Lake Alfred Impact Fees by Project Type
Lake Alfred: Single-Family Impact Fees
A new single-family home in Lake Alfred pays $36,477.00 per unit in impact fees (rates sourced October 27, 2026). Of that, Polk County-levied fees account for $15,503.00 and municipal or utility fees for $20,974.00.
The largest line items are Educational Impact Fee (Polk County) ($11,124.00), Water Connection Fee (City of Lake Alfred) ($6,333.00) and Sewer Connection Fee (City of Lake Alfred) ($5,021.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Alfred Impact Fee Schedule
- Water Connection Fee (City of Lake Alfred)$6,333.00City of Lake Alfred UtilitiesCity of Lake Alfred water connection fee: $6,333 per equivalent residential connection (a single-family home is 1 ERC), under Code Sec. 58-1(a), inside or outside the city.
- Water Meter Installation Fee (City of Lake Alfred) — 3/4" meter$630.00City of Lake AlfredCity of Lake Alfred water meter installation fee for a 3/4 in. meter: $630 (City Code Sec. 58-61; the city furnishes the meter), charged in addition to the water connection fee.
- Sewer Connection Fee (City of Lake Alfred)$5,021.00City of Lake Alfred UtilitiesCity of Lake Alfred wastewater connection fee: $5,021 per equivalent residential connection (a single-family home is 1 ERC), under Code Sec. 58-1(a), inside or outside the city.
- Sewer Tap-In Fee (City of Lake Alfred)$150.00City of Lake AlfredCity of Lake Alfred sewer tap-in fee: $150 per new sewer connection (City Code Sec. 58-128), charged in addition to the wastewater connection fee.
- Parks and Recreation Impact Fee (City of Lake Alfred)$4,035.00City of Lake AlfredCity of Lake Alfred parks and recreation impact fee: $4,035 per dwelling unit (Code sec. 2-363), a flat rate applied to single-family and multifamily alike.
- Transportation Impact Fee (City of Lake Alfred)$1,531.00City of Lake AlfredCity of Lake Alfred transportation impact fee: $1,531 per single-family home (Code Ch. 2, Art. VIII, Sec. 2-365; Ordinance 1516-23, adopted June 20, 2023). Polk County's transportation impact fee is paid in addition to this city fee.
- Public Facilities (General Government) Impact Fee (City of Lake Alfred)$1,435.00City of Lake AlfredCity of Lake Alfred public facilities (general government) impact fee: $1,435 per dwelling unit (Code sec. 2-364), a flat rate applied to single-family and multifamily alike.
- Fire Impact Fee (City of Lake Alfred)$955.00City of Lake AlfredCity of Lake Alfred fire impact fee: $955 per dwelling unit (Code sec. 2-362), a flat rate applied to single-family and multifamily alike.
- Police Impact Fee (City of Lake Alfred)$884.00City of Lake AlfredCity of Lake Alfred police impact fee: $884 per dwelling unit (Code sec. 2-361), a flat rate applied to single-family and multifamily alike.
- Educational Impact Fee (Polk County)$11,124.00Polk County / Polk County School BoardPolk County educational system (school) impact fee: $11,124 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $12,187 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
- Transportation Impact Fee (Polk County, District A)$3,710.00Polk CountyPolk County transportation impact fee, District A rate: $3,710 per single-family home. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $4,103 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
- Correctional Impact Fee (Polk County)$516.00Polk CountyPolk County correctional facilities impact fee: $516 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $662 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
- EMS Impact Fee (Polk County)$153.00Polk CountyPolk County emergency medical system (EMS) impact fee: $153 per single-family home. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
- Library Impact Fee (Polk County)$0.00Polk CountyPolk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
- Parks & Recreational Facilities Impact Fee (Polk County)$0.00Polk CountyPolk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
- Law Enforcement Impact Fee (Polk County)$0.00Polk CountyPolk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
- Fire Rescue Impact Fee (Polk County)$0.00Polk CountyPolk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Alfred: Multifamily Impact Fees
A new multifamily unit in Lake Alfred pays $31,599.00 per unit in impact fees (rates sourced October 27, 2026). Of that, Polk County-levied fees account for $11,062.00 and municipal or utility fees for $20,537.00.
