IMPACTFEES.ORG

Mulberry, Florida Impact Fees

Mulberry applies its own fee schedule: municipal fees plus the Polk County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $11,793.00 per unit (rates sourced July 18, 2026). 8 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Mulberry impact fees by project type

Mulberry: Single-Family Impact Fees

A new single-family home in Mulberry pays at least $11,793.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Polk County.

The largest line items are County Educational System Impact Fee (Polk County) ($11,124.00), County Correctional Facilities Impact Fee (Polk County) ($516.00) and County EMS Impact Fee (Polk County) ($153.00).

Water Connection/Capacity Fee (City of Mulberry) and Sewer Connection/Capacity Fee (City of Mulberry) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County), Law Enforcement Impact Fee (Polk County), Parks & Recreational Facilities Impact Fee (Polk County), Library Impact Fee (Polk County), and Transportation Impact Fee (Polk County, District B/C split) are set by the county and have no published standard rate. City Impact Fees (City of Mulberry) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Mulberry)
    City of Mulberry
    Mulberry operates its own water utility (Municode Ch 19 Art V, Sec 19-156). Connection/capacity fee amount not published online. $0 placeholder; confirm, Mulberry City Hall 863-425-1125.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Mulberry)
    City of Mulberry
    Mulberry operates its own wastewater utility (Municode Ch 19 Art V). Sewer connection/capacity fee not published online. $0 placeholder; confirm, Mulberry City Hall 863-425-1125.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Mulberry)
    City of Mulberry
    No dedicated municipal impact-fee program surfaced for Mulberry; appears to rely on Polk County fees. $0 placeholder; confirm no city parks/police/fire impact fee, City Hall 863-425-1125.
    Requires confirmation
County$11,793.00
  • County Educational System Impact Fee (Polk County)
    Polk County / Polk County School Board
    Polk Co Ord 2024-062 Ch 8.7 Art VI. Countywide. Current-collected 1/1/2026 $11,124 SFR (WH guide); 100%-study $14,338.
    $11,124.00
  • County Correctional Facilities Impact Fee (Polk County)
    Polk County
    Ord 2024-062 Art V. Countywide. Current-collected 1/1/2026 $516; 100%-study $662.
    $516.00
  • County EMS Impact Fee (Polk County)
    Polk County
    Ord 2024-062 Art III. Countywide. =100%-study $153 (not phased).
    $153.00
  • Fire Rescue Impact Fee (Polk County)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. IX. §8.7-93 (Municipal participation): the county fire rescue impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted rate (Att. 7, not phased, eff. 1/1/2025): SFR $377 / MF $273. Held at $0 + Unconfirmed because the county does not publish its list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Law Enforcement Impact Fee (Polk County)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. X. §8.7-103 (Municipal participation): the county law enforcement impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted Phase Two rate (Att. 8, eff. 1/1/2026, final phase): SFR $578 / MF $417. Held at $0 + Unconfirmed pending the county's list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Parks & Recreational Facilities Impact Fee (Polk County)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. VIII. §8.7-83 (Municipal participation): the county park impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): SFR $1,381 / MF $1,033; Phase Three 1/1/2027: SFR $1,864 / MF $1,396. Held at $0 + Unconfirmed pending the county's list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Library Impact Fee (Polk County)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): the county library impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): SFR $188 / MF $141. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Confirm with Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Transportation Impact Fee (Polk County, District B/C split)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 App. B: the District B / District C boundary runs east along State Road 60 "passing through the City of Mulberry" — Mulberry is SPLIT between District B (Northwest) and District C (South), so no single citywide rate exists; the district is determined per parcel. Current PHASE TWO rates (eff. 1/1/2026–12/31/2026): District B SFR $3,640 / MF $2,462; District C SFR $3,052 / MF $2,062. Phase Three (1/1/2027): B SFR $4,000 / MF $2,715; C SFR $3,185 / MF $2,160. §8.7-43(A) applies the fee countywide, so a Mulberry permit DOES pay it. Held at $0 + Unconfirmed pending a parcel-level district determination. Polk County Building Division, (863) 534-6000.
    Requires confirmation
Total (Mulberry): $11,793.00
Sources last checked July 18, 2026Official fee schedules:City of Mulberry Polk County / Polk County School Board Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mulberry: Multifamily Impact Fees

A new multifamily unit in Mulberry pays at least $8,554.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Polk County.

