Dundee, Florida Impact Fees

Dundee applies its own fee schedule: municipal fees plus the Polk County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $20,945.43 per unit (rates sourced July 17, 2026). 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Dundee impact fees by project type

Dundee: Single-Family Impact Fees

A new single-family home in Dundee pays at least $20,945.43 per unit in impact fees (rates sourced July 17, 2026). Of that, Polk County-levied fees account for $11,793.00 and municipal or utility fees for $9,152.43.

The largest line items are Educational Impact Fee (SFR - Polk County, collected in Dundee) ($11,124.00), Sewer Connection Fee (SFR - Town of Dundee) ($3,835.14) and Roads Impact Fee (SFR - Town of Dundee) ($3,491.00).

Parks & Recreational Facilities Impact Fee (Polk County), Transportation Impact Fee (Polk County, District A), Fire Rescue Impact Fee (Polk County), Law Enforcement Impact Fee (Polk County), and Library Impact Fee (Polk County) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$1,626.29
  • Water Connection Fee (SFR - Town of Dundee)
    Town of Dundee
    Town of Dundee own water utility. Water connection/impact fee $1,626.29 per town Impact/Connection Fee sheet (as of Feb 2022). VERIFY current amount post-Ord 26-01 — 863-438-8330.
    $1,626.29
Sewer$3,835.14
  • Sewer Connection Fee (SFR - Town of Dundee)
    Town of Dundee
    Town of Dundee own sewer utility. Sewer connection/impact fee $3,835.14 per town Impact/Connection Fee sheet (as of Feb 2022). VERIFY current amount post-Ord 26-01 — 863-438-8330.
    $3,835.14
City$3,691.00
  • Roads Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    Town of Dundee own Roads impact fee, new construction, $3,491.00 per town Impact/Connection Fee sheet (as of Feb 2022). In lieu of county Transportation. VERIFY current amount post-Ord 26-01 — Public Works/Utilities 863-438-8330.
    $3,491.00
  • Recreation Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    Town of Dundee own Recreation impact fee, $200.00 per town Impact/Connection Fee sheet (Feb 2022). In lieu of county Parks & Rec. VERIFY current amount 863-438-8330.
    $200.00
County$11,793.00
  • Educational Impact Fee (SFR - Polk County, collected in Dundee)
    Polk County
    Polk County school impact fee, SFR, collected in Dundee (Ord. 2024-62). Phased-collected $11,124; 100%-study $14,338. VERIFY 863-534-6080.
    $11,124.00
  • Correctional Facilities Impact Fee (SFR - Polk County, collected in Dundee)
    Polk County
    Polk County Correctional impact fee, SFR, collected in Dundee (Ord. 2024-62). Phased $516; 100%-study $662. VERIFY 863-534-6080.
    $516.00
  • EMS Impact Fee (SFR - Polk County, collected in Dundee)
    Polk County
    Polk County EMS impact fee, SFR, collected in Dundee (Ord. 2024-62). $153 = 100%-study (not phased).
    $153.00
  • Parks & Recreational Facilities Impact Fee (Polk County)
    ADDED 7/14/2026 (fee type was missing for this jurisdiction). Polk County Ord. 2024-062, Ch. 8.7 Art. VIII; §8.7-83 requires a county-city interlocal for the fee to apply inside a city. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): SFR $1,381. $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Transportation Impact Fee (Polk County, District A)
    ADDED 7/14/2026 — Dundee had NO county transportation record, yet §8.7-43(A) imposes the fee countywide including inside cities. Dundee sits in the Northeast quadrant with its District A neighbours (Haines City, Lake Hamilton), but the App. B District A/C boundary runs nearby (Waverly Rd – Cypress Gardens Blvd – Masterpiece Rd), so the assignment is not proven from the metes-and-bounds description. Phase Two SFR rates (eff. 1/1/2026–12/31/2026): District A $3,710 / District C $3,052. Held at $0 + Unconfirmed pending district confirmation. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Fire Rescue Impact Fee (Polk County)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. IX. §8.7-93 (Municipal participation): the county fire rescue impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted rate (Att. 7, not phased, eff. 1/1/2025): SFR $377 / MF $273. Held at $0 + Unconfirmed because the county does not publish its list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Law Enforcement Impact Fee (Polk County)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. X. §8.7-103 (Municipal participation): the county law enforcement impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted Phase Two rate (Att. 8, eff. 1/1/2026, final phase): SFR $578 / MF $417. Held at $0 + Unconfirmed pending the county's list of participating cities. Confirm with Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Library Impact Fee (Polk County)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): the county library impact fee is NOT enforced inside a city unless the county and that city have entered an interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): SFR $188 / MF $141. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Confirm with Polk County Building Division, (863) 534-6000.
    Requires confirmation
Total (Dundee): $20,945.43
Sources last checked July 17, 2026Official fee schedules:Town of Dundee Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Multifamily Impact Fees

