Lake Hamilton impact fees by project type
Lake Hamilton: Single-Family Impact Fees
A new single-family home in Lake Hamilton pays at least $29,265.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Polk County-levied fees account for $15,503.00 and municipal or utility fees for $13,762.00.
The largest line items are Educational Impact Fee (Polk County) ($11,124.00), Sewer Capacity Fee (Town of Lake Hamilton) ($6,371.00) and Water Capacity Fee (Town of Lake Hamilton) ($5,650.00).
Fire Rescue Impact Fee (Polk County), Library Impact Fee (Polk County), Law Enforcement Impact Fee (Polk County), and Parks & Recreational Facilities Impact Fee (Polk County) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (Town of Lake Hamilton)$5,650.00Town of Lake HamiltonCh.32 §32-8 water system capacity fee: $5,650 per ERC; SFR Single-Family Detached = 1.000 ERC. MF ERC factors: Efficiency 0.500, 1-2BR 0.833, >2BR 1.000; Mobile Home 1-2BR 0.833.
- Sewer Capacity Fee (Town of Lake Hamilton)$6,371.00Town of Lake HamiltonCh.32 §32-9 wastewater system capacity fee: $6,371 per ERC; SFR = 1.000 ERC. Same ERC factor schedule as water (Efficiency 0.500, 1-2BR 0.833, >2BR 1.000).
- Streets Impact Fee (Town of Lake Hamilton)$707.00Town of Lake HamiltonNon-Utility Impact Fee, Code Ch.33 §33-10 (Streets); Willdan Financial Services study 3/17/2022. SFR $707/DU (VMT-based); MF $494. Collected IN ADDITION to Polk County transportation (Dist A).
- Parks and Trails Impact Fee (Town of Lake Hamilton)$461.00Town of Lake HamiltonNon-Utility Impact Fee §33-11 (Parks & Trails): SFR $461/DU, MF $380. Willdan study 3/17/2022. Town own parks fee → county Parks overlay not applied.
- Municipal Facilities Impact Fee (Town of Lake Hamilton)$288.00Town of Lake HamiltonNon-Utility Impact Fee §33-8 (Municipal Facilities / general government): SFR $288/DU, MF $238. Willdan study 3/17/2022.
- Public Safety Impact Fee (Town of Lake Hamilton)$285.00Town of Lake HamiltonNon-Utility Impact Fee §33-9 (Public Safety = police + fire): SFR $285/DU, MF $235. Willdan study 3/17/2022. Town own public safety fee → county Fire/Law overlays not applied.
- Educational Impact Fee (Polk County)$11,124.00Polk County / Polk County School BoardPolk countywide educational impact fee, Ord 2024-62 Art.VI. Current-collected SFR $11,124 (WH 2026 guide; 100%-study $14,338). Polk Building 863-534-6080.
- Transportation Impact Fee (Polk County, District A)$3,710.00Polk CountyPolk countywide transportation impact fee, District A, Ord 2024-62 Art.IV. Current-collected SFR $3,710 (100%-study $4,103). In addition to town's own Streets fee.
- Correctional Impact Fee (Polk County)$516.00Polk CountyPolk countywide correctional impact fee, Ord 2024-62 Art.V. Current-collected SFR $516 (100%-study $662).
- EMS Impact Fee (Polk County)$153.00Polk CountyPolk countywide EMS impact fee, Ord 2024-62 Art.III. $153 SFR (not phased).
- Fire Rescue Impact Fee (Polk County)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. IX; §8.7-93 requires a county-city interlocal for the fee to apply inside a city. Adopted rate (Att. 7, eff. 1/1/2025): SFR $377. $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Library Impact Fee (Polk County)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): the county library impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): SFR $188 / MF $141. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Confirm with Polk County Building Division, (863) 534-6000.
- Law Enforcement Impact Fee (Polk County)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. X; §8.7-103 requires a county-city interlocal for the fee to apply inside a city. Adopted Phase Two rate (Att. 8, eff. 1/1/2026): SFR $578. $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Parks & Recreational Facilities Impact Fee (Polk County)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. VIII; §8.7-83 requires a county-city interlocal for the fee to apply inside a city. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): SFR $1,381. $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Hamilton: Multifamily Impact Fees
A new multifamily unit in Lake Hamilton pays at least $22,422.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Polk County-levied fees account for $11,062.00 and municipal or utility fees for $11,360.00.