The largest line items are Educational Impact Fee (Polk County, MF) ($8,055.00), Water Connection Fee (City of Lake Alfred, MF) ($6,333.00) and Sewer Connection Fee (City of Lake Alfred, MF) ($5,021.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Alfred Impact Fee Schedule
- Water Connection Fee (City of Lake Alfred, MF)$6,333.00City of Lake Alfred UtilitiesNew apartment or other multifamily units in Lake Alfred pay a one-time water connection fee of $6,333 per dwelling unit. A separate meter installation charge also applies.
- Water Meter Installation Fee (City of Lake Alfred, MF) — 3/4" meter$630.00City of Lake AlfredCity of Lake Alfred water meter installation fee for a 3/4 in. meter: $630 (City Code Sec. 58-61; the city furnishes the meter), charged in addition to the water connection fee. The fee is per meter: a building on one larger meter pays once at that meter's rate.
- Sewer Connection Fee (City of Lake Alfred, MF)$5,021.00City of Lake Alfred UtilitiesNew apartment or other multifamily units in Lake Alfred pay a one-time sewer connection fee of $5,021 per dwelling unit.
- Sewer Tap-In Fee (City of Lake Alfred, MF)$150.00City of Lake AlfredCity of Lake Alfred sewer tap-in fee: $150 per new sewer connection (City Code Sec. 58-128), charged in addition to the wastewater connection fee. It is charged per connection: a building on one connection pays once.
- Parks and Recreation Impact Fee (City of Lake Alfred, MF)$4,035.00City of Lake AlfredCity of Lake Alfred parks and recreation impact fee: $4,035 per multifamily dwelling unit (Code sec. 2-363), a flat rate applied to single-family and multifamily alike.
- Public Facilities (General Government) Impact Fee (City of Lake Alfred, MF)$1,435.00City of Lake AlfredCity of Lake Alfred public facilities (general government) impact fee: $1,435 per multifamily dwelling unit (Code sec. 2-364), a flat rate applied to single-family and multifamily alike.
- Transportation Impact Fee (City of Lake Alfred, MF)$1,094.00City of Lake AlfredCity of Lake Alfred transportation impact fee: $1,094 per multifamily dwelling unit (Code Ch. 2, Art. VIII, Sec. 2-365; Ordinance 1516-23, adopted June 20, 2023). Polk County's transportation impact fee is paid in addition to this city fee.
- Fire Impact Fee (City of Lake Alfred, MF)$955.00City of Lake AlfredCity of Lake Alfred fire impact fee: $955 per multifamily dwelling unit (Code sec. 2-362), a flat rate applied to single-family and multifamily alike.
- Police Impact Fee (City of Lake Alfred, MF)$884.00City of Lake AlfredCity of Lake Alfred police impact fee: $884 per multifamily dwelling unit (Code sec. 2-361), a flat rate applied to single-family and multifamily alike.
- Educational Impact Fee (Polk County, MF)$8,055.00Polk County / Polk County School BoardPolk County educational system (school) impact fee: $8,055 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $9,070 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
- Transportation Impact Fee (Polk County, District A, MF)$2,508.00Polk CountyPolk County transportation impact fee, District A rate: $2,508 per multifamily dwelling unit. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $2,782 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
- Correctional Impact Fee (Polk County, MF)$385.00Polk CountyPolk County correctional facilities impact fee: $385 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $495 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
- EMS Impact Fee (Polk County, MF)$114.00Polk CountyPolk County emergency medical system (EMS) impact fee: $114 per multifamily dwelling unit. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
- Parks & Recreational Facilities Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
- Library Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
- Law Enforcement Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
- Fire Rescue Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Lake Alfred has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Lake Alfred.
