Volente, Texas Impact Fees

Volente applies its own fee schedule. Travis County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $1,200.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Volente Impact Fees by Project Type

Volente: Single-Family Impact Fees

A new single-family home in Volente pays at least $1,200.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

Parkland Dedication Fee in Lieu (Village of Volente) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (On-Site Septic, No Public Sewer) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Volente Impact Fee Schedule
Water$0.00
Sewer$0.00
City$1,200.00
  • Parkland Dedication Fee in Lieu (Village of Volente)
    Village of Volente
    Village of Volente charges $1,200 per lot as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    $1,200.00Requires confirmation
  • City Impact Fees (Village of Volente)
    Village of Volente
    The Village of Volente levies no impact fee. Subdivisions of four or more lots dedicate parkland at plat or pay a fee in lieu per lot, which is a platting cost, not a building permit fee.
    $0.00
County$0.00
  • County Impact Fees (Travis County)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Volente): $1,200.00
Sources last checked Official fee schedules:Private well On-site septic Village of Volente Travis County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Volente: Multifamily Impact Fees

A new multifamily unit in Volente pays at least $1,200.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

Parkland Dedication Fee in Lieu (Village of Volente, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (On-Site Septic, No Public Sewer, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Volente Impact Fee Schedule
Water$0.00
Sewer$0.00
City$1,200.00
  • Parkland Dedication Fee in Lieu (Village of Volente, MF)
    Village of Volente
    Village of Volente charges $1,200 per lot as money in lieu of parkland dedication. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    $1,200.00Requires confirmation
  • City Impact Fees (Village of Volente, MF)
    Village of Volente
    The Village of Volente levies no impact fee. Subdivisions of four or more lots dedicate parkland at plat or pay a fee in lieu per lot, which is a platting cost, not a building permit fee.
    $0.00
County$0.00
  • County Impact Fees (Travis County, MF)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Volente): $1,200.00
Sources last checked Official fee schedules:Private well On-site septic Village of Volente Travis County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Volente: Commercial Impact Fees

Volente does not currently levy impact fees on commercial development (rates sourced November 25, 2026). The schedule below documents the adopted zero or exempt status for each fee.

View the Full Volente Impact Fee Schedule
Water$0.00
Sewer$0.00
City$0.00
County$0.00
  • County Impact Fees (Travis County, Commercial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Volente): $0.00
Sources last checked Official fee schedules:Private well On-site septic Village of Volente Travis County

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Volente: Industrial Impact Fees

Volente does not currently levy impact fees on industrial development (rates sourced November 25, 2026). The schedule below documents the adopted zero or exempt status for each fee.

View the Full Volente Impact Fee Schedule
Water$0.00
Sewer$0.00
City$0.00
County$0.00
  • County Impact Fees (Travis County, Industrial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Volente): $0.00
Sources last checked Official fee schedules:Private well On-site septic Village of Volente Travis County

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Volente: Office Impact Fees

Volente does not currently levy impact fees on office development (rates sourced November 25, 2026). The schedule below documents the adopted zero or exempt status for each fee.

View the Full Volente Impact Fee Schedule
Water$0.00
Sewer$0.00
City$0.00
  • City Impact Fees (Village of Volente, Office)
    Village of Volente
    The Village of Volente levies no water, wastewater, drainage or roadway impact fee, and its parkland dedication and fee in lieu apply only to residential subdivisions.
    $0.00
County$0.00
  • County Impact Fees (Travis County, Office)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Volente): $0.00
Sources last checked Official fee schedules:Private well On-site septic Village of Volente Travis County

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Volente Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Volente Impact Fee FAQs

What are the total impact fees for a single-family home in Volente, Texas?

A new single-family home in Volente pays at least $1,200.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Volente?

Volente does not currently levy impact fees on commercial development.

Does Volente charge its own impact fees?

Yes. Volente levies its own municipal impact or utility fees. Travis County does not currently add county-level impact fees inside Volente. The schedule on this page shows every fee that applies to development in Volente.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Travis County impact fees page.