Skip to content
IMPACTFEES.ORG

Dundee, Florida Impact Fees

Dundee applies its own fee schedule: municipal fees plus the Polk County-levied fees that apply inside city limits. Combined, a new single-family home pays $29,206.05 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Dundee Impact Fees by Project Type

Dundee: Single-Family Impact Fees

A new single-family home in Dundee pays $29,206.05 per unit in impact fees (rates sourced November 15, 2026). Of that, Polk County-levied fees account for $15,503.00 and municipal or utility fees for $13,703.05.

The largest line items are Educational Impact Fee (SFR - Polk County, collected in Dundee) ($11,124.00), Roads (Transportation) Impact Fee (SFR - Town of Dundee) ($6,093.00) and Transportation Impact Fee (Polk County, District A) ($3,710.00).

Water Meter Installation Fee (Town of Dundee) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Dundee Impact Fee Schedule
Water$2,779.05
  • Water Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    The Town of Dundee charges a water connection fee of $2,408.40 for a new single-family home (1.0 equivalent residential connection), under Town Code Sec. 54-72 and Ordinance 22-02, adopted January 25, 2022. A separate water meter installation charge applies.
    $2,408.40
  • Water Meter Installation Fee (Town of Dundee)
    Town of Dundee
    The Town of Dundee charges a separate water meter installation fee on a new connection, in addition to the water connection fee.
    $370.65Requires confirmation
Sewer$3,068.00
  • Sewer Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    The Town of Dundee charges a wastewater connection fee of $3,068 for a new single-family home (1.0 equivalent residential connection), under Town Code Sec. 54-128 and Ordinance 22-02, adopted January 25, 2022. A separate sewer tap inspection fee ($52.50) applies.
    $3,068.00
City$7,856.00
  • Roads (Transportation) Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    The Town of Dundee charges its own transportation (roads) impact fee of $6,093 for a new single-family home, effective January 1, 2025 (Town of Dundee Transportation Impact Fee Schedule). This is the town's road fee and is separate from and in addition to the Polk County transportation impact fee, which is also charged on the same home.
    $6,093.00
  • Recreation Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    The Town of Dundee charges a recreation impact fee of $1,083 on a new single-family home, under Town Code Sec. 14-3 (Ordinance 22-03).
    $1,083.00
  • Fire/Rescue Services Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    The Town of Dundee charges a fire/rescue services impact fee of $336.00 per dwelling unit on a new single-family home (Town Code sec. 14-241(a)(2)). This is a town fee, separate from the Polk County fire rescue impact fee (which is not collected inside the town).
    $336.00
  • Library Services Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    The Town of Dundee charges a library services impact fee of $291.00 per dwelling unit on a new single-family home (Town Code sec. 14-241(a)(3)). This is a town fee, separate from the Polk County library impact fee (which is not collected inside the town).
    $291.00
  • Police Services Impact Fee (SFR - Town of Dundee)
    Town of Dundee
    The Town of Dundee charges a police services impact fee of $53.00 per dwelling unit on a new single-family home (Town Code sec. 14-241(a)(1)).
    $53.00
County$15,503.00
  • Educational Impact Fee (SFR - Polk County, collected in Dundee)
    Polk County
    Polk County educational system (school) impact fee: $11,124 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $12,187 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
    $11,124.00
  • Transportation Impact Fee (Polk County, District A)
    Polk County
    A new single-family home in Dundee pays the Polk COUNTY transportation impact fee, collected inside the town under the county-city interlocal agreement in addition to the Town of Dundee's own roads impact fee. Dundee lies in County road-fee District A (its neighbors Haines City, Lake Hamilton and Lake Alfred are all District A); the rate is $3,710, the Phase Two rate effective January 1 to December 31, 2026, stepping up to $4,103 on January 1, 2027. A parcel near the town's southwest District A/C boundary may instead fall in District C, where the rate is $3,052.
    $3,710.00
  • Correctional Facilities Impact Fee (SFR - Polk County, collected in Dundee)
    Polk County
    Polk County correctional facilities impact fee: $516 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $662 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
    $516.00
  • EMS Impact Fee (SFR - Polk County, collected in Dundee)
    Polk County
    Polk County emergency medical system (EMS) impact fee: $153 per single-family home. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
    $153.00
  • Parks & Recreational Facilities Impact Fee (Polk County)
    Polk County
    Polk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
  • Fire Rescue Impact Fee (Polk County)
    Polk County
    Polk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
  • Law Enforcement Impact Fee (Polk County)
    Polk County
    Polk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
  • Library Impact Fee (Polk County)
    Polk County
    Polk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
Total (Dundee): $29,206.05
Sources last checked Official fee schedules:Town of Dundee Polk County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Multifamily Impact Fees

A new multifamily unit in Dundee pays $21,253.28 per unit in impact fees (rates sourced November 15, 2026). Of that, Polk County-levied fees account for $11,062.00 and municipal or utility fees for $10,191.28.

