Lago Vista Impact Fees by Project Type
Lago Vista: Single-Family Impact Fees
A new single-family home in Lago Vista pays at least $20,468.67 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Lago Vista) — Service Area 1, 3.19 SU × $2,493/SU ($7,952.67), Water Impact Fee (City of Lago Vista) — 5/8" x 3/4" meter ($3,486.00) and Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service ($3,400.00).
Parkland Dedication Fee in Lieu (City of Lago Vista) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lago Vista Impact Fee Schedule
- Water Impact Fee (City of Lago Vista) — 5/8" x 3/4" meter$3,486.00City of Lago VistaCity of Lago Vista water impact fee of $3,486 per service unit, adopted December 2, 2021; a home on a standard 5/8 in. x 3/4 in. meter is 1 service unit. Larger meters pay by the city's service unit table. It is charged in addition to the water tap fee.
- Water Tap Fee (City of Lago Vista) — short service$3,000.00Short service, 3/4" meterCity of Lago VistaCity of Lago Vista minimum water tap fee for a standard 3/4 in. meter set by the city where the service line does not cross the road. The city may recalculate actual charges before the account is set up. A line that crosses the road pays the long service fee instead.
- Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service$3,400.00Gravity sewer (4"), short serviceCity of Lago VistaCity of Lago Vista minimum wastewater tap fee for a 4 in. gravity sewer connection where the service line does not cross the road. Pressure sewer areas and lines that cross the road pay the other listed amounts; the city may recalculate actual charges before the account is set up.
- Wastewater Impact Fee (City of Lago Vista) — 5/8" x 3/4" meter$2,630.00City of Lago VistaCity of Lago Vista wastewater impact fee of $2,630 per service unit; a home on a standard 5/8 in. x 3/4 in. meter is 1 service unit. Larger meters pay by the city's service unit table. It is charged in addition to the sewer tap fee.
- Roadway Impact Fee (City of Lago Vista) — Service Area 1, 3.19 SU × $2,493/SU$7,952.67City of Lago VistaCity of Lago Vista roadway impact fee in Service Area 1, adopted December 2, 2021: $2,493 per service unit, with a single-family detached home at 3.19 service units. This is the highest of 2 service areas; Service Area 2 charges $537 per service unit.
- Parkland Dedication Fee in Lieu (City of Lago Vista)Requires confirmationCity of Lago VistaLago Vista's subdivision regulations require parkland dedication for new residential development, with a fee in lieu of land where the city accepts one.
- County Impact Fees (Travis County)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lago Vista: Multifamily Impact Fees
A new multifamily unit in Lago Vista pays at least $17,003.40 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Lago Vista, MF) — Service Area 1, 1.8 SU × $2,493/SU ($4,487.40), Water Impact Fee (City of Lago Vista, MF) — 5/8" x 3/4" meter ($3,486.00) and Sewer Tap Fee (City of Lago Vista, MF) — gravity sewer, short service ($3,400.00).
Parkland Dedication Fee in Lieu (City of Lago Vista, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lago Vista Impact Fee Schedule
- Water Impact Fee (City of Lago Vista, MF) — 5/8" x 3/4" meter$3,486.00City of Lago VistaCity of Lago Vista water impact fee of $3,486 per service unit, charged by meter size with no per-unit multifamily factor: a unit on its own 5/8 in. x 3/4 in. meter pays 1 service unit, and a master-metered building pays once by its meter's service units.
- Water Tap Fee (City of Lago Vista, MF) — short service$3,000.00Short service, 3/4" meterCity of Lago VistaCity of Lago Vista minimum water tap fee for a standard 3/4 in. meter where the service line does not cross the road. It is charged per tap, so a building on one connection pays once; larger taps are priced by the city.
- Sewer Tap Fee (City of Lago Vista, MF) — gravity sewer, short service$3,400.00Gravity sewer (4"), short serviceCity of Lago VistaCity of Lago Vista minimum wastewater tap fee for a 4 in. gravity sewer connection where the service line does not cross the road. It is charged per tap, so a building on one connection pays once.
- Wastewater Impact Fee (City of Lago Vista, MF) — 5/8" x 3/4" meter$2,630.00City of Lago VistaCity of Lago Vista wastewater impact fee of $2,630 per service unit, charged by meter size with no per-unit multifamily factor: a unit on its own 5/8 in. x 3/4 in. meter pays 1 service unit, and a master-metered building pays once by its meter's service units.