The largest line items are Educational Impact Fee (Polk County, MF) ($8,055.00), Sewer Capacity Fee (Town of Lake Hamilton, MF) ($5,307.00) and Water Capacity Fee (Town of Lake Hamilton, MF) ($4,706.00).
Fire Rescue Impact Fee (Polk County, MF), Law Enforcement Impact Fee (Polk County, MF), Library Impact Fee (Polk County, MF), and Parks & Recreational Facilities Impact Fee (Polk County, MF) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capacity Fee (Town of Lake Hamilton, MF)$4,706.00Town of Lake HamiltonCh.32 §32-8: $5,650/ERC. MF 1-2BR default = 0.833 ERC = $4,706 (5650×0.833). Other tiers: Efficiency 0.500 = $2,825; >2BR 1.000 = $5,650.
- Sewer Capacity Fee (Town of Lake Hamilton, MF)$5,307.00Town of Lake HamiltonCh.32 §32-9: $6,371/ERC. MF 1-2BR default = 0.833 ERC = $5,307 (6371×0.833). Other tiers: Efficiency 0.500 = $3,186; >2BR 1.000 = $6,371.
- Streets Impact Fee (Town of Lake Hamilton, MF)$494.00Town of Lake HamiltonCh.33 §33-10 Streets, MF $494/DU (SFR $707). Willdan 3/17/2022. In addition to county Transportation Dist A.
- Parks and Trails Impact Fee (Town of Lake Hamilton, MF)$380.00Town of Lake Hamilton§33-11 Parks & Trails, MF $380/DU (SFR $461). County Parks not applied.
- Municipal Facilities Impact Fee (Town of Lake Hamilton, MF)$238.00Town of Lake Hamilton§33-8 Municipal Facilities, MF $238/DU (SFR $288).
- Public Safety Impact Fee (Town of Lake Hamilton, MF)$235.00Town of Lake Hamilton§33-9 Public Safety (police+fire), MF $235/DU (SFR $285). County Fire/Law not applied.
- Educational Impact Fee (Polk County, MF)$8,055.00Polk County / Polk County School BoardPolk countywide educational, Ord 2024-62 Art.VI. Current-collected MF $8,055 (100%-study $10,670).
- Transportation Impact Fee (Polk County, District A, MF)$2,508.00Polk CountyPolk countywide transportation Dist A, Ord 2024-62 Art.IV. Current-collected MF $2,508 (100%-study $2,782). In addition to town Streets fee.
- Correctional Impact Fee (Polk County, MF)$385.00Polk CountyPolk countywide correctional, Ord 2024-62 Art.V. Current-collected MF $385 (100%-study $495).
- EMS Impact Fee (Polk County, MF)$114.00Polk CountyPolk countywide EMS, Ord 2024-62 Art.III. MF $114 (not phased).
- Fire Rescue Impact Fee (Polk County, MF)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. IX; §8.7-93 requires a county-city interlocal. Adopted rate (Att. 7, eff. 1/1/2025): MF $273/unit. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
- Law Enforcement Impact Fee (Polk County, MF)Requires confirmationADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. X; §8.7-103 requires a county-city interlocal. Adopted Phase Two rate (Att. 8, eff. 1/1/2026): MF $417/unit. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
- Library Impact Fee (Polk County, MF)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): Multi-Family $141/unit. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Parks & Recreational Facilities Impact Fee (Polk County, MF)Requires confirmationPolk CountyADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. VIII; §8.7-83 requires a county-city interlocal. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): MF $1,033/unit. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Hamilton: Commercial Impact Fees
Commercial development in Lake Hamilton pays $7.14 per square foot in impact fees, plus $12,021.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $368,871.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Fee (Town of Lake Hamilton) ($6,371.00 one-time), Water Capacity Fee (Town of Lake Hamilton) ($5,650.00 one-time) and Transportation Impact Fee (Polk County, Commercial) ($5.56/sq ft).
