Frostproof, Florida Impact Fees

Frostproof applies its own fee schedule: municipal fees plus the Polk County-levied fees that apply inside city limits. Combined, a new single-family home pays $25,611.25 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Frostproof Impact Fees by Project Type

Frostproof: Single-Family Impact Fees

A new single-family home in Frostproof pays $25,611.25 per unit in impact fees (rates sourced October 27, 2026). Of that, Polk County-levied fees account for $14,845.00 and municipal or utility fees for $10,766.25.

The largest line items are County Educational System Impact Fee (Polk County) ($11,124.00), Transportation Impact Fee (Polk County, District C) ($3,052.00) and County Correctional Facilities Impact Fee (Polk County) ($516.00).

Fire Impact Fee (City of Frostproof), Vehicle Fleet Facilities Impact Fee (City of Frostproof), General Government Facilities Impact Fee (City of Frostproof), Water Connection/Capacity Fee (City of Frostproof), Parks and Recreation Impact Fee (City of Frostproof), Stormwater Management Impact Fee (City of Frostproof), Sewer Connection/Capacity Fee (City of Frostproof), Transportation Impact Fee (City of Frostproof), and Library Impact Fee (City of Frostproof) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Frostproof Impact Fee Schedule
Water$1,875.00
Sewer$3,750.00
City$5,141.25
  • Fire Impact Fee (City of Frostproof)
    City of Frostproof
    City of Frostproof fire impact fee: $2,070.00 for a new single-family home, as of January 1, 2026 (next scheduled update January 1, 2027). Collected before the building permit issues under City Code Ch. 15, Art. IV.
    $2,070.00Requires confirmation
  • Vehicle Fleet Facilities Impact Fee (City of Frostproof)
    City of Frostproof
    City of Frostproof vehicle fleet facilities impact fee: $836.25 for a new single-family home, as of January 1, 2026 (next scheduled update January 1, 2027). Collected before the building permit issues under City Code Ch. 15, Art. IV.
    $836.25Requires confirmation
  • Parks and Recreation Impact Fee (City of Frostproof)
    City of Frostproof
    City of Frostproof parks and recreation impact fee: $708.75 for a new single-family home, as of January 1, 2026 (next scheduled update January 1, 2027). Collected before the building permit issues under City Code Ch. 15, Art. IV.
    $708.75Requires confirmation
  • General Government Facilities Impact Fee (City of Frostproof)
    City of Frostproof
    City of Frostproof general government facilities impact fee: $528.75 for a new single-family home, as of January 1, 2026 (next scheduled update January 1, 2027). Collected before the building permit issues under City Code Ch. 15, Art. IV.
    $528.75Requires confirmation
  • Stormwater Management Impact Fee (City of Frostproof)
    City of Frostproof
    City of Frostproof stormwater management impact fee: $375.00 for a new single-family home, as of January 1, 2026 (next scheduled update January 1, 2027). Collected before the building permit issues under City Code Ch. 15, Art. IV.
    $375.00Requires confirmation
  • Transportation Impact Fee (City of Frostproof)
    City of Frostproof
    City of Frostproof transportation impact fee: $332.50 for a new single-family home, as of January 1, 2026 (next scheduled update January 1, 2027). Collected before the building permit issues under City Code Ch. 15, Art. IV. Polk County's transportation impact fee is paid in addition.
    $332.50Requires confirmation
  • Library Impact Fee (City of Frostproof)
    City of Frostproof
    City of Frostproof library impact fee: $290.00 for a new single-family home, as of January 1, 2026 (next scheduled update January 1, 2027). Collected before the building permit issues under City Code Ch. 15, Art. IV.
    $290.00Requires confirmation
County$14,845.00
  • County Educational System Impact Fee (Polk County)
    Polk County / Polk County School Board
    Polk County educational system (school) impact fee: $11,124 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $12,187 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
    $11,124.00
  • Transportation Impact Fee (Polk County, District C)
    Polk County
    Polk County transportation impact fee, District C rate: $3,052 per single-family home. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $3,185 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
    $3,052.00
  • County Correctional Facilities Impact Fee (Polk County)
    Polk County
    Polk County correctional facilities impact fee: $516 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $662 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
    $516.00
  • County EMS Impact Fee (Polk County)
    Polk County
    Polk County emergency medical system (EMS) impact fee: $153 per single-family home. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
    $153.00
  • Parks & Recreational Facilities Impact Fee (Polk County)
    Polk County
    Polk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
  • Fire Rescue Impact Fee (Polk County)
    Polk County
    Polk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
  • Library Impact Fee (Polk County)
    Polk County
    Polk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
  • Law Enforcement Impact Fee (Polk County)
    Polk County
    Polk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
Total (Frostproof): $25,611.25
Sources last checked Official fee schedules:City of Frostproof Polk County / Polk County School Board Polk County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frostproof: Multifamily Impact Fees