The largest line items are Educational Impact Fee (MF - Polk County, collected in Dundee) ($8,055.00), Roads (Transportation) Impact Fee (Town of Dundee, MF) ($4,235.00) and Transportation Impact Fee (Polk County, District A, MF) ($2,508.00).

Recreation Impact Fee (Town of Dundee, MF) and Water Meter Installation Fee (Town of Dundee, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Dundee Impact Fee Schedule
Water$1,984.28
  • Water Impact Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges a water connection fee of $1,613.63 per multifamily unit (0.67 of the $2,408.40 single-family connection), under Town Code Sec. 54-8 Attachment A as re-adopted by Ordinance 25-09 (January 13, 2026). A separate water meter installation charge applies.
    $1,613.63
  • Water Meter Installation Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges a separate water meter installation fee on a new connection, in addition to the water connection fee.
    $370.65Requires confirmation
Sewer$2,209.00
  • Sewer Impact Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges a wastewater connection fee of $2,209.00 per multifamily unit (0.72 of the $3,068 single-family connection), under Town Code Sec. 54-8 Attachment A as re-adopted by Ordinance 25-09 (January 13, 2026). A separate sewer tap inspection fee also applies.
    $2,209.00
City$5,998.00
  • Roads (Transportation) Impact Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges its own transportation (roads) impact fee of $4,235 per multifamily dwelling unit, effective January 1, 2025 (Town of Dundee Transportation Impact Fee Schedule). This is the town's road fee, separate from and in addition to the Polk County transportation impact fee also charged on the same unit.
    $4,235.00
  • Recreation Impact Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges a recreation impact fee of $1,083 for new residential development (Town Code Sec. 14-3); how it applies to each unit of a multifamily building is set by the town.
    $1,083.00Requires confirmation
  • Fire/Rescue Services Impact Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges a fire/rescue services impact fee of $336.00 per multifamily dwelling unit (Town Code sec. 14-241(a)(2)). This is a town fee, separate from the Polk County fire rescue impact fee (not collected inside the town).
    $336.00
  • Library Services Impact Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges a library services impact fee of $291.00 per multifamily dwelling unit (Town Code sec. 14-241(a)(3)). This is a town fee, separate from the Polk County library impact fee (not collected inside the town).
    $291.00
  • Police Services Impact Fee (Town of Dundee, MF)
    Town of Dundee
    The Town of Dundee charges a police services impact fee of $53.00 per multifamily dwelling unit (Town Code sec. 14-241(a)(1)).
    $53.00
County$11,062.00
  • Educational Impact Fee (MF - Polk County, collected in Dundee)
    Polk County
    Polk County educational system (school) impact fee: $8,055 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $9,070 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
    $8,055.00
  • Transportation Impact Fee (Polk County, District A, MF)
    Polk County
    A new multifamily unit in Dundee pays the Polk COUNTY transportation impact fee, collected inside the town under the county-city interlocal agreement in addition to the Town of Dundee's own roads impact fee. Dundee lies in County road-fee District A (its neighbors are all District A); the rate is $2,508 per unit, the Phase Two rate effective January 1 to December 31, 2026, stepping up on January 1, 2027. A parcel near the town's southwest District A/C boundary may instead fall in District C, where the rate is $2,062 per unit.
    $2,508.00
  • Correctional Facilities Impact Fee (MF - Polk County, collected in Dundee)
    Polk County
    Polk County correctional facilities impact fee: $385 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $495 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
    $385.00
  • EMS Impact Fee (MF - Polk County, collected in Dundee)
    Polk County
    Polk County emergency medical system (EMS) impact fee: $114 per multifamily dwelling unit. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
    $114.00
  • Parks & Recreational Facilities Impact Fee (Polk County, MF)
    Polk County
    Polk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
  • Law Enforcement Impact Fee (Polk County, MF)
    Polk County
    Polk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
  • Fire Rescue Impact Fee (Polk County, MF)
    Polk County
    Polk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
  • Library Impact Fee (Polk County, MF)
    Polk County
    Polk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Dundee has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Dundee.
    $0.00
Total (Dundee): $21,253.28
Sources last checked Official fee schedules:Town of Dundee Polk County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Commercial Impact Fees

Commercial development in Dundee pays $25.40 per square foot in impact fees, plus $13,691.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).