A new multifamily unit in Dundee pays at least $17,706.43 per unit in impact fees (rates sourced July 17, 2026). Of that, Polk County-levied fees account for $8,554.00 and municipal or utility fees for $9,152.43.

The largest line items are Educational Impact Fee (MF - Polk County, collected in Dundee) ($8,055.00), Correctional Facilities Impact Fee (MF - Polk County, collected in Dundee) ($385.00) and EMS Impact Fee (MF - Polk County, collected in Dundee) ($114.00).

Water Connection Fee (Town of Dundee, MF), Sewer Connection Fee (Town of Dundee, MF), Recreation Impact Fee (Town of Dundee, MF), and Roads Impact Fee (Town of Dundee, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Parks & Recreational Facilities Impact Fee (Polk County, MF), Transportation Impact Fee (Polk County, District A, MF), Law Enforcement Impact Fee (Polk County, MF), Fire Rescue Impact Fee (Polk County, MF), and Library Impact Fee (Polk County, MF) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$1,626.29
  • Water Connection Fee (Town of Dundee, MF)
    Town of Dundee
    Town of Dundee own water utility. Connection fee $1,626.29 per town sheet (Feb 2022). MF per-unit/meter basis may differ — VERIFY current amount post-Ord 26-01, 863-438-8330.
    $1,626.29Requires confirmation
Sewer$3,835.14
  • Sewer Connection Fee (Town of Dundee, MF)
    Town of Dundee
    Town of Dundee own sewer utility. Connection fee $3,835.14 per town sheet (Feb 2022). MF per-unit/meter basis may differ — VERIFY current amount post-Ord 26-01, 863-438-8330.
    $3,835.14Requires confirmation
City$3,691.00
  • Roads Impact Fee (Town of Dundee, MF)
    Town of Dundee
    Town of Dundee own Roads impact fee, $3,491.00 per town fee sheet (Feb 2022); in lieu of county Transportation. MF per-unit rate may differ from SFR — VERIFY 863-438-8330.
    $3,491.00Requires confirmation
  • Recreation Impact Fee (Town of Dundee, MF)
    Town of Dundee
    Town of Dundee own Recreation impact fee, $200.00 per town fee sheet (Feb 2022); in lieu of county Parks. MF per-unit rate may differ — VERIFY 863-438-8330.
    $200.00Requires confirmation
County$8,554.00
  • Educational Impact Fee (MF - Polk County, collected in Dundee)
    Polk County
    Polk County school impact fee, MF, collected in Dundee (Ord. 2024-62). Phased $8,055; 100%-study $10,670. VERIFY 863-534-6080.
    $8,055.00
  • Correctional Facilities Impact Fee (MF - Polk County, collected in Dundee)
    Polk County
    Polk County Correctional impact fee, MF, collected in Dundee (Ord. 2024-62). Phased $385; 100%-study $495. VERIFY 863-534-6080.
    $385.00
  • EMS Impact Fee (MF - Polk County, collected in Dundee)
    Polk County
    Polk County EMS impact fee, MF, collected in Dundee (Ord. 2024-62). $114 = 100%-study (not phased).
    $114.00
  • Parks & Recreational Facilities Impact Fee (Polk County, MF)
    ADDED 7/14/2026 (fee type was missing for this jurisdiction). Ord. 2024-062 Ch. 8.7 Art. VIII; §8.7-83 requires a county-city interlocal. Adopted Phase Two rate (Att. 6, eff. 1/1/2026–12/31/2026): MF $1,033/unit. $0 + Unconfirmed. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Transportation Impact Fee (Polk County, District A, MF)
    ADDED 7/14/2026 — Dundee had NO county transportation record, yet §8.7-43(A) imposes the fee countywide. Dundee sits in the Northeast quadrant with its District A neighbours, but the App. B A/C boundary runs nearby (Waverly Rd – Cypress Gardens Blvd – Masterpiece Rd), so the assignment is unproven. Phase Two MF rates: District A $2,508 / District C $2,062 per unit. $0 + Unconfirmed pending district confirmation. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Law Enforcement Impact Fee (Polk County, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. X. §8.7-103 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted Phase Two rate (Att. 8, eff. 1/1/2026, final phase): Multi-Family $417/unit. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Fire Rescue Impact Fee (Polk County, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. IX. §8.7-93 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted rate (Att. 7, not phased, eff. 1/1/2025): Multi-Family $273/unit. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
  • Library Impact Fee (Polk County, MF)
    Polk County
    Polk County Ord. 2024-062, Code Ch. 8.7 Art. VII. §8.7-73 (Municipal participation): not enforced inside a city absent a county-city interlocal agreement. Adopted rate (Att. 5, not phased, eff. 1/1/2025): Multi-Family $141/unit. Participation is city-by-city — Lakeland and Bartow DO pay it. Held at $0 + Unconfirmed pending the county's interlocal list. Polk County Building Division, (863) 534-6000.
    Requires confirmation
Total (Dundee): $17,706.43
Sources last checked July 17, 2026Official fee schedules:Town of Dundee Polk County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Commercial Impact Fees