The largest line items are County Educational System Impact Fee (Polk County, MF) ($8,055.00), County Correctional Facilities Impact Fee (Polk County, MF) ($385.00) and County EMS Impact Fee (Polk County, MF) ($114.00).

Water Connection/Capacity Fee (City of Mulberry, MF) and Sewer Connection/Capacity Fee (City of Mulberry, MF) are set by the utility and not published online. Parks & Recreational Facilities Impact Fee (Polk County, MF), Library Impact Fee (Polk County, MF), Fire Rescue Impact Fee (Polk County, MF), Law Enforcement Impact Fee (Polk County, MF), and Transportation Impact Fee (Polk County, District B/C split, MF) are set by the county and have no published standard rate. City Impact Fees (City of Mulberry, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
Sewer$0.00
City$0.00
County$8,554.00
  • County Educational System Impact Fee (Polk County, MF)
    Polk County / Polk County School Board
    Ord 2024-062 Art VI. Countywide. MF 1/1/2026 $8,055 (WH guide); study $10,670.
    $8,055.00
  • County Correctional Facilities Impact Fee (Polk County, MF)
    Polk County
    Ord 2024-062 Art V. Countywide. MF $385; study $495.
    $385.00
  • County EMS Impact Fee (Polk County, MF)
    Polk County
    Ord 2024-062 Art III. Countywide. MF = 100%-study $114.
    $114.00
  • Parks & Recreational Facilities Impact Fee (Polk County, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. VIII. §8.7-83 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): Multi-Family $1,033/unit; Phase Three 1/1/2027: $1,396. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Library Impact Fee (Polk County, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): Multi-Family $141/unit. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Fire Rescue Impact Fee (Polk County, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. IX. §8.7-93 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted rate (Att. 7, not phased, eff. 1/1/2025): Multi-Family $273/unit. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Law Enforcement Impact Fee (Polk County, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. X. §8.7-103 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted Phase Two rate (Att. 8, eff. 1/1/2026, final phase): Multi-Family $417/unit. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Transportation Impact Fee (Polk County, District B/C split, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 App. B: the District B / District C boundary runs east along State Road 60 "passing through the City of Mulberry" — Mulberry is SPLIT between District B (Northwest) and District C (South); the district is determined per parcel. Current PHASE TWO MF rates (eff. 1/1/2026–12/31/2026): District B $2,462/unit; District C $2,062/unit. Phase Three (1/1/2027): B $2,715; C $2,160. §8.7-43(A) applies the fee countywide, so a Mulberry permit DOES pay it. Held at $0 + Unconfirmed pending a parcel-level district determination. Polk County Building Division, (863) 534-6000.
    Requires confirmation
Total (Mulberry): $8,554.00
Sources last checked July 18, 2026Official fee schedules:City of Mulberry Polk County / Polk County School Board Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mulberry: Commercial Impact Fees

