Lake Wales impact fees by project type
Lake Wales: Single-Family Impact Fees
A new single-family home in Lake Wales pays at least $26,597.63 per unit in impact fees (rates sourced July 18, 2026). Of that, Polk County-levied fees account for $14,845.00 and municipal or utility fees for $11,752.63.
The largest line items are Educational Impact Fee (Polk County) ($11,124.00), Sewer Capacity Fee (City of Lake Wales) ($3,411.89) and Transportation Impact Fee (Polk County, District C) ($3,052.00).
Law Enforcement Impact Fee (Polk County), Fire Rescue Impact Fee (Polk County), Parks & Recreational Facilities Impact Fee (Polk County), and Library Impact Fee (Polk County) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Lake Wales)$2,691.10City of Lake Wales UtilitiesCity Impact Fee Schedule, eff 10/1/2025. Water: SF (0.75in meter) $2,691.10 / MF $2,017.76 per unit. Larger meters: 1in $4,574.20; 1.5in $8,880.18; 2in $14,262.37.
- Sewer Capacity Fee (City of Lake Wales)$3,411.89City of Lake Wales UtilitiesCity Impact Fee Schedule, eff 10/1/2025. Sewer: SF $3,411.89 / MF $2,558.64 per unit. Meter-based: 1in $5,799.43; 1.5in $11,258.90; 2in $18,082.66.
- Multimodal Transportation Impact Fee (City of Lake Wales)$2,159.38City of Lake WalesCity Multimodal Transportation Impact Fee, Schedule C (Ord 2022-38; NUE Urban Concepts Technical Report July 2022); Impact Fee Schedule eff 10/1/2025. SF Detached $2,159.38/DU; SF Attached (townhome/villa/duplex/triplex) $1,648.73; MF 2-3 stories $1,543.40; MF 4-10 stories $1,039.62. Polk transportation District C. City own mobility fee — whether county Transportation also applies on top (HB479 in-lieu) is unconfirmed.
- Parks Impact Fee (City of Lake Wales)$1,972.52City of Lake WalesCity Public Facilities Impact Fee Schedule (Raftelis study 9/2/2020; Code §23-763), North & South Service Areas, eff 10/1/2025. Parks: SF $1,972.52 / MF $1,702.07 per housing unit. City own parks fee → county Parks not applied.
- Police Impact Fee (City of Lake Wales)$622.54City of Lake WalesCity Public Facilities Impact Fee Schedule, eff 10/1/2025. Police: SF $622.54 / MF $545.29 per unit. City own police fee → county Law Enforcement not applied.
- Fire & EMS Impact Fee (City of Lake Wales)$538.67City of Lake WalesCity Public Facilities Impact Fee Schedule, eff 10/1/2025. Fire & EMS: SF $538.67 / MF $449.25 per unit. City own fire fee → county Fire not applied (county EMS still applies countywide).
- Library Impact Fee (City of Lake Wales)$356.53City of Lake WalesCity Public Facilities Impact Fee Schedule, eff 10/1/2025. Libraries: SF $356.53 / MF $306.85 per unit. City own library fee → county Library not applied.
- Educational Impact Fee (Polk County)$11,124.00Polk County / Polk County School BoardPolk countywide educational impact fee, Ord 2024-62 Art.VI. Current-collected SFR $11,124 (WH 2026 guide; 100%-study $14,338). Polk Building 863-534-6080.
- Transportation Impact Fee (Polk County, District C)$3,052.00Polk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District C (South) SFR $3,052 (Phase Three $3,185 on 1/1/2027). §8.7-43(A) applies the fee countywide incl. inside Lake Wales. CORRECTED 7/14/2026: prior $3,185 was the 2027 rate.
- Correctional Impact Fee (Polk County)$516.00Polk CountyPolk countywide correctional impact fee, Ord 2024-62 Art.V. Current-collected SFR $516 (100%-study $662).
- EMS Impact Fee (Polk County)$153.00Polk CountyPolk countywide EMS impact fee, Ord 2024-62 Art.III. $153 SFR (not phased). Note: city also levies a Fire & EMS fee — county EMS funds county ambulance service (countywide).
