Skip to content
IMPACTFEES.ORG

West Lake Hills, Texas Impact Fees

West Lake Hills applies its own fee schedule: municipal fees plus the Travis County-levied fees that apply inside city limits. Combined, a new single-family home pays $10,939.00 per unit (rates sourced ). The full breakdown is below.

West Lake Hills Impact Fees by Project Type

West Lake Hills: Single-Family Impact Fees

A new single-family home in West Lake Hills pays $10,939.00 per unit in impact fees (rates sourced November 11, 2026). Of that, Travis County-levied fees account for $378.00 and municipal or utility fees for $10,561.00.

The largest line items are Wastewater Impact Fee (City of West Lake Hills) ($7,661.00), Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 5/8" PD meter ($2,900.00) and Water Meter Purchase Fee (Travis County WCID 10) — 5/8" meter ($378.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full West Lake Hills Impact Fee Schedule
Water$378.00
  • Water Meter Purchase Fee (Travis County WCID 10) — 5/8" meter
    Travis County WCID 10
    Water service in West Lake Hills is provided by Travis County WCID 10 (Water District 10). The district sells the meter at a fixed price by size, rates effective September 9, 2026, and also charges its actual cost to install the meter and to tap its line and install the service, prepaid on the district's estimate. The district charges no capital recovery or impact fee.
    $378.00
Sewer$10,561.00
  • Wastewater Impact Fee (City of West Lake Hills)
    City of West Lake Hills
    City of West Lake Hills wastewater impact fee per single-family connection, effective September 9, 2026 (Ordinance 2026-017). The city's system is low pressure: a new connection also buys a grinder pump at the city-specified price and pays a $100 application fee, a $500 plan review fee and inspection fees, plus the City of Austin capital recovery fee. Lots that stay on septic systems do not pay it.
    $7,661.00
  • Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 5/8" PD meter
    City of West Lake Hills
    City of Austin wastewater capital recovery fee, collected by the City of West Lake Hills on each new wastewater connection by water meter size: $2,900 per service unit for lots platted on or after October 1, 2023; a 5/8 in. meter is 1 service unit. Lots platted earlier pay Austin's schedule for their plat date. Irrigation meters are exempt.
    $2,900.00
City$0.00
  • City Impact Fees (City of West Lake Hills)
    City of West Lake Hills
    The City of West Lake Hills levies no roadway, drainage or parkland fee; its one-time development charges are the wastewater impact fee and the City of Austin capital recovery fee.
    $0.00
County$0.00
  • County Impact Fees (Travis County)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (West Lake Hills): $10,939.00
Sources last checked Official fee schedules:Travis County WCID 10 City of West Lake Hills Travis County

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Lake Hills: Multifamily Impact Fees

A new multifamily unit in West Lake Hills pays $10,939.00 per unit in impact fees (rates sourced November 11, 2026). Of that, Travis County-levied fees account for $378.00 and municipal or utility fees for $10,561.00.

The largest line items are Wastewater Capital Recovery Fee (City of West Lake Hills, MF) — City of Austin, 5/8" PD meter ($2,900.00) and Water Meter Purchase Fee (Travis County WCID 10, MF) — 5/8" meter ($378.00).

Wastewater Impact Fee (City of West Lake Hills, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full West Lake Hills Impact Fee Schedule
Water$378.00
  • Water Meter Purchase Fee (Travis County WCID 10, MF) — 5/8" meter
    Travis County WCID 10
    Water service in West Lake Hills is provided by Travis County WCID 10 (Water District 10). The district sells each meter at a fixed price by size, rates effective September 9, 2026, plus its actual cost to install the meter and tap its line; a building on one meter pays once for that meter. The district charges no capital recovery or impact fee.
    $378.00
Sewer$10,561.00
  • Wastewater Impact Fee (City of West Lake Hills, MF)
    City of West Lake Hills
    City of West Lake Hills wastewater impact fee, $7,661 per living unit equivalent, effective September 9, 2026 (Ordinance 2026-017); the city counts each multifamily dwelling unit as one living unit equivalent. New connections to the low-pressure system also buy a grinder pump at the city-specified price and pay application, plan review and inspection fees, plus the City of Austin capital recovery fee.
    $7,661.00Requires confirmation
  • Wastewater Capital Recovery Fee (City of West Lake Hills, MF) — City of Austin, 5/8" PD meter
    City of West Lake Hills
    City of Austin wastewater capital recovery fee, collected by the City of West Lake Hills by water meter size: $2,900 per service unit for lots platted on or after October 1, 2023; a 5/8 in. meter is 1 service unit and a building on one meter pays once for that meter. Lots platted earlier pay Austin's schedule for their plat date.
    $2,900.00
City$0.00
  • City Impact Fees (City of West Lake Hills, MF)
    City of West Lake Hills
    The City of West Lake Hills levies no roadway, drainage or parkland fee; its one-time development charges are the wastewater impact fee and the City of Austin capital recovery fee.
    $0.00
County$0.00
  • County Impact Fees (Travis County, MF)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (West Lake Hills): $10,939.00
Sources last checked Official fee schedules:Travis County WCID 10 City of West Lake Hills Travis County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Lake Hills: Commercial Impact Fees