Commercial development in Mulberry pays $0.91 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $59,310.02. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Mulberry) — 1" meter ($8,890.82 one-time), Water Capacity Fee (City of Mulberry) — 1" meter ($5,119.20 one-time) and Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Law Enforcement Impact Fee (Polk County, Commercial), Transportation Impact Fee (Polk County, Commercial), and Fire Rescue Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,119.20 one-time
  • Water Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry water capacity fee, Sec. 19-155(d), Ord. 2021-04. In-city $2,559.60/ERC. Nonres ERC by meter size (Table 19-155): 1"=2.0 ERC = $5,119.20 (canonical default). Ladder ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($3,199.00/ERC).
    $5,119.20 one-time
Sewer$8,890.82 one-time
  • Sewer Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry wastewater capacity fee, Sec. 19-155(d). In-city $4,445.41/ERC. 1"=2.0 ERC = $8,890.82 (canonical default). ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($5,556.26/ERC).
    $8,890.82 one-time
City$0.00
  • Municipal Impact Fee (City of Mulberry, Commercial)
    City of Mulberry
    No municipal nonresidential impact fee. City of Mulberry Schedule of Development Fees (RES-2024-17, eff 8/15/2025) contains only land-development/application/plan-review fees; no transportation/police/fire/parks impact fee. City relies on Polk County impact fees. $0 confirmed for nonres. (City-imposed nonres development charges are its W/S capacity fees - see W/S table.)
    $0.00
County$0.91/sq ft
  • Correctional Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional Facilities), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide.
    $0.73/sq ft
  • EMS Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide.
    $0.18/sq ft
  • Library Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 - no nonresidential rows; residential-only. $0 confirmed for nonres.
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 - no nonresidential rows; residential-only. $0 confirmed for nonres.
    $0.00
  • Law Enforcement Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. X (Law Enforcement), Sec. 8.7-103 municipal participation. Latent nonres Att. 8: Comm $645/Off $326/Ind $182 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
    Requires confirmation
  • Transportation Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 2 (Transportation). Mulberry is SPLIT between District B and District C (SR 60 boundary runs through the city per App. B) - no single citywide rate; district is parcel-level. Phase Two nonres Comm (per 1,000 sf): District B $5,456 / District C $4,572. Countywide fee applies (§8.7-43(A)). Held $0 Unconfirmed pending parcel district determination. 863-534-6000.
    Requires confirmation
  • Fire Rescue Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. IX (Fire Rescue), Sec. 8.7-93 municipal participation (interlocal required to apply in city). Latent nonres Att. 7: Comm $428/Off $216/Ind $121 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
    Requires confirmation
Total (Mulberry): $0.91/sq ft + $14,010.02 one-time (≈ $59,310.02 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Mulberry Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mulberry: Industrial Impact Fees

Industrial development in Mulberry pays $0.26 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $26,760.02. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Mulberry) — 1" meter ($8,890.82 one-time), Water Capacity Fee (City of Mulberry) — 1" meter ($5,119.20 one-time) and Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Transportation Impact Fee (Polk County, Industrial), Fire Rescue Impact Fee (Polk County, Industrial), and Law Enforcement Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,119.20 one-time
  • Water Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry water capacity fee, Sec. 19-155(d), Ord. 2021-04. In-city $2,559.60/ERC. Nonres ERC by meter size (Table 19-155): 1"=2.0 ERC = $5,119.20 (canonical default). Ladder ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($3,199.00/ERC).
    $5,119.20 one-time
Sewer$8,890.82 one-time
  • Sewer Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry wastewater capacity fee, Sec. 19-155(d). In-city $4,445.41/ERC. 1"=2.0 ERC = $8,890.82 (canonical default). ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($5,556.26/ERC).
    $8,890.82 one-time
City$0.00
County$0.26/sq ft
Total (Mulberry): $0.26/sq ft + $14,010.02 one-time (≈ $26,760.02 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Mulberry Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mulberry: Office Impact Fees

Office development in Mulberry pays $0.46 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to at least $25,435.02. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Mulberry) — 1" meter ($8,890.82 one-time), Water Capacity Fee (City of Mulberry) — 1" meter ($5,119.20 one-time) and Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Rescue Impact Fee (Polk County, Office), Law Enforcement Impact Fee (Polk County, Office), and Transportation Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,119.20 one-time
  • Water Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry water capacity fee, Sec. 19-155(d), Ord. 2021-04. In-city $2,559.60/ERC. Nonres ERC by meter size (Table 19-155): 1"=2.0 ERC = $5,119.20 (canonical default). Ladder ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($3,199.00/ERC).
    $5,119.20 one-time
Sewer$8,890.82 one-time
  • Sewer Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry wastewater capacity fee, Sec. 19-155(d). In-city $4,445.41/ERC. 1"=2.0 ERC = $8,890.82 (canonical default). ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($5,556.26/ERC).
    $8,890.82 one-time
City$0.00
County$0.46/sq ft
Total (Mulberry): $0.46/sq ft + $14,010.02 one-time (≈ $25,435.02 at 25,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Mulberry Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Mulberry

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Mulberry, Florida?

A new single-family home in Mulberry pays at least $11,793.00 per unit in combined impact fees (rates sourced July 18, 2026). 8 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Mulberry?

Commercial development in Mulberry pays $0.91 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $59,310.02 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Mulberry charge its own impact fees?

Yes. Mulberry levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Mulberry, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Polk County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000