Mulberry, Florida Impact Fees

Mulberry applies its own fee schedule: municipal fees plus the Polk County-levied fees that apply inside city limits. Combined, a new single-family home pays $22,438.01 per unit (rates sourced August 6, 2026). The full breakdown is below.

Mulberry impact fees by project type

Mulberry: Single-Family Impact Fees

A new single-family home in Mulberry pays $22,438.01 per unit in impact fees (rates sourced August 6, 2026). Of that, Polk County-levied fees account for $15,433.00 and municipal or utility fees for $7,005.01.

The largest line items are County Educational System Impact Fee (Polk County) ($11,124.00), Sewer Capacity Fee (City of Mulberry) ($4,445.41) and Transportation Impact Fee (Polk County, District B) ($3,640.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$2,559.60
  • Water Capacity Fee (City of Mulberry)
    City of Mulberry
    CONFIRMED 8/6/2026 (was flagged on currency). City of Mulberry 'Water Capacity/Meter Set Fee Schedule' (posted at cityofmulberryfl.org/building-department/page/development-fee-schedules; provided by Turner) lists the inside-city water capacity fee at $2,559.60 (outside city $3,199.00) — matches the codified sec. 19-155(d) figure exactly. The schedule is stamped eff. 10/1/2021 and remains the city's currently-posted schedule, so the sec. 19-164 annual CPI indexing ('if any increase occurs; never downward') has not been applied to the capacity fee — 10/1/2021 is current-unchanged, not stale. Amount = capacity/impact component only; additional one-time charges on the same schedule: water meter set fee $302.23 (5/8x3/4"), water tap fee $500 (3/4").
    $2,559.60
Sewer$4,445.41
  • Sewer Capacity Fee (City of Mulberry)
    City of Mulberry
    CONFIRMED 8/6/2026 (was flagged on currency). City of Mulberry 'Water Capacity/Meter Set Fee Schedule' (posted at cityofmulberryfl.org/building-department/page/development-fee-schedules; provided by Turner) lists the inside-city sewer capacity fee at $4,445.41 (outside city $5,556.26) — matches the codified sec. 19-155(d) figure exactly. Schedule stamped eff. 10/1/2021 and remains the city's currently-posted schedule, so the sec. 19-164 annual CPI indexing has not been applied — current-unchanged, not stale. Amount = capacity/impact component only; separate one-time sewer tap fee $1,500 on the same schedule.
    $4,445.41
City$0.00
  • City Impact Fees (City of Mulberry)
    City of Mulberry
    VERIFIED 8/4/2026 via Municode: Mulberry Code contains no municipal parks/police/fire/transportation impact-fee program (only utility capacity fees in Ch. 19 Art. V, tracked separately; city Schedule of Development Fees eff. 8/15/2025 lists permit/planning fees). Polk County countywide impact fees (Ch. 8.7) apply.
    $0.00
County$15,433.00
  • County Educational System Impact Fee (Polk County)
    Polk County / Polk County School Board
    Polk Co Ord 2024-062 Ch 8.7 Art VI. Countywide. Current-collected 1/1/2026 $11,124 SFR (WH guide); 100%-study $14,338.
    $11,124.00
  • Transportation Impact Fee (Polk County, District B)
    Polk County
    8/6/2026: RESOLVED (was $0 + Unconfirmed 'District B/C split'). County transportation IS collected inside the city per the executed 'Interlocal Agreement for Collection of Polk County Impact Fees' Sec. 5.A (standard form, BoCC agenda item 25-1582, 9/2/2025; independently verified 8/6/2026 against the Dundee copy). Mulberry straddles Districts B and C. Exploded to both district tiers per the district-tier rule (Fee Group mulberry-county-transportation-sfr), default on the higher (District B). Phase Two SFR rates eff. 1/1/2026-12/31/2026 (Ch. 8.7 Att. 2): B $3,640 / C $3,052; Phase Three B $4,000 eff. 1/1/2027. Which district a given parcel falls in is developer-input - not Unconfirmed.
    $3,640.00
  • County Correctional Facilities Impact Fee (Polk County)
    Polk County
    Ord 2024-062 Art V. Countywide. Current-collected 1/1/2026 $516; 100%-study $662.
    $516.00
  • County EMS Impact Fee (Polk County)
    Polk County
    Ord 2024-062 Art III. Countywide. =100%-study $153 (not phased).
    $153.00
  • Fire Rescue Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Fire Rescue article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Law Enforcement Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Law Enforcement article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Parks article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Library Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Library article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
Total (Mulberry): $22,438.01
Sources last checked August 6, 2026Official fee schedules:City of Mulberry Polk County / Polk County School Board Polk County

Mulberry: Multifamily Impact Fees

A new multifamily unit in Mulberry pays $18,021.01 per unit in impact fees (rates sourced August 6, 2026). Of that, Polk County-levied fees account for $11,016.00 and municipal or utility fees for $7,005.01.