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Alfred: Commercial Impact Fees
Commercial development in Lake Alfred pays $17.61 per square foot in impact fees, plus $12,414.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 50,000 sq ft building, that comes to at least $892,964.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Lake Alfred) ($6,333.00 one-time), Sewer Connection Fee (City of Lake Alfred) ($5,021.00 one-time) and Water Meter Installation Fee (City of Lake Alfred) ($910.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Law Enforcement Impact Fee (Polk County, Commercial) and Fire Rescue Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Lake Alfred Impact Fee Schedule
- Water Connection Fee (City of Lake Alfred)$6,333.00 one-timeCity of Lake AlfredCity of Lake Alfred water connection fee for nonresidential development: $22.76 per gallon of estimated average daily flow from the city flow table (for example, 15 gallons per 100 sq ft of office space), never less than the single-family connection fee of $6,333, the amount shown. Rates set by Ord. 1504-22, effective March 6, 2023; the city may index them each October 1 to the ENR construction cost index.
- Water Meter Installation Fee (City of Lake Alfred)$910.00 one-time1"City of Lake AlfredCity of Lake Alfred water meter installation fee for a 1 in. meter furnished and set by the city (Ord. 1567-25, adopted November 17, 2025). Charged in addition to the water connection fee. Other sizes: 3/4 in. $630, 1-1/2 in. $1,970, 2 in. $2,320; meters of 3 in. and larger are priced by the city.
- Sewer Connection Fee (City of Lake Alfred)$5,021.00 one-timeCity of Lake AlfredCity of Lake Alfred wastewater connection fee for nonresidential development: $21.19 per gallon of estimated average daily flow from the city flow table, never less than the single-family connection fee of $5,021, the amount shown. Rates set by Ord. 1504-22, effective March 6, 2023; the city may index them each October 1 to the ENR construction cost index.
- Sewer Tap-In Fee (City of Lake Alfred)$150.00 one-timeCity of Lake AlfredCity of Lake Alfred sewer tap-in fee for each new sewer connection, charged in addition to the wastewater connection fee.
- Transportation Impact Fee (City of Lake Alfred, Commercial)$7.23/sq ft40,000-150,000 sfCity of Lake AlfredCity of Lake Alfred transportation impact fee (Ord. 1516-23, adopted June 20, 2023) for general commercial buildings of 40,000 to 150,000 sq ft, per 1,000 sq ft of gross floor area. Smaller buildings pay $5,834 and larger ones $3,965 per 1,000 sq ft. Charged in addition to the Polk County transportation impact fee.
- Public Facilities Impact Fee (City of Lake Alfred, Commercial)$1.79/sq ftCity of Lake AlfredCity of Lake Alfred public facilities (general government) impact fee per 1,000 sq ft of gross floor area, retail rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Fire Impact Fee (City of Lake Alfred, Commercial)$1.19/sq ftCity of Lake AlfredCity of Lake Alfred fire impact fee per 1,000 sq ft of gross floor area, retail rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Police Impact Fee (City of Lake Alfred, Commercial)$1.10/sq ftCity of Lake AlfredCity of Lake Alfred police impact fee per 1,000 sq ft of gross floor area, retail rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Parks & Recreation Impact Fee (City of Lake Alfred, Commercial)$0.00City of Lake AlfredThe City of Lake Alfred parks and recreation impact fee applies to new dwelling units only; nonresidential construction does not pay it.
- Transportation Impact Fee (Polk County, Commercial)$5.56/sq ftPolk CountyPolk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
- Correctional Facilities Impact Fee (Polk County, Commercial)$0.56/sq ftPolk CountyPolk County correctional facilities impact fee, phased in under Ordinance 2024-062: $560 per 1,000 sq ft of retail/commercial space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $727 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
- EMS Impact Fee (Polk County, Commercial)$0.18/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Parks & Recreational Facilities Impact Fee (Polk County, Commercial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Library Impact Fee (Polk County, Commercial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Law Enforcement Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyNot charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
- Fire Rescue Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyNot charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Alfred: Industrial Impact Fees
Industrial development in Lake Alfred pays $2.32 per square foot in impact fees, plus $12,414.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 50,000 sq ft building, that comes to at least $128,614.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Lake Alfred) ($6,333.00 one-time), Sewer Connection Fee (City of Lake Alfred) ($5,021.00 one-time) and Water Meter Installation Fee (City of Lake Alfred) ($910.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Lake Alfred Impact Fee Schedule
- Water Connection Fee (City of Lake Alfred)$6,333.00 one-timeCity of Lake AlfredCity of Lake Alfred water connection fee for nonresidential development: $22.76 per gallon of estimated average daily flow from the city flow table (for example, 15 gallons per 100 sq ft of office space), never less than the single-family connection fee of $6,333, the amount shown. Rates set by Ord. 1504-22, effective March 6, 2023; the city may index them each October 1 to the ENR construction cost index.
