IMPACTFEES.ORG

Eagle Lake, Florida Impact Fees

Eagle Lake applies its own fee schedule: municipal fees plus the Polk County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $36,503.00 per unit (rates sourced August 4, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Eagle Lake impact fees by project type

Eagle Lake: Single-Family Impact Fees

A new single-family home in Eagle Lake pays at least $36,503.00 per unit in impact fees (rates sourced August 4, 2026). Of that, Polk County-levied fees account for $15,503.00 and municipal or utility fees for $21,000.00.

The largest line items are Educational Impact Fee (SFR - Polk County, collected in Eagle Lake) ($11,124.00), Transportation Impact Fee (Polk County, District A) ($3,710.00) and Correctional Facilities Impact Fee (SFR - Polk County, collected in Eagle Lake) ($516.00).

Sewer Impact Fee (City of Eagle Lake) and Water Capacity (Impact) Fee (City of Eagle Lake) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Municipal (City) Impact Fee (City of Eagle Lake) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$10,500.00
  • Water Capacity (Impact) Fee (City of Eagle Lake)
    City of Eagle Lake
    8/4/2026 — City operates own water utility. Code Sec. 16-29 (Ord. O-20-24, adopted 8/3/2020): water capacity (impact) fee 5/8x3/4" meter = $5,500.00 at adoption, with code-mandated +$2,500 increases (ratio 1.00 for 3/4") in years two and three after adoption -> $10,500 current per the codified formula. Amount = capacity/impact component per that math; NOT directly published as a current number, so kept flagged. Other components: water tap-in fee $300 (3/4" inside city; $500 outside, Sec. 16-28); meter and backflow at market cost. City has also been reviewing impact fees with Polk Regional Water Coop/Raftelis, so a newer resolution may supersede. VERIFY current billed amount w/ Eagle Lake Utilities 863-293-4141.
    $10,500.00Requires confirmation
Sewer$10,500.00
  • Sewer Impact Fee (City of Eagle Lake)
    City of Eagle Lake
    8/4/2026 — City operates its own sewer collection; treatment by City of Bartow under interlocal agreement. Code Sec. 16-61 (Ord. O-20-25, adopted 8/3/2020): sewer impact fee $5,500.00/ERC inside city ($6,875 outside) at adoption, with code-mandated +$2,500/ERC increases in years two and three after adoption -> $10,500/ERC current per the codified formula (1 ERC per single-family dwelling). Amount = city impact/capacity component per that math; NOT directly published as a current number, so kept flagged. Breakdown of other components: sewer tap-in fee $500/ERC (Sec. 16-60) PLUS the current City of Bartow treatment-agreement fee (Bartow wastewater development fee, currently $2,398/unit) PLUS possible ENR index adjustments (Sec. 16-61(d)). VERIFY current billed total w/ Eagle Lake Utilities 863-293-4141.
    $10,500.00Requires confirmation
City$0.00
  • Municipal (City) Impact Fee (City of Eagle Lake)
    City of Eagle Lake
    8/4/2026 — Re-checked city code (Municode, current through Supp. 43): only codified impact fees are the water and sewer utility fees in Ch. 16; no fire/police/parks/transportation city impact fee chapter found. Likely relies on county overlays, but no official statement located to prove $0. $0 placeholder retained. VERIFY Eagle Lake City Hall 863-293-4141.
    Requires confirmation
County$15,503.00
  • Educational Impact Fee (SFR - Polk County, collected in Eagle Lake)
    Polk County
    Polk County school impact fee, SFR, collected in Eagle Lake (Ord. 2024-62). Phased-collected $11,124; 100%-study $14,338. VERIFY 863-534-6080.
    $11,124.00
  • Transportation Impact Fee (Polk County, District A)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District A SFR $3,710 (Phase Three $4,103 on 1/1/2027). §8.7-43(A) applies the fee countywide incl. inside Eagle Lake. CORRECTED 7/14/2026: prior $4,103 was the 2027 rate.
    $3,710.00
  • Correctional Facilities Impact Fee (SFR - Polk County, collected in Eagle Lake)
    Polk County
    Polk County Correctional impact fee, SFR, collected in Eagle Lake (Ord. 2024-62). Phased $516; 100%-study $662. VERIFY 863-534-6080.
    $516.00
  • EMS Impact Fee (SFR - Polk County, collected in Eagle Lake)
    Polk County
    Polk County EMS impact fee, SFR, collected in Eagle Lake (Ord. 2024-62). $153 = 100%-study (not phased).
    $153.00
  • Law Enforcement Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Law Enforcement article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Fire Rescue Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Fire Rescue article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Library Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Library article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Parks article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
Total (Eagle Lake): $36,503.00
Sources last checked August 4, 2026Official fee schedules:City of Eagle Lake Polk County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Eagle Lake: Multifamily Impact Fees

A new multifamily unit in Eagle Lake pays at least $21,562.00 per unit in impact fees (rates sourced August 4, 2026). Of that, Polk County-levied fees account for $11,062.00 and municipal or utility fees for $10,500.00.