A new multifamily unit in Frostproof pays at least $10,616.00 per unit in impact fees (rates sourced October 27, 2026). All of it is levied by Polk County.

The largest line items are County Educational System Impact Fee (Polk County, MF) ($8,055.00), Transportation Impact Fee (Polk County, District C, MF) ($2,062.00) and County Correctional Facilities Impact Fee (Polk County, MF) ($385.00).

Sewer Connection/Capacity Fee (City of Frostproof, MF) and Water Connection/Capacity Fee (City of Frostproof, MF) are set by the utility and not published online. Stormwater Management Impact Fee (City of Frostproof, MF), Library Impact Fee (City of Frostproof, MF), Fire Impact Fee (City of Frostproof, MF), Vehicle Fleet Facilities Impact Fee (City of Frostproof, MF), Transportation Impact Fee (City of Frostproof, MF), Parks and Recreation Impact Fee (City of Frostproof, MF), and General Government Facilities Impact Fee (City of Frostproof, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Frostproof Impact Fee Schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Frostproof, MF)
    City of Frostproof
    The City of Frostproof charges a water impact fee per ERC, set by city resolution; the city lists only the single-family amount (1.0 ERC), and the ERCs assessed per multifamily unit are not published.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Frostproof, MF)
    City of Frostproof
    The City of Frostproof charges a sewer impact fee per ERC, set by city resolution; the city lists only the single-family amount (1.0 ERC), and the ERCs assessed per multifamily unit are not published.
    Requires confirmation
City$0.00
County$10,616.00
  • County Educational System Impact Fee (Polk County, MF)
    Polk County / Polk County School Board
    Polk County educational system (school) impact fee: $8,055 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $9,070 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
    $8,055.00
  • Transportation Impact Fee (Polk County, District C, MF)
    Polk County
    Polk County transportation impact fee, District C rate: $2,062 per multifamily dwelling unit. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $2,160 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
    $2,062.00
  • County Correctional Facilities Impact Fee (Polk County, MF)
    Polk County
    Polk County correctional facilities impact fee: $385 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $495 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
    $385.00
  • County EMS Impact Fee (Polk County, MF)
    Polk County
    Polk County emergency medical system (EMS) impact fee: $114 per multifamily dwelling unit. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
    $114.00
  • Law Enforcement Impact Fee (Polk County, MF)
    Polk County
    Polk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
  • Library Impact Fee (Polk County, MF)
    Polk County
    Polk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
  • Fire Rescue Impact Fee (Polk County, MF)
    Polk County
    Polk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County, MF)
    Polk County
    Polk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Frostproof has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Frostproof.
    $0.00
Total (Frostproof): $10,616.00
Sources last checked Official fee schedules:City of Frostproof Polk County / Polk County School Board Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frostproof: Commercial Impact Fees

Commercial development in Frostproof pays $5.31 per square foot in impact fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $265,550.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Commercial) ($4.57/sq ft), Correctional Facilities Impact Fee (Polk County, Commercial) ($0.56/sq ft) and EMS Impact Fee (Polk County, Commercial) ($0.18/sq ft).