Commercial development in Dundee pays $0.91 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $45,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft) and EMS Impact Fee (Polk County, Commercial) ($0.18/sq ft).

Wastewater (Sewer) Connection (Capacity) Fee (Town of Dundee) and Water Connection (Capacity) Fee (Town of Dundee) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Commercial), Transportation Impact Fee (Polk County, Commercial), and Fire Rescue Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Municipal Impact Fees (Town of Dundee, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (Town of Dundee)
    Town of Dundee
    Town of Dundee operates its own water utility. Published fee sheet (Feb 2022) gives only the per-dwelling water connection fee ($1,626.29 SFR); nonres is meter-based, not published. $0 placeholder Unconfirmed — VERIFY current nonres meter schedule (post Ord 26-01) w/ Dundee Utilities (863) 438-8330.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (Town of Dundee)
    Town of Dundee
    Town of Dundee operates its own sewer utility. Published fee sheet (Feb 2022) gives only the per-dwelling sewer connection fee ($3,835.14 SFR); nonres is meter-based, not published. $0 placeholder Unconfirmed — VERIFY current nonres meter schedule w/ Dundee Utilities (863) 438-8330.
    Requires confirmation
City$0.00
  • Municipal Impact Fees (Town of Dundee, Commercial)
    Town of Dundee
    Town of Dundee LEVIES its own municipal impact fees: Roads, Police (PD), Fire, Library, and Recreation. Published fee sheet (Feb 2022) shows only per-DWELLING (SFR) amounts: Roads $3,491 / PD $455.24 / Fire $341.15 / Library $647.96 / Recreation $200. NONRESIDENTIAL rates are not published (the sheet is a single-family permit calculator). $0 placeholder Unconfirmed — obtain nonres schedule from Town of Dundee (863) 438-8330. NOTE: the Feb-2022 sheet's county figures are pre-Ord-2024-062 and stale.
    Requires confirmation
County$0.91/sq ft
Total (Dundee): $0.91/sq ft (≈ $45,300.00 at 50,000 sq ft)
Sources last checked July 17, 2026Official fee schedules:Town of Dundee Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Industrial Impact Fees

Industrial development in Dundee pays $0.26 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $12,750.00. The calculator below adjusts to your exact square footage.