The largest line items are Educational Impact Fee (MF - Polk County, collected in Eagle Lake) ($8,055.00), Transportation Impact Fee (Polk County, District A, MF) ($2,508.00) and Correctional Facilities Impact Fee (MF - Polk County, collected in Eagle Lake) ($385.00).

Sewer Impact Fee (City of Eagle Lake, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Fee (City of Eagle Lake, MF) is set by the utility and not published online. Municipal (City) Impact Fee (City of Eagle Lake, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (City of Eagle Lake, MF)
    City of Eagle Lake
    8/4/2026 — Meter-size-only schedule; no per-unit MF rate published. Code Sec. 16-29 water capacity fees run by meter size (5/8x3/4" $5,500 ... 6" $275,000 at adoption, Ord. O-20-24 8/3/2020, plus $2,500-per-ratio increases in years two and three), and Sec. 16-29(c) makes the impact fee negotiable with the city commission for developments with six or more connections. Multifamily amount therefore depends on master meter size or negotiation — cannot state per-unit. Kept flagged, amount null. VERIFY Eagle Lake Utilities 863-293-4141.
    Requires confirmation
Sewer$10,500.00
  • Sewer Impact Fee (City of Eagle Lake, MF)
    City of Eagle Lake
    8/4/2026 — Per-unit basis IS published: code Sec. 16-61(c)(1) assigns one ERC to each dwelling unit, expressly including apartment, condominium, townhouse and mobile home units. Fee (Ord. O-20-25, adopted 8/3/2020): $5,500.00/ERC inside city at adoption + code-mandated $2,500 increases in years two and three -> $10,500/unit per the codified formula; not directly published as a current number, so kept flagged. Additional components per unit: $500/ERC tap-in (Sec. 16-60) PLUS current City of Bartow treatment-agreement fee (Bartow wastewater development fee, currently $2,398/unit) PLUS possible ENR adjustments. VERIFY current billed total w/ Eagle Lake Utilities 863-293-4141.
    $10,500.00Requires confirmation
City$0.00
  • Municipal (City) Impact Fee (City of Eagle Lake, MF)
    City of Eagle Lake
    8/4/2026 — Re-checked city code: only codified impact fees are the water and sewer utility fees in Ch. 16; no fire/police/parks/transportation city impact fee found. Likely relies on county overlays, but no official statement located to prove $0. $0 placeholder retained. VERIFY Eagle Lake City Hall 863-293-4141.
    Requires confirmation
County$11,062.00
  • Educational Impact Fee (MF - Polk County, collected in Eagle Lake)
    Polk County
    Polk County school impact fee, MF, collected in Eagle Lake (Ord. 2024-62). Phased $8,055; 100%-study $10,670. VERIFY 863-534-6080.
    $8,055.00
  • Transportation Impact Fee (Polk County, District A, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District A MF $2,508/unit (Phase Three $2,782 on 1/1/2027). §8.7-43(A) applies countywide incl. inside Eagle Lake. CORRECTED 7/14/2026: prior $2,782 was the 2027 rate.
    $2,508.00
  • Correctional Facilities Impact Fee (MF - Polk County, collected in Eagle Lake)
    Polk County
    Polk County Correctional impact fee, MF, collected in Eagle Lake (Ord. 2024-62). Phased $385; 100%-study $495. VERIFY 863-534-6080.
    $385.00
  • EMS Impact Fee (MF - Polk County, collected in Eagle Lake)
    Polk County
    Polk County EMS impact fee, MF, collected in Eagle Lake (Ord. 2024-62). $114 = 100%-study (not phased).
    $114.00
  • Parks & Recreational Facilities Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Parks article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Library Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Library article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Fire Rescue Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Fire Rescue article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
  • Law Enforcement Impact Fee (Polk County, MF)
    Polk County
    8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Eagle Lake). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Eagle Lake's current 'Interlocal Agreement for Collection of Polk County Impact Fees' (standard form approved for all 15 municipalities via BoCC agenda item 25-1582, 9/2/2025) expressly supersedes all prior county-city impact-fee agreements (Sec. 3) and provides for city collection of ONLY the countywide Transportation, Correctional Facilities, Emergency Medical System and Educational System impact fees (Sec. 5.A); it does not implement the Law Enforcement article. Verified against the executed agreement PDF (Legistar attachment). No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
    $0.00
Total (Eagle Lake): $21,562.00
Sources last checked August 4, 2026Official fee schedules:City of Eagle Lake Polk County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Eagle Lake: Commercial Impact Fees

Commercial development in Eagle Lake pays $6.47 per square foot in impact fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $323,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Commercial) ($5.56/sq ft), Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft) and EMS Impact Fee (Polk County, Commercial) ($0.18/sq ft).

Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Commercial) and Law Enforcement Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Eagle Lake)
    City of Eagle Lake
    City of Eagle Lake operates its own water utility. Nonres connection/capacity fee not published online (city reviewing impact fees w/ Polk Regional Water Coop / Raftelis per residential pass). $0 placeholder. VERIFY amount + meter ladder 863-293-4141.
    Requires confirmation
Sewer$0.00
City$0.00
  • Municipal Impact Fee (City of Eagle Lake, Commercial)
    City of Eagle Lake
    No municipal (non-utility) nonres impact fee published; small town, relies on county overlay. eaglelakefl.gov checked, no adopted schedule. $0 placeholder. VERIFY City Hall 863-293-4141.
    Requires confirmation
County$6.47/sq ft
  • Transportation Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Att. 2. Transportation IF applies countywide incl. Eagle Lake (§8.7-43(A)). District A (per city SFR record). Phase Two eff. 1/1/2026–12/31/2026 (Phase Three 1/1/2027 = $6,157). Per 1,000 sf GFA; schedule row Retail/Commercial. 2026 warehouse/industrial transp increases under BoCC consideration — recheck.
    $5.56/sq ft
  • Correctional Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 3. County-provided → countywide incl. Eagle Lake. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
    $0.73/sq ft
  • EMS Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 1. EMS is county-provided → applies countywide incl. Eagle Lake. 100% study rate, not phased, eff. 1/1/2025. Per 1,000 sf.
    $0.18/sq ft
  • Parks & Recreational Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 6. Park schedule has NO nonresidential rows — $0 confirmed for all nonres uses (residential/lodging only).
    $0.00
  • Library Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 5. Library schedule has NO nonresidential rows — $0 confirmed for all nonres uses.
    $0.00
  • Fire Rescue Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 7, §8.7-93 municipal participation: NOT enforced inside a city absent county-city interlocal. Adopted nonres latent rate Comm $428/1,000 sf. Held $0 pending county interlocal list — call Polk County Building Div. 863-534-6000.
    Requires confirmation
  • Law Enforcement Impact Fee (Polk County, Commercial)
    Polk County
    Polk County Ord. 2024-062, Ch. 8.7 Att. 8, §8.7-103 municipal participation: NOT enforced inside a city absent interlocal. Latent nonres Comm $645/1,000 sf. Held $0 pending county interlocal list — 863-534-6000.
    Requires confirmation
Total (Eagle Lake): $6.47/sq ft (≈ $323,300.00 at 50,000 sq ft)
Sources last checked August 4, 2026Official fee schedules:City of Eagle Lake Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Eagle Lake: Industrial Impact Fees

Industrial development in Eagle Lake pays $0.86 per square foot in impact fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $43,100.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Industrial) ($0.61/sq ft), Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft) and EMS Impact Fee (Polk County, Industrial) ($0.05/sq ft).

Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Eagle Lake)
    City of Eagle Lake
    City of Eagle Lake operates its own water utility. Nonres connection/capacity fee not published online (city reviewing impact fees w/ Polk Regional Water Coop / Raftelis per residential pass). $0 placeholder. VERIFY amount + meter ladder 863-293-4141.
    Requires confirmation
Sewer$0.00
City$0.00
County$0.86/sq ft
Total (Eagle Lake): $0.86/sq ft (≈ $43,100.00 at 50,000 sq ft)
Sources last checked August 4, 2026Official fee schedules:City of Eagle Lake Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Eagle Lake: Office Impact Fees

Office development in Eagle Lake pays $4.13 per square foot in impact fees (rates sourced August 4, 2026).

For a 25,000 sq ft building, that comes to at least $103,375.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (Polk County, Office) ($3.68/sq ft), Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft) and EMS Impact Fee (Polk County, Office) ($0.09/sq ft).

Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Office) and Law Enforcement Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (City of Eagle Lake)
    City of Eagle Lake
    City of Eagle Lake operates its own water utility. Nonres connection/capacity fee not published online (city reviewing impact fees w/ Polk Regional Water Coop / Raftelis per residential pass). $0 placeholder. VERIFY amount + meter ladder 863-293-4141.
    Requires confirmation
Sewer$0.00
City$0.00
County$4.13/sq ft
Total (Eagle Lake): $4.13/sq ft (≈ $103,375.00 at 25,000 sq ft)
Sources last checked August 4, 2026Official fee schedules:City of Eagle Lake Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Eagle Lake

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Eagle Lake, Florida?

A new single-family home in Eagle Lake pays at least $36,503.00 per unit in combined impact fees (rates sourced August 4, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Eagle Lake?

Commercial development in Eagle Lake pays $6.47 per square foot in impact fees, at least $323,300.00 for a 50,000 sq ft building. 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Eagle Lake charge its own impact fees?

Yes. Eagle Lake levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Eagle Lake, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Polk County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000