Eagle Lake impact fees by project type
Eagle Lake: Single-Family Impact Fees
A new single-family home in Eagle Lake pays at least $15,503.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Polk County.
The largest line items are Educational Impact Fee (SFR - Polk County, collected in Eagle Lake) ($11,124.00), Transportation Impact Fee (Polk County, District A) ($3,710.00) and Correctional Facilities Impact Fee (SFR - Polk County, collected in Eagle Lake) ($516.00).
Sewer Connection Fee (City of Eagle Lake) and Water Connection Fee (City of Eagle Lake) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County), Fire Rescue Impact Fee (Polk County), Library Impact Fee (Polk County), and Parks & Recreational Facilities Impact Fee (Polk County) are set by the county and have no published standard rate. Municipal (City) Impact Fee (City of Eagle Lake) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake operates own water utility. Connection/impact fee amount not published online (city reviewing impact fees w/ Polk Regional Water Coop / Raftelis). $0 placeholder. VERIFY 863-293-4141.
- Sewer Connection Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake sewer service. Connection/impact fee not published online. $0 placeholder. VERIFY provider (own vs Winter Haven/PCU) + amount 863-293-4141.
- Municipal (City) Impact Fee (City of Eagle Lake)Requires confirmationCity of Eagle Lake$0 placeholder for non-utility municipal impact fees. Small town; own (non-utility) impact fees not confirmed — likely relies on county overlays. VERIFY Eagle Lake City Hall 863-293-4141.
- Educational Impact Fee (SFR - Polk County, collected in Eagle Lake)$11,124.00Polk CountyPolk County school impact fee, SFR, collected in Eagle Lake (Ord. 2024-62). Phased-collected $11,124; 100%-study $14,338. VERIFY 863-534-6080.
- Transportation Impact Fee (Polk County, District A)$3,710.00Polk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District A SFR $3,710 (Phase Three $4,103 on 1/1/2027). §8.7-43(A) applies the fee countywide incl. inside Eagle Lake. CORRECTED 7/14/2026: prior $4,103 was the 2027 rate.
- Correctional Facilities Impact Fee (SFR - Polk County, collected in Eagle Lake)$516.00Polk CountyPolk County Correctional impact fee, SFR, collected in Eagle Lake (Ord. 2024-62). Phased $516; 100%-study $662. VERIFY 863-534-6080.
- EMS Impact Fee (SFR - Polk County, collected in Eagle Lake)$153.00Polk CountyPolk County EMS impact fee, SFR, collected in Eagle Lake (Ord. 2024-62). $153 = 100%-study (not phased).
- Law Enforcement Impact Fee (Polk County)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. X. §8.7-103 (Municipal participation): the county law enforcement impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted Phase Two rate (Att. 8, eff. 1/1/2026, final phase): SFR $578 / MF $417. Held at $0 + Unconfirmed pending the county's list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
- Fire Rescue Impact Fee (Polk County)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. IX. §8.7-93 (Municipal participation): the county fire rescue impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted rate (Att. 7, not phased, eff. 1/1/2025): SFR $377 / MF $273. Held at $0 + Unconfirmed because the county does not publish its list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
- Library Impact Fee (Polk County)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): the county library impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): SFR $188 / MF $141. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Confirm with Polk County Building Division, (863) 534-6000.
- Parks & Recreational Facilities Impact Fee (Polk County)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. VIII. §8.7-83 (Municipal participation): the county park impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): SFR $1,381 / MF $1,033; Phase Three 1/1/2027: SFR $1,864 / MF $1,396. Held at $0 + Unconfirmed pending the county's list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Multifamily Impact Fees
A new multifamily unit in Eagle Lake pays at least $11,062.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Polk County.
The largest line items are Educational Impact Fee (MF - Polk County, collected in Eagle Lake) ($8,055.00), Transportation Impact Fee (Polk County, District A, MF) ($2,508.00) and Correctional Facilities Impact Fee (MF - Polk County, collected in Eagle Lake) ($385.00).
Sewer Connection Fee (City of Eagle Lake, MF) and Water Connection Fee (City of Eagle Lake, MF) are set by the utility and not published online. Parks & Recreational Facilities Impact Fee (Polk County, MF), Library Impact Fee (Polk County, MF), Fire Rescue Impact Fee (Polk County, MF), and Law Enforcement Impact Fee (Polk County, MF) are set by the county and have no published standard rate. Municipal (City) Impact Fee (City of Eagle Lake, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Eagle Lake, MF)Requires confirmationCity of Eagle LakeEagle Lake own water utility. MF per-meter/ERC. Amount not published online. $0 placeholder. VERIFY 863-293-4141.
