Hillcrest Heights Impact Fees by Project Type
Hillcrest Heights: Single-Family Impact Fees
A new single-family home in Hillcrest Heights pays $18,683.00 per unit in impact fees (rates sourced November 15, 2026). All of it is levied by Polk County.
The largest line items are County Educational System Impact Fee (Polk County) ($11,124.00), Transportation Impact Fee (Polk County, District C) ($3,052.00) and Water Connection Fee (Polk County Utilities) ($3,038.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Hillcrest Heights Impact Fee Schedule
- Water Connection Fee (Polk County Utilities)$3,038.00Polk County UtilitiesPolk County Utilities provides water in Hillcrest Heights (its Babson Park system; the town has no utility). A new single-family home pays a one-time water connection fee of $3,038 under the county utility rate resolution adopted July 21, 2026; the fee rises to $3,989 on January 1, 2027. A separate meter installation charge applies ($800 for a standard 3/4 in. meter).
- Meter Installation Charge (Polk County Utilities) — 3/4" meter$800.00Polk County UtilitiesPolk County Utilities meter installation charge for a 3/4 in. meter: $800, under the rate resolution adopted July 21, 2026 (effective October 1, 2026, unchanged through 2030). Charged where Polk County Utilities provides water, which includes Hillcrest Heights; meters larger than 2 in. are billed at actual cost.
- Sewer Impact/Connection Fee (Hillcrest Heights)$0.00Town of Hillcrest HeightsNo central sewer serves Hillcrest Heights: the town has no sewer utility and its developed parcels use on-site septic systems (Florida Department of Health water management inventory), so no sewer connection fee applies. A septic system permit from the Florida Department of Health is required instead.
- City Impact Fees (Hillcrest Heights)$0.00Town of Hillcrest HeightsThe Town of Hillcrest Heights does not charge its own impact fees on new construction. Polk County's countywide transportation, EMS, correctional facilities and school impact fees apply.
- County Educational System Impact Fee (Polk County)$11,124.00Polk County / Polk County School BoardPolk County educational system (school) impact fee: $11,124 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $12,187 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
- Transportation Impact Fee (Polk County, District C)$3,052.00Polk CountyPolk County transportation impact fee, District C rate: $3,052 per single-family home. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $3,185 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
- County Correctional Facilities Impact Fee (Polk County)$516.00Polk CountyPolk County correctional facilities impact fee: $516 per single-family home. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $662 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
- County EMS Impact Fee (Polk County)$153.00Polk CountyPolk County emergency medical system (EMS) impact fee: $153 per single-family home. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
- Law Enforcement Impact Fee (Polk County)$0.00Polk CountyPolk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
- Parks & Recreational Facilities Impact Fee (Polk County)$0.00Polk CountyPolk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
- Fire Rescue Impact Fee (Polk County)$0.00Polk CountyPolk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
- Library Impact Fee (Polk County)$0.00Polk CountyPolk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Multifamily Impact Fees
A new multifamily unit in Hillcrest Heights pays $13,087.00 per unit in impact fees (rates sourced November 15, 2026). All of it is levied by Polk County.
The largest line items are County Educational System Impact Fee (Polk County, MF) ($8,055.00), Transportation Impact Fee (Polk County, District C, MF) ($2,062.00) and Water Connection Fee (Polk County Utilities, MF) ($1,671.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Hillcrest Heights Impact Fee Schedule
- Water Connection Fee (Polk County Utilities, MF)$1,671.00Polk County UtilitiesPolk County Utilities provides water in Hillcrest Heights (its Babson Park system; the town has no utility). New apartment or other multifamily units pay a one-time water connection fee of $1,671 per unit under the county utility rate resolution adopted July 21, 2026; the fee rises to $2,194 on January 1, 2027.
- Meter Installation Charge (Polk County Utilities, MF) — 3/4" meter$800.00Polk County UtilitiesPolk County Utilities meter installation charge for a 3/4 in. meter: $800, under the rate resolution adopted July 21, 2026 (effective October 1, 2026, unchanged through 2030). Charged where Polk County Utilities provides water, which includes Hillcrest Heights; meters larger than 2 in. are billed at actual cost. The charge is per meter: a building on one larger meter pays once at that meter's rate.