- Roadway Impact Fee (City of Lago Vista, MF) — Service Area 1, 1.8 SU × $2,493/SU$4,487.40City of Lago VistaCity of Lago Vista roadway impact fee per multifamily dwelling unit in Service Area 1, adopted December 2, 2021: $2,493 per service unit at 1.8 service units per unit. This is the highest of 2 service areas; Service Area 2 charges $537 per service unit. Mid-rise units over first-floor commercial are rated 1.16 service units.
- Parkland Dedication Fee in Lieu (City of Lago Vista, MF)Requires confirmationCity of Lago VistaLago Vista's subdivision regulations require parkland dedication for new residential development, with a fee in lieu of land where the city accepts one.
- County Impact Fees (Travis County, MF)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lago Vista: Commercial Impact Fees
Commercial development in Lago Vista pays $7.70 per square foot in impact fees, plus $21,690.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 50,000 sq ft building, that comes to about $406,858.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $3,486/SU ($8,715.00 one-time), Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service ($3,400.00 one-time) and Roadway Impact Fee (City of Lago Vista, Commercial) — Service Area 1, 3.09 SU × $2,493/SU per 1,000 sf ($7.70/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Lago Vista) — short service and Wastewater Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $2,630/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Lago Vista Impact Fee Schedule
- Water Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $3,486/SU$8,715.00 one-timeCity of Lago VistaCity of Lago Vista water impact fee of $3,486 per service unit, adopted December 2, 2021; a 1 in. meter is 2.5 service units. It is charged in addition to the water tap fee.
- Water Tap Fee (City of Lago Vista) — short service$3,000.00 one-timeRequires confirmationShort service, 3/4" meterCity of Lago VistaCity of Lago Vista minimum water tap fee for a standard 3/4 in. meter set by the city where the service line does not cross the road. Larger taps and actual costs may be recalculated by the city before the account is set up.
- Wastewater Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $2,630/SU$6,575.00 one-timeRequires confirmationCity of Lago VistaCity of Lago Vista wastewater impact fee of $2,630 per service unit in the city's codified fee schedule (Ordinance 21-12-02-04, December 2, 2021); a 1 in. meter is 2.5 service units. A companion ordinance adopted the same night prints $2,360. It is charged in addition to the sewer tap fee; sites on septic systems do not pay it.
- Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service$3,400.00 one-timeGravity sewer (4"), short serviceCity of Lago VistaCity of Lago Vista minimum wastewater tap fee for a 4 in. gravity sewer connection where the service line does not cross the road. Pressure sewer areas and lines that cross the road pay the other listed amounts; the city may recalculate actual charges before the account is set up.
- Roadway Impact Fee (City of Lago Vista, Commercial) — Service Area 1, 3.09 SU × $2,493/SU per 1,000 sf$7.70/sq ftCity of Lago VistaCity of Lago Vista roadway impact fee for a shopping center in Service Area 1, adopted December 2, 2021: $2,493 per service unit at 3.09 service units per 1,000 sq ft of gross floor area. This is the highest of 2 service areas; Service Area 2 charges $537 per service unit.
- County Impact Fees (Travis County, Commercial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lago Vista: Industrial Impact Fees
Industrial development in Lago Vista pays $7.58 per square foot in impact fees, plus $21,690.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 50,000 sq ft building, that comes to about $400,626.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $3,486/SU ($8,715.00 one-time), Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service ($3,400.00 one-time) and Roadway Impact Fee (City of Lago Vista, Industrial) — Service Area 1, 3.04 SU × $2,493/SU per 1,000 sf ($7.58/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Lago Vista) — short service and Wastewater Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $2,630/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Lago Vista Impact Fee Schedule
- Water Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $3,486/SU$8,715.00 one-timeCity of Lago VistaCity of Lago Vista water impact fee of $3,486 per service unit, adopted December 2, 2021; a 1 in. meter is 2.5 service units. It is charged in addition to the water tap fee.
- Water Tap Fee (City of Lago Vista) — short service$3,000.00 one-timeRequires confirmationShort service, 3/4" meterCity of Lago VistaCity of Lago Vista minimum water tap fee for a standard 3/4 in. meter set by the city where the service line does not cross the road. Larger taps and actual costs may be recalculated by the city before the account is set up.