Law Enforcement Impact Fee (Polk County, Commercial) and Fire Rescue Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (Town of Lake Hamilton)$5,650.00 one-timeTown of Lake HamiltonTown of Lake Hamilton water system capacity fee = $5,650 per ERC (1 ERC = 250 gpd), Code Sec. 32-8, Ord O-23-09 eff 8-1-2023. Amount shown = 1-ERC base charge. Nonres ERC count set by a use-specific factor schedule (per 1,000 sf GFA or driver unit), NOT a meter-size table: Office 0.400/1,000 sf, Retail 0.500/1,000 sf, Industrial/Manufacturing 0.400 (0/showers)-1.250/1,000 sf, Warehouse 0.200/1,000 sf; unlisted uses set administratively by gpd estimate. Total fee = ERC factor x sf x $5,650.
- Sewer Capacity Fee (Town of Lake Hamilton)$6,371.00 one-timeTown of Lake HamiltonTown of Lake Hamilton wastewater system capacity fee = $6,371 per ERC, Code Sec. 32-9, Ord O-23-09 eff 8-1-2023. Amount shown = 1-ERC base charge. Nonres ERC count by same use-specific factor schedule as water (Office 0.400/1,000 sf, Retail 0.500/1,000 sf, Warehouse 0.200/1,000 sf, Industrial 0.400-1.250/1,000 sf); unlisted uses set administratively by gpd estimate. Total fee = ERC factor x sf x $6,371.
- Streets Impact Fee (Town of Lake Hamilton, Commercial)$0.47/sq ftTown of Lake HamiltonTown of Lake Hamilton Streets Impact Fee, Code Sec. 33-10(c), Ord O-22-13 (VMT-based). Nonres per 1,000 sf GFA. Row: Commercial. (Office $332; Industrial $171.) Separate from and stacks with county transportation.
- Public Safety Impact Fee (Town of Lake Hamilton, Commercial)$0.12/sq ftTown of Lake HamiltonTown of Lake Hamilton Public Safety (police + fire) Impact Fee, Code Sec. 33-9(c), Ord O-22-13. Nonres per 1,000 sf GFA. Row: Commercial. (Office $158; Industrial $62.) Town own public-safety fee; county Fire/Law overlay held $0.
- Municipal Facilities Impact Fee (Town of Lake Hamilton, Commercial)$0.08/sq ftTown of Lake HamiltonTown of Lake Hamilton Municipal Facilities (general government) Impact Fee, Code Sec. 33-8(c); Ord O-22-13, Willdan study 3/17/2022. Nonres per 1,000 sf GFA. Row: Commercial. (Office $98; Industrial $38.)
- Parks and Trails Impact Fee (Town of Lake Hamilton, Commercial)$0.00Town of Lake HamiltonTown of Lake Hamilton Parks & Trails Impact Fee, Code Sec. 33-11 — imposed on residential development only; nonres schedule = $0.00 (EDU 0.0000). $0 confirmed for nonres.
- Transportation Impact Fee (Polk County, Commercial)$5.56/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. IV (Transportation), Att. 2, District A. Phase Two rate eff. 1/1/2026-12/31/2026, per 1,000 sf GFA. Lake Hamilton = District A (per town SFR record). Countywide, applies in town. Phase Three (1/1/2027) = $6,157. Row: General Commercial. 863-534-6080.
- Correctional Facilities Impact Fee (Polk County, Commercial)$0.73/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional Facilities), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide.
- EMS Impact Fee (Polk County, Commercial)$0.18/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, county-provided countywide.
- Library Impact Fee (Polk County, Commercial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 — no nonresidential rows; residential-only. $0 confirmed for nonres.
- Parks & Recreational Facilities Impact Fee (Polk County, Commercial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 — no nonresidential rows; residential-only. $0 confirmed for nonres.
- Law Enforcement Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. X (Law Enforcement), Sec. 8.7-103 = municipal participation. Latent nonres (Att. 8): Comm $645/Off $326/Ind $182 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
- Fire Rescue Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. IX (Fire Rescue), Sec. 8.7-93 = municipal participation (interlocal required to apply in town); Lake Hamilton also levies own Public Safety fee. Latent nonres (Att. 7): Comm $428/Off $216/Ind $121 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Hamilton: Industrial Impact Fees
Industrial development in Lake Hamilton pays $1.13 per square foot in impact fees, plus $12,021.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $68,671.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Fee (Town of Lake Hamilton) ($6,371.00 one-time), Water Capacity Fee (Town of Lake Hamilton) ($5,650.00 one-time) and Transportation Impact Fee (Polk County, Industrial) ($0.61/sq ft).
Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (Town of Lake Hamilton)$5,650.00 one-timeTown of Lake HamiltonTown of Lake Hamilton water system capacity fee = $5,650 per ERC (1 ERC = 250 gpd), Code Sec. 32-8, Ord O-23-09 eff 8-1-2023. Amount shown = 1-ERC base charge. Nonres ERC count set by a use-specific factor schedule (per 1,000 sf GFA or driver unit), NOT a meter-size table: Office 0.400/1,000 sf, Retail 0.500/1,000 sf, Industrial/Manufacturing 0.400 (0/showers)-1.250/1,000 sf, Warehouse 0.200/1,000 sf; unlisted uses set administratively by gpd estimate. Total fee = ERC factor x sf x $5,650.
- Sewer Capacity Fee (Town of Lake Hamilton)$6,371.00 one-timeTown of Lake HamiltonTown of Lake Hamilton wastewater system capacity fee = $6,371 per ERC, Code Sec. 32-9, Ord O-23-09 eff 8-1-2023. Amount shown = 1-ERC base charge. Nonres ERC count by same use-specific factor schedule as water (Office 0.400/1,000 sf, Retail 0.500/1,000 sf, Warehouse 0.200/1,000 sf, Industrial 0.400-1.250/1,000 sf); unlisted uses set administratively by gpd estimate. Total fee = ERC factor x sf x $6,371.
- Streets Impact Fee (Town of Lake Hamilton, Industrial)$0.17/sq ftTown of Lake HamiltonTown of Lake Hamilton Streets Impact Fee, Sec. 33-10(c), Ord O-22-13. Row: Industrial, per 1,000 sf GFA.
- Public Safety Impact Fee (Town of Lake Hamilton, Industrial)$0.06/sq ftTown of Lake HamiltonTown of Lake Hamilton Public Safety Impact Fee, Sec. 33-9(c), Ord O-22-13. Row: Industrial, per 1,000 sf GFA.
- Municipal Facilities Impact Fee (Town of Lake Hamilton, Industrial)$0.04/sq ftTown of Lake HamiltonTown of Lake Hamilton Municipal Facilities Impact Fee, Sec. 33-8(c), Ord O-22-13. Row: Industrial, per 1,000 sf GFA.
- Parks and Trails Impact Fee (Town of Lake Hamilton, Industrial)$0.00Town of Lake HamiltonTown of Lake Hamilton Parks & Trails Impact Fee, Sec. 33-11 — residential-only; nonres $0.00. $0 confirmed for nonres.
- Transportation Impact Fee (Polk County, Industrial)$0.61/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 2 (Transportation), District A, Phase Two eff. 1/1/2026-12/31/2026, per 1,000 sf GFA. Phase Three (1/1/2027) = $639. Row: Industrial.
- Correctional Facilities Impact Fee (Polk County, Industrial)$0.20/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- EMS Impact Fee (Polk County, Industrial)$0.05/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- Parks & Recreational Facilities Impact Fee (Polk County, Industrial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 — no nonresidential rows; residential-only. $0 confirmed for nonres.
- Library Impact Fee (Polk County, Industrial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 — no nonresidential rows; residential-only. $0 confirmed for nonres.
- Law Enforcement Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Sec. 8.7-103, municipal participation. Latent Att. 8 Industrial = $182 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
- Fire Rescue Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Sec. 8.7-93, municipal participation. Latent Att. 7 Industrial = $121 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Hamilton: Office Impact Fees
Office development in Lake Hamilton pays $4.72 per square foot in impact fees, plus $12,021.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to at least $130,096.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capacity Fee (Town of Lake Hamilton) ($6,371.00 one-time), Water Capacity Fee (Town of Lake Hamilton) ($5,650.00 one-time) and Transportation Impact Fee (Polk County, Office) ($3.68/sq ft).