The largest line items are County Educational System Impact Fee (Polk County, MF) ($8,055.00), Sewer Connection/Capacity Fee (City of Mulberry, MF) ($4,445.41) and Water Connection/Capacity Fee (City of Mulberry, MF) ($2,559.60).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$2,559.60
  • Water Connection/Capacity Fee (City of Mulberry, MF)
    City of Mulberry
    RESOLVED 8/6/2026 (developer-input meter basis, not Unconfirmed). Mulberry water capacity fee = $2,559.60 per ERC in-city (sec. 19-155(d); 1 ERC = base 5/8x3/4" meter = 250 gpd), confirmed on the city's posted Water Capacity/Meter Set Fee Schedule (eff. 10/1/2021, still current; provided by Turner). Master-metered multifamily pays the building's total ERCs (by master-meter size per Table 19-155: 5/8x3/4"=1 ERC ... 2"=8 ERC) or engineer flow calc, so the per-building fee scales with meter size. Entered as the 1-ERC FLOOR ($2,559.60) per the developer-input meter-tier rule, with the scaling noted; flag cleared.
    $2,559.60
Sewer$4,445.41
  • Sewer Connection/Capacity Fee (City of Mulberry, MF)
    City of Mulberry
    RESOLVED 8/6/2026 (developer-input meter basis, not Unconfirmed). Mulberry sewer capacity fee = $4,445.41 per ERC in-city (sec. 19-155(d); 1 ERC = base 5/8x3/4" meter = 185 gpd), confirmed on the city's posted Water Capacity/Meter Set Fee Schedule (eff. 10/1/2021, still current; provided by Turner). Master-metered multifamily pays the building's total ERCs (by master-meter size per Table 19-155) or engineer flow calc, so the per-building fee scales with meter size. Entered as the 1-ERC FLOOR ($4,445.41) per the developer-input meter-tier rule, with the scaling noted; flag cleared.
    $4,445.41
City$0.00
County$11,016.00
  • County Educational System Impact Fee (Polk County, MF)
    Polk County / Polk County School Board
    Ord 2024-062 Art VI. Countywide. MF 1/1/2026 $8,055 (WH guide); study $10,670.
    $8,055.00
  • Transportation Impact Fee (Polk County, District B, MF)
    Polk County
    8/6/2026: RESOLVED (was $0 + Unconfirmed 'District B/C split'). County transportation IS collected in-city per the executed interlocal Sec. 5.A (BoCC agenda item 25-1582, 9/2/2025; verified 8/6/2026 against the Dundee copy). Mulberry straddles Districts B and C. Exploded per the district-tier rule (Fee Group mulberry-county-transportation-mf), default District B (higher). Phase Two MF rates eff. 1/1/2026-12/31/2026 (Ch. 8.7 Att. 2): B $2,462 / C $2,062. Developer-input which district a parcel falls in - not Unconfirmed.
    $2,462.00
  • County Correctional Facilities Impact Fee (Polk County, MF)
    Polk County
    Ord 2024-062 Art V. Countywide. MF $385; study $495.
    $385.00
  • County EMS Impact Fee (Polk County, MF)
    Polk County
    Ord 2024-062 Art III. Countywide. MF = 100%-study $114.
    $114.00
  • Parks & Recreational Facilities Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Parks article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Library Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Library article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Fire Rescue Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Fire Rescue article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Law Enforcement Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Mulberry). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Mulberry's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Law Enforcement article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
Total (Mulberry): $18,021.01
Sources last checked August 6, 2026Official fee schedules:City of Mulberry Polk County / Polk County School Board Polk County

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mulberry: Commercial Impact Fees

Commercial development in Mulberry pays $0.91 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (rates sourced August 6, 2026).

