Hillcrest Heights impact fees by project type
Hillcrest Heights: Single-Family Impact Fees
A new single-family home in Hillcrest Heights pays $14,845.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Polk County.
The largest line items are County Educational System Impact Fee (Polk County) ($11,124.00), Transportation Impact Fee (Polk County, District C) ($3,052.00) and County Correctional Facilities Impact Fee (Polk County) ($516.00).
View the full fee schedule
- Water Impact/Connection Fee (Hillcrest Heights)$0.00Town of Hillcrest HeightsVERIFIED 8/4/2026 via EPA SDWIS: no public water system owned or operated by the Town of Hillcrest Heights exists in Florida SDWIS (statewide PWS name search 'Hillcrest' and Babson Park/Frostproof-area searches return no town system). The town operates no water utility; homes use private wells or small private systems. $0 town water connection fee.
- Sewer Impact/Connection Fee (Hillcrest Heights)$0.00Town of Hillcrest HeightsVERIFIED 8/4/2026: town operates no utilities at all (not even water per SDWIS); no municipal sewer system; homes on septic. $0 town sewer connection fee.
- City Impact Fees (Hillcrest Heights)$0.00Town of Hillcrest HeightsVERIFIED 8/4/2026: Town of Hillcrest Heights (pop ~234) adopts no municipal impact fees — no published code or impact-fee program; city transportation portion $0 per Haines City 3/2025 comparison. Polk County countywide impact fees (Ch. 8.7) apply.
- County Educational System Impact Fee (Polk County)$11,124.00Polk County / Polk County School BoardPolk Co Ord 2024-062 Ch 8.7 Art VI. Countywide. Current-collected 1/1/2026 $11,124 SFR (WH guide); 100%-study $14,338.
- Transportation Impact Fee (Polk County, District C)$3,052.00Polk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District C (South) SFR $3,052 (Phase Three $3,185 on 1/1/2027). §8.7-43(A) applies the fee countywide incl. inside Hillcrest Heights. CORRECTED 7/14/2026: prior $3,185 was the 2027 rate.
- County Correctional Facilities Impact Fee (Polk County)$516.00Polk CountyOrd 2024-062 Art V. Countywide. Current-collected 1/1/2026 $516; 100%-study $662.
- County EMS Impact Fee (Polk County)$153.00Polk CountyOrd 2024-062 Art III. Countywide. =100%-study $153 (not phased).
- Law Enforcement Impact Fee (Polk County)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
- Parks & Recreational Facilities Impact Fee (Polk County)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
- Fire Rescue Impact Fee (Polk County)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
- Library Impact Fee (Polk County)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Multifamily Impact Fees
A new multifamily unit in Hillcrest Heights pays $10,616.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Polk County.
The largest line items are County Educational System Impact Fee (Polk County, MF) ($8,055.00), Transportation Impact Fee (Polk County, District C, MF) ($2,062.00) and County Correctional Facilities Impact Fee (Polk County, MF) ($385.00).
View the full fee schedule
- Water Impact/Connection Fee (Hillcrest Heights, MF)$0.00Town of Hillcrest HeightsVERIFIED 8/4/2026 via EPA SDWIS: town operates no public water system (no town-owned PWS in Florida SDWIS). $0 town water connection fee.
- Sewer Impact/Connection Fee (Hillcrest Heights, MF)$0.00Town of Hillcrest HeightsVERIFIED 8/4/2026: no municipal sewer utility; septic. $0 town sewer connection fee.
- City Impact Fees (Hillcrest Heights, MF)$0.00Town of Hillcrest HeightsVERIFIED 8/4/2026: no municipal impact-fee program (see SFR record); Polk County countywide fees apply.
- County Educational System Impact Fee (Polk County, MF)$8,055.00Polk County / Polk County School BoardOrd 2024-062 Art VI. Countywide. MF 1/1/2026 $8,055 (WH guide); study $10,670.