- Water Meter Installation Fee (City of Lake Alfred)$910.00 one-time1"City of Lake AlfredCity of Lake Alfred water meter installation fee for a 1 in. meter furnished and set by the city (Ord. 1567-25, adopted November 17, 2025). Charged in addition to the water connection fee. Other sizes: 3/4 in. $630, 1-1/2 in. $1,970, 2 in. $2,320; meters of 3 in. and larger are priced by the city.
- Sewer Connection Fee (City of Lake Alfred)$5,021.00 one-timeCity of Lake AlfredCity of Lake Alfred wastewater connection fee for nonresidential development: $21.19 per gallon of estimated average daily flow from the city flow table, never less than the single-family connection fee of $5,021, the amount shown. Rates set by Ord. 1504-22, effective March 6, 2023; the city may index them each October 1 to the ENR construction cost index.
- Sewer Tap-In Fee (City of Lake Alfred)$150.00 one-timeCity of Lake AlfredCity of Lake Alfred sewer tap-in fee for each new sewer connection, charged in addition to the wastewater connection fee.
- Transportation Impact Fee (City of Lake Alfred, Industrial)$0.79/sq ftCity of Lake AlfredCity of Lake Alfred transportation impact fee (Ord. 1516-23, adopted June 20, 2023), per 1,000 sq ft of gross floor area, industrial rate. Charged in addition to the Polk County transportation impact fee, which also applies inside the city. No automatic annual index.
- Public Facilities Impact Fee (City of Lake Alfred, Industrial)$0.32/sq ftCity of Lake AlfredCity of Lake Alfred public facilities (general government) impact fee per 1,000 sq ft of gross floor area, industrial/warehousing rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Fire Impact Fee (City of Lake Alfred, Industrial)$0.21/sq ftCity of Lake AlfredCity of Lake Alfred fire impact fee per 1,000 sq ft of gross floor area, industrial/warehousing rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Police Impact Fee (City of Lake Alfred, Industrial)$0.19/sq ftCity of Lake AlfredCity of Lake Alfred police impact fee per 1,000 sq ft of gross floor area, industrial/warehousing rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Parks & Recreation Impact Fee (City of Lake Alfred, Industrial)$0.00City of Lake AlfredThe City of Lake Alfred parks and recreation impact fee applies to new dwelling units only; nonresidential construction does not pay it.
- Transportation Impact Fee (Polk County, Industrial)$0.61/sq ftPolk CountyPolk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
- Correctional Facilities Impact Fee (Polk County, Industrial)$0.16/sq ftPolk CountyPolk County correctional facilities impact fee, phased in under Ordinance 2024-062: $157 per 1,000 sq ft of industrial/manufacturing space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $205 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
- EMS Impact Fee (Polk County, Industrial)$0.05/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Library Impact Fee (Polk County, Industrial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Parks & Recreational Facilities Impact Fee (Polk County, Industrial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Law Enforcement Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyNot charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
- Fire Rescue Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyNot charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Alfred: Office Impact Fees
Office development in Lake Alfred pays $7.49 per square foot in impact fees, plus $12,414.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).
For a 25,000 sq ft building, that comes to at least $199,689.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of Lake Alfred) ($6,333.00 one-time), Sewer Connection Fee (City of Lake Alfred) ($5,021.00 one-time) and Water Meter Installation Fee (City of Lake Alfred) ($910.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Fire Rescue Impact Fee (Polk County, Office) and Law Enforcement Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Lake Alfred Impact Fee Schedule
- Water Connection Fee (City of Lake Alfred)$6,333.00 one-timeCity of Lake AlfredCity of Lake Alfred water connection fee for nonresidential development: $22.76 per gallon of estimated average daily flow from the city flow table (for example, 15 gallons per 100 sq ft of office space), never less than the single-family connection fee of $6,333, the amount shown. Rates set by Ord. 1504-22, effective March 6, 2023; the city may index them each October 1 to the ENR construction cost index.
