Point Venture Impact Fees by Project Type
Point Venture: Single-Family Impact Fees
A new single-family home in Point Venture pays $20,000.00 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Travis County.
The largest line items are Sewer Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00) and Water Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Point Venture Impact Fee Schedule
- Water Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00Long tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture water tap fee when the tap is installed on the opposite side of the street from the water main (long tap); $6,000 when it is on the same side (short tap). Rate order effective March 1, 2026. The district charges no water impact fee.
- Sewer Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00Long tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture sewer tap fee when the tap is installed on the opposite side of the street from the sewer main (long tap); $6,000 on the same side (short tap). The district charges no wastewater impact fee; homes connect through a grinder pump.
- City Impact Fees (Village of Point Venture)$0.00Village of Point VentureThe Village of Point Venture levies no impact, roadway or parkland fee; water and sewer tap fees are charged by Travis County WCID Point Venture.
- County Impact Fees (Travis County)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Point Venture: Multifamily Impact Fees
A new multifamily unit in Point Venture pays $20,000.00 per unit in impact fees (rates sourced November 11, 2026). All of it is levied by Travis County.
The largest line items are Sewer Tap Fee (Travis County WCID Point Venture, MF) — long tap ($10,000.00) and Water Tap Fee (Travis County WCID Point Venture, MF) — long tap ($10,000.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Point Venture Impact Fee Schedule
- Water Tap Fee (Travis County WCID Point Venture, MF) — long tap$10,000.00Long tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture water tap fee per apartment when the tap is on the opposite side of the street from the main; the district counts each apartment as a separate connection.
- Sewer Tap Fee (Travis County WCID Point Venture, MF) — long tap$10,000.00Long tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture sewer tap fee per apartment when the tap is on the opposite side of the street from the main; the district counts each apartment as a separate connection and charges no wastewater impact fee.
- City Impact Fees (Village of Point Venture, MF)$0.00Village of Point VentureThe Village of Point Venture levies no impact, roadway or parkland fee; water and sewer tap fees are charged by Travis County WCID Point Venture.
- County Impact Fees (Travis County, MF)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Point Venture: Commercial Impact Fees
Commercial development in Point Venture pays no per-square-foot impact fees, but owes $20,000.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $20,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00 one-time) and Sewer Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Point Venture Impact Fee Schedule
- Water Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00 one-timeLong tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture water tap fee when the tap is installed on the opposite side of the street from the water main (long tap); $6,000 on the same side (short tap). One price at every meter size, charged per business unit, including separate establishments in one building; rate order effective March 1, 2026. Tap costs above the fee are billed at actual cost. The district charges no water impact fee.
- Sewer Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00 one-timeLong tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture sewer tap fee when the tap is installed on the opposite side of the street from the sewer main (long tap); $6,000 on the same side (short tap). Charged per business unit; the district charges no wastewater impact fee, and tap costs above the fee are billed at actual cost.
- City Impact Fees (Village of Point Venture, Commercial)$0.00Village of Point VentureThe Village of Point Venture levies no roadway, water or wastewater impact fee on commercial development; water and sewer tap fees are charged by Travis County WCID Point Venture.
- County Impact Fees (Travis County, Commercial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Point Venture: Industrial Impact Fees
Industrial development in Point Venture pays no per-square-foot impact fees, but owes $20,000.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $20,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00 one-time) and Sewer Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Point Venture Impact Fee Schedule
- Water Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00 one-timeLong tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture water tap fee when the tap is installed on the opposite side of the street from the water main (long tap); $6,000 on the same side (short tap). One price at every meter size, charged per business unit, including separate establishments in one building; rate order effective March 1, 2026. Tap costs above the fee are billed at actual cost. The district charges no water impact fee.
- Sewer Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00 one-timeLong tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture sewer tap fee when the tap is installed on the opposite side of the street from the sewer main (long tap); $6,000 on the same side (short tap). Charged per business unit; the district charges no wastewater impact fee, and tap costs above the fee are billed at actual cost.
- City Impact Fees (Village of Point Venture, Industrial)$0.00Village of Point VentureThe Village of Point Venture levies no roadway, water or wastewater impact fee on industrial development; water and sewer tap fees are charged by Travis County WCID Point Venture.
- County Impact Fees (Travis County, Industrial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Point Venture: Office Impact Fees
Office development in Point Venture pays no per-square-foot impact fees, but owes $20,000.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to about $20,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00 one-time) and Sewer Tap Fee (Travis County WCID Point Venture) — long tap ($10,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Point Venture Impact Fee Schedule
- Water Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00 one-timeLong tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture water tap fee when the tap is installed on the opposite side of the street from the water main (long tap); $6,000 on the same side (short tap). One price at every meter size, charged per business unit, including separate establishments in one building; rate order effective March 1, 2026. Tap costs above the fee are billed at actual cost. The district charges no water impact fee.
- Sewer Tap Fee (Travis County WCID Point Venture) — long tap$10,000.00 one-timeLong tap (opposite side of street)Travis County WCID Point VentureTravis County WCID Point Venture sewer tap fee when the tap is installed on the opposite side of the street from the sewer main (long tap); $6,000 on the same side (short tap). Charged per business unit; the district charges no wastewater impact fee, and tap costs above the fee are billed at actual cost.
- City Impact Fees (Village of Point Venture, Office)$0.00Village of Point VentureThe Village of Point Venture levies no roadway, water or wastewater impact fee on office development; water and sewer tap fees are charged by Travis County WCID Point Venture.
- County Impact Fees (Travis County, Office)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Point Venture Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Point Venture Impact Fee FAQs
What are the total impact fees for a single-family home in Point Venture, Texas?
A new single-family home in Point Venture pays $20,000.00 per unit in combined impact fees (rates sourced November 11, 2026).
How much are commercial impact fees in Point Venture?
Commercial development in Point Venture pays no per-square-foot impact fees, but owes $20,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Point Venture charge its own impact fees?
No. Point Venture does not levy its own municipal impact fees. New development in Point Venture pays Travis County impact fees, shown on this page.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Travis County impact fees page.