- Sewer Impact/Connection Fee (Hillcrest Heights, MF)$0.00Town of Hillcrest HeightsNo central sewer serves Hillcrest Heights: the town has no sewer utility and its developed parcels use on-site septic systems (Florida Department of Health water management inventory), so no sewer connection fee applies. A septic system permit from the Florida Department of Health is required instead.
- City Impact Fees (Hillcrest Heights, MF)$0.00Town of Hillcrest HeightsThe Town of Hillcrest Heights does not charge its own impact fees on new construction. Polk County's countywide transportation, EMS, correctional facilities and school impact fees apply.
- County Educational System Impact Fee (Polk County, MF)$8,055.00Polk County / Polk County School BoardPolk County educational system (school) impact fee: $8,055 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $9,070 on January 1, 2027 (Phase Three). Administered under the Polk County School Board program (Ch. 8.7, Attachment 4; Ord. 2024-062) and levied countywide, including within municipalities.
- Transportation Impact Fee (Polk County, District C, MF)$2,062.00Polk CountyPolk County transportation impact fee, District C rate: $2,062 per multifamily dwelling unit. This is the current Phase Two rate (effective January 1–December 31, 2026) and steps up to $2,160 on January 1, 2027 (Phase Three). Set by county ordinance (Code of Ordinances Ch. 8.7, Attachment 2; Ord. 2024-062) and collected countywide, including within this city. Polk County has three transportation impact-fee districts (A, B and C) and the rate depends on the parcel's district.
- County Correctional Facilities Impact Fee (Polk County, MF)$385.00Polk CountyPolk County correctional facilities impact fee: $385 per multifamily dwelling unit. Current Phase Two rate (effective January 1–December 31, 2026); steps up to $495 on January 1, 2027 (Phase Three). Set by county ordinance (Ch. 8.7, Attachment 3; Ord. 2024-062) and collected countywide, including within municipalities.
- County EMS Impact Fee (Polk County, MF)$114.00Polk CountyPolk County emergency medical system (EMS) impact fee: $114 per multifamily dwelling unit. This is a flat countywide rate that has applied since January 1, 2025 (Code of Ordinances Ch. 8.7, Attachment 1; Ord. 2024-062); it is not phased. It is collected both in unincorporated Polk County and within municipalities.
- Parks & Recreational Facilities Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's parks and recreation impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
- Law Enforcement Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's law enforcement impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
- Fire Rescue Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's fire rescue impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
- Library Impact Fee (Polk County, MF)$0.00Polk CountyPolk County's library impact fee applies inside a city or town only where that municipality has opted in by agreement with the county. Hillcrest Heights has not opted in - as of the county's September 2025 agreements with its municipalities, no city or town in Polk County participates in this fee - so it is collected only in unincorporated Polk County and does not apply inside Hillcrest Heights.
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Commercial Impact Fees
Commercial development in Hillcrest Heights pays $5.31 per square foot in impact fees, plus $4,113.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).
For a 50,000 sq ft building, that comes to about $269,663.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (Polk County Utilities) ($3,038.00 one-time), Meter Installation Charge (Polk County Utilities) — 1" meter ($1,075.00 one-time) and Transportation Impact Fee (Polk County, Commercial) ($4.57/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Hillcrest Heights Impact Fee Schedule
- Water Connection (Capacity) Fee (Polk County Utilities)$3,038.00 one-timePolk County UtilitiesPolk County Utilities provides water in Hillcrest Heights (its Babson Park system; the town has no utility). For nonresidential service, projected daily use divided by 250 gallons gives the number of equivalent residential connections (ERC), each charged at the single-family rate of $3,038 under the rate resolution adopted July 21, 2026. The amount shown is one ERC. The per-ERC charge rises to $3,989 on January 1, 2027. A separate meter installation charge applies.
- Meter Installation Charge (Polk County Utilities) — 1" meter$1,075.00 one-timePolk County UtilitiesPolk County Utilities meter installation charge for a 1 in. meter: $1,075, under the rate resolution adopted July 21, 2026 (effective October 1, 2026, unchanged through 2030). Charged where Polk County Utilities provides water, which includes Hillcrest Heights; meters larger than 2 in. are billed at actual cost.
- Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights)$0.00Town of Hillcrest Heights (provider unconfirmed)No central sewer serves Hillcrest Heights: the town has no sewer utility and its developed parcels use on-site septic systems (Florida Department of Health water management inventory), so no sewer connection fee applies. A septic system permit from the Florida Department of Health is required instead.