- Law Enforcement Impact Fee (Polk County)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. X; §8.7-103 requires a county-city interlocal for the fee to apply inside a city. Adopted Phase Two rate (Att. 8, eff. 1/1/2026): SFR $578. $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Fire Rescue Impact Fee (Polk County)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. IX; §8.7-93 requires a county-city interlocal for the fee to apply inside a city. Adopted rate (Att. 7, eff. 1/1/2025): SFR $377. $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Parks & Recreational Facilities Impact Fee (Polk County)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. VIII; §8.7-83 requires a county-city interlocal for the fee to apply inside a city. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): SFR $1,381. Lake Wales levies its own city Parks impact fee. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
- Library Impact Fee (Polk County)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. VII; §8.7-73 requires a county-city interlocal for the fee to apply inside a city. Adopted rate (Att. 5, eff. 1/1/2025): SFR $188. Participation is city-by-city — Lakeland and Bartow DO pay it. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Wales: Multifamily Impact Fees
A new multifamily unit in Lake Wales pays at least $19,235.48 per unit in impact fees (rates sourced July 18, 2026). Of that, Polk County-levied fees account for $10,616.00 and municipal or utility fees for $8,619.48.
The largest line items are Educational Impact Fee (Polk County, MF) ($8,055.00), Sewer Capacity Fee (City of Lake Wales, MF) ($2,558.64) and Transportation Impact Fee (Polk County, District C, MF) ($2,062.00).
Library Impact Fee (Polk County, MF), Fire Rescue Impact Fee (Polk County, MF), Parks & Recreational Facilities Impact Fee (Polk County, MF), and Law Enforcement Impact Fee (Polk County, MF) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capacity Fee (City of Lake Wales, MF)$2,017.76City of Lake Wales UtilitiesCity Impact Fee Schedule, eff 10/1/2025. Water MF $2,017.76/unit (SF 0.75in $2,691.10). Master-metered nonres by meter size.
- Sewer Capacity Fee (City of Lake Wales, MF)$2,558.64City of Lake Wales UtilitiesCity Impact Fee Schedule, eff 10/1/2025. Sewer MF $2,558.64/unit (SF $3,411.89).
- Parks Impact Fee (City of Lake Wales, MF)$1,702.07City of Lake WalesCity Public Facilities Impact Fee Schedule, eff 10/1/2025. Parks MF $1,702.07/unit (SF $1,972.52). County Parks not applied.
- Multimodal Transportation Impact Fee (City of Lake Wales, MF 4-10 stories)$1,039.62City of Lake WalesCity Multimodal Transportation Impact Fee Schedule C, eff 10/1/2025. MF (Four to Ten Stories) $1,039.62/DU — DEFAULT (tallest tier). See non-default 2-3 stories record ($1,543.40). Ord 2022-38 / NUE Technical Report 7/2022. District C.
- Police Impact Fee (City of Lake Wales, MF)$545.29City of Lake WalesCity Public Facilities Impact Fee Schedule, eff 10/1/2025. Police MF $545.29/unit (SF $622.54). County Law Enforcement not applied.
- Fire & EMS Impact Fee (City of Lake Wales, MF)$449.25City of Lake WalesCity Public Facilities Impact Fee Schedule, eff 10/1/2025. Fire & EMS MF $449.25/unit (SF $538.67). County Fire not applied.
- Library Impact Fee (City of Lake Wales, MF)$306.85City of Lake WalesCity Public Facilities Impact Fee Schedule, eff 10/1/2025. Libraries MF $306.85/unit (SF $356.53). County Library not applied.
- Educational Impact Fee (Polk County, MF)$8,055.00Polk County / Polk County School BoardPolk countywide educational, Ord 2024-62 Art.VI. Current-collected MF $8,055 (100%-study $10,670).
- Transportation Impact Fee (Polk County, District C, MF)$2,062.00Polk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District C (South) MF $2,062/unit (Phase Three $2,160 on 1/1/2027). §8.7-43(A) applies countywide incl. inside Lake Wales. CORRECTED 7/14/2026: prior $2,160 was the 2027 rate.
- Correctional Impact Fee (Polk County, MF)$385.00Polk CountyPolk countywide correctional, Ord 2024-62 Art.V. Current-collected MF $385 (100%-study $495).
- EMS Impact Fee (Polk County, MF)$114.00Polk CountyPolk countywide EMS, Ord 2024-62 Art.III. MF $114 (not phased). City also levies Fire & EMS; county EMS funds county ambulance.