- Transportation Impact Fee (Polk County, District C, MF)$2,062.00Polk CountyPolk County Ord. 2024-062, Code Ch. 8.7 Att. 2. PHASE TWO rate eff. 1/1/2026–12/31/2026: District C (South) MF $2,062/unit (Phase Three $2,160 on 1/1/2027). §8.7-43(A) applies countywide incl. inside Hillcrest Heights. CORRECTED 7/14/2026: prior $2,160 was the 2027 rate.
- County Correctional Facilities Impact Fee (Polk County, MF)$385.00Polk CountyOrd 2024-062 Art V. Countywide. MF $385; study $495.
- County EMS Impact Fee (Polk County, MF)$114.00Polk CountyOrd 2024-062 Art III. Countywide. MF = 100%-study $114.
- Parks & Recreational Facilities Impact Fee (Polk County, MF)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-83 (Ord. 2024-062 §8.02) (Municipal participation): the county parks & recreational facilities impact fee (Ch. 8.7 Art. VIII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 6 Phase Two (eff. 1/1/2026-12/31/2026): SFR $1,381 / MF $1,033; Phase Three (1/1/2027): SFR $1,864 / MF $1,396 (Municode Supp. 109, codified through Ord. 2026-047).
- Law Enforcement Impact Fee (Polk County, MF)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-103 (Ord. 2024-062 §10.03) (Municipal participation): the county law enforcement impact fee (Ch. 8.7 Art. X) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 8 Phase Two (eff. 1/1/2026, final phase): SFR $578 / MF $417 (Municode Supp. 109, codified through Ord. 2026-047).
- Fire Rescue Impact Fee (Polk County, MF)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-93 (Ord. 2024-062 §9.03) (Municipal participation): the county fire rescue impact fee (Ch. 8.7 Art. IX) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 7 (eff. 1/1/2025, not phased): SFR $377 / MF $273 (Municode Supp. 109, codified through Ord. 2026-047).
- Library Impact Fee (Polk County, MF)$0.00Polk County8/4/2026: RESOLVED - DOCUMENTED $0 (county fee does not apply inside Hillcrest Heights). Polk County Code sec. 8.7-73 (Ord. 2024-062 §7.03) (Municipal participation): the county library impact fee (Ch. 8.7 Art. VII) is not enforced within a municipality unless the county and that municipality execute an interlocal agreement implementing it. Polk County has NO impact-fee interlocal of any kind with the Town of Hillcrest Heights: BoCC agenda item 25-1582 (approved 9/2/2025) identifies the complete set of municipalities holding county impact-fee interlocal agreements - 15 cities/towns - and Hillcrest Heights is not among them. No Polk County municipality currently participates in the Library, Parks, Fire Rescue or Law Enforcement county impact fees; they are collected only in unincorporated Polk County (corroborated by Winter Haven's eff. 1/1/2026 residential fee guide and Davenport's official fee sheet, which show only the four countywide county fees inside city limits). Current adopted county rate should the city ever opt in: Att. 5 (eff. 1/1/2025, not phased): SFR $188 / MF $141 (Municode Supp. 109, codified through Ord. 2026-047).
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Commercial Impact Fees
Commercial development in Hillcrest Heights pays $5.48 per square foot in impact fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $273,900.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Commercial) ($4.57/sq ft), Correctional Facilities Impact Fee (Polk County, Commercial) ($0.73/sq ft) and EMS Impact Fee (Polk County, Commercial) ($0.18/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights) and Water Connection (Capacity) Fee (Town of Hillcrest Heights) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Commercial) and Fire Rescue Impact Fee (Polk County, Commercial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Capacity) Fee (Town of Hillcrest Heights)Requires confirmationTown of Hillcrest Heights (provider unconfirmed)Very small town (pop ~234) near Frostproof; no identified municipal water utility — likely private wells. $0 placeholder. VERIFY provider/fee, Polk County Utilities 863-298-4100.
- Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights)Requires confirmationTown of Hillcrest Heights (provider unconfirmed)No municipal sewer utility identified; likely septic. $0 placeholder. VERIFY Polk County Utilities 863-298-4100.
