Winter Garden Parks & Recreation impact fee: $1,159 per multi-family unit, Ord. 15-11. Winter Garden assesses its own parks fee, so no Orange County parks fee applies.
    $1,159.00
  • Fire Impact Fee (City of Winter Garden, MF)
    City of Winter Garden
    City of Winter Garden Fire impact fee: $491 per multi-family unit (flat), Ord. 15-11. Winter Garden assesses its own fire fee, so no Orange County fire impact fee applies.
    $491.00
  • Police Impact Fee (City of Winter Garden, MF)
    City of Winter Garden
    City of Winter Garden Police impact fee: $339 per multi-family unit (flat), Ord. 15-11. Winter Garden assesses its own police fee, so no Orange County law enforcement fee applies.
    $339.00
County$6,751.00
Total (Winter Garden): $18,396.00
Sources last checked Official fee schedules:City of Winter Garden Orange County Public Schools

Winter Garden: Commercial Impact Fees

Commercial development in Winter Garden pays $14.22 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced September 25, 2026).

For a 50,000 sq ft building, that comes to about $730,105.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Commercial) ($12.72/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Winter Garden Impact Fee Schedule
Water$4,699.00 one-time
Sewer$14,606.00 one-time
City$14.22/sq ft
Total (Winter Garden): $14.22/sq ft + $19,305.00 one-time (≈ $730,105.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Winter Garden Orange County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winter Garden: Industrial Impact Fees

Industrial development in Winter Garden pays $2.90 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced September 25, 2026).

For a 50,000 sq ft building, that comes to about $164,505.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Industrial) ($1.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Winter Garden Impact Fee Schedule
Water$4,699.00 one-time
Sewer$14,606.00 one-time
City$2.90/sq ft
Total (Winter Garden): $2.90/sq ft + $19,305.00 one-time (≈ $164,505.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Winter Garden Orange County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winter Garden: Office Impact Fees

Office development in Winter Garden pays $7.25 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced September 25, 2026).

For a 25,000 sq ft building, that comes to about $200,505.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Office) ($5.75/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Winter Garden Impact Fee Schedule
Water$4,699.00 one-time
Sewer$14,606.00 one-time
City$7.25/sq ft
County$0.00
Total (Winter Garden): $7.25/sq ft + $19,305.00 one-time (≈ $200,505.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Winter Garden Orange County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winter Garden Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

Pending and Recent Changes

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Winter Garden Impact Fee FAQs

What are the total impact fees for a single-family home in Winter Garden, Florida?

A new single-family home in Winter Garden pays $25,031.00 per unit in combined impact fees (rates sourced September 25, 2026).

How much are commercial impact fees in Winter Garden?

Commercial development in Winter Garden pays $14.22 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $730,105.00 for a 50,000 sq ft building.

Does Winter Garden charge its own impact fees?

Yes. Winter Garden levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Winter Garden, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.