For a 50,000 sq ft building, that comes to about $1,283,791.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection Fee (Town of Dundee) — 1" meter ($7,670.00 one-time), Water Connection Fee (Town of Dundee) — 1" meter ($6,021.00 one-time) and Transportation Impact Fee (Town of Dundee, Commercial) — Retail 40,000 to 150,000 sq ft ($18.55/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Dundee Impact Fee Schedule
Water$6,021.00 one-time
  • Water Connection Fee (Town of Dundee) — 1" meter
    Town of Dundee
    Town of Dundee nonresidential water connection fee for a 1 in. meter: $6,021.00 (2.5 times the $2,408.40 single-family equivalent), from the meter-size table adopted by Ordinance 22-02 effective January 25, 2022. Every nonresidential connection pays at least one equivalent residential connection per meter. Outside the town limits a surcharge permitted by general law may apply.
    $6,021.00 one-time
Sewer$7,670.00 one-time
  • Wastewater Connection Fee (Town of Dundee) — 1" meter
    Town of Dundee
    Town of Dundee nonresidential wastewater connection fee for a 1 in. meter: $7,670.00 (2.5 times the $3,068.00 single-family equivalent), from the meter-size table adopted by Ordinance 22-02 effective January 25, 2022. Every nonresidential connection pays at least one equivalent residential connection per meter. Outside the town limits a surcharge permitted by general law may apply.
    $7,670.00 one-time
City$19.10/sq ft
  • Transportation Impact Fee (Town of Dundee, Commercial) — Retail 40,000 to 150,000 sq ft
    Town of Dundee
    Town of Dundee transportation impact fee (town portion) of $18,552 per 1,000 sq ft for retail buildings 40,000 to 150,000 sq ft, from the town schedule effective January 1, 2025 (September 2024 technical report). Polk County's transportation impact fee is charged in addition. Retail is priced in three size brackets: under 40,000 sq ft $9,571, 40,000 to 150,000 sq ft $18,552, over 150,000 sq ft $10,283 per 1,000 sq ft.
    $18.55/sq ft
  • Fire/Rescue Services Impact Fee (Town of Dundee, Commercial)
    Town of Dundee
    Town of Dundee fire protection services impact fee of $0.476 per square foot of gross floor area for retail space, adopted by Ordinance 22-03 effective January 25, 2022. Paid no later than building permit issuance; a change of use pays only the net increase over the most intense prior use.
    $0.48/sq ft
  • Police Services Impact Fee (Town of Dundee, Commercial)
    Town of Dundee
    Town of Dundee police services impact fee of $0.075 per square foot of gross floor area for retail space, adopted by Ordinance 22-03 effective January 25, 2022. Paid no later than building permit issuance; a change of use pays only the net increase over the most intense prior use.
    $0.07/sq ft
  • Recreation Impact Fee (Town of Dundee, Commercial)
    Town of Dundee
    The Town of Dundee recreational impact fee is set for new residential development only; no rate applies to nonresidential buildings.
    $0.00
  • Library Services Impact Fee (Town of Dundee, Commercial)
    Town of Dundee
    The Town of Dundee library services impact fee is charged on residential dwelling units only; the adopted schedule sets no rate for nonresidential buildings.
    $0.00
County$6.30/sq ft
  • Transportation Impact Fee (Polk County, Commercial)
    Polk County
    Polk County transportation impact fee for Dundee, which lies entirely in District A (Northeast): $5,560 per 1,000 sq ft of retail/commercial space, Phase Two rate effective January 1, 2026 through December 31, 2026, rising to $6,157 on January 1, 2027. Imposed countywide, including inside the cities, in addition to any city fee.
    $5.56/sq ft
  • Correctional Facilities Impact Fee (Polk County, Commercial)
    Polk County
    Polk County correctional facilities impact fee, phased in under Ordinance 2024-062: $560 per 1,000 sq ft of retail/commercial space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $727 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
    $0.56/sq ft
  • EMS Impact Fee (Polk County, Commercial)
    Polk County
    Effective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
    $0.18/sq ft
  • Law Enforcement Impact Fee (Polk County, Commercial)
    Polk County
    Not charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    $0.00
  • Fire Rescue Impact Fee (Polk County, Commercial)
    Polk County
    Not charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County, Commercial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Library Impact Fee (Polk County, Commercial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
Total (Dundee): $25.40/sq ft + $13,691.00 one-time (≈ $1,283,791.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Dundee Polk County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Industrial Impact Fees

Industrial development in Dundee pays $2.57 per square foot in impact fees, plus $13,691.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).