- Municipal Impact Fee (Town of Hillcrest Heights, Commercial)$0.00Town of Hillcrest HeightsTiny town (pop ~234) near Frostproof; no municipal impact-fee program (city transp $0 per Haines City 3/2025 comparison). Relies on Polk County fees. $0 confirmed.
- Transportation Impact Fee (Polk County, Commercial)$4.57/sq ftPolk CountyPolk County Ord. 2024-062, Ch. 8.7 Att. 2. Countywide incl. Hillcrest Heights (§8.7-43(A)). District C (South) per city SFR record. Phase Two eff. 1/1/2026; steps up 1/1/2027. Per 1,000 sf; row Retail/Commercial.
- Correctional Facilities Impact Fee (Polk County, Commercial)$0.73/sq ftPolk CountyCh. 8.7 Att. 3. County-provided → countywide incl. Hillcrest Heights. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- EMS Impact Fee (Polk County, Commercial)$0.18/sq ftPolk CountyCh. 8.7 Att. 1. EMS county-provided → countywide incl. Hillcrest Heights. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- Parks & Recreational Facilities Impact Fee (Polk County, Commercial)$0.00Polk CountyCh. 8.7 Att. 6. Park schedule has NO nonresidential rows — $0 confirmed.
- Library Impact Fee (Polk County, Commercial)$0.00Polk CountyCh. 8.7 Att. 5. Library schedule has NO nonresidential rows — $0 confirmed.
- Law Enforcement Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyCh. 8.7 Att. 8 municipal participation: NOT enforced in a city absent interlocal. Latent nonres Comm $645/1,000 sf. Held $0 pending interlocal — 863-534-6000.
- Fire Rescue Impact Fee (Polk County, Commercial)Requires confirmationPolk CountyCh. 8.7 Att. 7 municipal participation: NOT enforced in a city absent interlocal. Latent nonres Comm $428/1,000 sf. Held $0 pending interlocal — 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Industrial Impact Fees
Industrial development in Hillcrest Heights pays $0.75 per square foot in impact fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $37,600.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Industrial) ($0.50/sq ft), Correctional Facilities Impact Fee (Polk County, Industrial) ($0.20/sq ft) and EMS Impact Fee (Polk County, Industrial) ($0.05/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights) and Water Connection (Capacity) Fee (Town of Hillcrest Heights) are set by the utility and not published online. Law Enforcement Impact Fee (Polk County, Industrial) and Fire Rescue Impact Fee (Polk County, Industrial) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Capacity) Fee (Town of Hillcrest Heights)Requires confirmationTown of Hillcrest Heights (provider unconfirmed)Very small town (pop ~234) near Frostproof; no identified municipal water utility — likely private wells. $0 placeholder. VERIFY provider/fee, Polk County Utilities 863-298-4100.
- Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights)Requires confirmationTown of Hillcrest Heights (provider unconfirmed)No municipal sewer utility identified; likely septic. $0 placeholder. VERIFY Polk County Utilities 863-298-4100.
- Municipal Impact Fee (Town of Hillcrest Heights, Industrial)$0.00Town of Hillcrest HeightsNo municipal impact-fee program. Relies on Polk County fees. $0 confirmed.
- Transportation Impact Fee (Polk County, Industrial)$0.50/sq ftPolk CountyCh. 8.7 Att. 2. Countywide incl. Hillcrest Heights. District C. Phase Two eff. 1/1/2026. Per 1,000 sf; row General Light Industrial.
- Correctional Facilities Impact Fee (Polk County, Industrial)$0.20/sq ftPolk CountyCh. 8.7 Att. 3. Countywide incl. Hillcrest Heights. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- EMS Impact Fee (Polk County, Industrial)$0.05/sq ftPolk CountyCh. 8.7 Att. 1. Countywide incl. Hillcrest Heights. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- Parks & Recreational Facilities Impact Fee (Polk County, Industrial)$0.00Polk CountyCh. 8.7 Att. 6. Park schedule has NO nonres rows — $0 confirmed.