- Sewer Connection Fee (City of Eagle Lake, MF)Requires confirmationCity of Eagle LakeEagle Lake sewer service. MF per-meter/ERC. Amount not published. $0 placeholder. VERIFY provider + amount 863-293-4141.
- Municipal (City) Impact Fee (City of Eagle Lake, MF)Requires confirmationCity of Eagle Lake$0 placeholder for non-utility municipal impact fees (MF). Small town; own fees not confirmed — likely relies on county overlays. VERIFY 863-293-4141.
- Educational Impact Fee (MF - Polk County, collected in Eagle Lake)$8,055.00Polk CountyPolk County school impact fee, MF, collected in Eagle Lake (Ord. 2024-62). Phased $8,055; 100%-study $10,670. VERIFY 863-534-6080.
- Transportation Impact Fee (Polk County, District A, MF)$2,508.00Polk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District A MF $2,508/unit (Phase Three $2,782 on 1/1/2027). §8.7-43(A) applies countywide incl. inside Eagle Lake. CORRECTED 7/14/2026: prior $2,782 was the 2027 rate.
- Correctional Facilities Impact Fee (MF - Polk County, collected in Eagle Lake)$385.00Polk CountyPolk County Correctional impact fee, MF, collected in Eagle Lake (Ord. 2024-62). Phased $385; 100%-study $495. VERIFY 863-534-6080.
- EMS Impact Fee (MF - Polk County, collected in Eagle Lake)$114.00Polk CountyPolk County EMS impact fee, MF, collected in Eagle Lake (Ord. 2024-62). $114 = 100%-study (not phased).
- Parks & Recreational Facilities Impact Fee (Polk County, MF)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. VIII. §8.7-83 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): Multi-Family $1,033/unit; Phase Three 1/1/2027: $1,396. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Library Impact Fee (Polk County, MF)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): Multi-Family $141/unit. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Fire Rescue Impact Fee (Polk County, MF)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. IX. §8.7-93 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted rate (Att. 7, not phased, eff. 1/1/2025): Multi-Family $273/unit. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
- Law Enforcement Impact Fee (Polk County, MF)Requires confirmationPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Art. X. §8.7-103 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted Phase Two rate (Att. 8, eff. 1/1/2026, final phase): Multi-Family $417/unit. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Commercial Impact Fees
Commercial development in Eagle Lake pays $6.47 per square foot in impact fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $323,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Commercial) ($5.56/sq ft), Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft) and EMS Impact Fee (Polk County, Commercial) ($0.18/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Commercial) and Law Enforcement Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake operates its own water utility. Nonres connection/capacity fee not published online (city reviewing impact fees w/ Polk Regional Water Coop / Raftelis per residential pass). $0 placeholder. VERIFY amount + meter ladder 863-293-4141.
- Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake sewer service. Nonres connection/capacity fee not published online. $0 placeholder. VERIFY provider (own vs Winter Haven/PCU) + amount 863-293-4141.
- Municipal Impact Fee (City of Eagle Lake, Commercial)Requires confirmationCity of Eagle LakeNo municipal (non-utility) nonres impact fee published; small town, relies on county overlay. eaglelakefl.gov checked, no adopted schedule. $0 placeholder. VERIFY City Hall 863-293-4141.
- Transportation Impact Fee (Polk County, Commercial)$5.56/sq ftPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. Transportation IF applies countywide incl. Eagle Lake (§8.7-43(A)). District A (per city SFR record). Phase Two eff. 1/1/2026–12/31/2026 (Phase Three 1/1/2027 = $6,157). Per 1,000 sf GFA; schedule row Retail/Commercial. 2026 warehouse/industrial transp increases under BoCC consideration — recheck.
- Correctional Facilities Impact Fee (Polk County, Commercial)$0.73/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 3. County-provided → countywide incl. Eagle Lake. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- EMS Impact Fee (Polk County, Commercial)$0.18/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 1. EMS is county-provided → applies countywide incl. Eagle Lake. 100% study rate, not phased, eff. 1/1/2025. Per 1,000 sf.
- Parks & Recreational Facilities Impact Fee (Polk County, Commercial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 6. Park schedule has NO nonresidential rows — $0 confirmed for all nonres uses (residential/lodging only).
- Library Impact Fee (Polk County, Commercial)$0.00Polk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 5. Library schedule has NO nonresidential rows — $0 confirmed for all nonres uses.
- Fire Rescue Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 7, §8.7-93 municipal participation: NOT enforced inside a city absent county-city interlocal. Adopted nonres latent rate Comm $428/1,000 sf. Held $0 pending county interlocal list — call Polk County Building Div. 863-534-6000.
