Eagle Lake Impact Fees by Project Type
Eagle Lake: Single-Family Impact Fees
A new single-family home in Eagle Lake pays at least $36,503.00 per unit in impact fees (rates sourced August 4, 2026). Of that, Polk County-levied fees account for $15,503.00 and municipal or utility fees for $21,000.00.
The largest line items are Educational Impact Fee (SFR - Polk County, collected in Eagle Lake) ($11,124.00), Transportation Impact Fee (Polk County, District A) ($3,710.00) and Correctional Facilities Impact Fee (SFR - Polk County, collected in Eagle Lake) ($516.00).
Sewer Impact Fee (City of Eagle Lake) and Water Capacity (Impact) Fee (City of Eagle Lake) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Municipal (City) Impact Fee (City of Eagle Lake) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Eagle Lake Impact Fee Schedule
- Water Capacity (Impact) Fee (City of Eagle Lake)$10,500.00Requires confirmationCity of Eagle LakeCity of Eagle Lake water capacity (impact) fee: $10,500 for a standard 5/8x3/4-inch meter. Adopted at $5,500 in 2020 with code-mandated $2,500 step-ups in each of the following two years. A $300 in-city tap-in fee plus meter and backflow costs apply separately.
- Sewer Impact Fee (City of Eagle Lake)$10,500.00Requires confirmationCity of Eagle LakeCity of Eagle Lake sewer impact fee: $10,500 per ERC inside the city (one dwelling unit = 1 ERC; add 25% outside city). Adopted at $5,500/ERC in 2020 with code-mandated $2,500/ERC step-ups in each of the following two years. A $500/ERC tap-in fee and the City of Bartow treatment-agreement charge apply on top; Eagle Lake's sewage is treated by Bartow under an interlocal agreement.
- Municipal (City) Impact Fee (City of Eagle Lake)Requires confirmationCity of Eagle LakeThe City of Eagle Lake does not levy a municipal non-utility impact fee; it relies on Polk County overlay fees. One-time city charges are limited to water and sewer utility fees.
- Educational Impact Fee (SFR - Polk County, collected in Eagle Lake)$11,124.00Polk CountyPolk County educational system (school) impact fee: $11,124 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $12,187 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
- Transportation Impact Fee (Polk County, District A)$3,710.00Polk CountyPolk County transportation impact fee, District A rate: $3,710 per single-family home. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $4,103 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
- Correctional Facilities Impact Fee (SFR - Polk County, collected in Eagle Lake)$516.00Polk CountyPolk County correctional facilities impact fee: $516 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $662 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
- EMS Impact Fee (SFR - Polk County, collected in Eagle Lake)$153.00Polk CountyPolk County emergency medical system (EMS) impact fee: $153 per single-family home. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
- Law Enforcement Impact Fee (Polk County)$0.00Polk CountyPolk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
- Fire Rescue Impact Fee (Polk County)$0.00Polk CountyPolk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
- Library Impact Fee (Polk County)$0.00Polk CountyPolk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
- Parks & Recreational Facilities Impact Fee (Polk County)$0.00Polk CountyPolk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Multifamily Impact Fees
A new multifamily unit in Eagle Lake pays at least $21,562.00 per unit in impact fees (rates sourced August 4, 2026). Of that, Polk County-levied fees account for $11,062.00 and municipal or utility fees for $10,500.00.
The largest line items are Educational Impact Fee (MF - Polk County, collected in Eagle Lake) ($8,055.00), Transportation Impact Fee (Polk County, District A, MF) ($2,508.00) and Correctional Facilities Impact Fee (MF - Polk County, collected in Eagle Lake) ($385.00).
Sewer Impact Fee (City of Eagle Lake, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection Fee (City of Eagle Lake, MF) is set by the utility and not published online. Municipal (City) Impact Fee (City of Eagle Lake, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Eagle Lake Impact Fee Schedule
- Water Connection Fee (City of Eagle Lake, MF)Requires confirmationCity of Eagle LakeCity of Eagle Lake water capacity fee is set by meter size (a 5/8x3/4-inch meter was $5,500 at 2020 adoption, rising with code-mandated step-ups). A multifamily development's fee depends on its master-meter size, and developments with six or more connections negotiate the fee with the city; no fixed per-unit rate is published.
- Sewer Impact Fee (City of Eagle Lake, MF)$10,500.00Requires confirmationCity of Eagle LakeCity of Eagle Lake sewer impact fee: $10,500 per unit - each dwelling unit, including apartment, condominium, townhouse and mobile-home units, counts as one ERC. Adopted at $5,500/ERC in 2020 with code-mandated $2,500 step-ups in each of the next two years. A $500/ERC tap-in fee and the City of Bartow treatment-agreement charge apply on top.
- Municipal (City) Impact Fee (City of Eagle Lake, MF)Requires confirmationCity of Eagle LakeThe City of Eagle Lake does not levy a municipal non-utility impact fee; it relies on Polk County overlay fees. One-time city charges are limited to water and sewer utility fees.