- Municipal Impact Fee (Town of Hillcrest Heights, Commercial)$0.00Town of Hillcrest HeightsThe Town of Hillcrest Heights charges no municipal impact fees; its annual financial reports through fiscal year 2024 show no impact fee revenue. The Polk County transportation, EMS and correctional facilities impact fees still apply inside the town.
- Transportation Impact Fee (Polk County, Commercial)$4.57/sq ftPolk CountyPolk County transportation impact fee, District C (South): $4,572 per 1,000 sq ft of retail/commercial space, Phase Two rate effective January 1, 2026 through December 31, 2026; rises to $4,778 on January 1, 2027. All of Hillcrest Heights lies in District C.
- Correctional Facilities Impact Fee (Polk County, Commercial)$0.56/sq ftPolk CountyPolk County correctional facilities impact fee, phased in under Ordinance 2024-062: $560 per 1,000 sq ft of retail/commercial space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $727 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
- EMS Impact Fee (Polk County, Commercial)$0.18/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Parks & Recreational Facilities Impact Fee (Polk County, Commercial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Law Enforcement Impact Fee (Polk County, Commercial)$0.00Polk CountyNot charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
- Library Impact Fee (Polk County, Commercial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Fire Rescue Impact Fee (Polk County, Commercial)$0.00Polk CountyNot charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Industrial Impact Fees
Industrial development in Hillcrest Heights pays $0.70 per square foot in impact fees, plus $4,113.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).
For a 50,000 sq ft building, that comes to about $39,313.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (Polk County Utilities) ($3,038.00 one-time), Meter Installation Charge (Polk County Utilities) — 1" meter ($1,075.00 one-time) and Transportation Impact Fee (Polk County, Industrial) ($0.50/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Hillcrest Heights Impact Fee Schedule
- Water Connection (Capacity) Fee (Polk County Utilities)$3,038.00 one-timePolk County UtilitiesPolk County Utilities provides water in Hillcrest Heights (its Babson Park system; the town has no utility). For nonresidential service, projected daily use divided by 250 gallons gives the number of equivalent residential connections (ERC), each charged at the single-family rate of $3,038 under the rate resolution adopted July 21, 2026. The amount shown is one ERC. The per-ERC charge rises to $3,989 on January 1, 2027. A separate meter installation charge applies.
- Meter Installation Charge (Polk County Utilities) — 1" meter$1,075.00 one-timePolk County UtilitiesPolk County Utilities meter installation charge for a 1 in. meter: $1,075, under the rate resolution adopted July 21, 2026 (effective October 1, 2026, unchanged through 2030). Charged where Polk County Utilities provides water, which includes Hillcrest Heights; meters larger than 2 in. are billed at actual cost.
- Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights)$0.00Town of Hillcrest Heights (provider unconfirmed)No central sewer serves Hillcrest Heights: the town has no sewer utility and its developed parcels use on-site septic systems (Florida Department of Health water management inventory), so no sewer connection fee applies. A septic system permit from the Florida Department of Health is required instead.
- Municipal Impact Fee (Town of Hillcrest Heights, Industrial)$0.00Town of Hillcrest HeightsThe Town of Hillcrest Heights charges no municipal impact fees; its annual financial reports through fiscal year 2024 show no impact fee revenue. The Polk County transportation, EMS and correctional facilities impact fees still apply inside the town.
- Transportation Impact Fee (Polk County, Industrial)$0.50/sq ftPolk CountyPolk County transportation impact fee, District C (South): $497 per 1,000 sq ft of industrial/manufacturing space, Phase Two rate effective January 1, 2026 through December 31, 2026; unchanged on January 1, 2027. All of Hillcrest Heights lies in District C.
- Correctional Facilities Impact Fee (Polk County, Industrial)$0.16/sq ftPolk CountyPolk County correctional facilities impact fee, phased in under Ordinance 2024-062: $157 per 1,000 sq ft of industrial/manufacturing space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $205 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
- EMS Impact Fee (Polk County, Industrial)$0.05/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Parks & Recreational Facilities Impact Fee (Polk County, Industrial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Library Impact Fee (Polk County, Industrial)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Law Enforcement Impact Fee (Polk County, Industrial)$0.00Polk CountyNot charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
- Fire Rescue Impact Fee (Polk County, Industrial)$0.00Polk CountyNot charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights: Office Impact Fees
Office development in Hillcrest Heights pays $3.41 per square foot in impact fees, plus $4,113.00 in one-time water and sewer connection fees (rates sourced November 15, 2026).
