Jonestown, Texas Impact Fees

Jonestown applies its own fee schedule. Travis County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $8,050.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Jonestown Impact Fees by Project Type

Jonestown: Single-Family Impact Fees

A new single-family home in Jonestown pays at least $8,050.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Equity Buy-In Fee (Jonestown WSC) ($4,600.00), Water Capital Recovery Fee (Jonestown WSC) ($3,000.00) and Water Installation Fee (Jonestown WSC) ($450.00).

Sewer Connection Fee — On-site septic (no city sewer) is set by the utility and not published online. Parkland Dedication Fee in Lieu (City of Jonestown) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Jonestown Impact Fee Schedule
Water$8,050.00
  • Water Equity Buy-In Fee (Jonestown WSC)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation equity buy-in fee per living unit equivalent; a home on a standard 5/8 in. x 3/4 in. meter is 1 unit. It is paid with the separate capital recovery fee and installation fee, plus a refundable $100 membership fee and $50 each for backflow device and customer service inspection.
    $4,600.00
  • Water Capital Recovery Fee (Jonestown WSC)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation capital recovery fee for each unit of capacity on a new connection, charged in addition to the equity buy-in fee; a standard home is 1 unit.
    $3,000.00
  • Water Installation Fee (Jonestown WSC)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation installation fee for a standard service tap, plus any additional cost the installation requires.
    $450.00
Sewer$0.00
  • Sewer Connection Fee — On-site septic (no city sewer)
    On-site septic, most of the city
    City of Jonestown
    Most of Jonestown has no public sewer and uses on-site septic systems, which need a $25 city septic permit. City wastewater service reaches The Hollows, the Carlton Planned Development District and the Angelside Oaks development only; those areas pay the tap fees in the other options.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Jonestown)
    City of Jonestown
    The City of Jonestown levies no roadway impact fee. Where the city provides sewer, it charges wastewater tap and capital recovery fees; parkland fees in lieu are paid at platting, before any building permit.
    $0.00
  • Parkland Dedication Fee in Lieu (City of Jonestown)
    City of Jonestown
    Jonestown requires park land of 1 acre per 100 new dwelling units or 5 percent of the project area, whichever is greater, due before the final plat is recorded. Where the council accepts a fee instead, it is $1,200 per required acre, so the amount depends on the subdivision's size and density.
    Requires confirmation
County$0.00
  • County Impact Fees (Travis County)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Jonestown): $8,050.00
Sources last checked Official fee schedules:Jonestown Water Supply Corporation City of Jonestown Travis County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jonestown: Multifamily Impact Fees

A new multifamily unit in Jonestown pays at least $8,050.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Equity Buy-In Fee (Jonestown WSC, MF) ($4,600.00), Water Capital Recovery Fee (Jonestown WSC, MF) ($3,000.00) and Water Installation Fee (Jonestown WSC, MF) ($450.00).

Sewer Connection Fee (MF) — On-site septic (no city sewer) is set by the utility and not published online. Parkland Dedication Fee in Lieu (City of Jonestown, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Jonestown Impact Fee Schedule
Water$8,050.00
  • Water Equity Buy-In Fee (Jonestown WSC, MF)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation equity buy-in fee; its tariff counts each multifamily residential unit as 1 living unit equivalent, so it is charged per unit.
    $4,600.00
  • Water Capital Recovery Fee (Jonestown WSC, MF)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation capital recovery fee for each unit of capacity, charged in addition to the equity buy-in fee; each multifamily residential unit counts as 1 unit.
    $3,000.00
  • Water Installation Fee (Jonestown WSC, MF)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation installation fee for a standard service tap. It is charged per tap, so a building on one connection pays once; a master-metered building is a non-standard service priced by contract.
    $450.00
Sewer$0.00
  • Sewer Connection Fee (MF) — On-site septic (no city sewer)
    On-site septic, most of the city
    City of Jonestown
    Most of Jonestown has no public sewer and uses on-site septic systems. City wastewater service reaches The Hollows, the Carlton Planned Development District and the Angelside Oaks development only; those areas pay the tap fees in the other options.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Jonestown, MF)
    City of Jonestown
    The City of Jonestown levies no roadway impact fee. Where the city provides sewer, it charges wastewater tap and capital recovery fees; parkland fees in lieu are paid at platting, before any building permit.
    $0.00
  • Parkland Dedication Fee in Lieu (City of Jonestown, MF)
    City of Jonestown
    Jonestown requires park land of 1 acre per 100 new dwelling units or 5 percent of the project area, whichever is greater, due before the final plat is recorded. Where the council accepts a fee instead, it is $1,200 per required acre, so the amount depends on the project's size and density.
    Requires confirmation
County$0.00
  • County Impact Fees (Travis County, MF)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Jonestown): $8,050.00
Sources last checked Official fee schedules:Jonestown Water Supply Corporation City of Jonestown Travis County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jonestown: Commercial Impact Fees