- Library Impact Fee (Polk County, MF)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. VII; §8.7-73 requires a county-city interlocal. Adopted rate (Att. 5, eff. 1/1/2025): MF $141/unit. Participation is city-by-city — Lakeland and Bartow DO pay it. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
- Fire Rescue Impact Fee (Polk County, MF)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. IX; §8.7-93 requires a county-city interlocal. Adopted rate (Att. 7, eff. 1/1/2025): MF $273/unit. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
- Parks & Recreational Facilities Impact Fee (Polk County, MF)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. VIII; §8.7-83 requires a county-city interlocal. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): MF $1,033/unit. Lake Wales levies its own city Parks impact fee. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
- Law Enforcement Impact Fee (Polk County, MF)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. X; §8.7-103 requires a county-city interlocal. Adopted Phase Two rate (Att. 8, eff. 1/1/2026): MF $417/unit. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Wales: Commercial Impact Fees
Commercial development in Lake Wales pays $9.86 per square foot in impact fees, plus $10,373.63 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $503,273.63. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Fee (City of Lake Wales) — 1" meter ($5,799.43 one-time), Water Capacity Fee (City of Lake Wales) — 1" meter ($4,574.20 one-time) and Multimodal Transportation Impact Fee (City of Lake Wales, Commercial) ($3.44/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (Polk County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Fire Rescue Impact Fee (Polk County, Commercial) and Law Enforcement Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Lake Wales) — 1" meter$4,574.20 one-timeCity of Lake WalesCity of Lake Wales water capacity fee, nonres by meter size (Impact Fee Schedule eff 10/1/2025). 1" = $4,574.20 (canonical default). Ladder: 3/4" $2,691.10; 1" $4,574.20; 1.5" $8,880.18; 2" $14,262.37; >2" by demand analysis.
- Sewer Capacity Fee (City of Lake Wales) — 1" meter$5,799.43 one-timeCity of Lake WalesCity of Lake Wales sewer capacity fee, nonres by meter size (eff 10/1/2025). 1" = $5,799.43 (canonical default). Ladder: 3/4" $3,411.89; 1" $5,799.43; 1.5" $11,258.90; 2" $18,082.66; >2" by demand analysis.
- Multimodal Transportation Impact Fee (City of Lake Wales, Commercial)$3.44/sq ftCity of Lake WalesCity of Lake Wales Multimodal Transportation Impact Fee, Schedule C, Ord 2022-38 (NUE Urban Concepts 2022), eff 10/1/2025. Per sq ft GFA. Row: Retail Business $3.44. (Office $2.24; Industrial/warehouse $0.66.) Citywide mobility fee.
- Police Impact Fee (City of Lake Wales, Commercial)$0.49/sq ftCity of Lake WalesCity of Lake Wales Police Impact Fee, Public Facilities schedule Code Sec. 23-763 (Raftelis 2020), eff 10/1/2025. Per sq ft. Row: ITE 820 Retail. (Office 710 $0.28; Light Industrial 110 $0.13.) City own police fee; county Law overlay held $0.
- Fire & EMS Impact Fee (City of Lake Wales, Commercial)$0.45/sq ftCity of Lake WalesCity of Lake Wales Fire & EMS Impact Fee, Public Facilities schedule Code Sec. 23-763, eff 10/1/2025. Per sq ft. Row: ITE 820 Retail. (Office 710 $0.26; Light Industrial 110 $0.12.) City own fire fee; county Fire overlay held $0 (county EMS still applies).
- Parks Impact Fee (City of Lake Wales, Commercial)$0.00City of Lake WalesCity of Lake Wales Parks Impact Fee, Public Facilities schedule Sec. 23-763 - residential-only (no nonresidential row published). $0 confirmed for nonres.
- Library Impact Fee (City of Lake Wales, Commercial)$0.00City of Lake WalesCity of Lake Wales Library Impact Fee, Public Facilities schedule Sec. 23-763 - residential-only (no nonresidential row). $0 confirmed for nonres.
- Transportation Impact Fee (Polk County, Commercial)$4.57/sq ftRequires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 2 (Transportation), District C (South). Phase Two rate eff. 1/1/2026-12/31/2026, per 1,000 sf GFA. Lake Wales = District C. Phase Three (1/1/2027) = $4,802. UNCONFIRMED: Lake Wales levies a citywide Multimodal (mobility) fee (Ord 2022-38); whether county transportation is collected on top or credited/in-lieu/escrowed under HB479 is unresolved - verify Ord 2022-38 / county 863-534-6000.