Water Connection (Capacity) Fee (City of Frostproof) and Wastewater (Sewer) Connection (Capacity) Fee (City of Frostproof) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Commercial) and Law Enforcement Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Vehicle Fleet Facilities Impact Fee (City of Frostproof, Commercial), Fire Impact Fee (City of Frostproof, Commercial), Stormwater Management Impact Fee (City of Frostproof, Commercial), General Government Facilities Impact Fee (City of Frostproof, Commercial), Library Impact Fee (City of Frostproof, Commercial), Parks and Recreation Impact Fee (City of Frostproof, Commercial), and Transportation Impact Fee (City of Frostproof, Commercial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Frostproof Impact Fee Schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Frostproof)
    City of Frostproof
    Frostproof's city water utility charges a water system expansion (impact) fee on each new connection, per equivalent residential unit (350 gallons per day), with the amount set by city council resolution; the city publishes only the single-family amount, so no nonresidential figure is shown. Customers outside the city limits may pay up to 25% more.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (City of Frostproof)
    City of Frostproof
    Frostproof's city wastewater utility charges a wastewater system expansion (impact) fee on each new connection, per equivalent residential unit (270 gallons per day), with the amount set by city council resolution; the city publishes only the single-family amount, so no nonresidential figure is shown. Customers outside the city limits may pay up to 25% more.
    Requires confirmation
City$0.00
  • Vehicle Fleet Facilities Impact Fee (City of Frostproof, Commercial)
    City of Frostproof
    The City of Frostproof charges a city vehicle fleet facilities impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Fire Impact Fee (City of Frostproof, Commercial)
    City of Frostproof
    The City of Frostproof charges a city fire impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Stormwater Management Impact Fee (City of Frostproof, Commercial)
    City of Frostproof
    The City of Frostproof charges a city stormwater management impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • General Government Facilities Impact Fee (City of Frostproof, Commercial)
    City of Frostproof
    The City of Frostproof charges a city general government facilities impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Library Impact Fee (City of Frostproof, Commercial)
    City of Frostproof
    The City of Frostproof charges a city library impact fee on new development under Ordinance 2007-31. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026); whether and how much nonresidential projects pay is not published.
    Requires confirmation
  • Parks and Recreation Impact Fee (City of Frostproof, Commercial)
    City of Frostproof
    The City of Frostproof charges a city parks and recreation impact fee on new development under Ordinance 2007-31. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026); whether and how much nonresidential projects pay is not published.
    Requires confirmation
  • Transportation Impact Fee (City of Frostproof, Commercial)
    City of Frostproof
    The City of Frostproof charges a city transportation impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
County$5.31/sq ft
  • Transportation Impact Fee (Polk County, Commercial)
    Polk County
    Polk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
    $4.57/sq ft
  • Correctional Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County correctional facilities impact fee, phased in under Ordinance 2024-062: $560 per 1,000 sq ft of retail/commercial space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $727 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
    $0.56/sq ft
  • EMS Impact Fee (Polk County, Commercial)
    Polk County
    Effective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
    $0.18/sq ft
  • Parks & Recreational Facilities Impact Fee (Polk County, Commercial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Library Impact Fee (Polk County, Commercial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Fire Rescue Impact Fee (Polk County, Commercial)
    Polk County
    Not charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    Requires confirmation
  • Law Enforcement Impact Fee (Polk County, Commercial)
    Polk County
    Not charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    Requires confirmation
Total (Frostproof): $5.31/sq ft (≈ $265,550.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Frostproof Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frostproof: Industrial Impact Fees

Industrial development in Frostproof pays $0.70 per square foot in impact fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $35,200.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Industrial) ($0.50/sq ft), Correctional Facilities Impact Fee (Polk County, Industrial) ($0.16/sq ft) and EMS Impact Fee (Polk County, Industrial) ($0.05/sq ft).