For a 50,000 sq ft building, that comes to about $142,191.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection Fee (Town of Dundee) — 1" meter ($7,670.00 one-time), Water Connection Fee (Town of Dundee) — 1" meter ($6,021.00 one-time) and Transportation Impact Fee (Town of Dundee, Industrial) ($1.66/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Dundee Impact Fee Schedule
Water$6,021.00 one-time
  • Water Connection Fee (Town of Dundee) — 1" meter
    Town of Dundee
    Town of Dundee nonresidential water connection fee for a 1 in. meter: $6,021.00 (2.5 times the $2,408.40 single-family equivalent), from the meter-size table adopted by Ordinance 22-02 effective January 25, 2022. Every nonresidential connection pays at least one equivalent residential connection per meter. Outside the town limits a surcharge permitted by general law may apply.
    $6,021.00 one-time
Sewer$7,670.00 one-time
  • Wastewater Connection Fee (Town of Dundee) — 1" meter
    Town of Dundee
    Town of Dundee nonresidential wastewater connection fee for a 1 in. meter: $7,670.00 (2.5 times the $3,068.00 single-family equivalent), from the meter-size table adopted by Ordinance 22-02 effective January 25, 2022. Every nonresidential connection pays at least one equivalent residential connection per meter. Outside the town limits a surcharge permitted by general law may apply.
    $7,670.00 one-time
City$1.76/sq ft
  • Transportation Impact Fee (Town of Dundee, Industrial)
    Town of Dundee
    Town of Dundee transportation impact fee (town portion) of $1,655 per 1,000 sq ft for manufacturing and warehouse space, from the town schedule effective January 1, 2025 (September 2024 technical report). Polk County's transportation impact fee is charged in addition.
    $1.66/sq ft
  • Fire/Rescue Services Impact Fee (Town of Dundee, Industrial)
    Town of Dundee
    Town of Dundee fire protection services impact fee of $0.087 per square foot of gross floor area for industrial and manufacturing space, adopted by Ordinance 22-03 effective January 25, 2022. Paid no later than building permit issuance; a change of use pays only the net increase over the most intense prior use.
    $0.09/sq ft
  • Police Services Impact Fee (Town of Dundee, Industrial)
    Town of Dundee
    Town of Dundee police services impact fee of $0.014 per square foot of gross floor area for industrial and manufacturing space, adopted by Ordinance 22-03 effective January 25, 2022. Paid no later than building permit issuance; a change of use pays only the net increase over the most intense prior use.
    $0.01/sq ft
  • Recreation Impact Fee (Town of Dundee, Industrial)
    Town of Dundee
    The Town of Dundee recreational impact fee is set for new residential development only; no rate applies to nonresidential buildings.
    $0.00
  • Library Services Impact Fee (Town of Dundee, Industrial)
    Town of Dundee
    The Town of Dundee library services impact fee is charged on residential dwelling units only; the adopted schedule sets no rate for nonresidential buildings.
    $0.00
County$0.81/sq ft
  • Transportation Impact Fee (Polk County, Industrial)
    Polk County
    Polk County transportation impact fee for Dundee, which lies entirely in District A (Northeast): $607 per 1,000 sq ft of industrial/manufacturing space, Phase Two rate effective January 1, 2026 through December 31, 2026, rising to $639 on January 1, 2027. Imposed countywide, including inside the cities, in addition to any city fee.
    $0.61/sq ft
  • Correctional Facilities Impact Fee (Polk County, Industrial)
    Polk County
    Polk County correctional facilities impact fee, phased in under Ordinance 2024-062: $157 per 1,000 sq ft of industrial/manufacturing space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $205 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
    $0.16/sq ft
  • EMS Impact Fee (Polk County, Industrial)
    Polk County
    Effective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
    $0.05/sq ft
  • Fire Rescue Impact Fee (Polk County, Industrial)
    Polk County
    Not charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    $0.00
  • Library Impact Fee (Polk County, Industrial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County, Industrial)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Law Enforcement Impact Fee (Polk County, Industrial)
    Polk County
    Not charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    $0.00
Total (Dundee): $2.57/sq ft + $13,691.00 one-time (≈ $142,191.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Dundee Polk County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee: Office Impact Fees

Office development in Dundee pays $9.48 per square foot in impact fees, plus $13,691.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).