- Correctional Facilities Impact Fee (Polk County, Commercial)$0.73/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional Facilities), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide.
- EMS Impact Fee (Polk County, Commercial)$0.18/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide (county ambulance service; applies even where city has own fire).
- Library Impact Fee (Polk County, Commercial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 - no nonresidential rows; residential-only. $0 confirmed for nonres.
- Parks & Recreational Facilities Impact Fee (Polk County, Commercial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 - no nonresidential rows; residential-only. $0 confirmed for nonres.
- Fire Rescue Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. IX (Fire Rescue), Sec. 8.7-93 = municipal participation; Lake Wales has own Fire & EMS fee. Latent nonres (Att. 7): Comm $428/Off $216/Ind $121 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
- Law Enforcement Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. X (Law Enforcement), Sec. 8.7-103 = municipal participation; Lake Wales has own Police fee. Latent nonres (Att. 8): Comm $645/Off $326/Ind $182 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Wales: Industrial Impact Fees
Industrial development in Lake Wales pays $1.66 per square foot in impact fees, plus $10,373.63 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $93,473.63. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Fee (City of Lake Wales) — 1" meter ($5,799.43 one-time), Water Capacity Fee (City of Lake Wales) — 1" meter ($4,574.20 one-time) and Multimodal Transportation Impact Fee (City of Lake Wales, Industrial) ($0.66/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (Polk County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Lake Wales) — 1" meter$4,574.20 one-timeCity of Lake WalesCity of Lake Wales water capacity fee, nonres by meter size (Impact Fee Schedule eff 10/1/2025). 1" = $4,574.20 (canonical default). Ladder: 3/4" $2,691.10; 1" $4,574.20; 1.5" $8,880.18; 2" $14,262.37; >2" by demand analysis.
- Sewer Capacity Fee (City of Lake Wales) — 1" meter$5,799.43 one-timeCity of Lake WalesCity of Lake Wales sewer capacity fee, nonres by meter size (eff 10/1/2025). 1" = $5,799.43 (canonical default). Ladder: 3/4" $3,411.89; 1" $5,799.43; 1.5" $11,258.90; 2" $18,082.66; >2" by demand analysis.
- Multimodal Transportation Impact Fee (City of Lake Wales, Industrial)$0.66/sq ftCity of Lake WalesCity of Lake Wales Multimodal Transportation Impact Fee, Schedule C, Ord 2022-38, eff 10/1/2025. Per sq ft GFA. Row: Industrial (warehouse/mfg) $0.66.
- Police Impact Fee (City of Lake Wales, Industrial)$0.13/sq ftCity of Lake WalesCity of Lake Wales Police Impact Fee, Sec. 23-763, eff 10/1/2025. Per sq ft. Row: ITE 110 Light Industrial.
- Fire & EMS Impact Fee (City of Lake Wales, Industrial)$0.12/sq ftCity of Lake WalesCity of Lake Wales Fire & EMS Impact Fee, Sec. 23-763, eff 10/1/2025. Per sq ft. Row: ITE 110 Light Industrial.
- Parks Impact Fee (City of Lake Wales, Industrial)$0.00City of Lake WalesCity of Lake Wales Parks Impact Fee, Sec. 23-763 - residential-only. $0 confirmed for nonres.
- Library Impact Fee (City of Lake Wales, Industrial)$0.00City of Lake WalesCity of Lake Wales Library Impact Fee, Sec. 23-763 - residential-only. $0 confirmed for nonres.
- Transportation Impact Fee (Polk County, Industrial)$0.50/sq ftRequires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 2 (Transportation), District C, Phase Two eff. 1/1/2026-12/31/2026, per 1,000 sf GFA. Phase Three = $522. UNCONFIRMED re HB479 mobility-in-lieu (city Multimodal fee) - verify Ord 2022-38.
- Correctional Facilities Impact Fee (Polk County, Industrial)$0.20/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- EMS Impact Fee (Polk County, Industrial)$0.05/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- Library Impact Fee (Polk County, Industrial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 - no nonresidential rows; residential-only. $0 confirmed for nonres.
- Parks & Recreational Facilities Impact Fee (Polk County, Industrial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 - no nonresidential rows; residential-only. $0 confirmed for nonres.