Water Connection (Capacity) Fee (City of Frostproof) and Wastewater (Sewer) Connection (Capacity) Fee (City of Frostproof) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Library Impact Fee (City of Frostproof, Industrial), Stormwater Management Impact Fee (City of Frostproof, Industrial), Vehicle Fleet Facilities Impact Fee (City of Frostproof, Industrial), Parks and Recreation Impact Fee (City of Frostproof, Industrial), Fire Impact Fee (City of Frostproof, Industrial), General Government Facilities Impact Fee (City of Frostproof, Industrial), and Transportation Impact Fee (City of Frostproof, Industrial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Frostproof Impact Fee Schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Frostproof)
    City of Frostproof
    Frostproof's city water utility charges a water system expansion (impact) fee on each new connection, per equivalent residential unit (350 gallons per day), with the amount set by city council resolution; the city publishes only the single-family amount, so no nonresidential figure is shown. Customers outside the city limits may pay up to 25% more.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (City of Frostproof)
    City of Frostproof
    Frostproof's city wastewater utility charges a wastewater system expansion (impact) fee on each new connection, per equivalent residential unit (270 gallons per day), with the amount set by city council resolution; the city publishes only the single-family amount, so no nonresidential figure is shown. Customers outside the city limits may pay up to 25% more.
    Requires confirmation
City$0.00
  • Library Impact Fee (City of Frostproof, Industrial)
    City of Frostproof
    The City of Frostproof charges a city library impact fee on new development under Ordinance 2007-31. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026); whether and how much nonresidential projects pay is not published.
    Requires confirmation
  • Stormwater Management Impact Fee (City of Frostproof, Industrial)
    City of Frostproof
    The City of Frostproof charges a city stormwater management impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Vehicle Fleet Facilities Impact Fee (City of Frostproof, Industrial)
    City of Frostproof
    The City of Frostproof charges a city vehicle fleet facilities impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Parks and Recreation Impact Fee (City of Frostproof, Industrial)
    City of Frostproof
    The City of Frostproof charges a city parks and recreation impact fee on new development under Ordinance 2007-31. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026); whether and how much nonresidential projects pay is not published.
    Requires confirmation
  • Fire Impact Fee (City of Frostproof, Industrial)
    City of Frostproof
    The City of Frostproof charges a city fire impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • General Government Facilities Impact Fee (City of Frostproof, Industrial)
    City of Frostproof
    The City of Frostproof charges a city general government facilities impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Transportation Impact Fee (City of Frostproof, Industrial)
    City of Frostproof
    The City of Frostproof charges a city transportation impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
County$0.70/sq ft
  • Transportation Impact Fee (Polk County, Industrial)
    Polk County
    Polk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
    $0.50/sq ft
  • Correctional Facilities Impact Fee (Polk County, Industrial)
    Polk County
    Polk County correctional facilities impact fee, phased in under Ordinance 2024-062: $157 per 1,000 sq ft of industrial/manufacturing space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $205 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
    $0.16/sq ft
  • EMS Impact Fee (Polk County, Industrial)
    Polk County
    Effective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
    $0.05/sq ft
  • Parks & Recreational Facilities Impact Fee (Polk County, Industrial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Library Impact Fee (Polk County, Industrial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Law Enforcement Impact Fee (Polk County, Industrial)
    Polk County
    Not charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    Requires confirmation
  • Fire Rescue Impact Fee (Polk County, Industrial)
    Polk County
    Not charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    Requires confirmation
Total (Frostproof): $0.70/sq ft (≈ $35,200.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Frostproof Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frostproof: Office Impact Fees

Office development in Frostproof pays $3.41 per square foot in impact fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to at least $85,225.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Office) ($3.03/sq ft), Correctional Facilities Impact Fee (Polk County, Office) ($0.29/sq ft) and EMS Impact Fee (Polk County, Office) ($0.09/sq ft).