For a 25,000 sq ft building, that comes to about $89,338.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (Polk County Utilities) ($3,038.00 one-time), Meter Installation Charge (Polk County Utilities) — 1" meter ($1,075.00 one-time) and Transportation Impact Fee (Polk County, Office) ($3.03/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Hillcrest Heights Impact Fee Schedule
- Water Connection (Capacity) Fee (Polk County Utilities)$3,038.00 one-timePolk County UtilitiesPolk County Utilities provides water in Hillcrest Heights (its Babson Park system; the town has no utility). For nonresidential service, projected daily use divided by 250 gallons gives the number of equivalent residential connections (ERC), each charged at the single-family rate of $3,038 under the rate resolution adopted July 21, 2026. The amount shown is one ERC. The per-ERC charge rises to $3,989 on January 1, 2027. A separate meter installation charge applies.
- Meter Installation Charge (Polk County Utilities) — 1" meter$1,075.00 one-timePolk County UtilitiesPolk County Utilities meter installation charge for a 1 in. meter: $1,075, under the rate resolution adopted July 21, 2026 (effective October 1, 2026, unchanged through 2030). Charged where Polk County Utilities provides water, which includes Hillcrest Heights; meters larger than 2 in. are billed at actual cost.
- Wastewater (Sewer) Connection (Capacity) Fee (Town of Hillcrest Heights)$0.00Town of Hillcrest Heights (provider unconfirmed)No central sewer serves Hillcrest Heights: the town has no sewer utility and its developed parcels use on-site septic systems (Florida Department of Health water management inventory), so no sewer connection fee applies. A septic system permit from the Florida Department of Health is required instead.
- Municipal Impact Fee (Town of Hillcrest Heights, Office)$0.00Town of Hillcrest HeightsThe Town of Hillcrest Heights charges no municipal impact fees; its annual financial reports through fiscal year 2024 show no impact fee revenue. The Polk County transportation, EMS and correctional facilities impact fees still apply inside the town.
- Transportation Impact Fee (Polk County, Office)$3.03/sq ftPolk CountyPolk County transportation impact fee, District C (South): $3,026 per 1,000 sq ft of office space, Phase Two rate effective January 1, 2026 through December 31, 2026; rises to $3,160 on January 1, 2027. All of Hillcrest Heights lies in District C.
- Correctional Facilities Impact Fee (Polk County, Office)$0.29/sq ftPolk CountyPolk County correctional facilities impact fee, phased in under Ordinance 2024-062: $293 per 1,000 sq ft of office space from January 1, 2026 through December 31, 2026 (Phase Two), rising to $367 per 1,000 sq ft on January 1, 2027 (Phase Three). Imposed countywide, including inside the cities.
- EMS Impact Fee (Polk County, Office)$0.09/sq ftPolk CountyEffective 1/1/2025 at the full adopted rate; applies countywide in both incorporated and unincorporated areas.
- Fire Rescue Impact Fee (Polk County, Office)$0.00Polk CountyNot charged inside this city. Polk County's fire rescue impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
- Parks & Recreational Facilities Impact Fee (Polk County, Office)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
- Law Enforcement Impact Fee (Polk County, Office)$0.00Polk CountyNot charged inside this city. Polk County's law enforcement impact fee applies in unincorporated Polk County, and inside a city only where the city joins the county program by interlocal agreement; no Polk County city has joined (Ordinance 2024-062).
- Library Impact Fee (Polk County, Office)$0.00Polk CountyThis county impact fee applies to residential development only; nonresidential development is exempt.
Where in Polk County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillcrest Heights Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.
Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Hillcrest Heights Impact Fee FAQs
What are the total impact fees for a single-family home in Hillcrest Heights, Florida?
A new single-family home in Hillcrest Heights pays $18,683.00 per unit in combined impact fees (rates sourced November 15, 2026).
How much are commercial impact fees in Hillcrest Heights?
Commercial development in Hillcrest Heights pays $5.31 per square foot in impact fees, plus $4,113.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $269,663.00 for a 50,000 sq ft building.
Does Hillcrest Heights charge its own impact fees?
No. Hillcrest Heights does not levy its own municipal impact fees. New development in Hillcrest Heights pays Polk County impact fees, shown on this page.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Polk County impact fees page.