- Law Enforcement Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Sec. 8.7-103 municipal participation. Latent Att. 8 Industrial = $182 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
- Fire Rescue Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Sec. 8.7-93 municipal participation. Latent Att. 7 Industrial = $121 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Wales: Office Impact Fees
Office development in Lake Wales pays $6.26 per square foot in impact fees, plus $10,373.63 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to at least $166,948.63. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Fee (City of Lake Wales) — 1" meter ($5,799.43 one-time), Water Capacity Fee (City of Lake Wales) — 1" meter ($4,574.20 one-time) and Multimodal Transportation Impact Fee (City of Lake Wales, Office) ($2.24/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (Polk County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Law Enforcement Impact Fee (Polk County, Office) and Fire Rescue Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (City of Lake Wales) — 1" meter$4,574.20 one-timeCity of Lake WalesCity of Lake Wales water capacity fee, nonres by meter size (Impact Fee Schedule eff 10/1/2025). 1" = $4,574.20 (canonical default). Ladder: 3/4" $2,691.10; 1" $4,574.20; 1.5" $8,880.18; 2" $14,262.37; >2" by demand analysis.
- Sewer Capacity Fee (City of Lake Wales) — 1" meter$5,799.43 one-timeCity of Lake WalesCity of Lake Wales sewer capacity fee, nonres by meter size (eff 10/1/2025). 1" = $5,799.43 (canonical default). Ladder: 3/4" $3,411.89; 1" $5,799.43; 1.5" $11,258.90; 2" $18,082.66; >2" by demand analysis.
- Multimodal Transportation Impact Fee (City of Lake Wales, Office)$2.24/sq ftCity of Lake WalesCity of Lake Wales Multimodal Transportation Impact Fee, Schedule C, Ord 2022-38, eff 10/1/2025. Per sq ft GFA. Row: Office $2.24.
- Police Impact Fee (City of Lake Wales, Office)$0.28/sq ftCity of Lake WalesCity of Lake Wales Police Impact Fee, Sec. 23-763, eff 10/1/2025. Per sq ft. Row: ITE 710 General Office.
- Fire & EMS Impact Fee (City of Lake Wales, Office)$0.26/sq ftCity of Lake WalesCity of Lake Wales Fire & EMS Impact Fee, Sec. 23-763, eff 10/1/2025. Per sq ft. Row: ITE 710 General Office.
- Library Impact Fee (City of Lake Wales, Office)$0.00City of Lake WalesCity of Lake Wales Library Impact Fee, Sec. 23-763 - residential-only. $0 confirmed for nonres.
- Parks Impact Fee (City of Lake Wales, Office)$0.00City of Lake WalesCity of Lake Wales Parks Impact Fee, Sec. 23-763 - residential-only. $0 confirmed for nonres.
- Transportation Impact Fee (Polk County, Office)$3.03/sq ftRequires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 2 (Transportation), District C, Phase Two eff. 1/1/2026-12/31/2026, per 1,000 sf GFA. Phase Three = $3,178. UNCONFIRMED re HB479 mobility-in-lieu (city Multimodal fee) - verify Ord 2022-38.
- Correctional Facilities Impact Fee (Polk County, Office)$0.37/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- EMS Impact Fee (Polk County, Office)$0.09/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- Parks & Recreational Facilities Impact Fee (Polk County, Office)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 - no nonresidential rows; residential-only. $0 confirmed for nonres.
- Library Impact Fee (Polk County, Office)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 - no nonresidential rows; residential-only. $0 confirmed for nonres.
- Law Enforcement Impact Fee (Polk County, Office)Requires confirmationPolk CountyPolk County Ord. 2024-062, Sec. 8.7-103 municipal participation. Latent Att. 8 Office = $326 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
- Fire Rescue Impact Fee (Polk County, Office)Requires confirmationPolk CountyPolk County Ord. 2024-062, Sec. 8.7-93 municipal participation. Latent Att. 7 Office = $216 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Lake Wales
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Lake Wales, Florida?
A new single-family home in Lake Wales pays at least $26,597.63 per unit in combined impact fees (rates sourced July 18, 2026). 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Lake Wales?
Commercial development in Lake Wales pays $9.86 per square foot in impact fees, plus $10,373.63 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $503,273.63 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Lake Wales charge its own impact fees?
Yes. Lake Wales levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lake Wales, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Polk County impact fees page.