Commercial development in Jonestown pays no per-square-foot impact fees (rates sourced November 25, 2026).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee — On-site septic (no city sewer) and Water Connection Fees (Jonestown WSC) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Jonestown Impact Fee Schedule
Water$0.00
  • Water Connection Fees (Jonestown WSC)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation treats all nonresidential service as non-standard and sets its charges case by case under a service contract. For comparison, a standard home pays a $4,600 equity buy-in fee and a $3,000 capital recovery fee per living unit equivalent, plus a $450 installation fee.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee — On-site septic (no city sewer)
    On-site septic, most of the city
    City of Jonestown
    Most of Jonestown has no public sewer and uses on-site septic systems, which need a $25 city septic permit. City wastewater service reaches The Hollows, the Carlton Planned Development District and the Angelside Oaks development only; those areas pay the tap and capital recovery fees in the other options, sized by water meter.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Jonestown, Commercial)
    City of Jonestown
    The City of Jonestown levies no roadway impact fee. Its one-time charges for nonresidential development are the wastewater tap and capital recovery fees where the city provides sewer.
    $0.00
County$0.00
  • County Impact Fees (Travis County, Commercial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Jonestown): $0.00
Sources last checked Official fee schedules:Jonestown Water Supply Corporation City of Jonestown Travis County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jonestown: Industrial Impact Fees

Industrial development in Jonestown pays no per-square-foot impact fees (rates sourced November 25, 2026).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee — On-site septic (no city sewer) and Water Connection Fees (Jonestown WSC) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Jonestown Impact Fee Schedule
Water$0.00
  • Water Connection Fees (Jonestown WSC)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation treats all nonresidential service as non-standard and sets its charges case by case under a service contract. For comparison, a standard home pays a $4,600 equity buy-in fee and a $3,000 capital recovery fee per living unit equivalent, plus a $450 installation fee.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee — On-site septic (no city sewer)
    On-site septic, most of the city
    City of Jonestown
    Most of Jonestown has no public sewer and uses on-site septic systems, which need a $25 city septic permit. City wastewater service reaches The Hollows, the Carlton Planned Development District and the Angelside Oaks development only; those areas pay the tap and capital recovery fees in the other options, sized by water meter.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Jonestown, Industrial)
    City of Jonestown
    The City of Jonestown levies no roadway impact fee. Its one-time charges for nonresidential development are the wastewater tap and capital recovery fees where the city provides sewer.
    $0.00
County$0.00
  • County Impact Fees (Travis County, Industrial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Jonestown): $0.00
Sources last checked Official fee schedules:Jonestown Water Supply Corporation City of Jonestown Travis County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jonestown: Office Impact Fees

Office development in Jonestown pays no per-square-foot impact fees (rates sourced November 25, 2026).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee — On-site septic (no city sewer) and Water Connection Fees (Jonestown WSC) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Jonestown Impact Fee Schedule
Water$0.00
  • Water Connection Fees (Jonestown WSC)
    Jonestown Water Supply Corporation
    Jonestown Water Supply Corporation treats all nonresidential service as non-standard and sets its charges case by case under a service contract. For comparison, a standard home pays a $4,600 equity buy-in fee and a $3,000 capital recovery fee per living unit equivalent, plus a $450 installation fee.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee — On-site septic (no city sewer)
    On-site septic, most of the city
    City of Jonestown
    Most of Jonestown has no public sewer and uses on-site septic systems, which need a $25 city septic permit. City wastewater service reaches The Hollows, the Carlton Planned Development District and the Angelside Oaks development only; those areas pay the tap and capital recovery fees in the other options, sized by water meter.
    Requires confirmation
City$0.00
  • City Impact Fees (City of Jonestown, Office)
    City of Jonestown
    The City of Jonestown levies no roadway impact fee. Its one-time charges for nonresidential development are the wastewater tap and capital recovery fees where the city provides sewer.
    $0.00
County$0.00
  • County Impact Fees (Travis County, Office)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Jonestown): $0.00
Sources last checked Official fee schedules:Jonestown Water Supply Corporation City of Jonestown Travis County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jonestown Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Jonestown Impact Fee FAQs

What are the total impact fees for a single-family home in Jonestown, Texas?

A new single-family home in Jonestown pays at least $8,050.00 per unit in combined impact fees (rates sourced November 25, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Jonestown?

Jonestown does not currently levy impact fees on commercial development.

Does Jonestown charge its own impact fees?

Yes. Jonestown levies its own municipal impact or utility fees. Travis County does not currently add county-level impact fees inside Jonestown. The schedule on this page shows every fee that applies to development in Jonestown.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Travis County impact fees page.