Travis County Impact Fees by Project Type
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Travis County: Single-Family Impact Fees
A new single-family home in unincorporated Travis County pays $36,101.00 per unit in impact fees (rates sourced November 25, 2026). All of it is levied by Travis County.
The largest line items are Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 5/8" meter ($22,641.00) and Water Impact Fee — Travis County WCID 17, 5/8" meter + $3,655 tap ($13,460.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Travis County Impact Fee Schedule
- Water Impact Fee — Travis County WCID 17, 5/8" meter + $3,655 tap$13,460.00Travis County Water Control and Improvement District No. 17Travis County WCID No. 17 water impact fee for a 5/8 in. meter (1 LUE), effective August 1, 2025. WCID 17 serves Steiner Ranch and much of the Lake Travis area; some defined areas add a per-LUE construction line fee. The District also charges a $3,655 tap fee for a single service with a road cut ($1,300 without a road cut), included here.
- Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 5/8" meter$22,641.00Travis County Water Control and Improvement District No. 17Travis County WCID No. 17 wastewater impact fee for one home on a 5/8 in. meter (1 LUE) connecting to the Flintrock treatment plant, the highest of 6 rates that depend on which plant serves the lot. Larger meters pay by the district's meter table. Some areas add a per-LUE subsequent user fee.
- City Impact/Development Fees (Travis County - Unincorporated)$0.00Travis CountyUnincorporated Travis County has no municipal impact, roadway or parkland fee; Texas reserves those to cities and utility districts. Water and wastewater providers charge their own impact fees.
- County Impact Fees (Travis County)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Travis County: Multifamily Impact Fees
A new multifamily unit in unincorporated Travis County pays $36,101.00 per unit in impact fees (rates sourced November 25, 2026). All of it is levied by Travis County.
The largest line items are Wastewater Impact Fee (MF) — Travis County WCID 17, Flintrock WWTP, 5/8" meter ($22,641.00) and Water Impact Fee (MF) — Travis County WCID 17, 5/8" meter + $3,655 tap ($13,460.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Travis County Impact Fee Schedule
- Water Impact Fee (MF) — Travis County WCID 17, 5/8" meter + $3,655 tap$13,460.00Travis County Water Control and Improvement District No. 17Travis County WCID No. 17 charges its water impact fee by meter size at $9,805 per LUE; this is the 5/8 in. meter amount. A building served by one master meter pays once at that meter's size, up to $78,440 for a 2 in. meter. The District also charges a $3,655 tap fee for a single service with a road cut ($1,300 without a road cut), included here.
- Wastewater Impact Fee (MF) — Travis County WCID 17, Flintrock WWTP, 5/8" meter$22,641.00Travis County Water Control and Improvement District No. 17Travis County WCID No. 17 wastewater impact fee per LUE (5/8 in. meter) for the Flintrock treatment plant, the highest of 6 rates that depend on which plant serves the lot. The district rates LUEs by meter size, so a building on one meter pays by that meter's LUE count.
- City Impact/Development Fees (Travis County - Unincorporated, MF)$0.00Travis CountyUnincorporated Travis County has no municipal impact, roadway or parkland fee; Texas reserves those to cities and utility districts. Water and wastewater providers charge their own impact fees.
- County Impact Fees (Travis County, MF)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Travis County: Commercial Impact Fees
Commercial development in unincorporated Travis County pays no per-square-foot impact fees, but owes $84,770.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $84,770.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 1" meter, 2.5 LUE × $22,641/LUE ($56,602.50 one-time) and Water Impact Fee — Travis County WCID 17, 1" meter, 2.5 LUE × $9,805/LUE + $3,655 tap ($28,167.50 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Travis County Impact Fee Schedule
- Water Impact Fee — Travis County WCID 17, 1" meter, 2.5 LUE × $9,805/LUE + $3,655 tap$28,167.50 one-timeTravis County Water Control and Improvement District No. 17Travis County WCID No. 17 water impact fee for a 1 in. meter (2.5 LUE at $9,805 per LUE), effective August 1, 2025. Several utilities serve unincorporated Travis County and the provider depends on location; some WCID 17 defined areas add a per-LUE subsequent user or construction line fee. The District also charges a $3,655 tap fee for a single service with a road cut ($1,300 without a road cut), included here.
- Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 1" meter, 2.5 LUE × $22,641/LUE$56,602.50 one-timeTravis County Water Control and Improvement District No. 17Travis County WCID No. 17 wastewater impact fee for a 1 in. meter (2.5 LUEs at $22,641 per LUE) where the Flintrock treatment plant serves the lot, the highest of 6 WCID 17 rates that depend on which plant serves the lot. LUEs follow meter size; some defined areas add a per-LUE subsequent user fee.