For a 50,000 sq ft building, that comes to at least $59,310.02. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Mulberry) — 1" meter ($8,890.82 one-time), Water Capacity Fee (City of Mulberry) — 1" meter ($5,119.20 one-time) and Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Law Enforcement Impact Fee (Polk County, Commercial), Transportation Impact Fee (Polk County, Commercial), and Fire Rescue Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,119.20 one-time
  • Water Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry water capacity fee, Sec. 19-155(d), Ord. 2021-04. In-city $2,559.60/ERC. Nonres ERC by meter size (Table 19-155): 1"=2.0 ERC = $5,119.20 (canonical default). Ladder ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($3,199.00/ERC).
    $5,119.20 one-time
Sewer$8,890.82 one-time
  • Sewer Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry wastewater capacity fee, Sec. 19-155(d). In-city $4,445.41/ERC. 1"=2.0 ERC = $8,890.82 (canonical default). ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($5,556.26/ERC).
    $8,890.82 one-time
City$0.00
  • Municipal Impact Fee (City of Mulberry, Commercial)
    City of Mulberry
    No municipal nonresidential impact fee. City of Mulberry Schedule of Development Fees (RES-2024-17, eff 8/15/2025) contains only land-development/application/plan-review fees; no transportation/police/fire/parks impact fee. City relies on Polk County impact fees. $0 confirmed for nonres. (City-imposed nonres development charges are its W/S capacity fees - see W/S table.)
    $0.00
County$0.91/sq ft
  • Correctional Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional Facilities), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide.
    $0.73/sq ft
  • EMS Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide.
    $0.18/sq ft
  • Library Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 - no nonresidential rows; residential-only. $0 confirmed for nonres.
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 - no nonresidential rows; residential-only. $0 confirmed for nonres.
    $0.00
  • Law Enforcement Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. X (Law Enforcement), Sec. 8.7-103 municipal participation. Latent nonres Att. 8: Comm $645/Off $326/Ind $182 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
    Requires confirmation
  • Transportation Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 2 (Transportation). Mulberry is SPLIT between District B and District C (SR 60 boundary runs through the city per App. B) - no single citywide rate; district is parcel-level. Phase Two nonres Comm (per 1,000 sf): District B $5,456 / District C $4,572. Countywide fee applies (§8.7-43(A)). Held $0 Unconfirmed pending parcel district determination. 863-534-6000.
    Requires confirmation
  • Fire Rescue Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Art. IX (Fire Rescue), Sec. 8.7-93 municipal participation (interlocal required to apply in city). Latent nonres Att. 7: Comm $428/Off $216/Ind $121 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
    Requires confirmation
Total (Mulberry): $0.91/sq ft + $14,010.02 one-time (≈ $59,310.02 at 50,000 sq ft)
Sources last checked August 6, 2026Official fee schedules:City of Mulberry Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mulberry: Industrial Impact Fees

Industrial development in Mulberry pays $0.26 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (rates sourced August 6, 2026).

For a 50,000 sq ft building, that comes to at least $26,760.02. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Mulberry) — 1" meter ($8,890.82 one-time), Water Capacity Fee (City of Mulberry) — 1" meter ($5,119.20 one-time) and Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Transportation Impact Fee (Polk County, Industrial), Fire Rescue Impact Fee (Polk County, Industrial), and Law Enforcement Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,119.20 one-time
  • Water Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry water capacity fee, Sec. 19-155(d), Ord. 2021-04. In-city $2,559.60/ERC. Nonres ERC by meter size (Table 19-155): 1"=2.0 ERC = $5,119.20 (canonical default). Ladder ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($3,199.00/ERC).
    $5,119.20 one-time
Sewer$8,890.82 one-time
  • Sewer Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry wastewater capacity fee, Sec. 19-155(d). In-city $4,445.41/ERC. 1"=2.0 ERC = $8,890.82 (canonical default). ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($5,556.26/ERC).
    $8,890.82 one-time
City$0.00
County$0.26/sq ft
Total (Mulberry): $0.26/sq ft + $14,010.02 one-time (≈ $26,760.02 at 50,000 sq ft)
Sources last checked August 6, 2026Official fee schedules:City of Mulberry Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mulberry: Office Impact Fees

Office development in Mulberry pays $0.46 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (rates sourced August 6, 2026).

For a 25,000 sq ft building, that comes to at least $25,435.02. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Mulberry) — 1" meter ($8,890.82 one-time), Water Capacity Fee (City of Mulberry) — 1" meter ($5,119.20 one-time) and Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Rescue Impact Fee (Polk County, Office), Law Enforcement Impact Fee (Polk County, Office), and Transportation Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,119.20 one-time
  • Water Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry water capacity fee, Sec. 19-155(d), Ord. 2021-04. In-city $2,559.60/ERC. Nonres ERC by meter size (Table 19-155): 1"=2.0 ERC = $5,119.20 (canonical default). Ladder ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($3,199.00/ERC).
    $5,119.20 one-time
Sewer$8,890.82 one-time
  • Sewer Capacity Fee (City of Mulberry) — 1" meter
    City of Mulberry
    City of Mulberry wastewater capacity fee, Sec. 19-155(d). In-city $4,445.41/ERC. 1"=2.0 ERC = $8,890.82 (canonical default). ERC factors: 5/8x3/4=1.0, 1"=2.0, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Outside-city +25% ($5,556.26/ERC).
    $8,890.82 one-time
City$0.00
County$0.46/sq ft
Total (Mulberry): $0.46/sq ft + $14,010.02 one-time (≈ $25,435.02 at 25,000 sq ft)
Sources last checked August 6, 2026Official fee schedules:City of Mulberry Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Mulberry

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Frequently asked questions

What are the total impact fees for a single-family home in Mulberry, Florida?

A new single-family home in Mulberry pays $22,438.01 per unit in combined impact fees (rates sourced August 6, 2026).

How much are commercial impact fees in Mulberry?

Commercial development in Mulberry pays $0.91 per square foot in impact fees, plus $14,010.02 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $59,310.02 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Mulberry charge its own impact fees?

Yes. Mulberry levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Mulberry, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Polk County impact fees page.