Commercial development in West Lake Hills pays no per-square-foot impact fees, but owes $15,406.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $15,406.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of West Lake Hills), per LUE ($7,661.00 one-time), Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 1" PD meter, 2.5 SU × $2,900/SU ($7,250.00 one-time) and Water Meter Purchase Fee (Travis County WCID 10) — 1" meter ($495.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full West Lake Hills Impact Fee Schedule
Water$495.00 one-time
  • Water Meter Purchase Fee (Travis County WCID 10) — 1" meter
    Travis County WCID 10
    Water service in West Lake Hills is provided by Travis County WCID 10 (Water District 10). The district sells the meter at a fixed price by size (rates effective September 9, 2026) and also charges its actual cost to install the meter and to tap its line and install the service, prepaid on the district's estimate. The district charges no capital recovery or impact fee.
    $495.00 one-time
Sewer$14,911.00 one-time
  • Wastewater Impact Fee (City of West Lake Hills), per LUE
    City of West Lake Hills
    City of West Lake Hills wastewater impact fee per LUE for a nonresidential connection, effective September 9, 2026 (Ordinance 2026-017). A nonresidential property's LUEs are its average monthly water use divided by 5,250 gallons. The city's system is low pressure: a new connection also buys a grinder pump at the city-specified price and pays a $100 application fee and inspection fees, plus the City of Austin capital recovery fee. Sites on septic systems do not pay it.
    $7,661.00 one-time
  • Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 1" PD meter, 2.5 SU × $2,900/SU
    City of West Lake Hills
    City of Austin wastewater capital recovery fee, collected by the City of West Lake Hills on each new nonresidential wastewater connection by water meter size and number of meters: $2,900 per service unit for lots platted on or after October 1, 2023, and a 1 in. meter is 2.5 service units. Lots platted earlier pay Austin's schedule for their plat date. Irrigation meters are exempt.
    $7,250.00 one-time
City$0.00
  • City Impact Fees (City of West Lake Hills, Commercial)
    City of West Lake Hills
    The City of West Lake Hills levies no roadway or drainage impact fee; its one-time development charge for wastewater is on the wastewater rows, and Travis County WCID 10 sets water charges.
    $0.00
County$0.00
  • County Impact Fees (Travis County, Commercial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (West Lake Hills): $15,406.00 one-time (≈ $15,406.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Travis County WCID 10 City of West Lake Hills Travis County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Lake Hills: Industrial Impact Fees