Water Connection (Capacity) Fee (City of Frostproof) and Wastewater (Sewer) Connection (Capacity) Fee (City of Frostproof) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Office) and Law Enforcement Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Library Impact Fee (City of Frostproof, Office), General Government Facilities Impact Fee (City of Frostproof, Office), Vehicle Fleet Facilities Impact Fee (City of Frostproof, Office), Parks and Recreation Impact Fee (City of Frostproof, Office), Transportation Impact Fee (City of Frostproof, Office), Fire Impact Fee (City of Frostproof, Office), and Stormwater Management Impact Fee (City of Frostproof, Office) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Frostproof Impact Fee Schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Frostproof)
    City of Frostproof
    Frostproof's city water utility charges a water system expansion (impact) fee on each new connection, per equivalent residential unit (350 gallons per day), with the amount set by city council resolution; the city publishes only the single-family amount, so no nonresidential figure is shown. Customers outside the city limits may pay up to 25% more.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (City of Frostproof)
    City of Frostproof
    Frostproof's city wastewater utility charges a wastewater system expansion (impact) fee on each new connection, per equivalent residential unit (270 gallons per day), with the amount set by city council resolution; the city publishes only the single-family amount, so no nonresidential figure is shown. Customers outside the city limits may pay up to 25% more.
    Requires confirmation
City$0.00
  • Library Impact Fee (City of Frostproof, Office)
    City of Frostproof
    The City of Frostproof charges a city library impact fee on new development under Ordinance 2007-31. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026); whether and how much nonresidential projects pay is not published.
    Requires confirmation
  • General Government Facilities Impact Fee (City of Frostproof, Office)
    City of Frostproof
    The City of Frostproof charges a city general government facilities impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Vehicle Fleet Facilities Impact Fee (City of Frostproof, Office)
    City of Frostproof
    The City of Frostproof charges a city vehicle fleet facilities impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Parks and Recreation Impact Fee (City of Frostproof, Office)
    City of Frostproof
    The City of Frostproof charges a city parks and recreation impact fee on new development under Ordinance 2007-31. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026); whether and how much nonresidential projects pay is not published.
    Requires confirmation
  • Transportation Impact Fee (City of Frostproof, Office)
    City of Frostproof
    The City of Frostproof charges a city transportation impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Fire Impact Fee (City of Frostproof, Office)
    City of Frostproof
    The City of Frostproof charges a city fire impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
  • Stormwater Management Impact Fee (City of Frostproof, Office)
    City of Frostproof
    The City of Frostproof charges a city stormwater management impact fee on new development under Ordinance 2007-31, and commercial and industrial projects have paid it since the temporary 100% reduction ended January 31, 2016. The city sets the amount by resolution and publishes only the single-family rate (as of January 1, 2026), so no nonresidential amount is shown.
    Requires confirmation
County$3.41/sq ft
  • Transportation Impact Fee (Polk County, Office)
    Polk County
    Polk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
    $3.03/sq ft
  • Correctional Facilities Impact Fee (Polk County, Office)
    Polk County
    Polk County correctional facilities impact fee, phased in under Ordinance 2024-062: $293 per 1,000 sq ft of office space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $367 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
    $0.29/sq ft
  • EMS Impact Fee (Polk County, Office)
    Polk County
    Effective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
    $0.09/sq ft
  • Parks & Recreational Facilities Impact Fee (Polk County, Office)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Library Impact Fee (Polk County, Office)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Fire Rescue Impact Fee (Polk County, Office)
    Polk County
    Not charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    Requires confirmation
  • Law Enforcement Impact Fee (Polk County, Office)
    Polk County
    Not charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    Requires confirmation
Total (Frostproof): $3.41/sq ft (≈ $85,225.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Frostproof Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frostproof Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Frostproof Impact Fee FAQs

What are the total impact fees for a single-family home in Frostproof, Florida?

A new single-family home in Frostproof pays $25,611.25 per unit in combined impact fees (rates sourced October 27, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Frostproof?

Commercial development in Frostproof pays $5.31 per square foot in impact fees, at least $265,550.00 for a 50,000 sq ft building. 11 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Frostproof charge its own impact fees?

Yes. Frostproof levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Frostproof, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Polk County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000