For a 25,000 sq ft building, that comes to about $250,666.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection Fee (Town of Dundee) — 1" meter ($7,670.00 one-time), Water Connection Fee (Town of Dundee) — 1" meter ($6,021.00 one-time) and Transportation Impact Fee (Town of Dundee, Office) ($5.21/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Dundee Impact Fee Schedule
Water$6,021.00 one-time
  • Water Connection Fee (Town of Dundee) — 1" meter
    Town of Dundee
    Town of Dundee nonresidential water connection fee for a 1 in. meter: $6,021.00 (2.5 times the $2,408.40 single-family equivalent), from the meter-size table adopted by Ordinance 22-02 effective January 25, 2022. Every nonresidential connection pays at least one equivalent residential connection per meter. Outside the town limits a surcharge permitted by general law may apply.
    $6,021.00 one-time
Sewer$7,670.00 one-time
  • Wastewater Connection Fee (Town of Dundee) — 1" meter
    Town of Dundee
    Town of Dundee nonresidential wastewater connection fee for a 1 in. meter: $7,670.00 (2.5 times the $3,068.00 single-family equivalent), from the meter-size table adopted by Ordinance 22-02 effective January 25, 2022. Every nonresidential connection pays at least one equivalent residential connection per meter. Outside the town limits a surcharge permitted by general law may apply.
    $7,670.00 one-time
City$5.42/sq ft
  • Transportation Impact Fee (Town of Dundee, Office)
    Town of Dundee
    Town of Dundee transportation impact fee (town portion) of $5,213 per 1,000 sq ft for office space, from the town schedule effective January 1, 2025 (September 2024 technical report). Polk County's transportation impact fee is charged in addition.
    $5.21/sq ft
  • Fire/Rescue Services Impact Fee (Town of Dundee, Office)
    Town of Dundee
    Town of Dundee fire protection services impact fee of $0.177 per square foot of gross floor area for office building space, adopted by Ordinance 22-03 effective January 25, 2022. Paid no later than building permit issuance; a change of use pays only the net increase over the most intense prior use.
    $0.18/sq ft
  • Police Services Impact Fee (Town of Dundee, Office)
    Town of Dundee
    Town of Dundee police services impact fee of $0.028 per square foot of gross floor area for office building space, adopted by Ordinance 22-03 effective January 25, 2022. Paid no later than building permit issuance; a change of use pays only the net increase over the most intense prior use.
    $0.03/sq ft
  • Library Services Impact Fee (Town of Dundee, Office)
    Town of Dundee
    The Town of Dundee library services impact fee is charged on residential dwelling units only; the adopted schedule sets no rate for nonresidential buildings.
    $0.00
  • Recreation Impact Fee (Town of Dundee, Office)
    Town of Dundee
    The Town of Dundee recreational impact fee is set for new residential development only; no rate applies to nonresidential buildings.
    $0.00
County$4.06/sq ft
  • Transportation Impact Fee (Polk County, Office)
    Polk County
    Polk County transportation impact fee for Dundee, which lies entirely in District A (Northeast): $3,678 per 1,000 sq ft of office space, Phase Two rate effective January 1, 2026 through December 31, 2026, rising to $4,069 on January 1, 2027. Imposed countywide, including inside the cities, in addition to any city fee.
    $3.68/sq ft
  • Correctional Facilities Impact Fee (Polk County, Office)
    Polk County
    Polk County correctional facilities impact fee, phased in under Ordinance 2024-062: $293 per 1,000 sq ft of office space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $367 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
    $0.29/sq ft
  • EMS Impact Fee (Polk County, Office)
    Polk County
    Effective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
    $0.09/sq ft
  • Library Impact Fee (Polk County, Office)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
  • Law Enforcement Impact Fee (Polk County, Office)
    Polk County
    Not charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    $0.00
  • Fire Rescue Impact Fee (Polk County, Office)
    Polk County
    Not charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
    $0.00
  • Parks & Recreational Facilities Impact Fee (Polk County, Office)
    Polk County
    This county impact fee applies to residential development only; nonresidential development is exempt.
    $0.00
Total (Dundee): $9.48/sq ft + $13,691.00 one-time (≈ $250,666.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Dundee Polk County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Polk County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dundee Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Dundee Impact Fee FAQs

What are the total impact fees for a single-family home in Dundee, Florida?

A new single-family home in Dundee pays $29,206.05 per unit in combined impact fees (rates sourced November 15, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Dundee?

Commercial development in Dundee pays $25.40 per square foot in impact fees, plus $13,691.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,283,791.00 for a 50,000 sq ft building.

Does Dundee charge its own impact fees?

Yes. Dundee levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Dundee, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Polk County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000