Industrial development in West Lake Hills pays no per-square-foot impact fees, but owes $15,406.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $15,406.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of West Lake Hills), per LUE ($7,661.00 one-time), Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 1" PD meter, 2.5 SU × $2,900/SU ($7,250.00 one-time) and Water Meter Purchase Fee (Travis County WCID 10) — 1" meter ($495.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full West Lake Hills Impact Fee Schedule
Water$495.00 one-time
  • Water Meter Purchase Fee (Travis County WCID 10) — 1" meter
    Travis County WCID 10
    Water service in West Lake Hills is provided by Travis County WCID 10 (Water District 10). The district sells the meter at a fixed price by size (rates effective September 9, 2026) and also charges its actual cost to install the meter and to tap its line and install the service, prepaid on the district's estimate. The district charges no capital recovery or impact fee.
    $495.00 one-time
Sewer$14,911.00 one-time
  • Wastewater Impact Fee (City of West Lake Hills), per LUE
    City of West Lake Hills
    City of West Lake Hills wastewater impact fee per LUE for a nonresidential connection, effective September 9, 2026 (Ordinance 2026-017). A nonresidential property's LUEs are its average monthly water use divided by 5,250 gallons. The city's system is low pressure: a new connection also buys a grinder pump at the city-specified price and pays a $100 application fee and inspection fees, plus the City of Austin capital recovery fee. Sites on septic systems do not pay it.
    $7,661.00 one-time
  • Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 1" PD meter, 2.5 SU × $2,900/SU
    City of West Lake Hills
    City of Austin wastewater capital recovery fee, collected by the City of West Lake Hills on each new nonresidential wastewater connection by water meter size and number of meters: $2,900 per service unit for lots platted on or after October 1, 2023, and a 1 in. meter is 2.5 service units. Lots platted earlier pay Austin's schedule for their plat date. Irrigation meters are exempt.
    $7,250.00 one-time
City$0.00
  • City Impact Fees (City of West Lake Hills, Industrial)
    City of West Lake Hills
    The City of West Lake Hills levies no roadway or drainage impact fee; its one-time development charge for wastewater is on the wastewater rows, and Travis County WCID 10 sets water charges.
    $0.00
County$0.00
  • County Impact Fees (Travis County, Industrial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (West Lake Hills): $15,406.00 one-time (≈ $15,406.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Travis County WCID 10 City of West Lake Hills Travis County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Lake Hills: Office Impact Fees

Office development in West Lake Hills pays no per-square-foot impact fees, but owes $15,406.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to about $15,406.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of West Lake Hills), per LUE ($7,661.00 one-time), Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 1" PD meter, 2.5 SU × $2,900/SU ($7,250.00 one-time) and Water Meter Purchase Fee (Travis County WCID 10) — 1" meter ($495.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full West Lake Hills Impact Fee Schedule
Water$495.00 one-time
  • Water Meter Purchase Fee (Travis County WCID 10) — 1" meter
    Travis County WCID 10
    Water service in West Lake Hills is provided by Travis County WCID 10 (Water District 10). The district sells the meter at a fixed price by size (rates effective September 9, 2026) and also charges its actual cost to install the meter and to tap its line and install the service, prepaid on the district's estimate. The district charges no capital recovery or impact fee.
    $495.00 one-time
Sewer$14,911.00 one-time
  • Wastewater Impact Fee (City of West Lake Hills), per LUE
    City of West Lake Hills
    City of West Lake Hills wastewater impact fee per LUE for a nonresidential connection, effective September 9, 2026 (Ordinance 2026-017). A nonresidential property's LUEs are its average monthly water use divided by 5,250 gallons. The city's system is low pressure: a new connection also buys a grinder pump at the city-specified price and pays a $100 application fee and inspection fees, plus the City of Austin capital recovery fee. Sites on septic systems do not pay it.
    $7,661.00 one-time
  • Wastewater Capital Recovery Fee (City of West Lake Hills) — City of Austin, 1" PD meter, 2.5 SU × $2,900/SU
    City of West Lake Hills
    City of Austin wastewater capital recovery fee, collected by the City of West Lake Hills on each new nonresidential wastewater connection by water meter size and number of meters: $2,900 per service unit for lots platted on or after October 1, 2023, and a 1 in. meter is 2.5 service units. Lots platted earlier pay Austin's schedule for their plat date. Irrigation meters are exempt.
    $7,250.00 one-time
City$0.00
  • City Impact Fees (City of West Lake Hills, Office)
    City of West Lake Hills
    The City of West Lake Hills levies no roadway or drainage impact fee; its one-time development charge for wastewater is on the wastewater rows, and Travis County WCID 10 sets water charges.
    $0.00
County$0.00
  • County Impact Fees (Travis County, Office)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (West Lake Hills): $15,406.00 one-time (≈ $15,406.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Travis County WCID 10 City of West Lake Hills Travis County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Lake Hills Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

West Lake Hills Impact Fee FAQs

What are the total impact fees for a single-family home in West Lake Hills, Texas?

A new single-family home in West Lake Hills pays $10,939.00 per unit in combined impact fees (rates sourced November 11, 2026).

How much are commercial impact fees in West Lake Hills?

Commercial development in West Lake Hills pays no per-square-foot impact fees, but owes $15,406.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does West Lake Hills charge its own impact fees?

Yes. West Lake Hills levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in West Lake Hills, with the combined total.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Travis County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.