- Educational Impact Fee (MF - Polk County, collected in Eagle Lake)$8,055.00Polk CountyPolk County educational system (school) impact fee: $8,055 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $9,070 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
- Transportation Impact Fee (Polk County, District A, MF)$2,508.00Polk CountyPolk County transportation impact fee, District A rate: $2,508 per multifamily dwelling unit. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $2,782 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
- Correctional Facilities Impact Fee (MF - Polk County, collected in Eagle Lake)$385.00Polk CountyPolk County correctional facilities impact fee: $385 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $495 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
- EMS Impact Fee (MF - Polk County, collected in Eagle Lake)$114.00Polk CountyPolk County emergency medical system (EMS) impact fee: $114 per multifamily dwelling unit. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
- Parks & Recreational Facilities Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
- Library Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
- Fire Rescue Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
- Law Enforcement Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Eagle Lake has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Eagle Lake.
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Commercial Impact Fees
Commercial development in Eagle Lake pays $6.47 per square foot in impact fees (rates sourced August 4, 2026).
For a 50,000 sq ft building, that comes to at least $323,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Commercial) ($5.56/sq ft), Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft) and EMS Impact Fee (Polk County, Commercial) ($0.18/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Commercial) and Law Enforcement Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Eagle Lake Impact Fee Schedule
- Water Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle Lake
- Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle Lake
- Municipal Impact Fee (City of Eagle Lake, Commercial)Requires confirmationCity of Eagle Lake
- Transportation Impact Fee (Polk County, Commercial)$5.56/sq ftPolk CountyPolk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
- Correctional Facilities Impact Fee (Polk County, Commercial)$0.73/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- EMS Impact Fee (Polk County, Commercial)$0.18/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Parks & Recreational Facilities Impact Fee (Polk County, Commercial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Library Impact Fee (Polk County, Commercial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Requires confirmation
- Requires confirmation
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Industrial Impact Fees
Industrial development in Eagle Lake pays $0.86 per square foot in impact fees (rates sourced August 4, 2026).
For a 50,000 sq ft building, that comes to at least $43,100.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Industrial) ($0.61/sq ft), Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft) and EMS Impact Fee (Polk County, Industrial) ($0.05/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Eagle Lake Impact Fee Schedule
- Water Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle Lake
- Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle Lake
- Municipal Impact Fee (City of Eagle Lake, Industrial)Requires confirmationCity of Eagle Lake
- Transportation Impact Fee (Polk County, Industrial)$0.61/sq ftPolk CountyPolk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
- Correctional Facilities Impact Fee (Polk County, Industrial)$0.20/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- EMS Impact Fee (Polk County, Industrial)$0.05/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Parks & Recreational Facilities Impact Fee (Polk County, Industrial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Library Impact Fee (Polk County, Industrial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Requires confirmation
- Requires confirmation
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake: Office Impact Fees
Office development in Eagle Lake pays $4.13 per square foot in impact fees (rates sourced August 4, 2026).
For a 25,000 sq ft building, that comes to at least $103,375.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Office) ($3.68/sq ft), Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft) and EMS Impact Fee (Polk County, Office) ($0.09/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake) and Water Connection (Capacity) Fee (City of Eagle Lake) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Office) and Law Enforcement Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Municipal Impact Fee (City of Eagle Lake, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Eagle Lake Impact Fee Schedule
- Water Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle Lake
- Wastewater (Sewer) Connection (Capacity) Fee (City of Eagle Lake)Requires confirmationCity of Eagle Lake
- Municipal Impact Fee (City of Eagle Lake, Office)Requires confirmationCity of Eagle Lake
- Transportation Impact Fee (Polk County, Office)$3.68/sq ftPolk CountyPolk County transportation impact fee, phased in: Phase Two rates are effective 1/1/2026 through 12/31/2026, and Phase Three rates take effect 1/1/2027. The applicable rate depends on the county transportation benefit district in which the parcel lies.
- Correctional Facilities Impact Fee (Polk County, Office)$0.37/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- EMS Impact Fee (Polk County, Office)$0.09/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Parks & Recreational Facilities Impact Fee (Polk County, Office)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Library Impact Fee (Polk County, Office)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Fire Rescue Impact Fee (Polk County, Office)Requires confirmationPolk County
- Requires confirmation
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Eagle Lake Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Eagle Lake Impact Fee FAQs
What are the total impact fees for a single-family home in Eagle Lake, Florida?
A new single-family home in Eagle Lake pays at least $36,503.00 per unit in combined impact fees (rates sourced August 4, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Eagle Lake?
Commercial development in Eagle Lake pays $6.47 per square foot in impact fees, at least $323,300.00 for a 50,000 sq ft building. 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Eagle Lake charge its own impact fees?
Yes. Eagle Lake levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Eagle Lake, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Polk County impact fees page.