- Water Meter Installation Fee (City of Lake Alfred)$910.00 one-time1"City of Lake AlfredCity of Lake Alfred water meter installation fee for a 1 in. meter furnished and set by the city (Ord. 1567-25, adopted November 17, 2025). Charged in addition to the water connection fee. Other sizes: 3/4 in. $630, 1-1/2 in. $1,970, 2 in. $2,320; meters of 3 in. and larger are priced by the city.
- Sewer Connection Fee (City of Lake Alfred)$5,021.00 one-timeCity of Lake AlfredCity of Lake Alfred wastewater connection fee for nonresidential development: $21.19 per gallon of estimated average daily flow from the city flow table, never less than the single-family connection fee of $5,021, the amount shown. Rates set by Ord. 1504-22, effective March 6, 2023; the city may index them each October 1 to the ENR construction cost index.
- Sewer Tap-In Fee (City of Lake Alfred)$150.00 one-timeCity of Lake AlfredCity of Lake Alfred sewer tap-in fee for each new sewer connection, charged in addition to the wastewater connection fee.
- Transportation Impact Fee (City of Lake Alfred, Office)$1.76/sq ftCity of Lake AlfredCity of Lake Alfred transportation impact fee (Ord. 1516-23, adopted June 20, 2023), per 1,000 sq ft of gross floor area, general office rate. Charged in addition to the Polk County transportation impact fee, which also applies inside the city. No automatic annual index.
- Public Facilities Impact Fee (City of Lake Alfred, Office)$0.73/sq ftCity of Lake AlfredCity of Lake Alfred public facilities (general government) impact fee per 1,000 sq ft of gross floor area, office building rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Fire Impact Fee (City of Lake Alfred, Office)$0.49/sq ftCity of Lake AlfredCity of Lake Alfred fire impact fee per 1,000 sq ft of gross floor area, office building rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Police Impact Fee (City of Lake Alfred, Office)$0.45/sq ftCity of Lake AlfredCity of Lake Alfred police impact fee per 1,000 sq ft of gross floor area, office building rate, in effect since March 6, 2023 (Ord. 1505-22). Paid in addition to the Polk County transportation, EMS and correctional facilities impact fees collected in the city. The city may raise the rate only by ordinance under the Florida Impact Fee Act; there is no automatic annual index.
- Parks & Recreation Impact Fee (City of Lake Alfred, Office)$0.00City of Lake AlfredThe City of Lake Alfred parks and recreation impact fee applies to new dwelling units only; nonresidential construction does not pay it.
- Transportation Impact Fee (Polk County, Office)$3.68/sq ftPolk CountyPolk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
- Correctional Facilities Impact Fee (Polk County, Office)$0.29/sq ftPolk CountyPolk County correctional facilities impact fee, phased in under Ordinance 2024-062: $293 per 1,000 sq ft of office space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $367 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
- EMS Impact Fee (Polk County, Office)$0.09/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Library Impact Fee (Polk County, Office)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Parks & Recreational Facilities Impact Fee (Polk County, Office)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Fire Rescue Impact Fee (Polk County, Office)Requires confirmationPolk CountyNot charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
- Law Enforcement Impact Fee (Polk County, Office)Requires confirmationPolk CountyNot charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Alfred Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lake Alfred Impact Fee FAQs
What are the total impact fees for a single-family home in Lake Alfred, Florida?
A new single-family home in Lake Alfred pays $36,477.00 per unit in combined impact fees (rates sourced October 27, 2026).
How much are commercial impact fees in Lake Alfred?
Commercial development in Lake Alfred pays $17.61 per square foot in impact fees, plus $12,414.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $892,964.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Lake Alfred charge its own impact fees?
Yes. Lake Alfred levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lake Alfred, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Polk County impact fees page.