- Wastewater Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $2,630/SU$6,575.00 one-timeRequires confirmationCity of Lago VistaCity of Lago Vista wastewater impact fee of $2,630 per service unit in the city's codified fee schedule (Ordinance 21-12-02-04, December 2, 2021); a 1 in. meter is 2.5 service units. A companion ordinance adopted the same night prints $2,360. It is charged in addition to the sewer tap fee; sites on septic systems do not pay it.
- Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service$3,400.00 one-timeGravity sewer (4"), short serviceCity of Lago VistaCity of Lago Vista minimum wastewater tap fee for a 4 in. gravity sewer connection where the service line does not cross the road. Pressure sewer areas and lines that cross the road pay the other listed amounts; the city may recalculate actual charges before the account is set up.
- Roadway Impact Fee (City of Lago Vista, Industrial) — Service Area 1, 3.04 SU × $2,493/SU per 1,000 sf$7.58/sq ftCity of Lago VistaCity of Lago Vista roadway impact fee for general light industrial space in Service Area 1, adopted December 2, 2021: $2,493 per service unit at 3.04 service units per 1,000 sq ft of floor area. This is the highest of 2 service areas; Service Area 2 charges $537 per service unit.
- County Impact Fees (Travis County, Industrial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lago Vista: Office Impact Fees
Office development in Lago Vista pays $7.28 per square foot in impact fees, plus $21,690.00 in one-time water and sewer connection fees (rates sourced November 24, 2026).
For a 25,000 sq ft building, that comes to about $203,679.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $3,486/SU ($8,715.00 one-time), Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service ($3,400.00 one-time) and Roadway Impact Fee (City of Lago Vista, Office) — Service Area 1, 2.92 SU × $2,493/SU per 1,000 sf ($7.28/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Lago Vista) — short service and Wastewater Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $2,630/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Lago Vista Impact Fee Schedule
- Water Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $3,486/SU$8,715.00 one-timeCity of Lago VistaCity of Lago Vista water impact fee of $3,486 per service unit, adopted December 2, 2021; a 1 in. meter is 2.5 service units. It is charged in addition to the water tap fee.
- Water Tap Fee (City of Lago Vista) — short service$3,000.00 one-timeRequires confirmationShort service, 3/4" meterCity of Lago VistaCity of Lago Vista minimum water tap fee for a standard 3/4 in. meter set by the city where the service line does not cross the road. Larger taps and actual costs may be recalculated by the city before the account is set up.
- Wastewater Impact Fee (City of Lago Vista) — 1" meter, 2.5 SU × $2,630/SU$6,575.00 one-timeRequires confirmationCity of Lago VistaCity of Lago Vista wastewater impact fee of $2,630 per service unit in the city's codified fee schedule (Ordinance 21-12-02-04, December 2, 2021); a 1 in. meter is 2.5 service units. A companion ordinance adopted the same night prints $2,360. It is charged in addition to the sewer tap fee; sites on septic systems do not pay it.
- Sewer Tap Fee (City of Lago Vista) — gravity sewer, short service$3,400.00 one-timeGravity sewer (4"), short serviceCity of Lago VistaCity of Lago Vista minimum wastewater tap fee for a 4 in. gravity sewer connection where the service line does not cross the road. Pressure sewer areas and lines that cross the road pay the other listed amounts; the city may recalculate actual charges before the account is set up.
- Roadway Impact Fee (City of Lago Vista, Office) — Service Area 1, 2.92 SU × $2,493/SU per 1,000 sf$7.28/sq ftCity of Lago VistaCity of Lago Vista roadway impact fee for a general office building in Service Area 1, adopted December 2, 2021: $2,493 per service unit at 2.92 service units per 1,000 sq ft of gross floor area. This is the highest of 2 service areas; Service Area 2 charges $537 per service unit.
- County Impact Fees (Travis County, Office)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lago Vista Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lago Vista Impact Fee FAQs
What are the total impact fees for a single-family home in Lago Vista, Texas?
A new single-family home in Lago Vista pays at least $20,468.67 per unit in combined impact fees (rates sourced November 24, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Lago Vista?
Commercial development in Lago Vista pays $7.70 per square foot in impact fees, plus $21,690.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $406,858.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Lago Vista charge its own impact fees?
Yes. Lago Vista levies its own municipal impact or utility fees. Travis County does not currently add county-level impact fees inside Lago Vista. The schedule on this page shows every fee that applies to development in Lago Vista.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Travis County impact fees page.