- Law Enforcement Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 8, §8.7-103 municipal participation: NOT enforced inside a city absent interlocal. Latent nonres Comm $645/1,000 sf. Held $0 pending county interlocal list — 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Industrial Impact Fees
Industrial development in Eagle Lake pays $0.86 per square foot in impact fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $43,100.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Industrial) ($0.61/sq ft), Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft) and EMS Impact Fee (Polk County, Industrial) ($0.05/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake operates its own water utility. Nonres connection/capacity fee not published online (city reviewing impact fees w/ Polk Regional Water Coop / Raftelis per residential pass). $0 placeholder. VERIFY amount + meter ladder 863-293-4141.
- Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake sewer service. Nonres connection/capacity fee not published online. $0 placeholder. VERIFY provider (own vs Winter Haven/PCU) + amount 863-293-4141.
- Municipal Impact Fee (City of Eagle Lake, Industrial)Requires confirmationCity of Eagle LakeNo municipal nonres impact fee published. $0 placeholder. VERIFY 863-293-4141.
- Transportation Impact Fee (Polk County, Industrial)$0.61/sq ftPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. Countywide incl. Eagle Lake. District A. Phase Two eff. 1/1/2026 (Phase Three 1/1/2027 = $639). Per 1,000 sf; row General Light Industrial.
- Correctional Facilities Impact Fee (Polk County, Industrial)$0.20/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 3. Countywide incl. Eagle Lake. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- EMS Impact Fee (Polk County, Industrial)$0.05/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 1. Countywide incl. Eagle Lake. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- Parks & Recreational Facilities Impact Fee (Polk County, Industrial)$0.00Polk CountyCh. 8.7 Att. 6. Park schedule has NO nonres rows — $0 confirmed.
- Library Impact Fee (Polk County, Industrial)$0.00Polk CountyCh. 8.7 Att. 5. Library schedule has NO nonres rows — $0 confirmed.
- Law Enforcement Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyCh. 8.7 Att. 8, §8.7-103 municipal participation. Latent nonres Industrial $182/1,000 sf. Held $0 pending interlocal — 863-534-6000.
- Fire Rescue Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyCh. 8.7 Att. 7, §8.7-93 municipal participation. Latent nonres Industrial $121/1,000 sf. Held $0 pending interlocal — 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Office Impact Fees
Office development in Eagle Lake pays $4.13 per square foot in impact fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to at least $103,375.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Office) ($3.68/sq ft), Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft) and EMS Impact Fee (Polk County, Office) ($0.09/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Office) and Law Enforcement Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake operates its own water utility. Nonres connection/capacity fee not published online (city reviewing impact fees w/ Polk Regional Water Coop / Raftelis per residential pass). $0 placeholder. VERIFY amount + meter ladder 863-293-4141.
- Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeCity of Eagle Lake sewer service. Nonres connection/capacity fee not published online. $0 placeholder. VERIFY provider (own vs Winter Haven/PCU) + amount 863-293-4141.
- Municipal Impact Fee (City of Eagle Lake, Office)Requires confirmationCity of Eagle LakeNo municipal nonres impact fee published. $0 placeholder. VERIFY 863-293-4141.
- Transportation Impact Fee (Polk County, Office)$3.68/sq ftPolk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. Countywide incl. Eagle Lake. District A. Phase Two eff. 1/1/2026 (Phase Three 1/1/2027 = $4,069). Per 1,000 sf; row General Office.
- Correctional Facilities Impact Fee (Polk County, Office)$0.37/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 3. Countywide incl. Eagle Lake. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- EMS Impact Fee (Polk County, Office)$0.09/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 1. Countywide incl. Eagle Lake. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- Parks & Recreational Facilities Impact Fee (Polk County, Office)$0.00Polk CountyCh. 8.7 Att. 6. Park schedule has NO nonres rows — $0 confirmed.
- Library Impact Fee (Polk County, Office)$0.00Polk CountyCh. 8.7 Att. 5. Library schedule has NO nonres rows — $0 confirmed.
- Fire Rescue Impact Fee (Polk County, Office)Requires confirmationPolk CountyCh. 8.7 Att. 7, §8.7-93 municipal participation. Latent nonres Office $216/1,000 sf. Held $0 pending interlocal — 863-534-6000.
- Law Enforcement Impact Fee (Polk County, Office)Requires confirmationPolk CountyCh. 8.7 Att. 8, §8.7-103 municipal participation. Latent nonres Office $326/1,000 sf. Held $0 pending interlocal — 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Eagle Lake
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Eagle Lake, Florida?
A new single-family home in Eagle Lake pays at least $15,503.00 per unit in combined impact fees (rates sourced July 17, 2026). 7 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Eagle Lake?
Commercial development in Eagle Lake pays $6.47 per square foot in impact fees, at least $323,300.00 for a 50,000 sq ft building. 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Eagle Lake charge its own impact fees?
Yes. Eagle Lake levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Eagle Lake, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.