IMPACTFEES.ORG

Davenport, Florida Impact Fees

Davenport applies its own fee schedule: municipal fees plus the Polk County-levied fees that apply inside city limits. Combined, a new single-family home pays $29,333.00 per unit (rates sourced August 6, 2026). The full breakdown is below.

Davenport impact fees by project type

Davenport: Single-Family Impact Fees

A new single-family home in Davenport pays $29,333.00 per unit in impact fees (rates sourced August 6, 2026). Of that, Polk County-levied fees account for $15,503.00 and municipal or utility fees for $13,830.00.

The largest line items are Educational Impact Fee (SFR - Polk County, collected in Davenport) ($11,124.00), Water Capital Connection Impact Fee (City of Davenport) ($6,300.00) and Sewer Capital Connection Impact Fee (City of Davenport) ($5,360.00).

View the full fee schedule
Water$6,300.00
  • Water Capital Connection Impact Fee (City of Davenport)
    City of Davenport
    8/4/2026 — Verified from city Building Dept impact fee schedule eff. 1/1/2025: Water Capital Connection Impact Fee (3/4") $6,300.00 per new single-family residence. Amount = the capacity/impact component only. Separate tap/meter components on same schedule: 3/4-inch water meter fee $425 and water & sewer deposit $200 (water-only $150).
    $6,300.00
Sewer$5,360.00
  • Sewer Capital Connection Impact Fee (City of Davenport)
    City of Davenport
    8/4/2026 — Verified from city Building Dept impact fee schedule eff. 1/1/2025: Sewer Capital Connection Impact Fee $5,360.00 per new single-family residence. Amount = the capacity/impact component. Separate related charges: water & sewer deposit $200 and 3/4-inch water meter fee $425 (listed under the water record).
    $5,360.00
City$2,170.00
  • Cultural, Parks & Recreation Impact Fee (City of Davenport)
    City of Davenport
    8/6/2026: Split the former combined 'Municipal Impact Fees' bundle ($2,170 SFR) into its five separate statutory components, each now its own City record — matching how Davenport's peer cities (e.g. Bartow) are modeled and the guide rule that distinct fees paid simultaneously are separate records. THIS record = Cultural/Parks/Recreation, $817/DU, Davenport Code sec. 13.5-23(c)(1), verified live on Municode via Chrome 8/6/2026 (code current through Ord. 1447, 4-20-2026). Companions: Fire $358 (c)(2), Law Enforcement $230 (c)(3), Public Buildings $303 (c)(4), Transportation $462 at 25% net (c)(5); the five sum to $2,170.
    $817.00
  • Transportation Impact Fee (City of Davenport)
    City transportation component, $462/DU (at 25% net), Davenport Code sec. 13.5-23(c)(5). Created 8/6/2026 by splitting the former $2,170 municipal bundle into separate components; verified live on Municode via Chrome 8/6/2026 (code current through Ord. 1447, 4-20-2026). Distinct from the Polk COUNTY transportation fee (county ch. 8.7) — both are charged.
    $462.00
  • Fire Protection Impact Fee (City of Davenport)
    Fire protection component, $358/DU, Davenport Code sec. 13.5-23(c)(2). Created 8/6/2026 by splitting the former $2,170 municipal bundle into its five separate statutory components; verified live on Municode via Chrome 8/6/2026 (code current through Ord. 1447, 4-20-2026).
    $358.00
  • Public Buildings Impact Fee (City of Davenport)
    Public buildings component, $303/DU, Davenport Code sec. 13.5-23(c)(4). Created 8/6/2026 by splitting the former $2,170 municipal bundle; verified live on Municode via Chrome 8/6/2026 (code current through Ord. 1447, 4-20-2026).
    $303.00
  • Law Enforcement Impact Fee (City of Davenport)
    Law enforcement component, $230/DU, Davenport Code sec. 13.5-23(c)(3). Created 8/6/2026 by splitting the former $2,170 municipal bundle; verified live on Municode via Chrome 8/6/2026 (code current through Ord. 1447, 4-20-2026).
    $230.00
County$15,503.00
  • Educational Impact Fee (SFR - Polk County, collected in Davenport)
    Polk County
    Polk County school impact fee, SFR, collected in Davenport (Ord. 2024-62). Current phased-collected $11,124; 100%-study $14,338. VERIFY 863-534-6080.
    $11,124.00
  • Transportation Impact Fee (Polk County, District A)
    Polk County
    AMOUNT RE-CONFIRMED 2026-08-05. Polk County Ord. 2024-062, Attachment 2 (Municode ch. 8.7, current through Ord. 2026-047, 6-16-2026): District A Phase Two, eff. 1/1/2026-12/31/2026, SFR $3,710 / MF $2,508. Davenport is District A. Phase Three eff. 1/1/2027. This is the county road fee; Davenport ALSO levies its own separate CITY transportation impact fee ($462 SFR / $318 MF at 25% net, Code sec. 13.5-23(c)(5)) — as of 8/6/2026 that city fee is its own standalone City record (part of the five-way split of the former municipal bundle), so both the county and city transportation fees are charged and each has its own row. NOTE FOR ANYONE COMPARING THE CITY'S OWN FEE SHEET: Davenport's sheet prints $3,190, the REPEALED Ord. 2023-1959 Zone A figure; this county row is correct. WATCH: Phase Three eff. 1/1/2027.
    $3,710.00
  • Correctional Facilities Impact Fee (SFR - Polk County, collected in Davenport)
    Polk County
    Polk County Correctional impact fee, SFR, collected in Davenport (Ord. 2024-62). Phased $516; 100%-study $662. VERIFY 863-534-6080.
    $516.00
  • EMS Impact Fee (SFR - Polk County, collected in Davenport)
    Polk County
    Polk County EMS impact fee, SFR, collected in Davenport (Ord. 2024-62). $153 = 100%-study (not phased).
    $153.00
  • Law Enforcement Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Law Enforcement article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Fire Rescue Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Fire Rescue article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Parks article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Library Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Library article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
Total (Davenport): $29,333.00
Sources last checked August 6, 2026Official fee schedules:City of Davenport Polk County