- Law Enforcement Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyCh. 8.7 Att. 8 municipal participation. Latent nonres Industrial $182/1,000 sf. Held $0 pending interlocal — 863-534-6000.
- Fire Rescue Impact Fee (Polk County, Industrial)Requires confirmationPolk CountyCh. 8.7 Att. 7 municipal participation. Latent nonres Industrial $121/1,000 sf. Held $0 pending interlocal — 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Office Impact Fees
Office development in Hillcrest Heights pays $3.48 per square foot in impact fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to at least $87,075.00. The calculator below adjusts to your exact square footage.
The largest line items are Transportation Impact Fee (Polk County, Office) ($3.03/sq ft), Correctional Facilities Impact Fee (Polk County, Office) ($0.37/sq ft) and EMS Impact Fee (Polk County, Office) ($0.09/sq ft).
Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights) and Water Connection (Capacity) Fee (Town of Hillcrest Heights) are set by the utility and not published online. Fire Rescue Impact Fee (Polk County, Office) and Law Enforcement Impact Fee (Polk County, Office) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Capacity) Fee (Town of Hillcrest Heights)Requires confirmationTown of Hillcrest Heights (provider unconfirmed)Very small town (pop ~234) near Frostproof; no identified municipal water utility — likely private wells. $0 placeholder. VERIFY provider/fee, Polk County Utilities 863-298-4100.
- Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights)Requires confirmationTown of Hillcrest Heights (provider unconfirmed)No municipal sewer utility identified; likely septic. $0 placeholder. VERIFY Polk County Utilities 863-298-4100.
- Municipal Impact Fee (Town of Hillcrest Heights, Office)$0.00Town of Hillcrest HeightsNo municipal impact-fee program. Relies on Polk County fees. $0 confirmed.
- Transportation Impact Fee (Polk County, Office)$3.03/sq ftPolk CountyCh. 8.7 Att. 2. Countywide incl. Hillcrest Heights. District C. Phase Two eff. 1/1/2026. Per 1,000 sf; row General Office.
- Correctional Facilities Impact Fee (Polk County, Office)$0.37/sq ftPolk CountyCh. 8.7 Att. 3. Countywide incl. Hillcrest Heights. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- EMS Impact Fee (Polk County, Office)$0.09/sq ftPolk CountyCh. 8.7 Att. 1. Countywide incl. Hillcrest Heights. 100%, not phased, eff. 1/1/2025. Per 1,000 sf.
- Parks & Recreational Facilities Impact Fee (Polk County, Office)$0.00Polk CountyCh. 8.7 Att. 6. Park schedule has NO nonres rows — $0 confirmed.
- Library Impact Fee (Polk County, Office)$0.00Polk CountyCh. 8.7 Att. 5. Library schedule has NO nonres rows — $0 confirmed.
- Fire Rescue Impact Fee (Polk County, Office)Requires confirmationPolk CountyCh. 8.7 Att. 7 municipal participation. Latent nonres Office $216/1,000 sf. Held $0 pending interlocal — 863-534-6000.
- Law Enforcement Impact Fee (Polk County, Office)Requires confirmationPolk CountyCh. 8.7 Att. 8 municipal participation. Latent nonres Office $326/1,000 sf. Held $0 pending interlocal — 863-534-6000.
Where in Polk County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Hillcrest Heights
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Hillcrest Heights, Florida?
A new single-family home in Hillcrest Heights pays $14,845.00 per unit in combined impact fees (rates sourced July 17, 2026).
How much are commercial impact fees in Hillcrest Heights?
Commercial development in Hillcrest Heights pays $5.48 per square foot in impact fees, at least $273,900.00 for a 50,000 sq ft building. 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Hillcrest Heights charge its own impact fees?
Yes. Hillcrest Heights levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Hillcrest Heights, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Polk County impact fees page.