Fire Rescue Impact Fee (Polk County, Office) and Law Enforcement Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capacity Fee (Town of Lake Hamilton)$5,650.00 one-timeTown of Lake HamiltonTown of Lake Hamilton water system capacity fee = $5,650 per ERC (1 ERC = 250 gpd), Code Sec. 32-8, Ord O-23-09 eff 8-1-2023. Amount shown = 1-ERC base charge. Nonres ERC count set by a use-specific factor schedule (per 1,000 sf GFA or driver unit), NOT a meter-size table: Office 0.400/1,000 sf, Retail 0.500/1,000 sf, Industrial/Manufacturing 0.400 (0/showers)-1.250/1,000 sf, Warehouse 0.200/1,000 sf; unlisted uses set administratively by gpd estimate. Total fee = ERC factor x sf x $5,650.
- Sewer Capacity Fee (Town of Lake Hamilton)$6,371.00 one-timeTown of Lake HamiltonTown of Lake Hamilton wastewater system capacity fee = $6,371 per ERC, Code Sec. 32-9, Ord O-23-09 eff 8-1-2023. Amount shown = 1-ERC base charge. Nonres ERC count by same use-specific factor schedule as water (Office 0.400/1,000 sf, Retail 0.500/1,000 sf, Warehouse 0.200/1,000 sf, Industrial 0.400-1.250/1,000 sf); unlisted uses set administratively by gpd estimate. Total fee = ERC factor x sf x $6,371.
- Streets Impact Fee (Town of Lake Hamilton, Office)$0.33/sq ftTown of Lake HamiltonTown of Lake Hamilton Streets Impact Fee, Sec. 33-10(c), Ord O-22-13. Row: Office, per 1,000 sf GFA.
- Public Safety Impact Fee (Town of Lake Hamilton, Office)$0.16/sq ftTown of Lake HamiltonTown of Lake Hamilton Public Safety Impact Fee, Sec. 33-9(c), Ord O-22-13. Row: Office, per 1,000 sf GFA.
- Municipal Facilities Impact Fee (Town of Lake Hamilton, Office)$0.10/sq ftTown of Lake HamiltonTown of Lake Hamilton Municipal Facilities Impact Fee, Sec. 33-8(c), Ord O-22-13. Row: Office, per 1,000 sf GFA.
- Parks and Trails Impact Fee (Town of Lake Hamilton, Office)$0.00Town of Lake HamiltonTown of Lake Hamilton Parks & Trails Impact Fee, Sec. 33-11 — residential-only; nonres $0.00. $0 confirmed for nonres.
- Transportation Impact Fee (Polk County, Office)$3.68/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 2 (Transportation), District A, Phase Two eff. 1/1/2026-12/31/2026, per 1,000 sf GFA. Phase Three (1/1/2027) = $4,069. Row: General Office.
- Correctional Facilities Impact Fee (Polk County, Office)$0.37/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. V (Correctional), Att. 3, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- EMS Impact Fee (Polk County, Office)$0.09/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. III (EMS), Att. 1, 100% eff. 1/1/2025, per 1,000 sf GFA, countywide.
- Parks & Recreational Facilities Impact Fee (Polk County, Office)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VIII (Parks), Att. 6 — no nonresidential rows; residential-only. $0 confirmed for nonres.
- Library Impact Fee (Polk County, Office)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Art. VII (Library), Att. 5 — no nonresidential rows; residential-only. $0 confirmed for nonres.
- Fire Rescue Impact Fee (Polk County, Office)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Sec. 8.7-93, municipal participation. Latent Att. 7 Office = $216 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
- Law Enforcement Impact Fee (Polk County, Office)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Sec. 8.7-103, municipal participation. Latent Att. 8 Office = $326 per 1,000 sf. Held $0 pending interlocal list. 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Lake Hamilton
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Lake Hamilton, Florida?
A new single-family home in Lake Hamilton pays at least $29,265.00 per unit in combined impact fees (rates sourced July 18, 2026). 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Lake Hamilton?
Commercial development in Lake Hamilton pays $7.14 per square foot in impact fees, plus $12,021.00 in one-time water and sewer connection fees, at least $368,871.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Lake Hamilton charge its own impact fees?
Yes. Lake Hamilton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lake Hamilton, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Polk County impact fees page.