Davenport: Multifamily Impact Fees

A new multifamily unit in Davenport pays at least $13,088.00 per unit in impact fees (rates sourced August 6, 2026). Of that, Polk County-levied fees account for $11,062.00 and municipal or utility fees for $2,026.00.

The largest line items are Educational Impact Fee (MF - Polk County, collected in Davenport) ($8,055.00), Transportation Impact Fee (Polk County, District A, MF) ($2,508.00) and Cultural, Parks & Recreation Impact Fee (City of Davenport, MF) ($817.00).

Sewer Connection Fee (City of Davenport, MF) and Water Connection Fee (City of Davenport, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (City of Davenport, MF)
    City of Davenport
    THE $0 IS WRONG BUT NO FIGURE IS DEFENSIBLE — HELD, 2026-08-05. Davenport sec. 18-31(a) levies the water capital connection fee on ALL development requesting capacity, with no multifamily exemption, so publishing $0 asserts an absence that the code contradicts. But no per-unit amount can be published: Davenport's capital connection fees (sec. 18-31, Ord. 1317 of 10-21-2024, on the Raftelis 4/8/2024 study) are indexed SOLELY BY WATER METER SIZE. There is no land-use column and no dwelling-unit rate anywhere in Chapter 18. The per-unit outcome swings from $6,300 for an individually metered 3/4-inch connection (sec. 18-6(a), the SFR figure at recNPS3k6ls2CFkAV) down to a few hundred dollars per unit under a master meter, and closing that gap needs a multifamily ERU factor THE UTILITY DOES NOT PUBLISH. The standing rule forbids deriving one, so the row is held rather than filled. ALSO FLAGGED FOR A FUTURE PASS: sec. 18-1(a) sets a SEPARATE additional charge ($425 assembly + $2,180 installation for 3/4-inch) that is not carried anywhere in the base — a possible understatement on the SFR side too. Round-3 2026-08-05; docs/verify-r3-davenport.json.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Davenport, MF)
    City of Davenport
    THE $0 IS WRONG BUT NO FIGURE IS DEFENSIBLE — HELD, 2026-08-05. Same finding as the water row recciB58ntQvweLYQ: sec. 18-31(a) levies the capital connection fee on all development requesting capacity with no multifamily exemption, so $0 asserts an absence the code contradicts; but the fee is indexed solely by water meter size (Ord. 1317 of 10-21-2024, Raftelis 4/8/2024 study) with no land-use column and no dwelling-unit rate in Chapter 18. Per-unit outcome ranges from the $5,360 individually metered 3/4-inch figure (rec9srsF4XvkkrG8E) down to a few hundred dollars under a master meter, and no published multifamily ERU factor exists to resolve it. Held rather than derived. Round-3 2026-08-05; docs/verify-r3-davenport.json.
    Requires confirmation
City$2,026.00
  • Cultural, Parks & Recreation Impact Fee (City of Davenport, MF)
    City of Davenport
    8/6/2026: Split the former combined 'Municipal Impact Fees' MF bundle ($2,026/unit) into its five separate statutory components, each now its own City record. THIS record = Cultural/Parks/Recreation, $817/unit, Davenport Code sec. 13.5-23(c)(1), verified live on Municode via Chrome 8/6/2026 (code current through Ord. 1447, 4-20-2026). Companions: Fire $358 (c)(2), Law Enforcement $230 (c)(3), Public Buildings $303 (c)(4), Transportation $318 at 25% net (c)(5); the five sum to $2,026. Four components (parks/fire/law/public bldg) are identical SF and MF per the code; only transportation differs ($318 MF vs $462 SFR).
    $817.00
  • Fire Protection Impact Fee (City of Davenport, MF)
    Fire protection component, $358/unit, Davenport Code sec. 13.5-23(c)(2) (same as SFR per the code). Created 8/6/2026 by splitting the former $2,026 MF municipal bundle; verified live on Municode via Chrome 8/6/2026 (Ord. 1447, 4-20-2026).
