Winter Garden, Florida Impact Fees

Winter Garden applies its own fee schedule: municipal fees plus the Orange County-levied fees that apply inside city limits. Combined, a new single-family home pays $25,031.00 per unit (rates sourced ). The full breakdown is below.

Winter Garden impact fees by project type

Winter Garden: Single-Family Impact Fees

A new single-family home in Winter Garden pays $25,031.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Orange County-levied fees account for $9,513.00 and municipal or utility fees for $15,518.00.

The largest line items are School Impact Fee (Orange County, collected by Winter Garden, SFR) ($9,513.00), Wastewater Impact Fee (City of Winter Garden) ($5,843.00) and Road Impact Fee (City of Winter Garden, SFR) ($3,517.00).

View the full Winter Garden impact fee schedule
Water$4,028.00
  • Irrigation Meter Impact Fee (City of Winter Garden, SFR)
    City of Winter Garden
    Winter Garden charges an irrigation impact fee of $2,685 per 3/4-inch irrigation connection. It applies to homes on dual-metered service, which is the configuration the city uses in its own single-family fee example, and is additional to the $1,343 potable water impact fee. A single-metered home instead pays $1,880 for water and no irrigation fee.
    $2,685.00
  • Water Impact Fee (City of Winter Garden)
    City of Winter Garden
    Winter Garden's potable water impact fee for a standard single-family connection is $1,343, adopted in December 2025 as part of a citywide update of utility impact fees. A separate irrigation-meter impact fee of $2,685 applies if an irrigation connection is installed.
    $1,343.00
Sewer$5,843.00
  • Wastewater Impact Fee (City of Winter Garden)
    City of Winter Garden
    Winter Garden's wastewater (sewer) impact fee for a standard single-family connection is $5,843, adopted in December 2025 to fund expansion of the city's wastewater treatment and water reclamation facilities.
    $5,843.00
City$5,647.00
County$9,513.00
Total (Winter Garden): $25,031.00
Sources last checked Official fee schedules:City of Winter Garden Orange County Public Schools

Winter Garden: Multifamily Impact Fees

A new multifamily unit in Winter Garden pays at least $11,210.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Orange County-levied fees account for $6,751.00 and municipal or utility fees for $4,459.00.

The largest line items are School Impact Fee (Orange County, collected by Winter Garden, MF, Non-High Rise) ($6,751.00), Road Impact Fee (City of Winter Garden, MF) ($2,470.00) and Parks & Recreation Impact Fee (City of Winter Garden, MF) ($1,159.00).

Wastewater Impact Fee (City of Winter Garden, MF) and Water Impact Fee (City of Winter Garden, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Winter Garden impact fee schedule
Water$0.00
Sewer$0.00
City$4,459.00
Total (Winter Garden): $11,210.00
Sources last checked Official fee schedules:City of Winter Garden Orange County Public Schools
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Winter Garden: Commercial Impact Fees

Commercial development in Winter Garden pays $14.22 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $730,105.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Commercial) ($12.72/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Winter Garden impact fee schedule
Water$4,699.00 one-time
Sewer$14,606.00 one-time
City$14.22/sq ft
Total (Winter Garden): $14.22/sq ft + $19,305.00 one-time (≈ $730,105.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Winter Garden Orange County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winter Garden: Industrial Impact Fees

Industrial development in Winter Garden pays $2.90 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $164,505.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Industrial) ($1.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Winter Garden impact fee schedule
Water$4,699.00 one-time
Sewer$14,606.00 one-time
City$2.90/sq ft
Total (Winter Garden): $2.90/sq ft + $19,305.00 one-time (≈ $164,505.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Winter Garden Orange County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winter Garden: Office Impact Fees

Office development in Winter Garden pays $7.25 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 25,000 sq ft building, that comes to about $200,505.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Winter Garden) — 1" meter ($14,606.00 one-time), Water Impact Fee (City of Winter Garden) — 1" meter ($4,699.00 one-time) and Road Impact Fee (City of Winter Garden, Office) ($5.75/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full Winter Garden impact fee schedule
Water$4,699.00 one-time
Sewer$14,606.00 one-time
City$7.25/sq ft
County$0.00
Total (Winter Garden): $7.25/sq ft + $19,305.00 one-time (≈ $200,505.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Winter Garden Orange County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Orange County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Winter Garden impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Winter Garden impact fee FAQs

What are the total impact fees for a single-family home in Winter Garden, Florida?

A new single-family home in Winter Garden pays $25,031.00 per unit in combined impact fees (rates sourced August 5, 2026).

How much are commercial impact fees in Winter Garden?

Commercial development in Winter Garden pays $14.22 per square foot in impact fees, plus $19,305.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $730,105.00 for a 50,000 sq ft building.

Does Winter Garden charge its own impact fees?

Yes. Winter Garden levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Winter Garden, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Orange County impact fees page.