- City Impact/Development Fees (Travis County - Unincorporated, Commercial)$0.00Travis CountyUnincorporated Travis County has no municipal impact or roadway fee; Texas reserves those to cities and utility districts. Water and wastewater providers charge their own impact fees.
- County Impact Fees (Travis County, Commercial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Travis County: Industrial Impact Fees
Industrial development in unincorporated Travis County pays no per-square-foot impact fees, but owes $84,770.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $84,770.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 1" meter, 2.5 LUE × $22,641/LUE ($56,602.50 one-time) and Water Impact Fee — Travis County WCID 17, 1" meter, 2.5 LUE × $9,805/LUE + $3,655 tap ($28,167.50 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Travis County Impact Fee Schedule
- Water Impact Fee — Travis County WCID 17, 1" meter, 2.5 LUE × $9,805/LUE + $3,655 tap$28,167.50 one-timeTravis County Water Control and Improvement District No. 17Travis County WCID No. 17 water impact fee for a 1 in. meter (2.5 LUE at $9,805 per LUE), effective August 1, 2025. Several utilities serve unincorporated Travis County and the provider depends on location; some WCID 17 defined areas add a per-LUE subsequent user or construction line fee. The District also charges a $3,655 tap fee for a single service with a road cut ($1,300 without a road cut), included here.
- Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 1" meter, 2.5 LUE × $22,641/LUE$56,602.50 one-timeTravis County Water Control and Improvement District No. 17Travis County WCID No. 17 wastewater impact fee for a 1 in. meter (2.5 LUEs at $22,641 per LUE) where the Flintrock treatment plant serves the lot, the highest of 6 WCID 17 rates that depend on which plant serves the lot. LUEs follow meter size; some defined areas add a per-LUE subsequent user fee.
- City Impact/Development Fees (Travis County - Unincorporated, Industrial)$0.00Travis CountyUnincorporated Travis County has no municipal impact or roadway fee; Texas reserves those to cities and utility districts. Water and wastewater providers charge their own impact fees.
- County Impact Fees (Travis County, Industrial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Travis County: Office Impact Fees
Office development in unincorporated Travis County pays no per-square-foot impact fees, but owes $84,770.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $84,770.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 1" meter, 2.5 LUE × $22,641/LUE ($56,602.50 one-time) and Water Impact Fee — Travis County WCID 17, 1" meter, 2.5 LUE × $9,805/LUE + $3,655 tap ($28,167.50 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Travis County Impact Fee Schedule
- Water Impact Fee — Travis County WCID 17, 1" meter, 2.5 LUE × $9,805/LUE + $3,655 tap$28,167.50 one-timeTravis County Water Control and Improvement District No. 17Travis County WCID No. 17 water impact fee for a 1 in. meter (2.5 LUE at $9,805 per LUE), effective August 1, 2025. Several utilities serve unincorporated Travis County and the provider depends on location; some WCID 17 defined areas add a per-LUE subsequent user or construction line fee. The District also charges a $3,655 tap fee for a single service with a road cut ($1,300 without a road cut), included here.
- Wastewater Impact Fee — Travis County WCID 17, Flintrock WWTP, 1" meter, 2.5 LUE × $22,641/LUE$56,602.50 one-timeTravis County Water Control and Improvement District No. 17Travis County WCID No. 17 wastewater impact fee for a 1 in. meter (2.5 LUEs at $22,641 per LUE) where the Flintrock treatment plant serves the lot, the highest of 6 WCID 17 rates that depend on which plant serves the lot. LUEs follow meter size; some defined areas add a per-LUE subsequent user fee.
- City Impact/Development Fees (Travis County - Unincorporated, Office)$0.00Travis CountyUnincorporated Travis County has no municipal impact or roadway fee; Texas reserves those to cities and utility districts. Water and wastewater providers charge their own impact fees.
- County Impact Fees (Travis County, Office)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Travis County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Travis County Impact Fee FAQs
What are single-family impact fees in Travis County, Texas?
A new single-family home in unincorporated Travis County pays $36,101.00 per unit in impact fees (rates sourced November 25, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Travis County?
Multifamily development in unincorporated Travis County pays $36,101.00 per unit in impact fees (rates sourced November 25, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Travis County?
Commercial development in unincorporated Travis County pays no per-square-foot impact fees, but owes $84,770.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Do Wells Branch and Hudson Bend pay Travis County impact fees?
Wells Branch and Hudson Bend are unincorporated, so the Travis County charges on this page apply there. In Texas the city whose extraterritorial jurisdiction covers a site can charge water, wastewater and drainage impact fees there, and a utility district can charge its own fees, so new construction outside city limits may still owe them. Search a specific address in the calculator below to confirm it sits outside every city limit.
Do cities in Travis County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 15 of 18 cities in Travis County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.