    $358.00
  • Transportation Impact Fee (City of Davenport, MF)
    City transportation component, $318/unit (at 25% net), Davenport Code sec. 13.5-23(c)(5); differs from the $462 SFR figure per the code. Created 8/6/2026 by splitting the former $2,026 MF bundle; verified live on Municode via Chrome 8/6/2026 (Ord. 1447, 4-20-2026). Distinct from the Polk COUNTY transportation fee (county ch. 8.7) — both are charged.
    $318.00
  • Public Buildings Impact Fee (City of Davenport, MF)
    Public buildings component, $303/unit, Davenport Code sec. 13.5-23(c)(4) (same as SFR per the code). Created 8/6/2026 by splitting the former $2,026 MF bundle; verified live on Municode via Chrome 8/6/2026 (Ord. 1447, 4-20-2026).
    $303.00
  • Law Enforcement Impact Fee (City of Davenport, MF)
    Law enforcement component, $230/unit, Davenport Code sec. 13.5-23(c)(3) (same as SFR per the code). Created 8/6/2026 by splitting the former $2,026 MF bundle; verified live on Municode via Chrome 8/6/2026 (Ord. 1447, 4-20-2026).
    $230.00
County$11,062.00
  • Educational Impact Fee (MF - Polk County, collected in Davenport)
    Polk County
    Polk County school impact fee, MF, collected in Davenport (Ord. 2024-62). Phased $8,055; 100%-study $10,670. VERIFY 863-534-6080.
    $8,055.00
  • Transportation Impact Fee (Polk County, District A, MF)
    Polk County
    Polk County transportation impact fee, District A, MF: $2,508/unit, Phase Two eff. 1/1/2026-12/31/2026 (Ord. 2024-062 Att. 2, Municode ch. 8.7 through Ord. 2026-047). Davenport is District A; Phase Three eff. 1/1/2027. This is the COUNTY fee; Davenport also levies its own separate CITY transportation impact fee ($318/unit at 25% net, Code sec. 13.5-23(c)(5)), which as of 8/6/2026 is its own standalone City record (from the five-way split of the former municipal bundle). Both are charged; each has its own row.
    $2,508.00
  • Correctional Facilities Impact Fee (MF - Polk County, collected in Davenport)
    Polk County
    Polk County Correctional impact fee, MF, collected in Davenport (Ord. 2024-62). Phased $385; 100%-study $495. VERIFY 863-534-6080.
    $385.00
  • EMS Impact Fee (MF - Polk County, collected in Davenport)
    Polk County
    Polk County EMS impact fee, MF, collected in Davenport (Ord. 2024-62). $114 = 100%-study (not phased).
    $114.00
  • Library Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Library article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Law Enforcement Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Law Enforcement article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Fire Rescue Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Fire Rescue article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Davenport). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Davenport's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Parks article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Corroboration: Davenport's official city+county fee sheet lists county Transportation/Correctional/EMS/School fees only, plus the city's own Fire, Law Enforcement and Recreation impact fees (mydavenport.org). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
Total (Davenport): $13,088.00
Sources last checked August 6, 2026Official fee schedules:City of Davenport Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davenport: Commercial Impact Fees

Commercial development in Davenport pays $6.47 per square foot in impact fees (rates sourced August 6, 2026).

For a 50,000 sq ft building, that comes to at least $323,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Commercial) ($5.56/sq ft), Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft) and EMS Impact Fee (Polk County, Commercial) ($0.18/sq ft).