The largest line items are Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft) and EMS Impact Fee (Polk County, Industrial) ($0.05/sq ft).

Wastewater (Sewer) Connection (Capacity) Fee (Town of Dundee) and Water Connection (Capacity) Fee (Town of Dundee) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Industrial), Transportation Impact Fee (Polk County, Industrial), and Law Enforcement Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Municipal Impact Fees (Town of Dundee, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (Town of Dundee)
    Town of Dundee
    Town of Dundee operates its own water utility. Published fee sheet (Feb 2022) gives only the per-dwelling water connection fee ($1,626.29 SFR); nonres is meter-based, not published. $0 placeholder Unconfirmed — VERIFY current nonres meter schedule (post Ord 26-01) w/ Dundee Utilities (863) 438-8330.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (Town of Dundee)
    Town of Dundee
    Town of Dundee operates its own sewer utility. Published fee sheet (Feb 2022) gives only the per-dwelling sewer connection fee ($3,835.14 SFR); nonres is meter-based, not published. $0 placeholder Unconfirmed — VERIFY current nonres meter schedule w/ Dundee Utilities (863) 438-8330.
    Requires confirmation
City$0.00
County$0.26/sq ft
Total (Dundee): $0.26/sq ft (≈ $12,750.00 at 50,000 sq ft)
Sources last checked July 17, 2026Official fee schedules:Town of Dundee Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Office Impact Fees

Office development in Dundee pays $0.46 per square foot in impact fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $11,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft) and EMS Impact Fee (Polk County, Office) ($0.09/sq ft).

Wastewater (Sewer) Connection (Capacity) Fee (Town of Dundee) and Water Connection (Capacity) Fee (Town of Dundee) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Office), Fire Rescue Impact Fee (Polk County, Office), and Transportation Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Municipal Impact Fees (Town of Dundee, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Capacity) Fee (Town of Dundee)
    Town of Dundee
    Town of Dundee operates its own water utility. Published fee sheet (Feb 2022) gives only the per-dwelling water connection fee ($1,626.29 SFR); nonres is meter-based, not published. $0 placeholder Unconfirmed — VERIFY current nonres meter schedule (post Ord 26-01) w/ Dundee Utilities (863) 438-8330.
    Requires confirmation
Sewer$0.00
  • Wastewater (Sewer) Connection (Capacity) Fee (Town of Dundee)
    Town of Dundee
    Town of Dundee operates its own sewer utility. Published fee sheet (Feb 2022) gives only the per-dwelling sewer connection fee ($3,835.14 SFR); nonres is meter-based, not published. $0 placeholder Unconfirmed — VERIFY current nonres meter schedule w/ Dundee Utilities (863) 438-8330.
    Requires confirmation
City$0.00
County$0.46/sq ft
Total (Dundee): $0.46/sq ft (≈ $11,425.00 at 25,000 sq ft)
Sources last checked July 17, 2026Official fee schedules:Town of Dundee Polk County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Dundee

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Dundee, Florida?

A new single-family home in Dundee pays at least $20,945.43 per unit in combined impact fees (rates sourced July 17, 2026). 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Dundee?

Commercial development in Dundee pays $0.91 per square foot in impact fees, at least $45,300.00 for a 50,000 sq ft building. 6 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Dundee charge its own impact fees?

Yes. Dundee levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Dundee, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Polk County impact fees page.