Water Connection (Capacity) Fee (City of Davenport) and Wastewater (Sewer) Connection (Capacity) Fee (City of Davenport) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Commercial) and Fire Rescue Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Municipal Impact Fees (City of Davenport, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Davenport)
    City of Davenport
    City of Davenport operates its own water utility (Municode Ch. 18 Water & Wastewater). Nonres connection/capacity fee amount not text-published online (set by resolution/fee schedule). $0 placeholder Unconfirmed — VERIFY Davenport Utilities (863) 419-3300.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (City of Davenport)
    City of Davenport
    City of Davenport operates its own wastewater utility (new 1.5 MGD WWTP opened May 2024). Nonres connection/capacity fee amount not text-published online. $0 placeholder Unconfirmed — VERIFY Davenport Utilities (863) 419-3300.
    Requires confirmation
City$0.00
  • Municipal Impact Fees (City of Davenport, Commercial)
    City of Davenport
    Davenport publishes a 'City and County Impact Fees' schedule (older public copy dated 2020) — the city levies its OWN municipal impact fees on top of the county overlays, but the current nonresidential amounts are not text-published online. $0 placeholder Unconfirmed — obtain current nonres schedule from Davenport City Hall (863) 419-3300.
    Requires confirmation
County$6.47/sq ft
Total (Davenport): $6.47/sq ft (≈ $323,300.00 at 50,000 sq ft)
Sources last checked August 6, 2026Official fee schedules:City of Davenport Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davenport: Industrial Impact Fees

Industrial development in Davenport pays $0.86 per square foot in impact fees (rates sourced August 6, 2026).

For a 50,000 sq ft building, that comes to at least $43,100.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Industrial) ($0.61/sq ft), Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft) and EMS Impact Fee (Polk County, Industrial) ($0.05/sq ft).

Water Connection (Capacity) Fee (City of Davenport) and Wastewater (Sewer) Connection (Capacity) Fee (City of Davenport) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Industrial) and Law Enforcement Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Municipal Impact Fees (City of Davenport, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Davenport)
    City of Davenport
    City of Davenport operates its own water utility (Municode Ch. 18 Water & Wastewater). Nonres connection/capacity fee amount not text-published online (set by resolution/fee schedule). $0 placeholder Unconfirmed — VERIFY Davenport Utilities (863) 419-3300.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (City of Davenport)
    City of Davenport
    City of Davenport operates its own wastewater utility (new 1.5 MGD WWTP opened May 2024). Nonres connection/capacity fee amount not text-published online. $0 placeholder Unconfirmed — VERIFY Davenport Utilities (863) 419-3300.
    Requires confirmation
City$0.00
County$0.86/sq ft
Total (Davenport): $0.86/sq ft (≈ $43,100.00 at 50,000 sq ft)
Sources last checked August 6, 2026Official fee schedules:City of Davenport Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Davenport: Office Impact Fees

Office development in Davenport pays $4.13 per square foot in impact fees (rates sourced August 6, 2026).

For a 25,000 sq ft building, that comes to at least $103,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Office) ($3.68/sq ft), Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft) and EMS Impact Fee (Polk County, Office) ($0.09/sq ft).

Water Connection (Capacity) Fee (City of Davenport) and Wastewater (Sewer) Connection (Capacity) Fee (City of Davenport) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Office) and Fire Rescue Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Municipal Impact Fees (City of Davenport, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Davenport)
    City of Davenport
    City of Davenport operates its own water utility (Municode Ch. 18 Water & Wastewater). Nonres connection/capacity fee amount not text-published online (set by resolution/fee schedule). $0 placeholder Unconfirmed — VERIFY Davenport Utilities (863) 419-3300.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (City of Davenport)
    City of Davenport
    City of Davenport operates its own wastewater utility (new 1.5 MGD WWTP opened May 2024). Nonres connection/capacity fee amount not text-published online. $0 placeholder Unconfirmed — VERIFY Davenport Utilities (863) 419-3300.
    Requires confirmation
City$0.00
County$4.13/sq ft
Total (Davenport): $4.13/sq ft (≈ $103,375.00 at 25,000 sq ft)
Sources last checked August 6, 2026Official fee schedules:City of Davenport Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Davenport

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Davenport, Florida?

A new single-family home in Davenport pays $29,333.00 per unit in combined impact fees (rates sourced August 6, 2026).

How much are commercial impact fees in Davenport?

Commercial development in Davenport pays $6.47 per square foot in impact fees, at least $323,300.00 for a 50,000 sq ft building. 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Davenport charge its own impact fees?

Yes. Davenport levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Davenport, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Polk County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000